Loading...
Tropical Chevrolet, 01-27-23 UES No 345761 SPECIAL insp rept #010 (drilled and epoxy dowels & footings) - GDZ + ASProject No.: 2110.2100049 Report No.: 345761 Date: January 27, 2023 STRUCTURAL OBSERVATION REPORT No. SPECIAL-010 CN: GDZ: ASD Page 1 of 7 cc: 1 − Job Site; 1 − Client; 1 The Original of this Report was Signed and Impressed Sealed by the Above Registered Engineer in Accordance with Rule 21H-18.11, Chapter 471, Florida Statute 8050 NW 77th Street · Miami, FL 33166 · P: 305.249.8434 · F: 305.249.8479 Client: Lebolo Construction Management, Inc. 2100 Corporate Drive Boynton Beach, FL 33426 Project: Tropical Chevrolet Renovation/Expansion 8880 Biscayne Blvd. Miami Shores, FL 33138 Agent: Gaetano Di Zio, E.I. Adrian Suarez Diaz Date of Services: 01/27/2022 Village of Miami Shores Building Permit No: CC-12-20-2951 (issued date 11/07/22, expires 05/08/23) Scope of Field Services: Professional observation of completed structural elements (Special/Welding Inspector). Reference Documents: • JSG structural drawings sheets S1.0 thru S-4.2 (15 pages), Bulleting 7 dated 07/21/2022, signed/sealed by Mark Johnson FL-PE#51983, reviewed/approved for structural compliance by the Village of Miami Shores Bldg. Dept. on 08/22, (permit set review by the Miami-Dade County Department of Regulatory and Economic Resources on 05/16/2022). Record of Field Observations: Visual verification for the reinforcing steel placement at the following locations indicated below: 1. Continuous wall footings as per S2.0, S1.1 & S4.0/S4.2: a) Cont. wall footing (with vertical dowels for CMU wall as per note 8) type WF26 along grids A between lines 8 thru 11 completed. b) Cont. wall footing (with vertical dowels for CMU wall & openings as per note 8 & 9/S4.0 and concrete tie columns type CC2 [x3]) type WF26 with integrated column pads type F40 (x2) along line 11 between grids A thru E.3 completed. c) Cont. wall footing (with vertical dowels for CMU wall as per note 8) type WF26 along grids E.2 between lines 8 thru 11 completed. d) Cont. wall footing (with vertical dowels for CMU wall as per note 9) type WF20 along grids D.1 between lines 11 thru proposed line 12 completed. e) Cont. wall footing (with vertical dowels for CMU wall as per note 9) type WF20 along proposed line 12 between grids D.1 thru D.6 completed. f) Cont. wall footing (with vertical dowels for CMU wall as per note 8) type WF26 along grids D.6 between lines 11 thru proposed line 12 completed. 2. Column pad footings as per S2.0, S1.1 & S4.0/S4.2: a) Column footings type F66 at grid-lines B.8x9 & D.5x9 completed (*). b) Column footings type F90 at grid-lines B.8x10 & D.5x10 completed (*). The above mentioned reinforcing steel placement was found to be performed in substantial compliance with the referenc e documents except (see below ↓↓↓ *) (*) as per S1.1 “column / base plate schedule: the bottom hex nut shall be “tack welded secured”. SUNCOR did not include a clarification/approval question for omission of the tack weld under dwg. Sheet AB1 “approver note”. As per approver note #2 a plate washer was approved above the previously mentioned hex nut. This plate was found to be loose (floating) not secured preventing displacement at the time of conc. placement. GC to provide clarification for the observed AS BUILT conditions. For items 2g & 2h. Project No.: 2110.2100049 Report No.: 345761 Date: January 27, 2023 STRUCTURAL OBSERVATION REPORT No. SPECIAL-010 CN: GDZ: ASD Page 2 of 7 cc: 1 − Job Site; 1 − Client; 1 The Original of this Report was Signed and Impressed Sealed by the Above Registered Engineer in Accordance with Rule 21H-18.11, Chapter 471, Florida Statute 8050 NW 77th Street · Miami, FL 33166 · P: 305.249.8434 · F: 305.249.8479 3. Visual verification of the reinforcing steel placement at the following locations indicated below: a) 8”/12” thick CMU stem wall along grids “A” and “E.2” between lines “8” thru ”11”, along line “11” between grids “A” thru “E.2”, along grids “D.1” and “D.6” between lines “11” thru “12” and along line “12” between grids “D.1” thru “D.6”, from elevation approx. −2'−0" to 0’−0”, as per S1.0, S2.0, S2.2, 2/S3.1, 1/S3.2, S4.0/details 1, 3 & 5, 7/S4.1 and attached clarification submitted by the SEoR via e-mail, as we addressed on UES Structural Observation Reports No. 004 (No.: 341925) dated 12/02/2022 and No. 006 (No.: 342202) dated 12/05/2022, 2nd re-inspection completed: ➢ Some reinforcing steel was found to be deformed. ➢ Five (5) courses (approx. elev. +3'−4") were found to be laid on top of the stem wall. ➢ Missing/over spaced vertical