Loading...
RC-07-19-1576, 1298 NE 95th St (3)- - -- -- -- PROPPE UNE -- -- _- -- - - -- 1 1 I 1 1 I O 1 O O O S303 1 2 5301 5301 ---------- _ - 1 C_2 1 4 .�— _ I-i0' - _-...._— -�--- --_-6--'--"--�,-:�_.--- 9-8. n�k 14 P 14 _ GB-Z P-14 _ _—G_P 1 FLOOD VENTS I 1 =— MAN n 4PC (SEE ARCM. 1 n tC -2 ... iC-t �1 I� iC- .t P-14-� P--: P 114 — ,• GB-� • Cr6 CB_2 — P-14 v ' L _� 1 II _,4 I ., I I 'I I I L -�; - I III aTOGPRAGEE-5' I • II II 3 Pa I ?OP EIF, 5' 8' II II i 1 14Y 4' CONIC: SLAB 9' CONIC. SIPB - • P-14 STORAGE i • Imo, _fL000 VENTS -WJ I5 ® ] II W/ ISO 12' EW. tU M1 CONIC. SLAB II .I d° CONIC. SUB • H (SEE ARCH. DUGS) / '' J • (CENTERED) ffffff I II CENtE1tED / IS ®12' EW. : W/ IS 0 12' EW. I -- Its c CENTERED II II (CEINTERm) - # I • " 2 - I• a' 3 I ❑ ❑❑ �• I S3033 ' • ' I I 2' °_JSHPC 11 " 1� II 53D2 I. 'F- I • P-, P-14 C ' 3 II II ®J • P-" ' 1 S303 P-14 L=_ P-14 P-14 P-11 _ • — B- J — B 2 i — GB-2 —9 / SI P-14 -' — — . • • •• • •• • • 1 - • IC- - _1—� l2-:. P-74 10. 7• •j P-II— 7— — — P_�• 71-4' I I`i ' Es Il Imo, 1 I •I � 1 .5 - - - - ,LEI' 11._D, S3D2 �c 'P-t4 P 14 — P-_1�. — P 14 _ q _ _7.�_ — — p-14 — — J _ • - 74 P-�4 ( . � • � GB-! GB-[ B=2 C9=2--2 _ I • I vl OPENING., (SEE - 5 ARCH. OWGS) • • 5307 I / II P74I CJ\G'I.•I 1 •I ' •78' 1 •I Im ( 1 •IT P-1400 1 I I ` I I I • I� T I I I.., I 53401 I•-3. _. 7D._7' 1. 3.. / I I - 5302 • I �LGB I I FLOOD VENTS • I P-14 • • I r(SEE ARCH. 17WGS) -� 1 4' 1 L14 CB 2 "NI J GB-1 — — — P-Id — GB-1 — p_74 — — GO-2 — __-- � — � 2 — — � • I I — — — — — — — — — — — — — — — _ — - — _ A. 1 8'. 4— 4 9�_._ .L5 1�__._.._�- s_-2 8 _-1P-14 1 / O 1 NORTH FOUNDATION LEVEL FRAMING PLAN / a`!7l91l 111111///! - - - - - - - - - _ � � � � � � � � � � � � �•.>:'``. -PROPERTY-•� E- M7M/.� � � �i GB2 circled in Orange were reinforced with 4 Approve these field modifications: bnd 4 #6 on Qi • ■ DENOTES A NEW B' CONCRETE MASONRY WALL DENOTES A NEW GRADE, BEAM DENOTES A NEW CONIC, COLUMN OR CON" WALL 4 DENOTES A COLUMN STARING AT THIS LEVEL (DENOTES A COLUMN BELOW THIS LEVEL ODENOTES A CONIC, TIE COLUMN DENOTES A CONE. COLUMN DENOTES A STEEL COLUMN `2 YP 14 'DENOTES A 14 a AUGERCAST PRE .-. ❑p - _- .DENOTES A 3 0 HELICAL PILE MOLES: 1-GENERAL CONTRACTOR SHALL SUBMIT SIGNED h SEALED CALCULATIONS AND SHOP DWG'S BY A FLORIDA DELEGATED PROFESSIONAL ENGINEER FOR STEEL FABRICATION TO ENGINEER OF RECORD PRIOR TO FABRICA11014 2-GENERAL CONTRACTOR SHALL SUBMIT SIGNED k SEALED CALCULATIONS AND SHOP OWG'S BY A FLORDA DELEGATED PROFESSIONAL ENGINEER FOR HAND RAPS, STORE FRON15, WINDOWS AND DOORS TO ENGINEER OF RECORD PRIOR TO FA8R07R . SUPERIMPOSED LOADS GROUND FLOOR DFtD 31 PSF LM 40 PSF CONCRETE MASONRY NOTES: 1. FRONDE 1-I5 VERTICAL IN FILLED CELL ADJACENT TO ANY WINDOW AND DOOR DPENINCS WHERE NO COLUMN IS INDICATED, UMESS OTHERWISE NOTED. EXTEND REINFORCEMENT FROM FRAA44G FLOOR TO BEAM ABOVE. 2. ALL MASONRY WN1S TO HAVE 9 GAGE UDDER TYPE DUR-O-WALL HORIZONTAL JOINT REINFORCING ON EVERY BLOCK COARSE. EXTEND REINFORCING MINIMUM 4" INTO CONC. COLUMNS. 