Loading...
PW-11-19-2783, 27 NE 94th StMiami Shores Village 10050 NE 2 Ave Miami Shores FL 33138 305-795-2204 Location Address Issue Date: 02/03/2020 Parcel Number Permit No. PW-11-19-2783 1 Permit Type: Public Works Work Ctassi/ication: Public Works Permit5t4tus: Approve Expiration: 08/03/2020 27 NE 94TH ST, Miami Shores, FL 33138 1132060130540 i Contacts KRISTINE A GEORGE TRS Owner TECO PEOPLES GAS SYSTEM Contractor 27 NE 94 ST, MIAMI SHORES, FL 33138 1ESUS VEGA 15779 West Dixie Hwy, North Miami Beach, FL 33162 Business: bertnunez2@aol.com 305957385777247 Other: 30597 01783 Description: TO INSTALL A NEW GAS SERVICE LINE 3 4' Valuation: Inspection Requests: p (/ ') $ 1,000.00 PLASTIC) BY DIRECTIONAL BORE Total Sq Feet: 5.00 1305-762-4949 Fees Amount Education Surcharge $0.20 Public Works Permit Fee $100.00 Scanning Fee $9.00 Technology Fee $2.50 Total: $111.70 Payments Date Paid Amt Paid Total Fees $111.70 Credit Card 02/03/2020 $111.70 Amount Due: $0.00 Building Department Copy In consideration of the issuance to me of this permit, I agree to perform the work covered hereunder in compliance with all ordinances and regulations pertaining thereto and in strict conformity with the plans, drawings, statements or specifications submitted to the proper authorities of Miami Shores Village. In accepting this permit I assume responsibility for all work done by either myself, my agent, servants, or employes. I understand that separate permits are regLiLed for ELECTRICAL, PLUMBING, MECHANICAL, WINDOWS, DOORS, ROOFING and SWIMMING POOL work. OWNERS AFFIDA IT: I certify that all the foregoing information is accurate and that all work will be done in compliance with all applicable laws regulating ponstrugfion and zoning. Futhermore. I authorize the above named contractor to do the work stated. 2-3- ze Owner / Applicant / Contractor / Agent Date February 03, 2020 Page 2 of 2 Miami Shores Village NOV 2 Z `O Public Works Department (305)795-2210 BY- 3 � Public works forms are available from the building department, 10050 NE 211 Ave., Miami Shores, FL 33138 PUBLIC WORKS PERMIT APPLICATION Permit Type: Work in the Right -of -Way on Miami Shores Village or Miami -Dade Property Permit#: vpl— l r "Z783 Name of Applicant (if utility see below): TECO PEOPLES GAS Owner off the following described property: Legal Description: Lot 15 & 16 Block 4 Subdivision MIAMI SHORES SEC 1 Folio #; 11-3206-013-0540 Address: 27 NE 94th ST. UTILITY NAME: TECO PEOPLES GAS Qualifier/Authorized Agent: JESUS VEGA Address: 5101 NW 21 AVE. City: FT. LAUDERDALE State: FL ZIP: 33309 Telephone: 954-453-0806 Email: MCABRERA@TECOENERGY.COM State Certification or Registration #: E1608 Certificate of Competency # CONTRACTOR NAME: Qualifier/Authorized Agent: Address: City: Telephone: State Certification or Registration #: Email: State: ZIP: Certificate of Competency #: Requests permission to install (describe work, attach separate page if necessary) in the adjoining right of way. TO INSTALL A NEW GAS SERVICE LINE (3/4") PLASTIC) BY DIRECTIONAL BORE Type of Work: ❑ Paving 0 Utility ❑ Sidewalk ❑ Electric ❑ Irrigation ❑ Landscape ❑ Antenna ❑ Other: DESIGNER: Architect/Engineer: Address: City: Telephone: Registration #: State: Email: Value of Work for this Permit: $1000 Permit Fee $ 100.00 Notary $ Bond $ ZIP: Square/Lineal Footage of Work: 5 *****Fees***** Training/Education $ 0.20 Technology Fee $ 0.80 Scanning $ (if required) Total Fee Now Due $ 11 k I Bonding Company's Name (if applicable): Bonding Company's Address: City: State: ZIP: Application is hereby made to obtain a public works permit to do the work in the right of way and installations as