Loading...
Tropical Chevrolet, 07-11-23 UES No 7838 SPECIAL insp rept #035 (roof decking @ service bldg. exp.) - GDZProject No.: 2110.2100049 Report No.: 7838 Date: July 11, 2023 8050 NW 77th Court · Miami, FL 33166 · P: 305.249.8434 · F: 305.249.8479 STRUCTURAL OBSERVATION REPORT No. SPECIAL-035 CN: GDZ Page 1 of 3 cc: 1 − Job Site; 1 − Client; 1 The Original of this Report was Signed and Impressed Sealed by the Above Registered Engineer in Accordance with Rule 21H -18.11, Chapter 471, Florida Statute Client: Lebolo Construction Management, Inc. 2100 Corporate Drive Boynton Beach, FL 33426 Project: Tropical Chevrolet Renovation/Expansion 8880 Biscayne Blvd. Miami Shores, FL 33138 Agent: Gaetano Di Zio, E.I. Date of Services: 07/11/2023 Village of Miami Shores Building Permit No: CC-12-20-2951 (issued date 11/07/22, expires 05/08/23) Scope of Field Services: Professional observation of completed structural elements (Special Inspector). Reference Documents: • JSG structural drawings sheets S1.0 thru S4.2 (15 pages), Bulleting 7 dated 07/21/2022, signed/sealed by Mark Johnson FL-PE#51983, reviewed/approved for structural compliance by the Village of Miami Shores Bldg. Dept. on 08/22, (permit set review by the Miami-Dade County Department of Regulatory and Economic Resources on 05/16/2022). • SUNCOR, Inc. structural steel erection/fabrication shop drawings sheets AB1 thru TP101 (total of 219 pages) dated 04/13/2022 (Rev. A – Issued for Approval) Submittal #051200-5.0 (Structural Steel Shop Drawings), reviewed for compliance (stamped “Reviewed as Noted - Make Corrections”) by JSG on 05/03/2022. • Canam Steel Corporation (CSC) steel metal deck shop drawings sheets DE1.1 thru DE2.1 (total of 3 pages) dated 04/08/2022 (Issued for Approval) Submittal #051200-6.0 (Deck Shop Drawings), reviewed for compliance (stamped “Reviewed as Noted - Make Corrections”) by JSG on 04/15/2022. Record of Field Observations: 1. Visual verification of the structural steel connections at the following locations indicated below: a) 3” deep 22 gauge galvanized G80 corrugated roof metal deck profile type “N” prior roof openings (A/S ducts, ventilations, roof hatches, etc.), connected to intermediate supports with 5/8”Ø puddle welds on a 24/4 pattern, 5/8”Ø puddle welds at 6” o.c. at deck perimeter and with #12 Type self-tapping screws @ 3” o.c. at side laps per span between grids “A” thru “E.3” and lines “8” thru “11” at building service expansion, as per S1.0, S2.2, 2/S3.2, S4.1/details 1, 2, 3, 4 & 5, Canam Steel Corporation deck shop drawing sheets DE1.1, DE1.3 & DE2.1 and attached clarification submitted by the steel erector via e-mail, as we addressed on UES Structural Observation Report No. 34 (No.: 7242) dated 07/06/2023, completed. b) 3” deep 22 gauge galvanized G80 corrugated roof metal deck profile type “N” prior roof openings (A/S ducts, ventilations, roof hatches, etc.), connected to intermediate supports with 5/8”Ø puddle welds on a 24/4 pattern, 5/8”Ø puddle welds at 6” o.c. at deck perimeter and with #12 Type self-tapping screws @ 3” o.c. at side laps per span between grids “D.1” thru “D.6” and lines “11” thru “12” at the oil storage, as per S1.0, S2.2, 2/S3.2, S4.1/details 1, 2, 3, 4 & 5, Canam Steel Corporation deck shop drawing sheets DE1.1, DE1.3 & DE2.1 and attached clarification submitted by the steel erector via