Tropical Chevrolet, 10-19-23 UES No 197895 SPECIAL insp rept #050 (structural steel connections) - GDZProject No.: 2110.2100049 Report No.: 197895 Date: October 19, 2023 8050 NW 77th Court · Miami, FL 33166 · P: 305.249.8434 · F: 305.249.8479 STRUCTURAL OBSERVATION REPORT No. SPECIAL-050 CN: GDZ Page 1 of 6 cc: 1 − Job Site; 1 − Client; 1 The Original of this Report was Signed and Impressed Sealed by the Above Registered Engineer in Accordance with Rule 21H-18.11, Chapter 471, Florida Statute Client: Lebolo Construction Management, Inc. 2100 Corporate Drive Boynton Beach, FL 33426 Project: Tropical Chevrolet Renovation/Expansion 8880 Biscayne Blvd. Miami Shores, FL 33138 Agent: Gaetano Di Zio, E.I. Date of Services: 10/19/2023 Village of Miami Shores Building Permit No: CC-12-20-2951 (issued date 11/07/22, expires 05/08/23) Scope of Field Services: Professional observation of completed structural elements (Special Inspector). Reference Documents: • JSG structural drawings sheets S1.0 thru S4.2 (15 pages), Bulleting 7 dated 07/21/2022, signed/sealed by Mark Johnson FL-PE#51983, reviewed/approved for structural compliance by the Village of Miami Shores Bldg. Dept. on 08/22, (permit set review by the Miami-Dade County Department of Regulatory and Economic Resources on 05/16/2022). • SUNCOR, Inc. structural steel erection/fabrication shop drawings sheets AB1 thru TP101 (total of 219 pages) dated 04/13/2022 (Rev. A – Issued for Approval) Submittal #051200-5.0 (Structural Steel Shop Drawings), reviewed for compliance (stamped “Reviewed as Noted - Make Corrections”) by JSG on 05/03/2022. • Canam Steel Corporation (CSC) steel metal deck shop drawings sheets DE1.1 thru DE2.1 (total of 3 pages) dated 04/08/2022 (Issued for Approval) Submittal #051200-6.0 (Deck Shop Drawings), reviewed for compliance (stamped “Reviewed as Noted - Make Corrections”) by JSG on 04/15/2022. Record of Field Observations: 1. Visual verification of the structural steel connections at the following locations indicated below: a) ½” Ø x 1½” shear studs welded connections to the proposed new C10x25 steel channels approx. between grids “C.5” thru “D.5” and lines “5.5” thru “6.5 for the precast concrete double “T’s” repair at the existing service department, as per Conemco Engineering, Inc. precast concrete double Tee’s structural repair drawings, as we addressed on UES Structural Observation Reports No. 38 (No.: 10040) dated 07/07/2023 and No. 41 (No.: 14712) dated 09/06/2023, re-inspection inconclusive (09/12/23) – pending current welder qualification certification (continuity paperwork- period of effectiveness): ➢ Welding slag was not completely removed from locations that require Visual Testing (VT). ➢ Incomplete or undersize fillet welds. ➢ Missing three (3) shear studs at locations marked in the field. ➢ A couple of shear studs were found to be spaced more than 8” o.c. b) New C10x25 steel channels bolted/anchored connections to the existing roof precast concrete double Tee’s/existing concrete beam approx. between grids “C.5” thru “D.5” and lines “5.5” thru “6.5 for the precast concrete double “T’s” repair at the existing service department, as per Conemco Engineering, Inc. precast concrete double Tee’s structural repair drawings, as we addressed on UES Structural Observation Report No. 044 (No.: 17436) dated 09/28/2023, corrections in progress on 10/06/23: ➢ Missing washers/nut at random locations. ➢ Anchor bolt threads were found not protruding (negative projection) beyond the outside surface of the nut (negative stick‐out) at several locations as per RCSC (Research Council for Structural Connections) Specification for Structural Joints Using ASTM A325 or A490 Bolts. ➢ One (1) loose-fitting thru bolt. ➢ One (1) screw anchor was found not to be ¾”. c) Continuous perimeter deck bearing angle L4”x4”x1/4” anchored connections (torque verified at 100 ft−lb as per Simpson Strong−Bolt 2 Wedge Anchor required installation torque schedule) to CMU bond beam along line “11” between grids “D.6” thru “E.2” at the Quick Lube (130), as per S1.0, S1.1/details 2 & 3, S2.2, 2/S3.1, 4/S4.1, E1000, E1001 and E1002, failed on 10/03/23 – pending re-inspection: ➢ Missing three (3) expansion anchors. DRAFT Project