Loading...
PW-5-16-1462, 10050 NE 2 AVE Unit:Misc StreetsFPLWR# 6860205 Miami Shores Village bfoc Works Department 0 2816 10050 N.W. 2"d Avenue, Miami Shores, Florida 33138 '3Y.9=-_1 . Tel: (305) 796.2204 Fax: (305) 766.8972 - Public Works Permit Application FBC 2004 UTILITY Pepe; 'Public Works WATER Owner's Name (Fee Simple Titleholder) Florida Power & Li ht Owner's Address 4200 West Fla ler St Permit No. - / / Phone#: 305-529-6120 City Miami State Florida Zip 33134 Tenant/Lessee Name N/A Phone # N/A -ALLEY S/O NE 91 ST BET NE 2 AVE TO PARK AVE, PARK AVE TO S/O NE 92 ST Job Address (where the work is being done) City Miami Shores Village Is Building Historically Designated: Yes N/A County Miami -Dade No N/A Zip Utility's Geptrastor's Company Name FLORIDA POWER AND LIGHT COMPANY Phone M (305) 442-6160 Utility's Gentraelees Address 4200 W. FLAGLER ST. — EPM / LFO City: MIAMI State: FLORIDA Zip: 33134 Architect/Engineer's Name (if applicable) Irene Hernandez $ Value of Work For this Permit: $ N/A Phone #: 305-529-6120 Lineal Footage Of Work: Type of Work: ❑ Addition ❑ Alteration ❑ New ❑ Repair/Replace ❑ Demolition Describe Work: Installing 2,509' of 2-6" HDPE Conduit by Directional Bore and installing 2 Splice Boxes Submittal Fee $ _ Notary $ Scanning $ Code Enforcement S Total Fee Now Due $ (Continued on opposite side) .................... Fees .................... Permit Fee S CCF $ Training/Education Fee $ Radon $ Structural Plan Review $ Zoning Technology Fee $ CO/CC Bond S Bonding Company's Name (if applicable) Bonding Company's Address N/A City State Zip Mortgage Lender's Name (if applicable) Mortgage Lender's Address City State Zip Application is hereby made to obtain a permit to do the work and installations as indicated. I certify that no work or installation has commenced prior to the issuance of a permit and that all work will be performed to meet the standards of all laws regulating construction in this jurisdiction. I understand that a separate permit must be secured for ELECTRICAL WORK, PLUMBING, SIGNS, WELLS, POOLS, FURNACES, BOILERS, HEATERS, TANKS and AIR CONDITIONERS, ETC..... OWNER'S AFFIDAVIT: I certify that all the foregoing information is accurate and that all work will be done in compliance with all applicable laws regulating construction and zoning. "WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT." Notice to Applicant: As a condition to this issuance of a Public Works permit with an estimated value exceeding $2500, the applicant must promise in good faith that a copy of the notice of commencement and construction lien law brochure will be delivered to the person whose property is subject to attachment. Also, a certified copy of the recorded notice of commencement must be posted at the job site for the first inspection which occurs seven (7) days after the building permit is issued. In the absence of such posted notice, the inspection will not be approved and a renrspection fee will be charged. n - n A /) If Signature N/A Signature Owner or Agent Utility Representative /-COR€er The foregoing instrument was acknowledged before me this 25th day of Mav 20 16 by Ivette Choc , who is personally