Loading...
Letter About ChapelCOSENTINO AND WEBB CONSULTING ENGINEERSH, INC 4 7 1 2 S O U T H L e J E U N E R O A D C O R A L GABLES, F L O R I D A 3 3 1 4 6 TEL EPHONES'667- 6604 -667 -1 621 MIAMI SHORES VILLAGE BUILDING DEPT, 10050 N. E. No AVER MIAMI SHORES, FLA. 33153 ATT: MR• BRADFORD CHIEF BLDG. INSPECTOR BE3 BARRY COLLEGE CHAPEL DEAR MR. BRADFORD, WE WILL ATTEMPT TO ANSWER YOUR QUESTION RELATIVE TO THE CUTTING OF THE SEAM FOR THE INSTALLATION OF THE AIR CONDITIONING DUCT. 0110 PLANS DEFINITELY SHOWED RUNNING UNDER THE SEAM, HOWEVER SAW FIT TO INSTRUCT THE WORKMEN TO RUN IT THROUGH THE SEAM. WE WERE EXTREMELY UPSET AND CONCERNED AT THE SIGHT AFTER THE CUTS WERE MADE. THE WORKMEN WERE TOLD TO STOP THIS IMMEDIATELY. WE HAD A STRUCTURAL ENGINEER CHECK THE PLANS AND INSPECT THE JOS THE PLANS SNOW A 16" X 58" SEAN AT THAT LOCATION AND A COLUMN ON EACH SIDE OF A 7 8" PASSAGE. WE WERE ALL EXTREMELY RELIEVED WHEN WE WERE TOLD THAT IN HIS OPINION, NE FELT CONFIDENT THE REMAINING PORTION OF INC SEAN WAS ADEQUATE AND SAW NO REASON FOR CONCERN. SINCERELY VOWS, AAC /RN SOMEONE AT THE COLLEGE