e-mail, as we addressed on UES Structural Observation Report No. 34 (No.: 7242) dated 07/06/2023, re-inspection in progress (pending final verification for item 1c below). c) Continuous perimeter deck bearing angle L4”x4”x1/4” anchored connections (torque verified at 100 ft−lb as per Simpson Strong−Bolt 2 Wedge Anchor required installation torque schedule) to CMU bond beam along grid “D.6” between lines “11” thru “12” at the oil storage, as per S1.0, S1.1/details 2 & 3, S2.2, 2/S3.1, 4/S4.1, E1000 and E1001, in progress on 07/06/23: ➢ Two (1) expansion anchors were found to be loose fitting at approx. gridlines D.6x11.3 and D.6x11.5. The structural steel connections at the locations mentioned above was found to be in substantial compliance with the reference documents, except for items 1b and 1c in progress. General Contractor will call for items 1b and 1c re−inspection after completion for final compliance verification. Mr. Jim Jenco, Project Superintendent and Mr. Sebastian Cienfuegos, Assistant Superintendent with Lebolo Construction, were notified of the aforementioned visual verification results. Please see adjacent report pages for photographs, clarification submitted by the steel erector via e-mail and sheet S2.2. DRAFT Project No.: 2110.2100049 Report No.: 7838 Date: July 11, 2023 8050 NW 77th Court · Miami, FL 33166 · P: 305.249.8434 · F: 305.249.8479 STRUCTURAL OBSERVATION REPORT No. SPECIAL-035 CN: GDZ Page 2 of 3 cc: 1 − Job Site; 1 − Client; 1 The Original of this Report was Signed and Impressed Sealed by the Above Registered Engineer in Accordance with Rule 21H -18.11, Chapter 471, Florida Statute DRAFT 1 Gaetano Di Zio From:Jim Jenco <jjenco@Lebolo.com> Sent:Wednesday, July 5, 2023 2:43 PM To:Gaetano Di Zio Cc:Victor Castro; Sebastian Cienfuegos; Maria Manjon Subject:FW: Tropical Chevrolet RFI 90 Puddle Weld in lieu of TEK Screw   This Message Is From an External Sender This message came from outside your organization.   Gaetano,    Please find the below e‐mail indicaƟng the spacing for puddle weld at the Corrugated Deck seam connecƟon in lieu of  TEK screw 3” O.C.  Thanks,       Jim Jenco  Lebolo Construction Management, Inc.  jjenco@lebolo.com   I    www.lebolo.com  M: (561) 667‐9726     I    O: (561) 742‐7644    SAFETY – INTEGRITY – ACCOUNTABILITY            From: Brian Smedley <bsmedley@jhn.com>   Sent: Monday, July 3, 2023 7:02 AM  To: Jim Jenco <jjenco@Lebolo.com>  Subject: FW: Tropical Chevrolet RFI 90 Puddle Weld in lieu of TEK Screw    Jim:  Please see email below.    BRIAN SMEDLEY, AIA NCARB |Director ‐ Automotive Group bsmedley@jhn.com Office: 248.324.8800 x104 | Cell: 586.764.1743   NUDELL ARCHITECTS Michigan | 30403 West 13 Mile Road | Farmington Hills, MI 48334   Florida  |  1807 Edgewater Drive (College Park) | Orlando, Florida 32804  DRAFT 2 From: Pedro R. Salom <psalom@johnsonstructural.com>   Sent: Saturday, July 1, 2023 8:42 AM  To: Brian Smedley <bsmedley@jhn.com>  Cc: Mark Johnson <mark@johnsonstructural.com>  Subject: RE: Tropical Chevrolet RFI 90 Puddle Weld in lieu of TEK Screw      Brian, use 5/8” puddle welds spaced at not more than 6” o.c.    Thanks.        Pedro Salom, P.E.  