Tropical Chevrolet, 06-30-23 UES No 6769 SPECIAL insp rept #032 (drilled holes & precast roof concrete joist repair) - GDZProject No.: 2110.2100049 Report No.: 6769 Date: June 30, 2023 8050 NW 77th Court · Miami, FL 33166 · P: 305.249.8434 · F: 305.249.8479 STRUCTURAL OBSERVATION REPORT No. SPECIAL-032 CN: GDZ Page 1 of 3 cc: 1 − Job Site; 1 − Client; 1 The Original of this Report was Signed and Impressed Sealed by the Above Registered Engineer in Accordance with Rule 21H-18.11, Chapter 471, Florida Statute Client: Lebolo Construction Management, Inc. 2100 Corporate Drive Boynton Beach, FL 33426 Project: Tropical Chevrolet Renovation/Expansion 8880 Biscayne Blvd. Miami Shores, FL 33138 Agent: Gaetano Di Zio, E.I. Date of Services: 06/30/2023 Village of Miami Shores Building Permit No: CC-12-20-2951 (issued date 11/07/22, expires 05/08/23) Scope of Field Services: Professional observation of completed structural elements (Special Inspector). Reference Documents: • JSG structural drawings sheets S1.0 thru S4.2 (15 pages), Bulleting 7 dated 07/21/2022, signed/sealed by Mark Johnson FL-PE#51983, reviewed/approved for structural compliance by the Village of Miami Shores Bldg. Dept. on 08/22, (permit set review by the Miami-Dade County Department of Regulatory and Economic Resources on 05/16/2022). • SUNCOR, Inc. structural steel erection/fabrication shop drawings sheets AB1 thru TP101 (total of 219 pages) dated 04/13/2022 (Rev. A – Issued for Approval) Submittal #051200-5.0 (Structural Steel Shop Drawings), reviewed for compliance (stamped “Reviewed as Noted - Make Corrections”) by JSG on 05/03/2022. • Canam Steel Corporation (CSC) steel metal deck shop drawings sheets DE1.1 thru DE2.1 (total of 3 pages) dated 04/08/2022 (Issued for Approval) Submittal #051200-6.0 (Deck Shop Drawings), reviewed for compliance (stamped “Reviewed as Noted - Make Corrections”) by JSG on 04/15/2022. Record of Field Observations: 1. Visual verification of drilled holes for post-installed rebar dowels by means of approved anchoring epoxy Hilti HIT -HY 200 at the following locations indicated below: a) Cleanness/depth check (6” min. embedment) for #5 vertical/horizontal rebar dowels into existing CMU bond beam/CMU jambs/CIP concrete headers/columns at gridlines E.6x3 and E.9x3.1 (men’s locker room) at the existing service building, as per S1.0, S2.3 and 3/4.1, completed: ➢ Pending application of anchoring epoxy Hilti HIT-HY 200. 2. Visual verification of the reinforcing steel placement at the following locations indicated below: a) Precast concrete roof joist web restoration repair approx. along line “6” between grids “C.5” thru “D” at the existing service building, as per attached sheet S−300, completed. The reinforcing steel placement at the locations mentioned above was found to be in substantial compliance with the reference documents. Explanatory Note: ➢ Drilled and epoxy of horizontal/vertical rebar dowels into existing concrete precast roof joist/girder were done by others prior to today’s site visit (a UES representative did not verify any drilled holes for cleanness, embedment, epoxy application and rebar dowels installation). Mr. Jim Jenco, Project Superintendent with Lebolo Construction, was notified of the aforementioned visual verification results. Please see adjacent report pages for photographs and sheet S−300. DRAFT Project No.: 2110.2100049 Report No.: 6769 Date: June 30, 2023 8050 NW 77th Court · Miami, FL 33166 · P: 305.249.8434 · F: 305.249.8479 STRUCTURAL OBSERVATION REPORT No. SPECIAL-032 CN: GDZ Page 2 of 3 cc: 1 − Job Site; 1 − Client; 1 The Original of this Report was Signed and Impressed Sealed by the Above Registered Engineer in Accordance with Rule 21H-18.11, Chapter 471, Florida Statute DRAFT Project No.: 2110.2100049 Report No.: 6769 Date: June 30, 2023 8050 NW 77th Court · Miami, FL 33166 · P: 305.249.8434 · F: 305.249.8479 STRUCTURAL OBSERVATION REPORT No. SPECIAL-032 CN: GDZ Page 3 of 3 cc: 1 − Job Site; 1 − Client; 1 The Original of this Report was Signed and Impressed Sealed by the Above Registered Engineer in Accordance with Rule 21H-18.11, Chapter 471, Florida Statute Reviewed by: Universal Engineering Sciences Certificate of Authorization No. 00549 Carlos Naumann, P.E., S.I. Florida Professional Engineer No. 18594 Florida Special Inspector No. 181 DRAFT DETAILS JOIST WEB RESTORATION DETAIL SCALE: N.T.S.A 6/29/2023 S-300PROJECT NAME:CLIENT/OWNER:TROPICAL CHEVROLET GARAGE -DOUBLE TEE'S STRUCTURAL REPAIRPLANSFPV-S231016 MR. VAL BENITEZ8880 BISCAYNE BLVD., MIAMI SHORES, FL33138Sheet No. DRAWING NO. SHEET NAME: DATE: SCALE: DRAWN: CHECKED: APPVD: REVISIONS DATE PROJECT ID: S-300 CA # 29447 782 NW 42ND AVENUE UNIT 635,MIAMI, FL 33126MAIN NUMBER 888-536-1536JOSE M PERALTA, P.E CONEMCO CONSULTANTS FLORIDA P.E. LIC. # 91463 AS SHOWN SM JP JC CONTRACT NO:- BLANK SPACE - CITY STAMP REMAINING PORTION OF CONC. JOISTSA A'SHORING BY OTHERS TO REMAIN UNTIL STEEL BRACKET INSTALLATION PROVIDE (3) #5 REBAR ANCHORED TO EXISTING JOIST WEB JOISTS FLANGE SLAB TO BE POURED AFTER CHANNEL INSTALLATION ANCHOR REBARS W/ HILTI HIT HY 200 EPOXY, 6" MIN. EMBED. #4 @ 8" VERTICAL REBAR #4 @ 8" VERTICAL REBAR JOISTS WEB TO BE POURED AFTER CHANNEL INSTALLATION #5 HORIZONTAL REBAR SECTION A-A' ANCHOR REBARS W/ HILTI HIT HY 200 EPOXY, 6" MIN. EMBED. EXISTING CONCRETE COLUMN DRAFT