known to me or-who-has-prsdueed N/A as identification, and who-did/did not take an oath. NOTARY PUBLIC: n,,OTAFRy PUG@/Lioe`. Sign: Sign: C� �/� Print:. Print: PAe&A D2p26 My Commission Expires: tY MARCIA DEL TORO Notary Public - State of Florida Jo"gl-, X Commission 8 FF 913576 FOF1FV�' My Comm. Expires Dec 1, 2019 Bonded through National Notary Assn. I g q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q APPLICATION APPROVED BY: 11 /17/2005 Public Works Director or his designee. Engineering and Project Management 4200 W. Flagler Street, Miami, Florida 33134 Office: (305) 442-5140 Fax: (305) 442-5123 F=pL PROCESS #: (Need to hand carry permit) May 25, 2016 Miami Shores Village Attn.: Mr. Ismael Naranjo Director of Building Department 10050 N.E. 2 Avenue Miami Shores, Florida 33138 Mr. Naranjo: SUBJECT: WR# 6860205 FPL plans to construct electrical facilities within you City limits. Attached for you approval for a "No fee" permit are the following documents: a. Permit application form b. Two copies of the job sketch with the proposed facilities highlighted If you have any questions, please call our engineer Ms. Irene Hernandez at 305-529- 6120. Otherwise, advise me of your approval avia e-mail @ Maridalia.Morgan fpl.com so I make arrangements to pick permit. FPL Attn.: Maridalia Morgan Permit Administrator 4200 W. Flagler Street — EMP/LFO Miami, Florida 33134 Very truly yours, (:L7mgte 6Phoa Permit Coordinator Arlenis Silvera From: Arlenis Silvera Sent: Tuesday, August 22, 2017 9:50 AM To: Arlenis Silvera Subject: FW: MIAMI SHORES VILLAGE FPL WR# 6860205 / PW-5-16-1462 From: Choc, Ivette [mailto:lvette.Choc@fpl.com] Sent: Friday, August 18, 2017 9:31 AM To: Arlenis Silvera <SiIveraA@msvfI.gov> Cc: MORGAN, Maridalia <Ma rida Iia. MORGAN @f pl.com>; Pineda, Viviam <Viviarn.Pineda@fpI.com>; del.Toro, Marcia <Marcia.deI.Toro@fpI.com> Subject: MIAMI SHORES VILLAGE FPL WR# 6860205 / PW-5-16-1462 Dear Arlenis. FPL requests the subject permit to he extended. since this project was not completed by the expiration date of 8/1/17 Attached for your review is a copy of the original permit and permit extension: The Project's start date is 8/28/2017, Please provide us with the granted extension by sending it my email address, lvette.,CLoc&,fpl,.gom If you have any questions', please call me at'305-442-5365. Thank you. Ivette Choc Permit Coordinator, 305-442-5365 1 Arlenis Silvera From: del.Toro, Marcia <Marcia.del.Toro@fpl.com> Sent: Friday, February 10, 2017 10:20 AM To: Arlenis Silvera Cc: Ramirez, Marta Subject: REQUEST FOR MIAMI SHORES VILLAGE PERMIT EXTENSION FOR WR 6860205 / PERMIT # PW-5-16-1462 Attachments: 6860205 MIAMI SHORES VILLAGE PERMIT.pdf Dear Arnelis: FPL will be releasing this Hardening project soon to bid to select the Contractor and this permit need to be extended as far out as possible.. 