3. ALL SLOPES, DRAINS AND RECESSES IN FLOOR SUB, COOROIRAIE W/ ARCH. AND MECHANICAL DRAWINGS PRIOR OF POURING FLOOR SUB. 4. INDICATES (1)-I6 IN FRIED CELL AT 32' O.C. MAXIMUM, UNLESS DTHERWISE NOTED. PROVIDE ADDITIONAL REBAR WHERE SHOWN ON PLAN. MASONRY SHALL HAVE A MINIMUM F'm - 1,500 psi. 5. WINDOW AND DOOR OPENINGS MUST BE COORDINATED W/ THE ARCHITECTURAL DRAWINGS AND THE MANUFACTURER. EpTES: 1. CONTRACTOR TO COORDINATE GROUT FILLED CELT. LOCATIONS AND CHANGE OF REAM HEIGHTS. 2. ALL ANCHORS SHALL BE EMBEDDED INTO POURED CONCRETE OR GROUT FILLED CELL 3. OC TO VERIFY ALL DOORS AND WINDOW OPENINGS DIMENSIONS PRIOR TO THE SLAB POURING W/ WJNUF. AND METRO DADE PRODUCT CONTROL REOIAREMENTS. 4. YIELD I4 X 1'-6' DWL U CONCRETE SILL 0 SIT. CO. DO NOT PAINT COL O SILL ALL ELECTRICAL, MECHANICAL NO PWMBOW PENETRATIONS THROUGH STRUCTURAL MEMBERS SHALL BE SAWED TO EO.R AND AFFIRM BY EAR $ ARCHITECT PREVIOUS C NSTRUCTION PHASE AND S i4LL BE COORDINATED BY THE DEMERIT. CONTRACTOR ACCORDINGLY. GENERAL CONIRMI SHALL VERAY THE LOCATION AND DTAIDWNS OF EQUIPMENTS BY SPECIFIC VENDOR PRIOR 10 RSTALUTIONL GENERAL CONTRACTOR IS RESPONSIBLE FOR CHECKING ADEQUACY OF EQUIPMENT WEIGHTS WTH STATED LOADS USED FOR STRUCTURAL DESIGN, IF LOADS EXCEED THOSE, GO WILL BE RESPONSIBLE FOR UPDATE THE DESIGN WITH EAR ACCORDNGLY, PERMRTNG TASKS AND TIMELINE COMsINNCF ASSOCIATED WITH NEW DESIGN WILL BE GENERAL CONNACTOR RESPON9BI RY AS WELL SEF H. �J5 PVC ENS, L.^y a NO.43302 YOUSSEF HACHEM 5 CONSULTING ENGINEERLNG STATE OF § 88 NW 27TH AVE �,t�, MUMI FL 33125�Q�p- TEL (786) 2874712/ (C FAX (305) 988-8453 S/QNAI www.yhanmeenng.com -.... No. 43302 7536 NE bth Court Suite 114 MIAMI, FL 33138 T 3051350-2993 F 3051350-2524 W twsw.ana-arc.com Camukant MI NIMN Calle 85 N' 16 - 26. Pi 2 PBX G+571) 6213066 1 530653SO I S306536 BogotA, Colombia ALL DRAWING AND WRITTEN MATERIALS HEREIN CONSTITUTE ORIGINAL WORK OF THE ARCHITECT AND MAY ONLY BE DUPLICATED WITH THEIR WRITTEN CONSENT. M 0 OJ M v v m 4 U- ITS Uj O d CO s.;t.F (V L Z L Client Cantw: Yon Morales 305 / 790 3849 Archkectural Registry on Stele of Flonda Rodrigo A Carrion Registrazion no.. AR 91744 Reuisimu Q eoc tyz 19 No, Issue Date RELEASED FOR CONSTRUCTION Date 07Y0512019 job Number 01901200 Scale Drawn Checked CAD File Sheet Title FOUNDATION FRAMING PLAN S 1 O 1 100% CONSTRUCTION DOCUMENTS PEST CONTROL INC 1-800-929 2847(BUGS) SERVICE INVOICE BUILDER APEX ACCOUNT North FL JB1988 Central FL JB4418 West FL JB6132 East FL JB1988 South FL/MB JB182261 South FL/WPB JB270379 AMOUNT Notice of Preventative Treatment for Termites (as required by Florida Building Code (FBC) 105.10 and 1816.17) Treatment Address or Lot/Block/Unit of Treatment PO# Date k. "t' ,`' jTime Applicator },°a ? 1 ( � t Product Used e f ': If ) c-.