Loading...
Tropical Chevrolet, 01-31-23 UES No 199024 SPECIAL insp rept #062 (roof topping slab and ramp @ existing bldg.) - GDZProject No.: 2110.2100049 Report No.: 199024 Date: January 31, 2024 8050 NW 77th Court · Miami, FL 33166 · P: 305.249.8434 · F: 305.249.8479 STRUCTURAL OBSERVATION REPORT No. SPECIAL-062 CN: GDZ Page 1 of 6 cc: 1 − Job Site; 1 − Client; 1 The Original of this Report was Signed and Impressed Sealed by the Above Registered Engineer in Accordance with Rule 21H-18.11, Chapter 471, Florida Statute Client: Lebolo Construction Management, Inc. 2100 Corporate Drive Boynton Beach, FL 33426 Project: Tropical Chevrolet Renovation/Expansion 8880 Biscayne Blvd. Miami Shores, FL 33138 Agent: Gaetano Di Zio, E.I. Date of Services: 01/31/2024 Village of Miami Shores Building Permit No: CC-12-20-2951 (issued date 11/07/22, expires 05/08/23) Scope of Field Services: Professional observation of completed structural elements (Special Inspector). Reference Documents: •JSG structural drawings sheets S1.0 thru S4.2 (15 pages), Bulleting 7 dated 07/21/2022, signed/sealed by Mark Johnson FL-PE#51983, reviewed/approved for structural compliance by the Village of Miami Shores Bldg. Dept. on 08/22, (permit set review by the Miami-Dade County Department of Regulatory and Economic Resources on 05/16/2022). •SUNCOR, Inc. structural steel erection/fabrication shop drawings sheets AB1 thru TP101 (total of 219 pages) dated 04/13/2022 (Rev. A – Issued for Approval) Submittal #051200-5.0 (Structural Steel Shop Drawings), reviewed for compliance (stamped “Reviewed as Noted - Make Corrections”) by JSG on 05/03/2022. •Canam Steel Corporation (CSC) steel metal deck shop drawings sheets DE1.1 thru DE2.1 (total of 3 pages) dated 04/08/2022 (Issued for Approval) Submittal #051200-6.0 (Deck Shop Drawings), reviewed for compliance (stamped “Reviewed as Noted - Make Corrections”) by JSG on 04/15/2022. Record of Field Observations: 1.Visual verification of the structural steel connections at the following locations indicated below: a)½” Ø x 1½” shear studs welded connections to the proposed new C10x25 steel channels approx. between grids “C.5” thru “D.5” and lines “5.5” thru “6.5 for the precast concrete double “T’s” repair at the existing service department, as per Conemco Engineering, Inc. precast concrete double Tee’s structural repair drawings, as we addressed on UES Structural Observation Reports No. 38 (No.: 10040) dated 07/07/2023 and No. 41 (No.: 14712) dated 09/06/2023, re-inspection inconclusive (09/12/23) – pending current welder qualification certification (continuity paperwork- period of effectiveness): ➢Welding slag was not completely removed from locations that require Visual Testing (VT). ➢Incomplete or undersize fillet welds. ➢Missing three (3) shear studs at locations marked in the field. ➢A couple of shear studs were found to be spaced more than 8” o.c . b)New C10x25 steel channels bolted/anchored connections to the existing roof precast concrete double Tee’s/existing concrete beam approx. between grids “C.5” thru “D.5” and lines “5.5” thru “6.5 for the precast concrete double “T’s” repair at the existing service department, as per Conemco Engineering, Inc. precast concrete double Tee’s structural repair drawings, as we addressed on UES Structural Observation Report No. 044 (No.: 17436) dated 09/28/2023, inconclusive on 10/25/23: ➢Pending final compliance verification for item 1a above. ➢Missing washers/nut at random locations. ➢Anchor bolt threads were found not protruding (negative projection) beyond the outside surface of the nut (negative stick‐out) at several locations as per RCSC (Research Council for Structural Connections) Specification for Structural Joints Using ASTM A325 or A490 Bolts. ➢One (1) loose-fitting thru bolt. ➢One (1) screw anchor was found not to be ¾”. The structural steel connections at the locations mentioned above were found to be in accordance with the reference documents, except for items 1a & 1b inconclusive. The welder qualification certificate for item “a” was provided during our site visit on 07/27/2023, however current continuity paperwork pending for review (Period