indicated. I certify that no work or installation has commenced prior to the issuance of a permit and that all work will be performed to meet the standards of all laws, regulation construction in this jurisdiction. I understand that separate permits must be secured for APPLICANT'S AFFIDAVIT: I certify that all the foregoing information is accurate and that all work will be done in compliance with applicable laws regulating construction and specifically construction in the right-of-way. "WARNING TO APPLICANT: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO THE RIGHT-OF-WAY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT." Notice to Applicant: As a condition to the issuance of a public works permit with an estimated value exceeding $2,500, the applicant must promise in good faith that a copy of the notice of commencement and construction lien law brochure will be delivered to the person whose property is subject to the attachment. Also, a certified copy of the recorded notice of commencement must be posted at the job site for the first inspection which occurs seven (7) days after the public works permit is issued. In the absence of such posted notice, the inspection will not be approved and a reinspection will be charged. Signature Applicant or Authorized Agent The foregoing instrument was acknowledged before me this day of 20 by who Signature C)Iti Company/UtilitHgent The foregoing instrument was acknowledged before me this ZI day of � J61, , 20 / 9 , by �J/ Gg—S w T q A who is personally known to me or who has produced isgersc as identification. identifi NOTARY PUBLIC: NOTAf Sign: Print: Print: SEAL: SEAL: vn,to me or who has produced as ;•;rC:'��?�•,, HUBERTNUNEZ { j�� MY COMMISSION p GG 104234 k• ' EXPIRES: September 11.2021 „ • n—d-i Thr., NMary Public Undorwrilors APPROVED BY: Z2-' Public Works Director, or Designee 2017-04-15 N W L1 E S LEGEND (i CENTER LINE M MONUMENT LINE RAW RIGHT OF WAY P/L PROPERTY LINE E.O.P. EDGE OF PAVEMENT T. T. TAPPING TEE E.F.V. EXCESS FLOW VALVE SVC. SERVICE LINE PE. PLAS7IC STM. SEW. STORM SEWER LOCATION MAP GENERAL NOTES 1. REPLACED BASE MATERIAL OVER DITCH SHALL BE TWICE THE THICKNESS OF THE BASE, MIN. 8" AND MAX. 18" 2. BASE MATERIAL SHALL BE PLACED IN 6" MAX. (LOOSE MEASUREMENT) LAYER AND EACH LAYER THOROUGHLY ROLLED OR TAMPED TO 98% OF MAX. DENSITY PER AASHTO T-180 SURFACE 3. ASPHALT CONCRETE PAVEMENT JOINTS SHALL BE MECHANICALLY SAWED 4. SURFACE MATERIAL SHALL BE CONSISTENT WITH SURROUNDING SURFACE � SRAM MATERIAL (1.5" MIN. THICKNESS) 5. BASE MATERIAL SHALL HAVE A MIN. LBR. OF 100 AND A MIN. CARBONATE �- - 3' f z 5 6" �o M GAS MAIN SOD RESTORATION DETAIL SCALE NOT TO SCALE nAL LANE CONTENT OF 70% (60% FOR LOCAL STREETS) 6. CONTRACTOR SHALL SOFT DIG TO VERIFY LOCATION OF EXISTING UTILITIES RESTORATION OF ROAD CU FOR UTILITY CROSSING \ 50' 3 z1 14 14 - ---18" MIN. I PROP. MAI 2" P.E. 1-_ 3 MIN.--,-- 15"WM� I-3 ' _--------........._...._L_....-.. -- cA s SAS.12 I I _. PR . 314" PLASTI - _ IOC TO s-------- _ DIRE TIONAL BORED 8 8 'ROFILE CROSSING NE 94 ST. SCALE: (V) 1: 5' (H) NTS 1 c) a 40 1 2019 g o a -) JIPP- WOOD POWER POLE OW f15 �1 CL -u L4 1) Cam, w I L ---------------- A --------- U - 15'ALLE 1. i0' ASPHALT PAVEMENT U IR :PIPE - _ W E E i i0.00L N P/L FOUND 0 2. 75 (—/�9 I I^ 00�1 IRON PE c° L p m oi�J 6+ I m q z S 1 i I W.FJ PROP. GAS } W.F. 01 SCALE:1 =30 RISER } -2 q a a 45 9413 � k.W W az 1 / ., G ,off. 16.6' • • • •i F 15' • . F U 6 // �/�/j 138 x e••.•• • a .� / • I One story`' • • • • • • a .' '" . PROP. 314" 2' 22 RESIDENCE #27 , ;': • • ° • • • 1 • • • P.E. GAS SVC. } U / // • •" • TO BE ,P/ g •••••• • ••�• • DIRECTIONAL �' • • • • • • • • . • • r. BORED i I 4 , - u:.. ,,.. co a • • • ch • } a y .