�....t Chemical Used (active ingredient)~ , t► i 2�iu>ber of Gallons Applied ) t 1 — 1 Percent Concentration Area Treated (square feet.) Linear Feet Treated Stage of Treatment (Horizontal, Vertical, Adjoining Slab, Retreat of Disturbed Area) As per 104.2.6 — If soil chemical barrier method for termite prevention is used, final exterior treatment shall be completed prior to final building approval. If this notice is for the final exterior treatment, initial and date this X AP-SN04 11/18 R/O MPS 407-657-7414 BUILDER r t APEX ACCOUNT TM PEST CONTROL INC 1-800-929 2847(BUGS) SERVICE INVOICE PO# North FL JB1988 Central FL JB4418 West FL JB6132 East FL JB1988 South FL/MB JB182261 South FL/WPB JB270379 AMOUNT Notice of Preventative Treatment for Termites (as required by Florida Building Code (FBC) 105.10 and 1816.17) LUILL Treatment Address or Lot/Block/Unit of Treatment :i Date } . r. f Time f 4 Applicator 1 ` A Product Used �'g `E ' 19 l � iT'3 ;-�,+ Chemical Used (active ingredient) �, '�� { � ; .�. Nu lber of Gallons Applied Percent Concentration 1 Area Treated (square feet) Linear Feet Treated Stage of Treatment (Horizontal, Vertical, Adjoining Slab, Retreat of Disturbed Area) i As per 104.2.6 — If soil chemical barrier method for termite prevention is used, final exterior treatment shall be completed prior to final building approval. If this notice is for the final exterior treatment, initial and date this line,` AP-SN04 11/18 R/O MPS 407-657-7414 w w r i Mo CE' • r•r • www.yhengrneer1ng.c9rhM • M + • , • , � 99+Nt+J 27 Avenue Miami. FL 33125 Phone (305)969-YHCE Fax (305)969-9453 Youssef Hachem Co uo irg Engirej_rirg CA26553 • February 4, 2020 •;' w Y • • .. , • Building Official Miami Shores Village 10050 NE 2nd Ave. Miami Shores, Florida 33138 RE: Morales Residence 1298 NE 95th Street Miami Shores, FL. 33138 PERMIT No. RC-07-19-1576 Dear Official: We have inspected the grade beams and piles for the foundations at the above mentioned project, the as -built clearance of 7" (4"pile clearance and 3" grade beam clear cover) is acceptable to us as well as the dimension of stirrups which is #3 stirrups 10"W'. This document is prepared on accordance with the Florida Building Code, and is to be submitted to the Miami Shores Village Building Department. If you have any questions, please do not hesitate to contact me at (305) 969-YHCE Sincer. > >����„�,,,,,,rl,,,, No 4 302 C- You °° °M"I I 'h.D., P.E. FL. Prof Engineer 43302 FL. Special Inspector 6985061 Cain vie Con-vinue V,S& Concre' c �Cuonq' 1411 SW 4111 Ave # I (H Davic, H. 11114 1'el- 914 -$44,61 IS I wild SoilprObeN 1--lioi ZDncerillo-& Te".)It-1110t) t7 December 11, 2019 J.L.0 Enterprises, Inc. 2800 NW 32 d Ave. '.Miami, FL 33142 RE: Report of Pile Installation Proposed Residence 1298 NE 95" St. Miami Shores, FL Soilprobc Engineering & Testing, Inc. has completed field observation of auger cast piles installation for the above referenced project. Piling operation was conducted by JLU Enterprises, Inc. corresponding to the time period of December 5, and 6, 2019 and installation witnessed by a representative of this office. The purpose of this site inspections was to observe and document piles installation operation only. A total number of sixty-four (64) auger cast