25' 11'-1 Could you please extend this permit as soon as possible? Your prompt response is appreciated. Thank you, Senior Permit Coordinator (305) 442-5150 6�i 6 DE -ENERGIZE & LEAVE IN PLACE 3PH-1000A �T ,/CU 25KV JKTD PROP DIRECTIONAL BORE 1 V 2-6" HDPE CONDUITS WITH 3PH-1000A 1/C I I POLYJKTD w 749' E TO LOG 141.51 ------------------- w ----------- p-------------------=1 SPL BOX �'WK--- ----------------------- z GRASS a Y w w w z F- > _- > ---- a a _ _ _ _ NE 91 ST ST I � ------ 565' -- -----~ 2016 z z� GRASS � O y MAY 2 6 - a -------------- - ---________- O 5'SWK 1661, C) I 96 G FOR SPL BOX INST �-- C CATION SKECH N.T.S m NOTIFY MIAMI SHORES IF N �— 48 HOURS BEFORE AND AFTER z 0 D_ I w ww CONSTRUCTION AT (305) 762-4949 1 i D-BORE 10' S FROM EOP 1 I I I DE -ENERGIZE &LEAVE IN PLACE 3PH-1000A 1 ,/CU 25KV JKTD PROP DIRECTIONAL BORE DIRECTIONAL BORE #1 I y 1 2-6" HOPE CONDUITS WITH 3PH-1000A 1/C LOC 96.51 - 141 LENGTH - 1216' 1 W 3 I POLY JKTD DIRECTIONAL BORE #2 LOC 141 - 121.5 LENGTH - 1293' 1 TOTAL LINEAR FEET - 1509' I I- Z I cf) F Y ' m ALLEY 3 Q w n UJI FPL SIDEWALK CONSTRUCTION NOTE i ,ten z - EXISTING SIDEWALK WILL BE CUT AND REMOVED FROM SEAM TO SEAM TX 5' PATCH ACROSS I ' AFFECTED AREA PER WORK LOCATION AS I - - - - - NECESSARY TO SET PROPOSED POLES ALONG I EXISTING POLE LINE. 1 I 1 SIDEWALK WILL BE RESTORED PER ALL ADA-� 5' REQUIREMENTS TO EXISTING OR BETTER I N 1 98 CONDITIONS. I ¢ I CONTRACTOR RESPONSIBLE TO SCHEDULE 1 ¢ 1 INSPECTION WITH COUNTY ENGINEERING PRIOR TO PLAN VIEW RESTORING ANY SIDEWALKS, NO EXCEPTIONS! I Icomi 70, I N.T.S 4� GRADE D C r O I¢ 0 ;- I 36'MIN z 7 Z rr (n N m z w I, 1 it n C 6i O 11 Fr, 3 i, ' z m C Q o o m 14 w ti ❑ TRENCH DETAIL 1 I C) -1 u~ 1 EXISTING O N.T.S. 1 - -A 1 GONG k< . z, Z -�C v W ,tip a 1 3 1 L\ q u z I W n ; 1 I I PROFILE VIEW O U m j I N a a D U) 1 N.T.S � * �� ¢ ° ° < 1 MOT 605, 660 GRADE-' - ; c�1 0 m D ,3 " MTQ GOVER I I Q C r (p DE -ENERGIZE & LEAVE IN PLACE 3PH-1000A D G - 25' 10' 10'—d0'.II«75'+�.g' ,/CU 25KV JKTD PROP DIRECTIONAL BORE �c 1 1 2-6" HDPE CONDUITS WITH 3PH-1000A 1/C -i m 0 35— 1 35' - POLY JKTD D a rn CONSTRUCTIONJLEGEND • O PROPOSED WOOD POLE' •• SE 06 lwp R►JG•42 Q • EXISTING.WOOD,POLE • • • • ❑ PROPOSEDCONCRETEPOLE • • • • ■ EXISTING CONCRETE POLE • F430PDIREETYJIWi1�• BOFjE ® EXISTING AT&T POLE FOREIGN •. • ..: • fjtE s1.sr sT • EXISTING WOOD TRANSMISSION POLE Q PROPOSED WOOD TRANSMISSION POLE UTILITIES STARTING 166'+/- E/O'NE•2I\1DAVE N p EXISTING CONCRETE TRANSMISSION POLE CITY OF MIAMI SHORES, FL G PROPOSED CONCRETE TRANSMISSION POLE [� EXISTING PADMOUNTED TRANSFORMEREXISTING NDUIT • • o PROPOSED CONDUIT • • T212016• • • • • Q —1 EXISTING ANCHOR PB IO/JO DATES z �A� --1 PROPOSED ANCHOR yrR: •• 6215 • • •• • REV w U p ® PROPOSED SPLICE BOX STM SEWER SAN SEWER MAP "• • NO Ww m EXISTING SPLICE BOX AB0267 �e OO PROPOSED HAND HOLE CAN NO. CZL.1 � ow O EXISTING HAND HOLE GAS O = ® RADIAL VAULT CS • • 4/5 • 009 • • U • V ®LOCATION OF WORK BEING DONE FPLA' WATER SBT N � � � • • • • • • • • • • • • • ••• • • • • •• •• DE -ENERGIZE & LEAVE IN PLACE 3PH-1000A 1/CU 25KV JKTD PROP DIRECTIONAL BORE 2-6" HOPE CONDUITS WITH 3PH-1000A 1/C POLYJKTD 141 j 0 I I 5WK J V GRASS N < w w z F— a > ¢ _ _ _ _ - — - NE91STST------i— —a — - — - — - — 565'— �— N O Of 0 z GRASS a O � I 5'SWK -------- '---- ------------- -— ---- ----- = 166' -1 96.51 U 96 a FDR SPL BOX INST m NOTIFY MIAMI SHORES 48 HOURS BEFORE AND AFTER CONSTRUCTION AT (305) 762-4949 DIRECTIONAL BORE #1 LOC 96.51 - 141 