SPECIAL insp rept #066 (Lift layout on SOG control joint foundation- repair reinf)Project No.: 2110.2100049 Report No.: 200415 Date: July 8, 2024 8050 NW 77th Court ꞏ Miami, FL 33166 ꞏ P: 305.249.8434 ꞏ F: 305.249.8479 STRUCTURAL OBSERVATION REPORT No. SPECIAL-066 CN: JS Page 1 of 3 cc: 1 − Job Site; 1 − Client; 1 The Original of this Report was Signed and Impressed Sealed by the Above Registered Engineer in Accordance with Rule 21H-18.11, Chapter 471, Florida Statute Client: Lebolo Construction Management, Inc. 2100 Corporate Drive Boynton Beach, FL 33426 Project: Tropical Chevrolet Renovation/Expansion 8880 Biscayne Blvd. Miami Shores, FL 33138 Agent: Joselyn Sanchez, E.I. Date of Services: 07/08/2024 Village of Miami Shores Building Permit No: CC-12-20-2951 (issued date 11/07/22, expires 05/08/23) Scope of Field Services: Professional observation of completed structural elements (Special Inspector). Reference Documents:  JSG structural drawings sheets S1.0 thru S4.2 (15 pages), Bulleting 7 dated 07/21/2022, signed/sealed by Mark Johnson FL-PE #51983, reviewed/approved for structural compliance by the Village of Miami Shores Bldg. Dept. on 08/22, (permit set review by the Miami-Dade County Department of Regulatory and Economic Resources on 05/16/2022).  SUNCOR, Inc. structural steel erection/fabrication shop drawings sheets AB1 thru TP101 (total of 219 pages) dated 04/13/2022 (Rev. A – Issued for Approval) Submittal #051200-5.0 (Structural Steel Shop Drawings), reviewed for compliance (stamped “Reviewed as Noted - Make Corrections”) by JSG on 05/03/2022.  Canam Steel Corporation (CSC) steel metal deck shop drawings sheets DE1.1 thru DE2.1 (total of 3 pages) dated 04/08/2022 (Issued for Approval) Submittal #051200-6.0 (Deck Shop Drawings), reviewed for compliance (stamped “Reviewed as Noted - Make Corrections”) by JSG on 04/15/2022.  Storage Rack Engineering, Inc. mezzanine dealership equipment racks shop drawings sheets 0.0 thru L3.0 (total of 15 pages) dated 12/01/2023 (Rev. E – Approval Drawings) Submittal #00 80 00-13.0, signed/sealed by Ali Abolhassani FL-PE# 64212 on 12/12/2023, reviewed/approved for compliance by the Village of Miami Shores Bldg. Dept. on 11/20/2023.  SUNCOR, Inc. miscellaneous steel fabrication/erection shop drawings sheets E4000 thru E4014 (total of 15 pages) dated 06/04/2022 (Rev. A – Issued for Approval) Submittal #051200-8, reviewed for compliance (stamped “Reviewed as Noted - Make Corrections”) by JSG on 07/25/2022. Record of Field Observations: 1. Visual verification of the reinforcing steel placement at the following locations indicated below: a) Lift layout on Slab on Grade Control Joint Foundation repairs (to bypass the control joints where layout for Lifts lands on control joints) on existing 6” thick concrete slab. Sections with dimensions of 6’-0” x 7’-0” were removed (4 in total, no overcut) as per SBS-1.3 layout between grids “A” thru “F” and lines ‘4.5’ thru ‘7.5’. Subsequently, #5 rebars will be installed using drilling and epoxy at 12” O.C. (both ways) with a 6” embed over a 10-mil vapor barrier and with 2.9 x 2.9 WWM (4000-psi concrete per approved slab mix design), and concrete finish to match the existing as per RFI #146 (remedial details). In Progress on 7/8/2024.  Pending SEoR approval for Simpson ET-EG Epoxy to proceed with the work (approved by Mark Johnson, P.E. SECB, Johnson Structural Group, Inc. on 07-08-24 after the inspection).  95% compaction (N/A). The soil remained undisturbed as the Contractor removed the concrete sections without any overcut, as specified in layout detail SBS-1.3 and RFI #146. The reinforcing steel placement at the locations mentioned above were found to be In Progress with the reference documents. Mr. Jim Jenco, Senior Superintendent with Lebolo Construction, was notified of the aforementioned visual verification results. Please see adjacent report pages for photograph, and corresponding documents. Project No.: 2110.2100049 Report No.: 200415 Date: July 8, 2024 8050 NW 77th Court ꞏ Miami, FL 33166 ꞏ P: 305.249.8434 ꞏ F: 305.249.8479 STRUCTURAL OBSERVATION REPORT No. SPECIAL-066 CN: JS Page 2 of 3 cc: 1 − Job Site; 1 − Client; 1 The Original of this Report was Signed and Impressed Sealed by the Above Registered Engineer in Accordance with Rule 21H-18.11, Chapter 471, Florida Statute Project No.: 2110.2100049 Report No.: 200415 Date: July 8, 2024 8050 NW 77th Court ꞏ Miami, FL 33166 ꞏ P: 305.249.8434 ꞏ F: 305.249.8479 STRUCTURAL OBSERVATION REPORT No. SPECIAL-066 CN: JS Page 3 of 3 cc: 1 − Job Site; 1 − Client; 1 The Original of this Report was Signed and Impressed Sealed by the Above Registered Engineer in Accordance with Rule 21H-18.11, Chapter 471, Florida Statute Reviewed by: Universal Engineering Sciences FBPE Registry Number 4930 Carlos Naumann, P.E., S.I. Florida Professional Engineer No. 18594 Florida Special Inspector No. 181 TIRE CAROUSEL 20'-9"W X 6'-11"D X 13'-2"H TIRE CAROUSEL 20'-9"W X 6'-11"D X 13'-2"H TIRE CAROUSEL 20'-9"W X 6'-11"D X 13'-2"H MEN'S TECH. LOCKERS FIRE RISER SERVICE MGR PARTS COUNTERS GET READY MGRS. WARRANTY CLERK JANITOR'S CLOSET BREAK ROOM WOMEN'S TECH. LOCKERS PARTS COUNTERS RETAIL PARTSDISPLAYRETAIL PARTS TECH TRAINING ROOM PARTS RECEIVING PARTS MANAGERWARRANTY PARTS LOBBY MACH. RM. LULA ELEV. TEAR DOWN SPECIAL TOOLS (2) 4' FLUORESCENT LIGHTS SUMP HOLE 24" X 24" X 24"WITH PUMP, OIL ALARMAND COVER12346910111213141161 11920212223 24226293031 34333 32 22 36 3 BENCH LANDING / STAIRS CONCRETE JOINT / LIFT PLACEMENT