piles were placed at locations staked in the field by the owner's representative and to depths as indicated in the attached field inspection logs. Pile installation data for each pile are presented in the attached field installation logs. Follow4ng our observation of pile installation operation at the scheduled time, and our knowledge of project documents we certify that the referenced piles were adequately installed for achieving an allowable bearing capacity of 35 tons compression and 17 tons tension. Sincerely, Soilprobe Engineering & Testing, Inc. t, Z!5 ro (For Er.c. Pile instalhidoun logs Location sketch r: SCI DV/Log ;C, N TAKEN 0 RESUBMIT AS kl_! 17 eREVIEWED J '..:"'S",S NOTED (NOT REQUIRED TO K' These c m reviewed only for conformance %,,cl and int a with the information given in the f, The Co i:,,;ble for confirming and correlating i dimen and construction methods and coorow.�,,;, with all ci, trades. This review will not relieve the responsi'oilt of any terms of the agreement. Revievvrd D a , e: CONSULTING ENGINEEIPS P:13iTli, FL33125 -Tel: 305.969-9423; Fax, 310S 9, , , 3 Engineering is the essence .. . . . . . . . . . . . . . . . . . . . . . . . . of science and technology SOILPROBE ENGINEERING AND TESTING, INC. 14" Auger Cast Pile Log Contractor: CONSTRUCTION DNA GroutSpec's PROJECT: PROPOSED RESIDENCE Load Bearing (toss) Logged By: 1P 5000 psi SOILPROBE ENGINEERING & 35 comp TESTING, INC. ADDRESS: 1298 NE 95th St Misc. Info: Engineers Sign and Seal: 17 tension CITY: Miami Shores, FL Field Notes: Steel Spec's: 6#6's with #3 ties @12" full length Pile I.D. Auger Time MIN. Depth (feet) Theorical Grout Am't C.Y. Pump Strokes Actual Grout Amt. C.Y. Grout Factor Ki s P comp tension Date: December 5, 2t01 J Notes 1 1 2:09 35 1.40 60 2.34 1.67 70 34 Start 10:31 Arrived 10:14 2 2 2:20 35 1.40 54 2.11 1.50 70 34 ADONEL #4012 Test taken 9 Cy 3 3 2:22 35 1.40 58 2.26 1.62 70 34 4 4 2:12 35 1.40 62 2.42 1.73 70 34 Stop 10:57 Start ' 1:04 5 5 2:17 35 1.40 56 2.18 1.56 70 34 ADONEL #4004 Arrived 10:48 6 6 2:28 35 1.40 64 2.50 1.78 70 34 9 cy 7 7 2:10 1 35 1.40 65 2.54 1.81 70 34 8 8 2:15 35 1.40 60 2.34 1.67 70 34 Stop 11:39 Start 11:44 9 9 2:23 35 1.40 55 2.15 1.53 70 34 ADONEL #906 Amved 11:19 10 10 2:11 35 1.40 56 2.18 1.56 70 34 9 Cy 11 11 2:21 35 1.40 52 2.03 1.45 70 34 12 12 2:16 35 1.40 49 1.91 1.37 70 34 13 13 2:20 35 1.40 52 2.03 1.45 70 34 Stop 12:19 Start 12:22 14 14 2:31 35 1.40 51 1.99 1.42 70 34 ADONEL #919 Arrived 12:00 15 15 2:23 35 1.40 55 2.15 1.53 70 34 9 Cy 16 16 2:33 35 1.40 54 2.11 1.50 70 34 17 17 2:20 35 1.40 56 2.18 1.56 70 34 Stop 1:02 Start 1:^4 18 18 2:14 35 1.40 55 2.15 1.53 70 34 ADONEL *4020 '14 s 19 1 19 2:25 35 1.40 53 2.07 1_48 1 70 34 20 1 20 1 2:30 35 1 1.40 58 1 2.26 1.62 1 70 34 Pag.: 1/4 SOILPROBE ENGINEERING AND TESTING, INC. 14" Auger Cast Pile Log PROJECT: PROPOSED RESIDENCE Contractor: CONSTRUCTION DNA GroutSpec's Logged By: 1P 5000 psi Load Bearing (tons) SOILPROBE ENGINEERING & 35 comp TESTING, INC. ADDRESS: 1298 NE 95th