Tropical Chevrolet, 08-09-23 UES No 11718 SPECIAL insp rept #040 (slab on grade & footings) - GDZProject No.: 2110.2100049
Report No.: 11718
Date: August 9, 2023
8050 NW 77th Court · Miami, FL 33166 · P: 305.249.8434 · F: 305.249.8479
STRUCTURAL OBSERVATION REPORT No. SPECIAL-040
CN: GDZ Page 1 of 7
cc: 1 − Job Site; 1 − Client; 1
The Original of this Report was Signed and Impressed Sealed by the Above Registered Engineer in Accordance with Rule 21H -18.11, Chapter 471, Florida Statute
Client: Lebolo Construction Management, Inc.
2100 Corporate Drive
Boynton Beach, FL 33426
Project: Tropical Chevrolet Renovation/Expansion
8880 Biscayne Blvd.
Miami Shores, FL 33138
Agent: Gaetano Di Zio, E.I. Date of Services: 08/09/2023
Village of Miami Shores Building Permit No: CC-12-20-2951 (issued date 11/07/22, expires 05/08/23)
Scope of Field Services: Professional observation of completed structural elements (Special Inspector).
Reference Documents:
• JSG structural drawings sheets S1.0 thru S4.2 (15 pages), Bulleting 7 dated 07/21/2022, signed/sealed by Mark
Johnson FL-PE#51983, reviewed/approved for structural compliance by the Village of Miami Shores Bldg. Dept.
on 08/22, (permit set review by the Miami-Dade County Department of Regulatory and Economic Resources on
05/16/2022).
• SUNCOR, Inc. structural steel erection/fabrication shop drawings sheets AB1 thru TP101 (total of 219 pages) dated
04/13/2022 (Rev. A – Issued for Approval) Submittal #051200-5.0 (Structural Steel Shop Drawings), reviewed for
compliance (stamped “Reviewed as Noted - Make Corrections”) by JSG on 05/03/2022.
• Canam Steel Corporation (CSC) steel metal deck shop drawings sheets DE1.1 thru DE2.1 (total of 3 pages) dated
04/08/2022 (Issued for Approval) Submittal #051200-6.0 (Deck Shop Drawings), reviewed for compliance (stamped
“Reviewed as Noted - Make Corrections”) by JSG on 04/15/2022.
Record of Field Observations:
1. Visual verification of the structural steel connections at the following locations indicated below:
a) ½” Ø x 1½” shear studs welded connections to the proposed new C10x25 steel channels approx. between grids
“C.5” thru “D.5” and lines “5.5” thru “6.5 for the precast concrete double “T’s” repair on the roof at the existing
service department, as per the attached Conemco Engineering, Inc. precast concrete double Tee’s structural repair
drawings, in progress on 07/27/23 – pending reinspection:
➢ Welding slag was not completely removed from locations that require Visual Testing (VT).
➢ Incomplete or undersize fillet welds.
➢ Missing three (3) shear studs at locations marked in the field.
The structural steel connections at the locations mentioned above were found not to be in substantial compliance with the
reference documents. General Contractor will call for item 1a re-inspection after completion for final compliance verification
and prior to the placement of concrete.
Welder qualification certificate was provided on 07/27/2023, however current continuity paperwork pending for review
(Period of Effectiveness). The welder that performed the work was not available onsite in order to verify his welder
qualification.
As per The Structural Welding Code:
6.2.3 Period of Effectiveness
6.2.3.1 Welders and Welding Operators. The welder’s or welding operator’s qualification as specified in this code shall be
considered as remaining in effect indefinitely unless:
(1) the welder is not engaged in a given process of welding for which the welder or welding operator is qualified
for a period exceeding six months, or
(2) there is some specific reason to question a welder’s or welding operator’s ability (see 6.25.1).