LENGTH - 1216' DIRECTIONAL BORE #2 LOC 141 - 121.5 LENGTH - 1293' TOTAL LINEAR FEET - 1509' FPL SIDEWALK CONSTRUCTION NOTE EXISTING SIDEWALK WILL BE CUT AND REMOVED FROM SEAM TO SEAM 5' X Y PATCH ACROSS AFFECTED AREA PER WORK LOCATION AS NECESSARY TO SET PROPOSED POLES ALONG EXISTING POLE LINE. SIDEWALK WILL BE RESTORED PER ALL ADA REOUIREMENTS TO EXISTING OR BETTER CONDITIONS. CONTRACTOR RESPONSIBLE TO SCHEDULE INSPECTION WITH COUNTY ENGINEERING PRIOR TO RESTORING ANY SIDEWALKS, NO EXCEPTIONS! GRADE LIT TRENCH DETAIL N. T.S. Eel :T"D N I I , 34 749' E TO LOC 141.51 FDR PL BOX I � LOCATION SKECH N.T.S �— z a J U a 0 O I I I � I I I� 1 I 96.51 FDR SPL BOX INST 3 I DE -ENERGIZE & LEAVE IN PLACE 3PH-1000A 1� 20' 0 I 1/CU 25KV JKTD PROP DIRECTIONAL BORE I"' I 2-6" HDPE CONDUITS WITH 3PH-1000A 1/C POLY JKTD C7 I _ _ _ _ _ _ ----- 5'SWK Z GRASS - E3RDAVE - - --- `D I GRASS ---- ¢ OI _ 5'SWK _ _ _ _ _ _ PLAN VIEW 70' I I N.T.S z I I I I I � 1 1 1 N I I � I— co rn LU z I I � 1 z I O I I m a I PROFILE VIEW I 3 a acc 31 N.T.S Q o o US, MOT 605, 660 COVER N DE -ENERGIZE & LEAVE IN PLACE 3PH-1000A 1«-25' 10'�'�70' 10' 15'� 1/CU 25KV JKTD PROP DIRECTIONAL BORE I 2-6" HDPE CONDUITS WITH 3PH-1000A 1/C Ff-35'��35, 1 POLY JKTD I �70'yl 0- CONSTRUCTION LEGEND • • �C • OP •� RNG �2 • • Q O PROPOSED WOOD POLE ♦ EXISTING WOOD POLE • • [] PROPOSED CONCRETE POLE • Ly • • • • • • • •• F R SPE Bf�:• "Fil, ■ EXISTING CONCRETE POLE ® EXISTING AT&T POLE FOREIGN �r • •• •.. ry • ♦ EXISTING WOOD TRANSMISSION POLE C PRO POSED WOOD TRANSMISSION POLE UTILITIES ••• 58'+/- E/O NE 3RD A N ® EXISTING CONCRETETRPNSMISSIONPOLE CITY OF MIAMI SHORES, FL W O PROPOSED CONCRETE TRANSMISSION POLE [� Zj EXISTING PADMOUNTED TRANSFORMER • 000 E [STING o PROPOSED CONDUIT PB 10/70 jTE; 5.23:201 f3 • • • • EXISTING ANCHOR --1 PROPOSED ANCHOR PRO �} �: • • 6H 2 � • • •; • `' REV U p CM SPLICE BOX STM SEWER SAN SEWER • • 0 • so O W 0 EXISTING SPLICE BOX MAP A60267 Zw U OO PROPOSED HAND HOLE CATV GAS NO. O EXISTING HAND HOLE 0 = R RADIAL VAULT FPLg, o 2;5 : •; • : • V LOCATION OF WORK BEING DONE WATER SET • NO. • • 000 • • • DE -ENERGIZE & LEAVE IN PLACE 3PH-1000A N 1/CU 25KV JKTD PROP DIRECTIONAL BORE 2-6" HOPE CONDUITS WITH 3PH-1000A 1/13 1 141 POLYJKTD i� 4'-.. > TO LOC 141.51 -------------- > ------------------- Q---------------------- FDR PLBOX Y I GRASS ¢ w w z F— ! > QNE91STST-- cl f a Q N O W T Z 1 � z GRASS � v ------------ 5'SWK -- O 166' 1 I 96.51 C) 96 Q FDR SPL BOX INST LOCATION SKECH N.T.S } m NOTIFY MIAMI SHORES 33 PLAN VIEW N 48 HOURS BEFORE AND AFTER a 3 w N.T.S CONSTRUCTION AT (305) 762-4949 11 6 o , w I w DE -ENERGIZE & LEAVE IN PLACE 3PH-1000A 1/CU 25KV JKTD PROP POLE 1' FROM R/W <n I DIRECTIONAL BORE 2-6" HDPE 24' 34-�I a I CONDUITS WITH 3PH-1000A 1/C DIRECTIONAL BORE 41 141 I POLY JKTD LOC 96.51 - 141 LENGTH - 1216' _ I DIRECTIONAL BORE #2 LOC 141 - 121.5 LENGTH - 1293' TOTAL LINEAR FEET -1509'----------- - Z D-BORE 30' S & 750' E _O TO LOG 141.51 FDR SPL BOX LU - ^ - - - - - NE 9I ST ST - DE -ENERGIZE & LEAVE IN PLACE -� 3PH-1000A 1/CU 25KV JKTD PROP w FPL SIDEWALK CONSTRUCTION NOTE DIRECTIONAL BORE 2-6" HDPE > Q EXISTING SIDEWALK WILL BE CUT AND