St Misc. Info: Engineers Sign and Seal: 17 tension CITY: Miami Shores, FL Field Notes: Steel Spec's: 06's with #3 ties @12" full length Pile I.D. Auger Time MIN. Depth (feet) Theorica! Grout Am't C.Y. Pump Strokes Actual Grout Amt. C.Y. Grout Factor Ki s P comp tension Date: December 5, ?Ql9 Notes 1 21 2:21 35 1.40 54 2.11 1.50 70 34 Stop 1:44 Start 1:54 2 22 2:17 35 1.40 59 2.30 1.64 70 34 ADONEL #4007 Arrived 1.10 3 23 2:28 35 1.40 56 2.18 1.56 70 34 9 cy 4 24 2:19 35 1.40 59 2.30 1.64 70 34 5 25 2:22 35 1.40 53 2.07 1.48 70 1 34 Stop 3:03 Start 3:09 6 26 2:25 35 1.40 53 2.07 1A8 70 1 34 ADONEL #6MI Arrived 2:58 7 27 2:09 35 1.40 51 1.99 1.42 70 34 9 cy 8 28 2:23 35 1.40 49 1.91 1.37 70 34 9 29 2:18 35 1.40 50 1.95 1.39 70 34 Stop 3:43 10 30 2:09 35 1 A0 58 2.26 1.62 70 34 Start 3:57 Arrived 3 513 11 31 2:20 35 1.40 54 2.11 1.50 70 34 ADONEL #957 9 cy 12 32 2:21 35 1.40 56 2.18 1.56 70 34 13 33 2:10 35 1.40 60 2.34 1.67 70 34 Stop 4:20 14 34 2:20 35 1.40 58 2.26 1.62 70 34 15 35 2:27 35 1.40 58 2.26 1.62 70 34 Start 4:27 Arrived 4-'6 16 36 2:24 35 1.40 53 2.07 148 70 34 ADONEL #6004 9 17 37 2:19 35 1.40 55 2.15 1.53 70 34 Stop 5:05 18 19 20 Pag.: 2/"4 SOILPROBE ENGINEERING AND TESTING, INC. 14" Auger Cast Pile Log Contractor: CONSTRUCTION DNA Grout Spec's PROJECT: PROPOSED RESIDENCE Load Bearing (tons) Logged By: AO 5000 psi SOILPROBE ENGINEERING & 35 comp TESTING, INC. ADDRESS: 1298 NE 9Sth St Misc. Info: Engineers Sign and Seal: 27 tension CITY: Miami Shores, FL Field Notes: Steel Spec's: 6#6's with #3 ties @12" full length Pile I.D. Auger Time MIN. Depth (feet) Theorical Grout Am't C.Y. Pump Strokes Actual Grout Amt. C.Y. Grout Factor Ki s P comp tension Date: December 6, 2019 Notes 1 38 3:05 35 1.40 47 2.16 1.54 70 34 Start 9:22 Arrived 9.12 2 39 2:39 35 1.40 54 2.48 1.77 70 34 ADONEL #3008 9 Cy 3 40 4:16 35 1.40 48 2.21 1.58 70 34 4 41 2:55 35 1.40 50 2.30 1.64 70 34 5 42 4:23 35 1.40 50 2.30 1.64 70 34 Stop Start 10:15 6 43 3:34 35 1.40 49 2.25 1.61 70 34 ADONEL #4016 Arrived 9:50 7 44 2:28 1 35 1.40 50 2.30 1.64 70 34 9 Cy 8 45 2:45 35 1.40 50 2.30 1.64 70 34 9 46 3:00 35 1.40 44 2.02 1.45 70 34 Stop 11:00 10 47 4:12 35 1.40 54 2.48 1.77 70 34 Start 11:08 Amved 11.02 11 48 4:27 35 1.40 45 2.07 1.48 1 70 34 ADONEL #3002 Test taken 9 Cy 12 49 3:05 35 1.40 46 2.12 1.51 70 34 13 50 5:00 1 35 1.40 59 2.71 1.94 70 34 Stop 11:50 Start 12:06 14 51 5:10 35 1.40 50 2.30 1.64 70 34 ADONEL #4018 Arrived 11:30 15 52 5:12 35 1.40 48 2.21 1.58 70 34 9 Cy 16 53 3:04 35 1.40 51 2.35 1.68 70 34 17 54 4:35 35 1.40 51 2.35 1.68 70 34 Stop 1:00 18 55 4:28 35 1.40 44 2.02 1.45 70 34 Stan 1: ;G A?s red 100 19 56 3:09 35 1.40 49 2.25 1.61 70 34 A NEL #952 9 20 1 57 3:07 35 1 1.40 1 46 2.12 1.51 70 34 Pag.: 3J4 SOILPROBE ENGINEERING AND TESTING, INC. 14" Auger Cast Pile Log Contractor: CONSTRUCTION DNA Grout Spec's PROJECT: PROPOSED RESIDENCE Load Bearing (tans) Logged By: AO 5000 psi SOILPROBE ENGINEERING & 35 comp TESTING, INC. ADDRESS: 1298 NE 95th St Nfisc. Info: Engineers Sign