2. Visual verification of the reinforcing steel placement at the following locations indicated below:
a) Proposed new 6” thick interior slab on grade reinforced with 6x6 – W2.9xW2.9 W.W.F. with thickened edge over a
10 Mil vapor barrier and compacted fill between grids “D.6” thru “E.2” and lines “11” thru “13” at the Quick Lube DRAFT
Project No.: 2110.2100049
Report No.: 11718
Date: August 9, 2023
8050 NW 77th Court · Miami, FL 33166 · P: 305.249.8434 · F: 305.249.8479
STRUCTURAL OBSERVATION REPORT No. SPECIAL-040
CN: GDZ Page 2 of 7
cc: 1 − Job Site; 1 − Client; 1
The Original of this Report was Signed and Impressed Sealed by the Above Registered Engineer in Accordance with Rule 21H -18.11, Chapter 471, Florida Statute
(130) and between grids “G” thru “H” and lines “9.9” thru “10.2” at the Tech Training Room (121), top of slab
elevation 0’−0”, as per S1.0, S2.0, 2/S3.3 and S4.0/details 1, 5 & 7, completed. Termite treatment was performed
and vapor barrier was in placed prior to this site visit.
b) Continuous wall footing mark “WF26” (Cont. 2’−6”x1’−0”) with vertical dowels along grids “G” and “H” between lines
“8” thru “9” and along line “9” between grids “G” thru “G.3”, top of footing elevation approx. −1'−4", as per
S1.1/Foundation Schedule, S2.0, 1/S3.3, S4.0/details 1, 2, 3 & B and 1/S4.2, completed.
c) Continuous wall footing mark “WF20” (Cont. 2’−0”x1’−0”) with vertical dowels along grid “J” between lines “8” thru
“9”, top of footing elevation approx. −1'−4", as per S1.1/Foundation Schedule, S2.0, 1/S3.1, S4.0/details 1, 2, 3 &
B and 1/S4.2, completed.
d) Elevator pad with vertical dowels between grids “G.4” thru “H” and lines “8.5” thru “9” at Lobby, top of footing
elevation approx. −1'−4", as per S1.1/Foundation Schedule, S2.0, 1/S3.3 and 1/S4.2, completed.
e) Retrofit CIP concrete column at approx. gridline Dx3.3 at the existing service building, as per SK 04-25-23,
completed.
The reinforcing steel placement at the locations mentioned above was found to be in substantial compliance with the
reference documents. In place density tests were performed by a UES technician and it was found to meet or exceed the
minimum compaction requirement of 95% and ASTM D−1557.
Mr. Jim Jenco, Project Superintendent and Mr. Sebastian Cienfuegos, Assistant Superintendent with Lebolo Construction,
were notified of the aforementioned visual verification results.
Please see adjacent report pages for photographs, in place density draft test reports, soil treatment certificate, welder
certification qualification and sheet S2.0.
DRAFT
Project No.: 2110.2100049
Report No.: 11718
Date: August 9, 2023
8050 NW 77th Court · Miami, FL 33166 · P: 305.249.8434 · F: 305.249.8479
STRUCTURAL OBSERVATION REPORT No. SPECIAL-040
CN: GDZ Page 3 of 7
cc: 1 − Job Site; 1 − Client; 1
The Original of this Report was Signed and Impressed Sealed by the Above Registered Engineer in Accordance with Rule 21H -18.11, Chapter 471, Florida Statute
On 07/27/23
DRAFT
Project No.: 2110.2100049
Report No.: 11718
Date: August 9, 2023
8050 NW 77th Court · Miami, FL 33166 · P: 305.249.8434 · F: 305.249.8479
STRUCTURAL OBSERVATION REPORT No. SPECIAL-040
CN: GDZ Page 4 of 7
cc: 1 − Job Site; 1 − Client; 1
The Original of this Report was Signed and Impressed Sealed by the Above Registered Engineer in Accordance with Rule 21H -18.11, Chapter 471, Florida Statute
DRAFT
Project No.: 2110.2100049
Report No.: 11718
Date: August 9, 2023
8050 NW 77th Court · Miami, FL 33166 · P: 305.249.8434 · F: 305.249.8479
STRUCTURAL OBSERVATION REPORT No. SPECIAL-040
CN: GDZ Page 5 of 7
cc: 1 − Job Site; 1 − Client; 1
The Original of this Report was Signed and Impressed Sealed by the Above Registered Engineer in Accordance with Rule 21H -18.11, Chapter 471, Florida Statute
DRAFT
Project No.: 2110.2100049
Report No.: 11718
Date: August 9, 2023
8050 NW 77th Court · Miami, FL 33166 · P: 305.249.8434 · F: 305.249.8479
STRUCTURAL OBSERVATION REPORT No. SPECIAL-040
CN: GDZ Page 6 of 7
cc: 1 − Job Site; 1 − Client; 1
The Original of this Report was Signed and Impressed Sealed by the Above Registered Engineer in Accordance with Rule 21H -18.11, Chapter 471, Florida Statute
DRAFT
UES Project No:
Workorder No:
Report Date:
2110.2100049.0000
10899-1
08/04/2023
8050 NW 77th Court, Miami, FL 33166 - P: 305-249-8434
1215 Wallace Drive, Delray Beach, FL 33444 - P: 800-226-7522
In-Place Density Test Report
Client:Lebolo Construction Management, Inc.UES Technician:Roberto Jorrin De La Torre
2100 Corporate Drive
Boynton Beach, FL 33426
Date Tested:08/03/2023
Project:Tropical Chevrolet Renovation and Expansion
8880 Biscayne Blvd, Miami Shores, County, FL 33138
Type of Test:
Area Tested:121 TECH TRAINING ROOM Field:ASTM D-6938 Nuclear Gauge Method
Material:Fill Laboratory:ASTM D1557 Modified Proctor
Reference Datum:0 = Top of Fill
The tests below meet the 98% minimum compaction requirement.