of Effectiveness). The welders that performed the work were not available onsite in order to verify their welder qualifications. DRAFT Project No.: 2110.2100049 Report No.: 199024 Date: January 31, 2024 8050 NW 77th Court · Miami, FL 33166 · P: 305.249.8434 · F: 305.249.8479 STRUCTURAL OBSERVATION REPORT No. SPECIAL-062 CN: GDZ Page 2 of 6 cc: 1 − Job Site; 1 − Client; 1 The Original of this Report was Signed and Impressed Sealed by the Above Registered Engineer in Accordance with Rule 21H-18.11, Chapter 471, Florida Statute As per The Structural Welding Code: 6.2.3 Period of Effectiveness 6.2.3.1 Welders and Welding Operators. The welder’s or welding operator’s qualification as specified in this code shall be considered as remaining in effect indefinitely unless: (1) the welder is not engaged in a given process of welding for which the welder or welding operator is qualified for a period exceeding six months, or (2) there is some specific reason to question a welder’s or welding operator’s ability (see 6.25.1). 2. Visual verification of the reinforcing steel placement at the following locations indicated below: a) Proposed new 3” minimum thick CIP concrete topping slab reinforced with 6x6 – Double Layer of W1.4xW1.4 W.W.F. between grids “A” thru “J” and lines “1” thru “8” and between grids “H” thru “J” and lines “8” thru “11.5” over the existing parking deck and existing access ramp, as per attached SK 04-21-23 and RFI #125 (Two Layers of WWF 1.4 x 1.4 in lieu of WWF 2.9 x 2.9 for Topping Slab @ Parking), completed. The reinforcing steel placement at the locations mentioned above was found to be in substantial compliance with the reference documents. Mr. Jim Jenco, Senior Superintendent with Lebolo Construction, was notified of the aforementioned visual verification results. Please see adjacent report pages for photographs, RFI #125 (Two Layers of WWF 1.4 x 1.4 in lieu of WWF 2.9 x 2.9 for Topping Slab @ Parking) and sheet SK 04−21−23. DRAFT Project No.: 2110.2100049 Report No.: 199024 Date: January 31, 2024 8050 NW 77th Court · Miami, FL 33166 · P: 305.249.8434 · F: 305.249.8479 STRUCTURAL OBSERVATION REPORT No. SPECIAL-062 CN: GDZ Page 3 of 6 cc: 1 − Job Site; 1 − Client; 1 The Original of this Report was Signed and Impressed Sealed by the Above Registered Engineer in Accordance with Rule 21H-18.11, Chapter 471, Florida Statute On 09/12/23 DRAFT Project No.: 2110.2100049 Report No.: 199024 Date: January 31, 2024 8050 NW 77th Court · Miami, FL 33166 · P: 305.249.8434 · F: 305.249.8479 STRUCTURAL OBSERVATION REPORT No. SPECIAL-062 CN: GDZ Page 4 of 6 cc: 1 − Job Site; 1 − Client; 1 The Original of this Report was Signed and Impressed Sealed by the Above Registered Engineer in Accordance with Rule 21H-18.11, Chapter 471, Florida Statute DRAFT Project No.: 2110.2100049 Report No.: 199024 Date: January 31, 2024 8050 NW 77th Court · Miami, FL 33166 · P: 305.249.8434 · F: 305.249.8479 STRUCTURAL OBSERVATION REPORT No. SPECIAL-062 CN: GDZ Page 5 of 6 cc: 1 − Job Site; 1 − Client; 1 The Original of this Report was Signed and Impressed Sealed by the Above Registered Engineer in Accordance with Rule 21H-18.11, Chapter 471, Florida Statute DRAFT 1 Gaetano Di Zio From:Jim Jenco <jjenco@Lebolo.com> Sent:Wednesday, January 31, 2024 11:02 AM To:Gaetano Di Zio Cc:Osmay Lopez; Maria Manjon Subject:FW: Tropical Chevrolet Renovation: New RFI 125 (two layers of www 1.4 x 1.4 in lie of www 2.9 x 2.9) This Message Is From an External Sender This message came from outside your organization. Gaetano, Please find the below e-mail response to RFI 125 Mark Johnson allowing double 1.4 x 1.4 mesh in lieu of 2.9 x 2.9. Thanks, Jim Jenco Superintendent Lebolo Construction Management, Inc. jjenco@lebolo.com m. (561) 667-9726 www.lebolo.com o. (561) 742-7644 SAFETY | INTEGRITY | ACCOUNTABILITY "This e-mail is subject to the Electronics Communications Privacy Act, 18 U.S.C. § 2510-2521, and may be legally privileged. The information contained in this e-mail message is confidential information intended only for the use of the individual or entity named above. If the reader of this message is not the intended recipient, you are