-3T I J • • •a�a 1 • • . �" ;.li, lab �n •♦ • • • U'1 •.• 112' MARBLE " I a •r;j N SAS ••• W O pa PG d nn/ FOUN _.a."05'- _ �� I 6s FOUND it`0 Vx] N R/vv IRO PE pf�i �. j z3.o, SJ IRON PIPE W — SAW CUT ASPHALT - - - - -- D E- �-+ (MICA 1 5' SIDEWALK 50.00'(Meas&R) 5' SIDEWALK _� w t` e.o 02 13' PARKWAY 13' PARKWAY 0. MARBLE _ o E.O.P. 9 S ASPHALT - 9.5' ASPHALT PAVEMEN < PAVEMENT ® } 51. a - N.E. 94th STREET .. 21 PAVEMENT " 00 LL 75' — 21'-- =— ---- —. O w Q T "(75' TOTAt R,* by PLAT) V W U X m � Co .E.O.P. — ------MA -- --- "I%" ld Q�z ------ .24'.----- PUBLIC WQBK-(!&E.V-I M 5' SIDEWALK _ SR -------------T ---- 9) 1 i i TIE IN SVC TO GAS ; 42 0 0 I , MAIN Jn Xk�t 6" P.E. GAS MAIN V2 I WITH T.T./E.F.V. 1-3 " ALL EXISTING UTILITIES SHOWN ON THESE PLANS ARE TO BE CONSIDERED APPROXIMATE & q SHOULD BE VERIFIED BY THE CONTRACTOR PRIOR TO THE 'x START OF WORK OPERATIONS. NO. OF 11HZCIS:.y SHM NO.: 1 l Drawing File: C:\Users\Ikrupinski\27 NE 94TH ST MIAMI SHORES.dwg 11/13/2019 Tov) a Less Than 2001 lP 400 50 200 20, ROAD More Than WORK 20D AHEAD ROAD WORK AHEAD 200' 200' 400' ROAD WORK AHEAD 2017 400' J .0 a CONDITIONS WHERE ANY VEHICLE, EQUIPMENT, WORKERS OR THEIR ACTIVITIES ENCROACH ON THE PAVEMENT REQUIRING THE CLOSURE OF ONE TRAFFIC LANE, FOR WORK AREAS LESS THAN 200' DOWNSTREAM FROM AN INTERSECTION FOR A PERIOD OF MORE THAN 60 MINUTES. CONDITIONS WHERE ANY VEHICLE, EQUIPMENT, WORKERS OR THEIR ACTIVITIES ENCROACH ON THE PAVEMENT REQUIRING THE CLOSURE OF ONE TRAFFIC LANE, FOR WORK AREAS 200' OR MORE DOWNSTREAM FROM AN INTERSECTION FOR A PERIOD OF MORE THAN 60 MINUTES. DURATION NOTES SYMBOLS GENERAL NOTES ® Work Area 1. Work operations shall be confined to one travel lane, leaving 5. The FLAGGER legend sign may be substituted for the symbol sign. 1 ROAD WORK AHEAD sign may be omitted if all of the following the opposing travel lane open to traffic. conditions are met: ■ Channeli-9 Device (See Index 102-500) 5. The maximum spacing between devices shall be no greater than 25.' 2. When vehicles in a parking zone block the line of sight [o TCZ a. Work operations are 60 minutes or less. signs or when TCZ signs encroach on a normal pedestrian 7. For general TCZ requirements and add%AnalWt•d matbn, •efer •b • • b. SW@d is 45 mph or less. Work Zone Sign walkway, the signs shall be post mounted and located in Index 102-600. • • • • • • • • c.940 sight obstructions to vehicles approaching the work area for accordance with Index 700-101. • • • • • • • • • •a distance of 600 feet. Flagger 8. The two cnannelizln devices direct) • g yin �onf an '�dir�ctlyat e • • • • tl. Vehicles in the work area nave high -intensity, rotating, 3. If work area is confined to an outside auxiliary lane, the work end of the work area may be omitteiP p►ovida"icles 4r.he wrk • • • • •tWsliing, oscillating. or strobe lights operating. Lane Identification + Direction of Traffic area shall be barricaded and the FLAGGER signs replaced by area have high -intensity rotating, flashing, oscillating, or strobe e. Volume and complexity of the roadway has been considered. ROAD WORK AHEAD signs. Flaggers are not required. lights operating. 4. Flaggers shall be in sight of each other or in direct 9. Use Temporary Raised Rumble Strut• in •c•o•dance wily/QCer• • • • • communication at all times. 102-603. Placement of Rumble Arips and llditional signs should • • • • • • • begin at FLAGGER sign location. • • : : • • • • • • • •• •• • • •• • LAST DESCRIPTION: FY 2019-20 • • INDEX SHEET REVISION 111� FDOT TWO-LANE, TWO-WAY, WORK NEAR INTERSECTION F2-605 11101117 �' STANDARD PLANS 1 of 1