Tropical Chevrolet, 03-07-23 UES Inspection Log, SPECIAL insp rept #015cc: 1 – Client, 1 – Job Site Page 1 of 4 Item No. UES Report No. Inspection Date & Inspector Description of work inspected Result of Inspection Date of Re- inspection & Inspector 1 SP#01 (341224) 11/17/2022 Humberto Carvajal, CWI. 1. Continuous wall footings as per S2.0, S1.1 & S4.0/S4.2: a) Cont. wall footing (with vertical dowels for CMU wall as per note 8) type WF26 along grids A between lines 8 thru 11. b) Cont. wall footing (with vertical dowels for CMU wall & openings as per note 8 & 9/S4.0 and concrete tie columns type CC2 [x3]) type WF26 with integrated column pads type F40 (x2) along line 11 between grids A thru E.3. c) Cont. wall footing (with vertical dowels for CMU wall as per note 8) type WF26 along grids E.2 between lines 8 thru 11. d) Cont. wall footing (with vertical dowels for CMU wall as per note 9) type WF20 along grids D.1 between lines 11 thru proposed line 12. e) Cont. wall footing (with vertical dowels for CMU wall as per note 9) type WF20 along proposed line 12 between grids D.1 thru D.6. f) Cont. wall footing (with vertical dowels for CMU wall as per note 8) type WF26 along grids D.6 between lines 11 thru proposed line 12. 2. Column pad footings as per S2.0, S1.1 & S4.0/S4.2: g) Column footings type F66 at grid-lines B.8x9 & D.5x9 in progress (*). h) Column footings type F90 at grid-lines B.8x10 & D.5x10 in progress (*). Pending PASS 11/18/22 HC Partially completed Pending re-inspection 11/30/22 HC 2 SP#02 (341357) 11/18/2022 Humberto Carvajal, CWI. 1. Continuous wall footings as per S2.0, S1.1 & S4.0/S4.2: a) Cont. wall footing (with vertical dowels for CMU wall as per note 8) type WF26 along grids A between lines 8 thru 11 completed (**). b) Cont. wall footing (with vertical dowels for CMU wall & openings as per note 8 & 9/S4.0 and concrete tie columns type CC2 [x3]) type WF26 with integrated column pads type F40 (x2) along line 11 between grids A thru E.3 completed. c) Cont. wall footing (with vertical dowels for CMU wall as per note 8) type WF26 along grids E.2 between lines 8 thru 11 completed (**). Partial (see 11/23/22) INSPECTION LOG UNIVERSAL ENGINEERING SCIENCES PROJECT: Tropical Chevrolet Renovation & Expansion Date: March 7, 2023 PROJECT LOCATION: 8880 Biscayne Blvd., Miami Shores, FL 33138 UES PROJECT. NO.: 2110.2100049 CLIENT: Lebolo Construction Management, Inc. CONTRACTOR: Lebolo Construction ENG. OF RECORD: Mark Johnson FL-PE#51983 with JSG PERMIT #: CC-12-20-2951 THRESHOLD ENG: n/a UES Certificate of Authorization 000549 cc: 1 – Client, 1 – Job Site Page 2 of 4 Item No. UES Report No. Inspection Date & Inspector Description of work inspected Result of Inspection Date of Re- inspection & Inspector SP#02 (341357) 11/18/2022 Humberto Carvajal, CWI d) Cont. wall footing (with vertical dowels for CMU wall as per note 9) type WF20 along grids D.1 between lines 11 thru proposed line 12 completed. e) Cont. wall footing (with vertical dowels for CMU wall as per note 9) type WF20 along proposed line 12 between grids D.1 thru D.6 completed. f) Cont. wall footing (with vertical dowels for CMU wall as per note 8) type WF26 along grids D.6 between lines 11 thru proposed line 12 completed. 2. Column pad footings as per S2.0, S1.1 & S4.0/S4.2: a) Column footings type F66 at grid-lines B.8x9 & D.5x9 completed (*). b) Column footings type F90 at grid-lines B.8x10 & D.5x10 completed (*). The above mentioned reinforcing steel placement was found to be performed in substantial compliance with the reference documents except (see below ↓↓↓ *, **, ***) (*) as per S1.1 “column / base plate schedule: the bottom hex nut shall be “tack welded secured”. SUNCOR did not include a clarification/approval question for omission of the tack weld under dwg. Sheet AB1 “approver note”. As per approver note #2 a plate washer was approved above the previously mentioned hex nut. This plate was found to be loose (floating) not secured preventing displacement at the time of conc. placement. GC to provide clarification for the observed AS BUILT conditions. For items 2g & 2h. (**) required [if applicable] drilled & epoxy dowels missing as per 1/S4.2 for items 1a & 1c. (**) installation of the additional reinforcing for the proposed “MCJ” was found to be missing at the time of this site visit as per 1/S1.0 for items 1a thru 1h. ↑↑↑ ↓↓↓ ←←← 3 SP#03 (341409) 11/23/2022 Humberto Carvajal, CWI. ITEMS 1a thru 1f COMPLETED. ITEMS 2a & 2b pending clarification and/or approval from the SEoR. Partial N/A 4 SP#04 (341925) SP#06 (342202) SP#07 (342311) 11/30/2022 12/05/2022 12/06/2022 Gaetano Di Zio, E.I. 1. Visual verification of the reinforcing steel placement at the following locations indicated below: a) 8”/12” thick CMU stem wall along grids “A” and “E.2” between lines “8” thru ”11”, along line “11” between grids “A” thru “E.2”, along grids “D.1” and “D.6” between lines “11” thru “12” and along line “12” between grids “D.1” thru “D.6”, from elevation approx. −2'−0" to 0’−0”. Failed Reinspection Failed Pass 12/06/22. See Insp. Rept. #07 for details G. Di Zio 5 SP#05 (342087) 12/02/2022 Gaetano Di Zio, E.I. Construction Meeting N/A 6 SP#06 (342202) SP#07 (342311) 12/05/2022 12/06/2022 Gaetano Di Zio, E.I. 1. Visual verification of the reinforcing steel placement at the following locations indicated below: b) CIP concrete tie column mark CC2 (12"x24") at gridlines B.8x11 and D.5x11, from elevation −2'−0" (top of footing) to 0'−0". Failed Pass 12/06/22. See Insp. Rept. #07 for details G. Di Zio 7 SP#07 12/06/2022 1. Visual verification of the reinforcing steel placement at the following locations indicated below: Pass cc: 1 – Client, 1 – Job Site Page 3 of 4 Item No. UES Report No. Inspection Date & Inspector Description of work inspected Result of Inspection Date of Re- inspection & Inspector (342311) Gaetano Di Zio, E.I. a) CIP concrete tie column mark CC2 (12"x24") at gridline E.2x11, from elevation −2'−0" (top of footing) to 0'−0". 8 SP#08 (345306) 01/23/2023 Gaetano Di Zio, E.I. Adrian Suarez Diaz 1. Visual verification of drilled holes for post-installed rebar dowels by means of approved anchoring epoxy: a) Cleanness/depth check (9” min. embedment) and epoxy application for #5 horizontal rebar dowels into existing two (2) CIP concrete footings. Failed Pass 01/25/23. See Insp. Rept. #09 for details G. Di Zio b) Cleanness/depth check (6” min. embedment) and epoxy application for #5 horizontal rebar dowels into existing CIP concrete slab on grade along gird “E” between lines “5” thru “8” Failed Preliminary Pass 01/27/23. See Insp. Rept. #10 for details G. Di Zio 9 SP#09 (345425) 01/25/2023 Gaetano Di Zio, E.I. Adrian Suarez Diaz 1. Visual verification of drilled holes for post-installed rebar dowels by means of approved anchoring epoxy: a) Cleanness/depth check (9” min. embedment) and epoxy application for #5 horizontal rebar dowels into existing CIP concrete footings at gridlines B.8x9 and B.8x10. Pass b) Cleanness/depth check (9” min. embedment) and epoxy application for #5 horizontal rebar dowels into existing CIP concrete footings at gridlines D.3x9 and D.3x10. Preliminary Pass 01/27/23. See Insp. Rept. #10 for details G. Di Zio 10 SP#10 (345761) 01/27/2023 Gaetano Di Zio, E.I. Adrian Suarez Diaz 1) Visual verification of the reinforcing steel placement at the following locations indicated below: a) 8” thick interior slab on grade between grids “C.5” thru “C.8” and lines “2.8” thru “3.1” at the alignment pit, top of slab elevation approx. −0’−9”. Preliminary Pass 02/02/23. See Insp. Rpt. #11 for details G. Di Zio b) New CIP concrete column footings extension (6’-0x6’-0”x1’-0”) at two (2) existing interior column footings (S1.0R). c) New CIP concrete column footings extension at existing column footings located at gridlines B.8x9, B.8x10, D.3x9 and D.3x10. Pass 11 SP#11 (346032 - 346245) SP#12 (346033) 02/02/2023 02/03/2023 Gaetano Di Zio, E.I. Adrian Suarez Diaz 1) Visual verification of the reinforcing steel placement at the following locations indicated below: a) Proposed new 6” thick interior slab on grade between grids “A” thru “J” and lines “1” thru “8” at the Service Building, between grids “A” thru “E.2” and lines “8” thru “11” at the Service Building Addition and between grids “D.1” thru “D.6” and lines “11” thru “12” at the Oil Storage, top of slab elevation 0’−0”. Preliminary Pass 02/03/23. See Insp. Rpt. #12 for details G. Di Zio 12 SP#13 (347405) 02/21/2023 Gaetano Di Zio, E.I. 1) Visual verification of drilled holes for post-installed rebar dowels by means of approved anchoring epoxy: a) Cleanness/depth check (5” min. embedment) for #5 vertical rebar dowels into existing CMU bond beam (windows sills) and concrete lintels between grids “A” thru “E” and lines “1” thru “8” for existing ribbon window openings infill at the existing service building. b) Cleanness/depth check (6” min. embedment) for #5 vertical rebar dowels into existing CMU parapet bond beam between grids “A” thru “E” and lines “1” thru “8” along the existing parapet walls at the existing service building. Pass 13 SP#14 (348219) 03/06/2023 Gaetano Di Zio, E.I. 1) Visual verification of the reinforcing steel placement at the following locations indicated below: a) 8” thick CMU parapet wall extension between grids “A” and “J” and lines “1” thru ”8”, single lift from elevation approx. +20'−0" to +22’−8”. Pass cc: 1 – Client, 1 – Job Site Page 4 of 4 Item No. UES Report No. Inspection Date & Inspector Description of work inspected Result of Inspection Date of Re- inspection & Inspector 14 SP#15 (348488) 03/07/2023 Gaetano Di Zio, E.I. 1) Visual verification of the reinforcing steel placement at the following locations indicated below: a) 8” thick CMU wall infill for existing ribbon window openings at the existing service building between grids “A” thru “J” and lines “1” thru “8”. Pass