REMOVED CONDUITS WITH 3PH-1000A1/C = GRASS FROM SEAM TOSEAM S'%3'PATCH S POLY J KTD AFFECTED AREA PER WORK LOCATIONTION.AS N �-------�--"' NECESSARY TO SET PROPOSED POLES ALONG w 5'S\A/I( E < IUSTWO POLE LINE. Z _ fr _ _ _ _ _ _ SIDEWALK WILL BE RESTORED PER All ADA ('J I REQUIREMENTS TO EXISTING OR BETTER I , CONDNIONS. CONTRACTOR RESPONSIBLE TO SCHEDULE 70' INSPECTIONWIT COUNTY ENGINEERING PRIOR TO 3 I , RESTORING ANY SIDEWALKS, NO EXCEPTIONSI GRADE 'J U N il�li as'eaw �IIJ I' 3 I w LU Q , I a , w I TRENCH DETAIL I > , O Mrs. EXISTING , = Z CONC POLE , a , w I z I W PROFILE VIEW W I I I 3 N a a � 1 N.T.S I GRADE I MOT 60�, 660 POLE 1' FROM R/W I 1 36" MIN TO COVER Q I I OE -ENERGIZE & LEAVE IN PLACE 3PH-1000A �) 2' 25' 10' 10'--►�-25'� DE -ENERGIZE & LEAVE IN PLACE 3PH-1000A 1/CU 25KV JKTD PROP DIRECTIONAL BORE I 1/CU 25KV JKTD PROP DIRECTIONAL BORE 2-6" HDPE CONDUITS WITH 3PH-1000A 1/C-39 35' 2-6" HDPE CONDUITS WITH 3PH-1000A 1/C POLY JKTD I I POLY JKTD tom^70'� 1? CONSTRUCTION LEGEND a' O PROPOSED WOOD POLE • • • SEC:D6� p .A2 • • Q • EXISTING WOOD POLE • • ❑ PROPOSED CONCRETE POLE • 4PpIR CT N L�p: • ■ EXISTING CONCRETE POLE •N%4TRA�,6't'+/•N/0)NE•91S•TST • ® EXISTING AT&T POLE FOREIGN •• • EXISTING WOOD TRANSMISSION POLE PROP AtCTIMAL ObRE • • O PROPOSED WOOD TRANSMISSION POLE ® EXISTING CONCRETE TRANSMISSION POLE UTILITIES NE 4TH AVE, 34'+/-W/O NE 9IST ST N W 3 PROP OSEDCONCRETETRANSMISSION POLE CITY OF MIAMI SHORES, FL Q B EXISTING PADMOUNTED TRANSFORMER • • • • • • z EXSTING CONDUIT • • • • • < PRO POSED CONDUIT PB 10/70 E:• 5/13101Qp • -I EXISTING ANCHOR •� • --1 PROPOSEDANCHOR •: : • 6H6020G • • • • E / p ® PROPOSED SPLICE BOX STM SEWER SAN SEWER • • V .x U w Q EXISTINGSPLICE BOX MAP AB0267 • NO W � � � PROPOSED HAND HOLE la C.ATV NO. EXISTING HMO HOLE GAS 0 _ ® RADIAL VAULT VV • • 3/: • • • • • • V �LOCATION OFWORK BEING DONE FF)LA' WATER SBT Na • • • • • • DE -ENERGIZE & LEAVE IN PLACE 3PH-1000A 1/CU 25KV JKTD PROP DIRECTIONAL BORE 2-6" HDPE CONDUITS WITH 3PH-1000A 1/C POLY JKTD _ U m 0 /a PARKWAY ' NOTIFY MIAMI SHORES J 48 HOURS BEFORE AND AFTER z o " 0 CONSTRUCTION AT (305) 762-4949 I I It 110' I 20' —.! y l 1 (u) ill 1 0 I ¢ iNI 141.51 - - - - - 1 m ~ (5 1 - - - - - - - FDR SPL BOX INST ---- N ------- ¢ N----------- L1 � ODIRECTIONAL BORE /EI z LOC 96.51 - 141 LENGTH - 1216' DIRECTIONAL BORE N2 W LOC 141 - 121.5 LENGTH - 1293' - - — - - - - NE 5TH AVE— - - TOTAL LINEAR FEET - 1509' DE -ENERGIZE &LEAVE IN PLACE GRASS ASS 3PH-1000A 1/CU 25KV JKTD PROP ________ m - - --- DIRECTIONAL BORE 2-6" HDPE I ¢ CONDUITS WITH 3PH-1000A 1/C - - - - -I ¢ 3 I POLY JKTD I O N I I 70 I GRADE J ¢ CIE aB wI -=�I� z v I. „L I w ~ I I Q I F I a TRENCH DETAIL N.T-S. F z O I x rn I m LU I I J I W 0 a u3i o O U) U IL w u ¢ I p GRADE I + iv 1 36" MIN TO COVER � I v DE -ENERGIZE & LEAVE IN PLACE Q 3PH-1000A 1/CU 25KV JKTD PROP DIRECTIONAL BORE 2-6" HDPE I 15' 10' 10' 10' 1 25' CONDUITS WITH 3PH-1000A 1/C I_ I �I POLY JKTD I 35' 35' 1 I I 70' 5' SWK T 121.5 LOCATION SKECH N.T.S N FPL SIDEWALK CONSTRUCTION NOTE EXISTING SIDEWALK WILL BE CUT AND REMOVED FROM SEAM TO SEAM S' X S PATCH ACROSS AFFECTED AREA PER WORK LOCATION AS NECESSARY