Tropical Chevrolet, 08-09-23 UES No 11718 SPECIAL insp rept #040 (slab on grade & footings) - GDZProject No.: 2110.2100049 Report No.: 11718 Date: August 9, 2023 8050 NW 77th Court · Miami, FL 33166 · P: 305.249.8434 · F: 305.249.8479 STRUCTURAL OBSERVATION REPORT No. SPECIAL-040 CN: GDZ Page 1 of 7 cc: 1 − Job Site; 1 − Client; 1 The Original of this Report was Signed and Impressed Sealed by the Above Registered Engineer in Accordance with Rule 21H -18.11, Chapter 471, Florida Statute Client: Lebolo Construction Management, Inc. 2100 Corporate Drive Boynton Beach, FL 33426 Project: Tropical Chevrolet Renovation/Expansion 8880 Biscayne Blvd. Miami Shores, FL 33138 Agent: Gaetano Di Zio, E.I. Date of Services: 08/09/2023 Village of Miami Shores Building Permit No: CC-12-20-2951 (issued date 11/07/22, expires 05/08/23) Scope of Field Services: Professional observation of completed structural elements (Special Inspector). Reference Documents: • JSG structural drawings sheets S1.0 thru S4.2 (15 pages), Bulleting 7 dated 07/21/2022, signed/sealed by Mark Johnson FL-PE#51983, reviewed/approved for structural compliance by the Village of Miami Shores Bldg. Dept. on 08/22, (permit set review by the Miami-Dade County Department of Regulatory and Economic Resources on 05/16/2022). • SUNCOR, Inc. structural steel erection/fabrication shop drawings sheets AB1 thru TP101 (total of 219 pages) dated 04/13/2022 (Rev. A – Issued for Approval) Submittal #051200-5.0 (Structural Steel Shop Drawings), reviewed for compliance (stamped “Reviewed as Noted - Make Corrections”) by JSG on 05/03/2022. • Canam Steel Corporation (CSC) steel metal deck shop drawings sheets DE1.1 thru DE2.1 (total of 3 pages) dated 04/08/2022 (Issued for Approval) Submittal #051200-6.0 (Deck Shop Drawings), reviewed for compliance (stamped “Reviewed as Noted - Make Corrections”) by JSG on 04/15/2022. Record of Field Observations: 1. Visual verification of the structural steel connections at the following locations indicated below: a) ½” Ø x 1½” shear studs welded connections to the proposed new C10x25 steel channels approx. between grids “C.5” thru “D.5” and lines “5.5” thru “6.5 for the precast concrete double “T’s” repair on the roof at the existing service department, as per the attached Conemco Engineering, Inc. precast concrete double Tee’s structural repair drawings, in progress on 07/27/23 – pending reinspection: ➢ Welding slag was not completely removed from locations that require Visual Testing (VT). ➢ Incomplete or undersize fillet welds. ➢ Missing three (3) shear studs at locations marked in the field. The structural steel connections at the locations mentioned above were found not to be in substantial compliance with the reference documents. General Contractor will call for item 1a re-inspection after completion for final compliance verification and prior to the placement of concrete. Welder qualification certificate was provided on 07/27/2023, however current continuity paperwork pending for review (Period of Effectiveness). The welder that performed the work was not available onsite in order to verify his welder qualification. As per The Structural Welding Code: 6.2.3 Period of Effectiveness 6.2.3.1 Welders and Welding Operators. The welder’s or welding operator’s qualification as specified in this code shall be considered as remaining in effect indefinitely unless: (1) the welder is not engaged in a given process of welding for which the welder or welding operator is qualified for a period exceeding six months, or (2) there is some specific reason to question a welder’s or welding operator’s ability (see 6.25.1). 