Test
No.Location of Test Range
Maximum
Density
(pcf)
Optimum
Moisture
(%)
Field Dry
Density
(pcf)
Field
Moisture
(%)
Soil
Compaction
(%)
Pass
or
Fail
1 SLAB EAST ( 121 TECH TRAINING
ROOM)
12 inch 107.7 11.7 112.0 6.8 104 Pass
Reviewed By
Universal Engineering Sciences
FBPE Registry No.4930
Luke Aaron Berry, P.E
Professional Engineer
STATE OF FLORIDA
Professional Engineer No. 93889
This item has been digitally signed and sealed by Luke Aaron Berry,
P.E on the date adjacent to the seal. Printed copies of this document
are not considered signed and sealed and the signature must be
verified on any electronic copies.
To establish a mutual protection to Universal's clients, the Public and ourselves, all reports are submitted as confidential property of our clients and
authorization for publication of statements, conclusions or extracts from or regarding Universal's reports is reserved pending our written approval.
Page 1DRAFT
UES Project No:
Workorder No:
Report Date:
2110.2100049.0000
11526-1
08/09/2023
8050 NW 77th Court, Miami, FL 33166 - P: 305-249-8434
1215 Wallace Drive, Delray Beach, FL 33444 - P: 800-226-7522
In-Place Density Test Report
Client:Lebolo Construction Management, Inc.UES Technician:Juan David Ruiz
2100 Corporate Drive
Boynton Beach, FL 33426
Date Tested:08/08/2023
Project:Tropical Chevrolet Renovation and Expansion
8880 Biscayne Blvd, Miami Shores, County, FL 33138
Type of Test:
Area Tested:Building Pad Quick Lube Slab Field:ASTM D-2937 Drive Cylinder Method
Material:Native Laboratory:AASHTO T180 Modified Proctor
Reference Datum:0 = Bottom of Final Grade
Depth requirement is 12.00 inches
The tests below meet the 95% minimum compaction requirement.
Test
No.Location of Test Range
Maximum
Density
(pcf)
Optimum
Moisture
(%)
Field Dry
Density
(pcf)
Field
Moisture
(%)
Soil
Compaction
(%)
Native
Depth
(inch)
Pass
or
Fail
1 SOG, GL: "E.5" & "11.5"12 inch 107.7 11.7 109.5 10.3 102 12.00 Pass
Reviewed By
Universal Engineering Sciences
FBPE Registry No.4930
Luke Aaron Berry, P.E
Professional Engineer
STATE OF FLORIDA
Professional Engineer No. 93889
This item has been digitally signed and sealed by Luke Aaron Berry,
P.E on the date adjacent to the seal. Printed copies of this document
are not considered signed and sealed and the signature must be
verified on any electronic copies.
To establish a mutual protection to Universal's clients, the Public and ourselves, all reports are submitted as confidential property of our clients and
authorization for publication of statements, conclusions or extracts from or regarding Universal's reports is reserved pending our written approval.