and Seal: 17 tension CITY: Miami Shores, FL Field Notes: Steel Spec's: 6#6's with #3 ties @I2" full length Pile I.D. Auger Time MIN. Depth (feet) Theorical Grout Am C.Y. Pump Strokes Stroke s Actual Grout Amt C.Y. Grout Factor Ps comp tension Date: Delcember 6, '2019 Notes 1 58 2:59 35 1.40 51 2.35 1.68 70 34 2 59 2:56 35 1.40 48 2.21 1.58 70 34 Stop 1:45 Start 1.59 3 60 3:15 35 1.40 48 2.21 1.58 70 34 ADONEL #932 Arrived I : 39 4 61 3:08 35 1.40 53 2.44 1.74 70 34 9 Cy 5 62 3:49 35 1.40 57 2.62 1.87 70 34 6 63 4:12 35 1.40 52 2.39 1.71 70 34 Stop 2:41 Start 3:40 7 64 4:00 35 1.40 53 2.44 1.74 70 34 ADONEL #6007 Arrive3 3-35 8 Stop 4'00 9 10 11 12 13 14 15 16 17 18 19 20 Pag.: 4/4 • 1)IISWO"Avc.N104 • Davie, Fl, 3111.1 '1'cl: 954.5$4-h l 15 k-runil �t�s2lcttut�3szilRtsltlts�l�I Soilprobe Engineering Testing.), Inc. January 22, 2020 J.L.0 Enterprises, Inc. 2800 NW 32"d Ave. Miami, FL 33142 1tE: Report of Pile Installation Proposed Residence 1298 NE 95 h St. Miami Shores, FL Soilprobe Engineering & Testing, Inc. has completed field observation of steel helical and pin piles installation for the above referenced project. Piling operation was conducted by J1,U Enterprises, Inc. on January 10, 2020 and installation witnessed by a representative of this office. The purpose of this site inspections was to observe and document piles installation operation only. A total number of six (06) 3.5" O.D. schedule 80 Brackett Foundation Support brand steel helix piers were placed at locations staked in the field by the owner's representative and to depths as indicated in the attached field inspection log. Pile installation data for each pile are represented in the attached field installation log. Following our observation of pile installation operation at the scheduled time, and our knowledge of project documents we certify that the referenced helical piles were adequately installed for achieving an allowable bearing capacity of 12 tons compression and 6 tons tension. Sincerely, ` , SCi Div/Log Soilprobe Engineering &Testing, Inc. ;;;, I ;;;KEN ❑j� ESUBP,IiiT t;, r L , �1 REVIEWED S 1"C"TED (NOT REQUIRED TO REr' �.�ie.'na The r: and it rep e4 ed only for conformanc ev i� the information given in ther P.E. Reg. No 37334 The C dimens "or confirming and co rel t n 1 tr,,�;,,n methods and cony i �FOT the Firm) with al! respoi s. I M3 review will not reuave m6 r ,:ice Af ajy t firms of the agreement Enc. Pile installation log Location sketch CONSULTING ENGINEERS 9 1 F 33125 • Tel: 305.969.9423 ; Fa Engineering is the essence . . . • • . • . • • • . • • • • • • . • . ofseience and technology SOILPROBE ENGINEERING AND TESTING, INC. 3 1/2" Helix Piers Installation Log PROJECT: PROPOSED NEW RESIDENCE Contractor: CONSTRUCTION DNA Bearing (tons) 12 comp 6 tension Logged By: JP __dLoad SOILPROBE ENGINEERING & TESTING, INC. Engineers Sign and Seal: i ADDRESS: 1298 NE 95th St Miami Shores, FI 31/2 " O.D. Schedule 80 Pipe Misc. Ifo: nfo: CITY: Field Notes: Pile I.D. Type of Pier (in) Specified