2. Visual verification of the reinforcing steel placement at the following locations indicated below: a) Proposed new 6” thick interior slab on grade reinforced with 6x6 – W2.9xW2.9 W.W.F. with thickened edge over a 10 Mil vapor barrier and compacted fill between grids “D.6” thru “E.2” and lines “11” thru “13” at the Quick Lube DRAFT Project No.: 2110.2100049 Report No.: 11718 Date: August 9, 2023 8050 NW 77th Court · Miami, FL 33166 · P: 305.249.8434 · F: 305.249.8479 STRUCTURAL OBSERVATION REPORT No. SPECIAL-040 CN: GDZ Page 2 of 7 cc: 1 − Job Site; 1 − Client; 1 The Original of this Report was Signed and Impressed Sealed by the Above Registered Engineer in Accordance with Rule 21H -18.11, Chapter 471, Florida Statute (130) and between grids “G” thru “H” and lines “9.9” thru “10.2” at the Tech Training Room (121), top of slab elevation 0’−0”, as per S1.0, S2.0, 2/S3.3 and S4.0/details 1, 5 & 7, completed. Termite treatment was performed and vapor barrier was in placed prior to this site visit. b) Continuous wall footing mark “WF26” (Cont. 2’−6”x1’−0”) with vertical dowels along grids “G” and “H” between lines “8” thru “9” and along line “9” between grids “G” thru “G.3”, top of footing elevation approx. −1'−4", as per S1.1/Foundation Schedule, S2.0, 1/S3.3, S4.0/details 1, 2, 3 & B and 1/S4.2, completed. c) Continuous wall footing mark “WF20” (Cont. 2’−0”x1’−0”) with vertical dowels along grid “J” between lines “8” thru “9”, top of footing elevation approx. −1'−4", as per S1.1/Foundation Schedule, S2.0, 1/S3.1, S4.0/details 1, 2, 3 & B and 1/S4.2, completed. d) Elevator pad with vertical dowels between grids “G.4” thru “H” and lines “8.5” thru “9” at Lobby, top of footing elevation approx. −1'−4", as per S1.1/Foundation Schedule, S2.0, 1/S3.3 and 1/S4.2, completed. e) Retrofit CIP concrete column at approx. gridline Dx3.3 at the existing service building, as per SK 04-25-23, completed. The reinforcing steel placement at the locations mentioned above was found to be in substantial compliance with the reference documents. In place density tests were performed by a UES technician and it was found to meet or exceed the minimum compaction requirement of 95% and ASTM D−1557. Mr. Jim Jenco, Project Superintendent and Mr. Sebastian Cienfuegos, Assistant Superintendent with Lebolo Construction, were notified of the aforementioned visual verification results. Please see adjacent report pages for photographs, in place density draft test reports, soil treatment certificate, welder certification qualification and sheet S2.0. DRAFT Project No.: 2110.2100049 Report No.: 11718 Date: August 9, 2023 8050 NW 77th Court · Miami, FL 33166 · P: 305.249.8434 · F: 305.249.8479 STRUCTURAL OBSERVATION REPORT No. SPECIAL-040 CN: GDZ Page 3 of 7 cc: 1 − Job Site; 1 − Client; 1 The Original of this Report was Signed and Impressed Sealed by the Above Registered Engineer in Accordance with Rule 21H -18.11, Chapter 471, Florida Statute On 07/27/23 DRAFT Project No.: 2110.2100049 Report No.: 11718 Date: August 9, 2023 8050 NW 77th Court · Miami, FL 33166 · P: 305.249.8434 · F: 305.249.8479 STRUCTURAL OBSERVATION REPORT No. SPECIAL-040 CN: GDZ Page 4 of 7 cc: 1 − Job Site; 1 − Client; 1 The Original of this Report was Signed and Impressed Sealed by the Above Registered Engineer in Accordance with Rule 21H -18.11, Chapter 471, Florida Statute DRAFT Project No.: 2110.2100049 Report No.: 11718 Date: August 9, 2023 8050 NW 77th Court · Miami, FL 33166 · P: 305.249.8434 · F: 305.249.8479 STRUCTURAL OBSERVATION REPORT No. SPECIAL-040 CN: GDZ Page 5 of 7 cc: 1 − Job Site; 1 − Client; 1 The Original of this Report was Signed and Impressed Sealed by the Above Registered Engineer in Accordance with Rule 21H -18.11, Chapter 471, Florida Statute DRAFT Project No.: 2110.2100049 Report No.: 