JohnsonStructuralGroup,Inc.  160 West Camino Real  Suite 1000  Boca Raton, FL  33432  Phone (561) 982‐8999 Ext. 13  Fax: (561) 982‐8899  www.johnsonstructural.com      From: Brian Smedley <bsmedley@jhn.com>   Sent: Friday, June 30, 2023 10:18 AM  To: Pedro R. Salom <psalom@johnsonstructural.com>  Subject: FW: Tropical Chevrolet RFI 90 Puddle Weld in lieu of TEK Screw    Pedro:  Can you please review the  below and advise?   The reason for the request is in the email thread below.    DRAFT 3   BRIAN SMEDLEY, AIA NCARB |Director ‐ Automotive Group bsmedley@jhn.com Office: 248.324.8800 x104 | Cell: 586.764.1743   NUDELL ARCHITECTS Michigan | 30403 West 13 Mile Road | Farmington Hills, MI 48334   Florida  |  1807 Edgewater Drive (College Park) | Orlando, Florida 32804   From: Jim Jenco <jjenco@Lebolo.com>   Sent: Friday, June 30, 2023 10:12 AM  To: Brian Smedley <bsmedley@jhn.com>  Cc: Dave Pond <Dave.P@suncor.net>; Victor Castro <Victor.C@suncor.net>; Sebastian Cienfuegos  <SCienfuegos@Lebolo.com>; Maria Manjon <memanjon@Lebolo.com>  Subject: RE: Tropical Chevrolet RFI 90 Puddle Weld in lieu of TEK Screw    A secƟon of the decking seam ran on the edge of the W27 x 84 (approx.. 32 LF). The TEK screws are hiƫng steel and not  securing the lap.     From: Brian Smedley <bsmedley@jhn.com>   Sent: Friday, June 30, 2023 10:04 AM  To: Jim Jenco <jjenco@Lebolo.com>  Cc: Dave Pond <Dave.P@suncor.net>; Victor Castro <Victor.C@suncor.net>; Sebastian Cienfuegos  <SCienfuegos@Lebolo.com>; Maria Manjon <memanjon@Lebolo.com>  Subject: RE: Tropical Chevrolet RFI 90 Puddle Weld in lieu of TEK Screw    Jim:  What is driving the need for puddle welding in this area only?     BRIAN SMEDLEY, AIA NCARB |Director ‐ Automotive Group bsmedley@jhn.com Office: 248.324.8800 x104 | Cell: 586.764.1743   NUDELL ARCHITECTS Michigan | 30403 West 13 Mile Road | Farmington Hills, MI 48334   Florida  |  1807 Edgewater Drive (College Park) | Orlando, Florida 32804   From: Jim Jenco <jjenco@Lebolo.com>   Sent: Friday, June 30, 2023 9:59 AM  To: Brian Smedley <bsmedley@jhn.com>  Cc: Dave Pond <Dave.P@suncor.net>; Victor Castro <Victor.C@suncor.net>; Sebastian Cienfuegos  <SCienfuegos@Lebolo.com>; Maria Manjon <memanjon@Lebolo.com>  Subject: Tropical Chevrolet RFI 90 Puddle Weld in lieu of TEK Screw    Good Morning Brian,    RE: ClarificaƟon of RFI 90 Puddle Weld in lieu of TEK Screws    All laps on the deck are TEK screwed except one area of decking that ran on top of the edge of W27 x 84.   This is the area where the lap was puddle welded (approx. 32’ LF).  I edited the Procore RFI90  and included the aƩached marked up S2.2 Roof Framing Plan indicaƟng this area.  DRAFT 4 Thanks,     Jim Jenco  Lebolo Construction Management, Inc.  jjenco@lebolo.com   I    www.lebolo.com  M: (561) 667‐9726     I    O: (561) 742‐7644    SAFETY – INTEGRITY – ACCOUNTABILITY       DRAFT Project No.: 2110.2100049 Report No.: 7838 Date: July 11, 2023 8050 NW 77th Court · Miami, FL 33166 · P: 305.249.8434 · F: 305.249.8479 STRUCTURAL OBSERVATION REPORT No. SPECIAL-035 CN: GDZ Page 3 of 3 cc: 1 − Job Site; 1 − Client; 1 The Original of this Report was Signed and Impressed Sealed by the Above Registered Engineer in Accordance with Rule 21H -18.11, Chapter 471, Florida Statute Roof metal deck at service bldg. expansion completed Roof metal deck at the oil storage in progress Reviewed by: Universal Engineering Sciences Certificate of Authorization No. 549 Carlos Naumann, P.E., S.I. Florida Professional Engineer No. 18594 Florida Special Inspector No. 181 DRAFT