hereby notified that any dissemination, distribution, or copying of this communication is strictly prohibited. If you have received this communication in error, please immediately notify sender by telephone at 561-742-7644, and delete the original message. Thank you." From: Brian Smedley <bsmedley@jhn.com> Sent: Thursday, January 4, 2024 3:12 PM To: Jim Jenco <jjenco@Lebolo.com> Subject: FW: Tropical Chevrolet Renovation: New RFI 125 (two layers of www 1.4 x 1.4 in lie of www 2.9 x 2.9) Please see below. BRIAN SMEDLEY, AIA NCARB |Director - Automotive Group bsmedley@jhn.com Office: 248.324.8800 x104 | Cell: 586.764.1743 NUDELL ARCHITECTS Michigan | 30403 West 13 Mile Road | Farmington Hills, MI 48334 Florida | 1807 Edgewater Drive (College Park) | Orlando, Florida 32804 From: Mark Johnson <mark@johnsonstructural.com> Sent: Thursday, January 4, 2024 3:11 PM DRAFT 2 To: Brian Smedley <bsmedley@jhn.com>; Pedro R. Salom <psalom@johnsonstructural.com> Subject: RE: Tropical Chevrolet Renovation: New RFI 125 (two layers of www 1.4 x 1.4 in lie of www 2.9 x 2.9) No objection to the double layer of W1.4xW1.4. Thanks Mark Johnson, PE USAR FL-TF2 Structures Specialist FL Board Recognized Structural Engineer Johnson Structural Group, Inc. (561) 982-8999 x11 From: Brian Smedley <bsmedley@jhn.com> Sent: Thursday, January 4, 2024 2:01 PM To: Mark Johnson <mark@johnsonstructural.com>; Pedro R. Salom <psalom@johnsonstructural.com> Subject: FW: Tropical Chevrolet Renovation: New RFI 125 (two layers of www 1.4 x 1.4 in lie of www 2.9 x 2.9) Mark/Pedro: Please let me know your thoughts on the below. BRIAN SMEDLEY, AIA NCARB |Director - Automotive Group bsmedley@jhn.com Office: 248.324.8800 x104 | Cell: 586.764.1743 NUDELL ARCHITECTS Michigan | 30403 West 13 Mile Road | Farmington Hills, MI 48334 Florida | 1807 Edgewater Drive (College Park) | Orlando, Florida 32804 From: Jim Jenco (Lebolo Construction Management, Inc.) <Lebolo_Construction_Management_Inc_notifications@procoretech.com> Sent: Thursday, January 4, 2024 1:55 PM To: Brian Smedley <bsmedley@jhn.com> Subject: Tropical Chevrolet Renovation: New RFI 125 (two layers of www 1.4 x 1.4 in lie of www 2.9 x 2.9) Tropical Chevrolet Renovation More details: View online Open In App | View PDF To respond to this RFI simply reply to this email. Need help? Watch a short training video. New RFI #125 has been assigned to Smedley, Brian (Nudell Architects) by Jim Jenco (Lebolo Construction Management, Inc.) on 01/04/24. RFI Details This RFI is due on Sunday, January 7, 2024. DRAFT 3 QUESTION 1 Asked By: Jim Jenco (Lebolo Construction Management, Inc.) Date: Thu Jan 4, 2024 at 01:54 pm EST Location: Services Building Question: please let me know if two (2) layers of www 1.4 x 1.4 in lieu of www 2.9 x 2.9 is acceptable. Attachments: SK01.03.24.pdf ADDITIONAL DETAILS Project: Tropical Chevrolet Renovation Subject: two layers of www 1.4 x 1.4 in lie of www 2.9 x 2.9 Date Initiated: 01/04/24 Created By: Jim Jenco (Lebolo Construction Management, Inc.) Assigned To: Smedley, Brian (Nudell Architects) Responsible Contractor: Buildtek Group (Doral, FL) Distribution List: Lezcano, Lisvet (Buildtek Group (Doral, FL)) Lezcano, Miguel (Buildtek Group (Doral, FL)) Lopez, Osmay (Buildtek Group (Doral, FL)) Manjon, Maria Elena (Lebolo Construction Management, Inc.) Schedule Impact: No Cost Impact: No Drawing Number: A140, SK 04-21-23 More details: View online Open In App | View PDF Powered By Procore | support@procore.com | https://support.procore.com DRAFT Project No.: 2110.2100049 Report No.: 199024 Date: January 31, 2024 8050 NW 77th Court · Miami, FL 33166 · P: 305.249.8434 · F: 305.249.8479 STRUCTURAL OBSERVATION REPORT No. SPECIAL-062 CN: GDZ Page 6 of 6 cc: 1 − Job Site; 1 − Client; 1 The Original of this Report was Signed and Impressed Sealed by the Above Registered Engineer in Accordance with Rule 21H-18.11, Chapter 471, Florida Statute Roof concrete topping slab and access ramp completed (01/31/24) Reviewed by: Universal Engineering Sciences Certificate of Authorization No. 549 Carlos Naumann, P.E., S.I. Florida Professional Engineer No. 18594 Florida Special Inspector No. 181 DRAFT