11718 Date: August 9, 2023 8050 NW 77th Court · Miami, FL 33166 · P: 305.249.8434 · F: 305.249.8479 STRUCTURAL OBSERVATION REPORT No. SPECIAL-040 CN: GDZ Page 6 of 7 cc: 1 − Job Site; 1 − Client; 1 The Original of this Report was Signed and Impressed Sealed by the Above Registered Engineer in Accordance with Rule 21H -18.11, Chapter 471, Florida Statute DRAFT UES Project No: Workorder No: Report Date: 2110.2100049.0000 10899-1 08/04/2023 8050 NW 77th Court, Miami, FL 33166 - P: 305-249-8434 1215 Wallace Drive, Delray Beach, FL 33444 - P: 800-226-7522 In-Place Density Test Report Client:Lebolo Construction Management, Inc.UES Technician:Roberto Jorrin De La Torre 2100 Corporate Drive Boynton Beach, FL 33426 Date Tested:08/03/2023 Project:Tropical Chevrolet Renovation and Expansion 8880 Biscayne Blvd, Miami Shores, County, FL 33138 Type of Test: Area Tested:121 TECH TRAINING ROOM Field:ASTM D-6938 Nuclear Gauge Method Material:Fill Laboratory:ASTM D1557 Modified Proctor Reference Datum:0 = Top of Fill The tests below meet the 98% minimum compaction requirement. Test No.Location of Test Range Maximum Density (pcf) Optimum Moisture (%) Field Dry Density (pcf) Field Moisture (%) Soil Compaction (%) Pass or Fail 1 SLAB EAST ( 121 TECH TRAINING ROOM) 12 inch 107.7 11.7 112.0 6.8 104 Pass Reviewed By Universal Engineering Sciences FBPE Registry No.4930 Luke Aaron Berry, P.E Professional Engineer STATE OF FLORIDA Professional Engineer No. 93889 This item has been digitally signed and sealed by Luke Aaron Berry, P.E on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies. To establish a mutual protection to Universal's clients, the Public and ourselves, all reports are submitted as confidential property of our clients and authorization for publication of statements, conclusions or extracts from or regarding Universal's reports is reserved pending our written approval. Page 1DRAFT UES Project No: Workorder No: Report Date: 2110.2100049.0000 11526-1 08/09/2023 8050 NW 77th Court, Miami, FL 33166 - P: 305-249-8434 1215 Wallace Drive, Delray Beach, FL 33444 - P: 800-226-7522 In-Place Density Test Report Client:Lebolo Construction Management, Inc.UES Technician:Juan David Ruiz 2100 Corporate Drive Boynton Beach, FL 33426 Date Tested:08/08/2023 Project:Tropical Chevrolet Renovation and Expansion 8880 Biscayne Blvd, Miami Shores, County, FL 33138 Type of Test: Area Tested:Building Pad Quick Lube Slab Field:ASTM D-2937 Drive Cylinder Method Material:Native Laboratory:AASHTO T180 Modified Proctor Reference Datum:0 = Bottom of Final Grade Depth requirement is 12.00 inches The tests below meet the 95% minimum compaction requirement. Test No.Location of Test Range Maximum Density (pcf) Optimum Moisture (%) Field Dry Density (pcf) Field Moisture (%) Soil Compaction (%) Native Depth (inch) Pass or Fail 1 SOG, GL: "E.5" & "11.5"12 inch 107.7 11.7 109.5 10.3 102 12.00 Pass Reviewed By Universal Engineering Sciences FBPE Registry No.4930 Luke Aaron Berry, P.E Professional Engineer STATE OF FLORIDA Professional Engineer No. 93889 This item has been digitally signed and sealed by Luke Aaron Berry, P.E on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies. To establish a mutual protection to Universal's clients, the Public and ourselves, all reports are submitted as confidential property of our clients and authorization for publication of statements, conclusions or extracts from or regarding Universal's reports is reserved pending our written approval. Page 1DRAFT UES Project No: Workorder No: Report Date: 2110.2100049.0000 11524-1 08/09/2023 8050 NW 77th Court, Miami, FL 33166 - P: 305-249-8434 1215 Wallace Drive, Delray Beach, FL 33444 - P: 800-226-7522 In-Place Density Test Report