TO SET PROPOSED POLES ALONG EXISTING POLE LINE. SIDEWALK ML BE RESTORED PER ALL ADA REQUIREMENTS TO EXISTING OR BETTER CONDITIONS. CONTRACTOR RESPONSIBLE TO SCHEDULE INSPECTION WITH COUNTY ENGINEERING PRIOR TO RESTORING ANY SIDEWALKS, NO EXCEPTIONSI PLAN VIEW N.T.S N �- PROFILE VIEW N.T.S MOT 605, 660 n^- 1. _ CONSTRUCTION LEGEND •• ••• • • SEC•O�TWP V 42 • • Q O PROPOSED WOOD POLE EXISTING WOOD POLE RR • • • • • • _ PROPOSED CONCRETE POLE • • • • • • • • ■ EXISTING CONCRETE POLE 0 EXISTING AT&T POLE FOREIGN TT�•C • PROP•FD�Fi8Pl•Bak• • • • • • N E•91 STST • • • • • EXISTING WOOD TRANSMISSION POLE 0 PROPOSED WOOD TRANSMISSION POLE UTILITIES 40'+/- E/O NE 5TH AVE N EXISTING CONCRETETRANSMISSION POLE CITY OF MIAMI SHORES, FL �1 13 PROPOSED CONCRETE TRANSMISSION POLE • W z B EXISTING PADMOUNTED TRANSFORMER • • • • • • • • • z EXISTING CONDUIT o PROPOSEDCONDUIT PB I0/37 • • • �E:: 5434016• • • z —I EXISTING ANCHOR --R PROPOSED ANCHOR y�(F•j; �• 686080� • . �jEV W H ® PROPOSED TINGSP SPLICE BOX Q EXISTING SPLICE BOX STM SEWER SAN SEWER MAP NO W W W ABO267 [;] ty Y OO PROPOSED HAND HOLE CAT, 4' V GAS I V NO. 1 W W O EXISTING HAND HOLE • •c• • • • • • • • • • O! O = ® RADIAL VAULT DWCI • •4/5 • • • • `) V Ia) LOCATION OFWORK BEING DONE !3' WATER SBT NO• • • ••• • • • • • • • • • • • • • • DE -ENERGIZE & LEAVE IN PLACE 3PH-1000A 5' SWK N 1/CU 25KV JKTD PROP DIRECTIONAL BORE ,• / 2-6" HDPE CONDUITS WITH 3PH-1000A 1/C POLY JKTD 141.51 52' 141 FDR SPL BOX INST 4' y - ' ' I 40' 0 262' Q - _ - LU NE91STST- - > ¢� > ¢ o O _� GRASS _ ---- / ¢ / OF -__ ------------------ �n� U / �� LOCATION SKECH �. PARKWAY N.T.S m NOTIFY MIAMI SHORES 48 HOURS BEFORE AND AFTER 3 0 " o w CONSTRUCTION AT (305) 762-4949 DIRECTIONAL BORE #1 LOC 96.51 - 141 LENGTH - 1216' DIRECTIONAL BORE #2 LOC 141 - 121.5 LENGTH - 1293' z TOTAL LNEAR FEET - 1509' 0 10 > FPL SIDEWALK CONSTRUCTION NOTE W EXISTING SIDEWALK WILL BE CUT AND REMOVED FROM SEAM TO SEMI 5• X S PATCH ACROSS AFFECTED AREA PER WORK LOCATION AS NECESSARY TO SET PROPOSED POLES ALONG EXISTING POLE LINE. SIDEWALK WILL BE RESTORED PER ALL ADA REQUIREMENTS TO EXISTING OR BETTER CONDITIONS. CONTRACTOR RESPONSIBLE TO SCHEDULE INSPECTION WITH COUNTY ENGINEERING PRIOR TO RESTORING ANY SIDEWALKS. NO EXCEPTIONSI GRADE ��IE I . E iL LU _ d TRENCH DETAIL N.T.S. Q GRADE Q ►] I I IY U I Q I 52' I I I 11-24-747, POLE V FROM R/W H-15' 1 I 34'-''l l 1 I I 1 ¢ I I � I Y I ¢ I a a I DE -ENERGIZE & LEAVE IN PLACE y Y U I 3PH-1000A i/CU 25KV JKTD PROP I a ' `° I DIRECTIONAL BORE 2-6" HDPE CONDUITS WITH 3PH-1000A 1/C I I I o_ I I I POLY JKTD I I I 1 70 3 I I v I w I I I I I o I I I EXISTING Y I GONG POLE I Q I I }¢ I IY 13 cl) a 1 D_ 3 Y 1 3 UU W Q 1 c� o_ 36" MIN TO COVER I I -� IF- DE -ENERGIZE & LEAVE IN PLACE 3PH-1 OOOA 1/CU 25KV JKTD PROP 1 15' 10' 10' 10, 25' I DIRECTIONAL BORE 2-6" HDPE CONDUITS WITH 3PH-1000A 1/C ��35' 35�I I POLY JKTD I 70' PLAN VIEW N.T.S N PROFILE VIEW I N.T.S MOT 605, 660 IL CONSTRUCTION LEGEND • • • • • • • SEC b6 •TWP�� RN� •` • O PROPOSED WOOD POLE • EXISTING WOOD POLE • • • ❑ PROPOSED CONCRETE POLE • • • • • • : •. ■ EXISTING CONCRETE POLE ® EXISTING AT&T POLE FOREIGN FRQ�VIREOTIC4[-V:iE • • PA'F�K DR • • • • • EXISTING WOOD TRANSMISSION POLE G PROPOSED WOOD AN POLE UTILITIES 21 4' +/- N/O NE 91 ST ST M EXISTING CONCRETE TRANSMISSION POLE CITY OF MIAMI SHORES, FL N 13 PROPOSED CONCRETE TRANSMISSION POLE • • • • • QM EXISTING PADMOUNTED TRANSFORMER see • • z E%]STING CONDUIT PRO POSED CONDUIT PB 10/37 • • d.AYE: • 5/29/2816 • • • • z—� E%ISTING ANCHOR PROPOSED ANCHOR 0NO.AA0265 ; • 68"2105• • • • ,• MEV w F Cl [m PROPOSED SPLICE BOX O EXISTING SPLICE BOX STM SEWER SAN SEWER MAP NO [;] W W Y OO PROPOSED HAND HOLE CATV CZ 0' w O EXISTING HAND HOLE GAS x 0 = ® RADIAL VAULT FPL DWG • 5/5• • • i LT V(XX) LOCATION OF WORKBEING DONE R; WATER SBT NO: • • • • • • • • ••• • • • 000 0 0 a On Less Than 200' . 400' 50' 200' 200' ROAD More Than WORK 200' AHEAD 200' 200' 400' ROAD WORK AHEAD I\ 200'*41 V L CONDITIONS WHERE ANY VEHICLE, EQUIPMENT, WORKERS OR THEIR ACTIVITIES ENCROACH ON THE PAVEMENT REQUIRING THE CLOSURE OF ONE TRAFFIC LANE, FOR WORK AREAS LESS THAN 200' DOWNSTREAM FROM AN INTERSECTION FOR A PERIOD OF MORE THAN 60 MINUTES. CONDITIONS WHERE ANY VEHICLE, EQUIPMENT, WORKERS OR THEIR ACTIVITIES ENCROACH ON THE PAVEMENT REQUIRING THE CLOSURE OF ONE TRAFFIC LANE, FOR WORK AREAS 200' OR MORE DOWNSTREAM FROM AN INTERSECTION FOR A PERIOD OF MORE THAN 60 MINUTES, DURATION NOTES SYMBOLS GENERAL NOTES ® Work Are* • • 1. Work operations shall be confined to one travel lane, leaving 5. The FLAGGER legend sign may be substituted for the symbol Sign. 1. ROAD WORK AHEAD sign may be omitted If all of the following • • • the opposing travel lane open to frallic. conditions are met • • • • • • •+ • • Channeli zing Device (See Index•No.•fiSOt • 6. The maximum spacing between devices shall be no greater than 25.' • • 2. When vehicles in a parking zone block the line o/ sight to TCZ a. Work operations arc 60 minutes or less. • Work Zo�2 SR�r* • • • • signs or when TCZ signs encroach on a normal pedestrian 7. For general TCZ requirements and additional information, refer to b. Speed is 45 nt I or less. P P r • •� • • • • • • walkway, the signs shall be post mounted and located in Intlex No. 600. C. No sight obstructions to vehicles approaching the work area for • • • • accordance with Index No. 17302. a distance of 600 feet. • •� Flogger • • • • • • • B. The two channelixing devices directly in front and directly at the d. Vehicles in the work area have high -intensity, rolntinp, • • • • • Direction •raf•r• 3. If work area is confined to a i aufside auxiliary lane, the Work end Of the work area may be nmifled pl'ovirled vehicles m the walk flashing, Oscillating, ar drab' lights operating. Lone IdeIIfifi 0 he area shall be barricaded and the FLAGGER signs replaced by area have high -intensity rotating, flashing, oscillating, or strobe C. Volulne and complexity of the roadway has been considered. • • • • • • • • • • • . • • • ROAD WORK AHEAD signs. Flaggers are not required. lights operating. • • • • • • • • • • • • 4. Flaggers shall be in sight of each other or in direct 9. Use. Temporary Raised Rumble Strips in accordance With Index 603. • •• • • • communication at all [inns. Placonrent of Rumble Strips antl additional signs