Page 1DRAFT
UES Project No:
Workorder No:
Report Date:
2110.2100049.0000
11524-1
08/09/2023
8050 NW 77th Court, Miami, FL 33166 - P: 305-249-8434
1215 Wallace Drive, Delray Beach, FL 33444 - P: 800-226-7522
In-Place Density Test Report
Client:Lebolo Construction Management, Inc.UES Technician:Juan David Ruiz
2100 Corporate Drive
Boynton Beach, FL 33426
Date Tested:08/08/2023
Project:Tropical Chevrolet Renovation and Expansion
8880 Biscayne Blvd, Miami Shores, County, FL 33138
Type of Test:
Area Tested:Wall Footing, Parts Recieving/104 Field:ASTM D-6938 Nuclear Gauge Method
Material:Native Laboratory:AASHTO T180 Modified Proctor
Reference Datum:0 = Bottom of Foundation Footing
Depth requirement is 12.00 inches
The tests below meet the 95% minimum compaction requirement.
Test
No.Location of Test Range
Maximum
Density
(pcf)
Optimum
Moisture
(%)
Field Dry
Density
(pcf)
Field
Moisture
(%)
Soil
Compaction
(%)
Native
Depth
(inch)
Pass
or
Fail
1 WF20, GL: "J" between From "8" To
"9"
12 inch 107.7 11.7 110.4 11.8 103 12.00 Pass
Reviewed By
Universal Engineering Sciences
FBPE Registry No.4930
Luke Aaron Berry, P.E
Professional Engineer
STATE OF FLORIDA
Professional Engineer No. 93889
This item has been digitally signed and sealed by Luke Aaron Berry,
P.E on the date adjacent to the seal. Printed copies of this document
are not considered signed and sealed and the signature must be
verified on any electronic copies.
To establish a mutual protection to Universal's clients, the Public and ourselves, all reports are submitted as confidential property of our clients and
authorization for publication of statements, conclusions or extracts from or regarding Universal's reports is reserved pending our written approval.
Page 1DRAFT
UES Project No:
Workorder No:
Report Date:
2110.2100049.0000
11525-1
08/09/2023
8050 NW 77th Court, Miami, FL 33166 - P: 305-249-8434
1215 Wallace Drive, Delray Beach, FL 33444 - P: 800-226-7522
In-Place Density Test Report
Client:Lebolo Construction Management, Inc.UES Technician:Juan David Ruiz
2100 Corporate Drive
Boynton Beach, FL 33426
Date Tested:08/08/2023
Project:Tropical Chevrolet Renovation and Expansion
8880 Biscayne Blvd, Miami Shores, County, FL 33138
Type of Test:
Area Tested:Wall Footings Elev/124, Lobby/ 125
Mach/126: GL "G" and "H" between from
"8" to "9"
Field:ASTM D-6938 Nuclear Gauge Method
Material:Native Laboratory:AASHTO T180 Modified Proctor
Reference Datum:0 = Bottom of Final Grade
Depth requirement is 12.00 inches
The tests below meet the 95% minimum compaction requirement.
Test
No.Location of Test Range
Maximum
Density
(pcf)
Optimum
Moisture
(%)
Field Dry
Density
(pcf)
Field
Moisture
(%)
Soil
Compaction
(%)
Native
Depth
(inch)
Pass
or
Fail
1 WF26 GL "G" between from "8" to
"9"
12 inch 107.7 11.7 111.4 11.0 103 12.00 Pass
Reviewed By
Universal Engineering Sciences
FBPE Registry No.4930
Luke Aaron Berry, P.E
Professional Engineer
STATE OF FLORIDA
Professional Engineer No. 93889
This item has been digitally signed and sealed by Luke Aaron Berry,
P.E on the date adjacent to the seal. Printed copies of this document
are not considered signed and sealed and the signature must be
verified on any electronic copies.
To establish a mutual protection to Universal's clients, the Public and ourselves, all reports are submitted as confidential property of our clients and
authorization for publication of statements, conclusions or extracts from or regarding Universal's reports is reserved pending our written approval.
Page 1DRAFT
DRAFT
Project No.: 2110.2100049
Report No.: 11718
Date: August 9, 2023
8050 NW 77th Court · Miami, FL 33166 · P: 305.249.8434 · F: 305.249.8479
STRUCTURAL OBSERVATION REPORT No. SPECIAL-040
CN: GDZ Page 7 of 7
cc: 1 − Job Site; 1 − Client; 1
The Original of this Report was Signed and Impressed Sealed by the Above Registered Engineer in Accordance with Rule 21H -18.11, Chapter 471, Florida Statute
CIP concrete slab on grade completed
CIP concrete footings completed
Reviewed by:
Universal Engineering Sciences
Certificate of Authorization No. 549
Carlos Naumann, P.E., S.I.
Florida Professional Engineer No. 18594
Florida Special Inspector No. 181