No.: 2110.2100049 Report No.: 197895 Date: October 19, 2023 8050 NW 77th Court · Miami, FL 33166 · P: 305.249.8434 · F: 305.249.8479 STRUCTURAL OBSERVATION REPORT No. SPECIAL-050 CN: GDZ Page 2 of 6 cc: 1 − Job Site; 1 − Client; 1 The Original of this Report was Signed and Impressed Sealed by the Above Registered Engineer in Accordance with Rule 21H-18.11, Chapter 471, Florida Statute d) Indoor HVAC unit hanged supports anchored connections to existing precast concrete roof joists at approx. gridline C.3x3 (unit OAAHU-2) at the existing service building, as per Sunshine State RFI #02, completed. The structural steel connections at the locations mentioned above were found to be in accordance with the reference documents, except for item 1a inconclusive, item 1b in progress and item 1c failed. The General Contractor will call for items 1b and 1c re-inspection after completion for final compliance verification. The welder qualification certificate was provided during our site visit on 07/27/2023, however current continuity paperwork pending for review (Period of Effectiveness). The welder that performed the work was not available onsite in order to verify his welder qualification. As per The Structural Welding Code: 6.2.3 Period of Effectiveness 6.2.3.1 Welders and Welding Operators. The welder’s or welding operator’s qualification as specified in this code shall be considered as remaining in effect indefinitely unless: (1) the welder is not engaged in a given process of welding for which the welder or welding operator is qualified for a period exceeding six months, or (2) there is some specific reason to question a welder’s or welding operator’s ability (see 6.25.1). 2. Visual verification of drilled holes for post-installed threaded rods by means of approved anchoring epoxy Hilti HIT-HY 270 at the following locations indicated below: a) Cleanness/depth check (4½” min. embedment) and epoxy application for ½” Ø horizontal threaded rods into existing parapet CMU walls along grid “A” between lines “8” thru “11” and along line “11” between grids “A” thru “B” at the service building expansion, as per the E4010 and E4011, completed. Mr. Jim Jenco, Project Superintendent with Lebolo Construction, was notified of the aforementioned visual verification results. Please see adjacent report pages for photographs and welder certification qualification (pending). DRAFT Project No.: 2110.2100049 Report No.: 197895 Date: October 19, 2023 8050 NW 77th Court · Miami, FL 33166 · P: 305.249.8434 · F: 305.249.8479 STRUCTURAL OBSERVATION REPORT No. SPECIAL-050 CN: GDZ Page 3 of 6 cc: 1 − Job Site; 1 − Client; 1 The Original of this Report was Signed and Impressed Sealed by the Above Registered Engineer in Accordance with Rule 21H-18.11, Chapter 471, Florida Statute On 10/03/23 Welds to be grind off DRAFT Project No.: 2110.2100049 Report No.: 197895 Date: October 19, 2023 8050 NW 77th Court · Miami, FL 33166 · P: 305.249.8434 · F: 305.249.8479 STRUCTURAL OBSERVATION REPORT No. SPECIAL-050 CN: GDZ Page 4 of 6 cc: 1 − Job Site; 1 − Client; 1 The Original of this Report was Signed and Impressed Sealed by the Above Registered Engineer in Accordance with Rule 21H-18.11, Chapter 471, Florida Statute On 10/06/23 DRAFT Project No.: 2110.2100049 Report No.: 197895 Date: October 19, 2023 8050 NW 77th Court · Miami, FL 33166 · P: 305.249.8434 · F: 305.249.8479 STRUCTURAL OBSERVATION REPORT No. SPECIAL-050 CN: GDZ Page 5 of 6 cc: 1 − Job Site; 1 − Client; 1 The Original of this Report was Signed and Impressed Sealed by the Above Registered Engineer in Accordance with Rule 21H-18.11, Chapter 471, Florida Statute DRAFT Project No.: 2110.2100049 Report No.: 197895 Date: October 19, 2023 8050 NW 77th Court · Miami, FL 33166 · P: 305.249.8434 · F: 305.249.8479 STRUCTURAL OBSERVATION REPORT No. SPECIAL-050 CN: GDZ Page 6 of 6 cc: 1 − Job Site; 1 − Client; 1 The Original of this Report was Signed and Impressed Sealed by the Above Registered Engineer in Accordance with Rule 21H-18.11, Chapter 471, Florida Statute Reviewed by: Universal Engineering Sciences Certificate of Authorization No. 549 Carlos Naumann, P.E., S.I. Florida Professional Engineer No. 18594 Florida Special Inspector No. 181 DRAFT DRAFT