should begin at • s• • • • • • •••• FLAGGER sign location. • LA.S•r• p DE•CRIPAI•N: • • • 000 2016 INDEX SHEET' VISION L w • 0 • • • • • FDOT� TWO-LANE, TWO-WAY, WORK NEAR INTERSECTION NO. 4NO. 7107115 W . . • �- DESIGN STANDARDS605 1 of 1 eve SYMBOLS GENERAL NOTES ®1. Route pedestrian traffic around work at when construction 7. Provide a 5' wide temporary walkway, except where space restrictions warrant Work Area activities encroach on the sidewalk for more than 60 minutes a minimum width of 4'. Provide a 5' x 5' passing space for temporary walkways • Channelizing Device (Sec Index 600) using the devices and remedies shown on this Index. Use project less than 5' in width at intervals not to exceed 200'. specific designs for scenarios not included on this Index. Work Zone Sign B. Provide a cross -slope with a maximmlti value of 0.02 forall temporary Required Locations For Either Tomporar'y 2, Far' spacing of traffic control devices and general TCZ walkways. CR requirements refer to Index 600. The niaximuni spacing belween Or Permanent Curb Ramps. barricades, vertical panels, drums or tubular markers is 25'. 9. Temporary walkway surfaces and ramps must be stable, firm, .slip resistant, and ep Lane Identification + Direction of Traffic kept free of any obstructions anti hazards such as holes. debris, mud, Pedestrian Longitudinal Channelizing Device (LCD) 3. Use delineators on longitudinal Channelizing devices separating construction equipment and stored materials. with Mounted Work Zone Sign the work area from vehicular traffic. 10. Remove temporary walkways immediately after reopening of the sidewalk, unless •—• Pedestrian Longitudinal Channelizing Device (LCD) 4. Cover or deactivate pedestrian traffic signal otherwise noted in the plans. displays) controlling closed crosswalks. 11. Meet the requirements of Index 304 for temporary curb ramps. 5. Post mounted signs located near or adjacent to a sidewalk must have a 7' minimum clearance fr'uni the bottom of sign to the 12. Place pedesl—n longitudinal Channelizing devices) across the full width of the surface of the sidewalk, closed sidewalk. For temporary walkways, similar to the Sidewalk Diversion, 4 place LCD's to delineate both sides of the temporary walkway. 6. When construction activities involve sidewalks on both sides o/ the street, stage the construction so that one sidewalk is in service at all times. If this is not feasible and both sidewalks must be closed, as determined by the Engineer, provide a detour to guide pedestrians around the construction zone. ?I CR v ,k i 3tl3H SSOliO DETOUR � I 0 03SO10 NltlM301S col p 03SO10 N 0 � N�VM301S � Y J o Q W LU LU0 W O 2— co • • •Ihf-`13D • S{OEWALK CLOSED anoi3a • • USE . LLQl • IA ••••• : I��Y jj �j •• • ROAD > ••••• •• •••• u u • WORK •••••• AHEAD ••••• •• • •••• • • • • COROSSWALK CLOSURE AND • ' ••••• • •• ••• PESESTRIAN DETOUR • • E•C IP •••••• • ROAD WORK AHEAD SIDEWALK DETOUR SIDEWALK DIVERSION PEDESTRIAN WALKWAY ROAD WORK AHEAD • L 0 O R ■WV, • • • • • • 2016 INDEX SHEET I�VISION �, i • i • • FDOTI ]PE DE S TREAN CONI'1ROL FOR CLOS UR]E Off+ S I[DE ALKS NO. NO. S)��01115 •••• •••• �►'— DESIGN STANDARDS 660 1 Of 1