Torque (Ft.Lbs.) Installed Torque (Ft.Lbs.) Penetration (ft) Number &Size of Helices Kips comp tension Date: Januarg 10, 2020 Notes 1 1 3 1/2 6000 6000 34 10", 12", 14" 24 12 2 2 3 1/2 6000 6000 32 1011, 12", 14" 24 12 3 3 3 1/2 6000 6000 33 10", 1211, 14" 24 12 4 4 3 1/2 6000 6000 30 10", 12", 14" 24 12 5 5 3 1/2 6000 6000 32 10", 12", 14" 24 12 6 6 3 1/2 6000 6000 1 34 10", 12", 14" 24 12 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Pag.: 1/1 SOILPROBE ENGINEERING AND TESTING JLU Enterprises, Inc. Pile Location Sketch 3931 SW 47" Ave. #104 1298 NE 95" St. Davie, FL 33314 Miami Shores, FL Tel. (954) 584-6115 1k P(, 0-7 -19 MCE www.yhtanpinnrinp.com 99 NW 271" Ave Miami FL 33125 Phone 305 969-YHCE Fax 305 9453 Youssef Hachem Consulting Engineering THRESHOLD / SPECIAL / QUALITY CONTROL INSPECTION REPORT Project: Project No. Date: _ A Contractor: Permit No. Project Location: Discipline: THRESHOLD., SPECIAL QUALITY CONTROL (drde one) Inspected by: Type: ❑ Initial ❑ Partial ❑ In -Progress ❑ Follow -Up ❑ Added Se Mces I Reinforcing steel, grade and formwork for the SOG with Monitored concrete placement, mix design and mechan IcaI <' a monolithic footing consolidation Reinforcing steel placement and formwork for spread Installation of kmg span prefabricated roof busses footing, grade beam or pilecap Thickness, vapor barrier, reinforcing steel placement and Installation of wood -based, structural panel (sheathing) formwork for slab on grade Clean -outs and reinforcing steel placement for masonry Elevated floor truss:/joist framing, bracing and attachment bearing walls, tie column(s) (if applicable) and elevated tie beam W. Monitored concrete placement of fill cells; Ife column (s), (if Permanent and engineered truss bracing system and uplift applicable) and elevated tie beam (9). connectors. Follow-up observations of grout placement for masonry Structural steel framing, bolted and wekfed connections. bearing walls. Reinforcing steel placement, formwork for concrete vertical Attachment and side lap fasteners installation for structural sired mart ens, columns/walls, lap splice, grade, ties, hair pins deck. arrangement and spacing. Reinforcing steel placement for concrete beam, size, grade, lap Wall framing Installation, attachment, bracing, baddng splice length and location, stirrups arrangement and spacing. Reinforcing steel placement for elevated conventional concrete Installation of exterior window/door substrate members (buck, sill, slab. header,lambs) Reinforcing sled placement, post -tension tendon layout, Attachment of exterior window/door framing, mullion, transom, profile and associated mild re -steel for post -tensioned concrete glazing. slab. Shoring and re -shoring Other (write additional description in area below) Disposition of Inspection: ❑Items observed are in general compliance with plans and specifications ❑ Items noted are NOT in compliance with plans and specifications and require follow-up inspection. Additional Information on Member/Area Inspected: