Loading...
Tropical Chevrolet, 06-22-23 UES No 5601 SPECIAL insp rept #030 (drilled & epoxy dowels) - GDZProject No.: 2110.2100049 Report No.: 5601 Date: June 22, 2023 8050 NW 77th Court · Miami, FL 33166 · P: 305.249.8434 · F: 305.249.8479 STRUCTURAL OBSERVATION REPORT No. SPECIAL-030 CN: GDZ Page 1 of 5 cc: 1 − Job Site; 1 − Client; 1 The Original of this Report was Signed and Impressed Sealed by the Above Registered Engineer in Accordance with Rule 21H-18.11, Chapter 471, Florida Statute Client: Lebolo Construction Management, Inc. 2100 Corporate Drive Boynton Beach, FL 33426 Project: Tropical Chevrolet Renovation/Expansion 8880 Biscayne Blvd. Miami Shores, FL 33138 Agent: Gaetano Di Zio, E.I. Date of Services: 06/22/2023 Village of Miami Shores Building Permit No: CC-12-20-2951 (issued date 11/07/22, expires 05/08/23) Scope of Field Services: Professional observation of completed structural elements (Special Inspector). Reference Documents: • JSG structural drawings sheets S1.0 thru S4.2 (15 pages), Bulleting 7 dated 07/21/2022, signed/sealed by Mark Johnson FL-PE#51983, reviewed/approved for structural compliance by the Village of Miami Shores Bldg. Dept. on 08/22, (permit set review by the Miami-Dade County Department of Regulatory and Economic Resources on 05/16/2022). • SUNCOR, Inc. structural steel erection/fabrication shop drawings sheets AB1 thru TP101 (total of 219 pages) dated 04/13/2022 (Rev. A – Issued for Approval) Submittal #051200-5.0 (Structural Steel Shop Drawings), reviewed for compliance (stamped “Reviewed as Noted - Make Corrections”) by JSG on 05/03/2022. • Canam Steel Corporation (CSC) steel metal deck shop drawings sheets DE1.1 thru DE2.1 (total of 3 pages) dated 04/08/2022 (Issued for Approval) Submittal #051200-6.0 (Deck Shop Drawings), reviewed for compliance (stamped “Reviewed as Noted - Make Corrections”) by JSG on 04/15/2022. Record of Field Observations: 1. Visual verification of the structural steel connections at the following locations indicated below: a) W roof steel girder beams bolted connections to existing wall at gridlines B.8x8 and D.3x8 at the service building expansion, as per S1.0, S2.2, 2/S3.2, 8/S4.1 and Girder Bearing at Existing Wall detail SK 04−10−23 submitted by the SEoR, as we addressed on UES Structural Observation Report No. 27 (No.: 354485) dated 05/26/2023, re- inspection preliminary on 06/16/23: ➢ Loose expansion anchor at existing wall clip at gridline B.8x8. ➢ Missing washer for wall clip bolt to steel girder beam at gridline D.3x8. ➢ Threaded rods were found to be installed (drilled & epoxied) prior to our visual verification. A UES representative did not verify any drilled holes for cleanness, embedment, epoxy application and threaded rods installation. Torque verified at 100 ft−lb as per Hilti HIT HY-100 anchoring adhesive required installation torque schedule, please refer to item 2a below. b) W roof steel beams welded/bolted connections to CIP concrete beam embed plates along grid “E.4” between lines “8” thru “11” at the service building expansion, as per S1.0, S2.2, 1/S3.2, 1/S4.1, E1000, E1001 and Section @ Roof Beam Repair detail SK 04−12−23 submitted by the SEoR, preliminary on 06/16/23 – pending reinspection: ➢ Expansion anchor (1 beam @ gridline E.1x10.7) was found to be loose fitting. Torque verified at 100 ft−lb as per Simpson Strong−Bolt 2 Wedge Anchor required installation torque (in Masonry) schedule. The structural steel connections at the locations mentioned above were found to be preliminary. General Contractor will call for items 1a & 1b re-inspection after completion for final compliance verification. 2. Visual verification of drilled holes for post-installed threaded rods by means of approved anchoring epoxy Hilti HIT -HY 100 at the following locations indicated below: a) Cleanness/depth check (6¾” min. embedment) and epoxy application for ¾” Ø threaded anchor rods into existing CMU wall at gridlines B.8x8 and D.3x8 at the service building expansion, as per Girder Bearing at Existing Wall detail SK 04−10−23 submitted by the SEoR, preliminary on 06/16/23 - pending anchor rods torque verification at gridline D.3x8. DRAFT Project No.: 2110.2100049 Report No.: 5601 Date: June 22, 2023 8050 NW 77th Court · Miami, FL 33166 · P: 305.249.8434 · F: 305.249.8479 STRUCTURAL OBSERVATION REPORT No. SPECIAL-030 CN: GDZ Page 2 of 5 cc: 1 − Job Site; 1 − Client; 1 The Original of this Report was Signed and Impressed Sealed by the Above Registered Engineer in Accordance with Rule 21H-18.11, Chapter 471, Florida Statute 3. Visual verification of drilled holes for post-installed rebar dowels by means of approved anchoring epoxy DeWalt Pure50+ at the following locations indicated below: a) Cleanness/depth check (6” min. embedment) for #5 vertical rebar dowels into existing CMU bond beam (windows sills) and concrete lintels at rooms #101, 102, 119 and 120 for the existing ribbon window openings infill at the existing service building, as per S1.0, S2.3 and 5/4.2, completed. Mr. Jim Jenco, Project Superintendent with Lebolo Construction, was notified of the aforementioned visual verification results. Please see adjacent report pages for photographs and sheets S2.0 & S2.2. DRAFT Project No.: 2110.2100049 Report No.: 5601 Date: June 22, 2023 8050 NW 77th Court · Miami, FL 33166 · P: 305.249.8434 · F: 305.249.8479 STRUCTURAL OBSERVATION REPORT No. SPECIAL-030 CN: GDZ Page 3 of 5 cc: 1 − Job Site; 1 − Client; 1 The Original of this Report was Signed and Impressed Sealed by the Above Registered Engineer in Accordance with Rule 21H-18.11, Chapter 471, Florida Statute @ GL D.3x8 DRAFT Project No.: 2110.2100049 Report No.: 5601 Date: June 22, 2023 8050 NW 77th Court · Miami, FL 33166 · P: 305.249.8434 · F: 305.249.8479 STRUCTURAL OBSERVATION REPORT No. SPECIAL-030 CN: GDZ Page 4 of 5 cc: 1 − Job Site; 1 − Client; 1 The Original of this Report was Signed and Impressed Sealed by the Above Registered Engineer in Accordance with Rule 21H-18.11, Chapter 471, Florida Statute DRAFT Project No.: 2110.2100049 Report No.: 5601 Date: June 22, 2023 8050 NW 77th Court · Miami, FL 33166 · P: 305.249.8434 · F: 305.249.8479 STRUCTURAL OBSERVATION REPORT No. SPECIAL-030 CN: GDZ Page 5 of 5 cc: 1 − Job Site; 1 − Client; 1 The Original of this Report was Signed and Impressed Sealed by the Above Registered Engineer in Accordance with Rule 21H-18.11, Chapter 471, Florida Statute Roof steel framing completed on 06/16/23 Reviewed by: Universal Engineering Sciences Certificate of Authorization No. 00549 Carlos Naumann, P.E., S.I. Florida Professional Engineer No. 18594 Florida Special Inspector No. 181 DRAFT