Client:Lebolo Construction Management, Inc.UES Technician:Juan David Ruiz 2100 Corporate Drive Boynton Beach, FL 33426 Date Tested:08/08/2023 Project:Tropical Chevrolet Renovation and Expansion 8880 Biscayne Blvd, Miami Shores, County, FL 33138 Type of Test: Area Tested:Wall Footing, Parts Recieving/104 Field:ASTM D-6938 Nuclear Gauge Method Material:Native Laboratory:AASHTO T180 Modified Proctor Reference Datum:0 = Bottom of Foundation Footing Depth requirement is 12.00 inches The tests below meet the 95% minimum compaction requirement. Test No.Location of Test Range Maximum Density (pcf) Optimum Moisture (%) Field Dry Density (pcf) Field Moisture (%) Soil Compaction (%) Native Depth (inch) Pass or Fail 1 WF20, GL: "J" between From "8" To "9" 12 inch 107.7 11.7 110.4 11.8 103 12.00 Pass Reviewed By Universal Engineering Sciences FBPE Registry No.4930 Luke Aaron Berry, P.E Professional Engineer STATE OF FLORIDA Professional Engineer No. 93889 This item has been digitally signed and sealed by Luke Aaron Berry, P.E on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies. To establish a mutual protection to Universal's clients, the Public and ourselves, all reports are submitted as confidential property of our clients and authorization for publication of statements, conclusions or extracts from or regarding Universal's reports is reserved pending our written approval. Page 1DRAFT UES Project No: Workorder No: Report Date: 2110.2100049.0000 11525-1 08/09/2023 8050 NW 77th Court, Miami, FL 33166 - P: 305-249-8434 1215 Wallace Drive, Delray Beach, FL 33444 - P: 800-226-7522 In-Place Density Test Report Client:Lebolo Construction Management, Inc.UES Technician:Juan David Ruiz 2100 Corporate Drive Boynton Beach, FL 33426 Date Tested:08/08/2023 Project:Tropical Chevrolet Renovation and Expansion 8880 Biscayne Blvd, Miami Shores, County, FL 33138 Type of Test: Area Tested:Wall Footings Elev/124, Lobby/ 125 Mach/126: GL "G" and "H" between from "8" to "9" Field:ASTM D-6938 Nuclear Gauge Method Material:Native Laboratory:AASHTO T180 Modified Proctor Reference Datum:0 = Bottom of Final Grade Depth requirement is 12.00 inches The tests below meet the 95% minimum compaction requirement. Test No.Location of Test Range Maximum Density (pcf) Optimum Moisture (%) Field Dry Density (pcf) Field Moisture (%) Soil Compaction (%) Native Depth (inch) Pass or Fail 1 WF26 GL "G" between from "8" to "9" 12 inch 107.7 11.7 111.4 11.0 103 12.00 Pass Reviewed By Universal Engineering Sciences FBPE Registry No.4930 Luke Aaron Berry, P.E Professional Engineer STATE OF FLORIDA Professional Engineer No. 93889 This item has been digitally signed and sealed by Luke Aaron Berry, P.E on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies. To establish a mutual protection to Universal's clients, the Public and ourselves, all reports are submitted as confidential property of our clients and authorization for publication of statements, conclusions or extracts from or regarding Universal's reports is reserved pending our written approval. Page 1DRAFT DRAFT Project No.: 2110.2100049 Report No.: 11718 Date: August 9, 2023 8050 NW 77th Court · Miami, FL 33166 · P: 305.249.8434 · F: 305.249.8479 STRUCTURAL OBSERVATION REPORT No. SPECIAL-040 CN: GDZ Page 7 of 7 cc: 1 − Job Site; 1 − Client; 1 The Original of this Report was Signed and Impressed Sealed by the Above Registered Engineer in Accordance with Rule 21H -18.11, Chapter 471, Florida Statute CIP concrete slab on grade completed CIP concrete footings completed Reviewed by: Universal Engineering Sciences Certificate of Authorization No. 549 Carlos Naumann, P.E., S.I. Florida Professional Engineer No. 18594 Florida Special Inspector No. 181 DRAFT