reinforcing steel at some locations. ➢ Debris (chunks of masonry) was found in the CMU cells. ➢ Missing masonry interlocking of CMU wall at gridlines E.2x11 and D.6x12. ➢ Missing CMU control joint (partial) at gridline D.3x11. ➢ Missing neoprene pre-formed gasket at CMU control joints, as per 1/S1.0. To be provided for the 1st lift. ➢ Vertical dowels were found not to meet the minimum lap splice length of 48 Ø bar, as per S1.0/Masonry Note M11. ➢ CMU reinforced filled cells head joints were found not to be aligned and obstructed approx. gridline E.2x8.1, as per S1.0/Masonry Note M6. ➢ CMU horizontal reinforcement (ladder) was found not to extended into concrete tie column, as per S1.0/Masonry Note M7. b) CIP concrete tie column mark CC2 (12"x24") at gridlines B.8x11 and D.5x11, 1st lift from elevation −2'−0" (top of footing) to 0'−0", as per S1.0, S1.1/Concrete Tie Column Schedule, S2.0 and 4/S4.0, as we addressed on UES Structural Observation Report No. 006 (No.: 342202) dated 12/05/2022, re-inspection completed: ➢ Reinforcing steel was found not to meet the minimum concrete cover of 1½”, as per 4/S4.0. ➢ CMU horizontal reinforcement (ladder) was found not to extended into concrete tie column, as per S1.0/Masonry Note M7. Project No.: 2110.2100049 Report No.: 345761 Date: January 27, 2023 STRUCTURAL OBSERVATION REPORT No. SPECIAL-010 CN: GDZ: ASD Page 3 of 7 cc: 1 − Job Site; 1 − Client; 1 The Original of this Report was Signed and Impressed Sealed by the Above Registered Engineer in Accordance with Rule 21H-18.11, Chapter 471, Florida Statute 8050 NW 77th Street · Miami, FL 33166 · P: 305.249.8434 · F: 305.249.8479 c) CIP concrete tie column mark CC2 (12"x24") at gridline E.5x11, 1st lift from elevation −2'−0" (top of footing) to 0'−0", as per S1.0, S1.1/Concrete Tie Column Schedule, S2.0 , 4/S4.0 and attached clarification submitted by the SEoR via e-mail, completed. d) 8” thick interior slab on grade over a 10 Mil vapor barrier and compacted fill between grids “C.5” thru “C.8” and lines “2.8” thru “3.1” at the alignment pit, top of slab elevation approx. −0’−9”, as per S1.0, 2/S2. 1 and A100A, preliminary – pending in place density tests. e) New CIP concrete column footings extension (6’-0x6’-0”x1’-0”) at two (2) existing interior column footings, as per sheet S1.0R, completed. f) New CIP concrete column footings extension at existing column footings located at gridlines B.8x9, B.8x10, D.3x9 and D.3x10, as per attached drawing No. SK-01-17-23 (RFI #62), completed. The reinforcing steel placement at the locations mentioned above was found to be in substantial compliance with the reference documents, except for item 1d preliminary. 4. Visual verification of drilled holes for post-installed rebar dowels by means of approved anchoring epoxy Hilti HIT-HY 200 at the following locations indicated below: a) Cleanness/depth check (9” min. embedment) and epoxy application for #5 horizontal rebar dowels into existing two (2) CIP concrete footings, as per sheet S1.0 R, as we addressed on UES Structural Observation Report No. 08 (No.: 345306) dated 01/23/2023, re-inspection completed: ➢ Drilled holes were found not to meet the minimum embedment. b) Cleanness/depth check (6” min. embedment) and epoxy application for #5 horizontal rebar dowels into existing CIP concrete slab on grade along grid “E” between lines “5” thru “8”, as per 3/S4.2, as we addressed on UES Structural Observation Report No. 08 (No.: 345306) dated 01/23/2023 and 09 (No.: 345425) dated 01/25/2023, re-inspection completed: ➢ Drilled holes were found to be the same diameter as the rebars to be epoxied. ➢ Pending application of anchoring epoxy Hilti HIT-HY 200. c) Cleanness/depth check (9” min. embedment) and epoxy application for #5 horizontal rebar dowels into existing CIP concrete footings at gridlines B.8x9 and B.8x10, as per attached drawing No. SK-01-17-23 (RFI #62), completed. d) Cleanness/depth check (9” min. embedment) and epoxy application for #5 horizontal rebar dowels into existing CIP concrete footings at gridlines D.3x9 and D.3x10, as per attached drawing No. SK-01-17-23 (RFI #62), as we addressed on UES Structural Observation Report No. 09 (No.: 345425) dated 01/25/2023, re-inspection completed: ➢ Pending application of anchoring epoxy Hilti HIT-HY 200. Mr. Jim Jenco, Project Superintendents with Lebolo Construction, was notified of the aforementioned visual verification results. Please see adjacent report pages for photographs and drawing No. SK-01-17-23. Project No.: 2110.2100049 Report No.: 345761 Date: January 27, 2023 STRUCTURAL OBSERVATION REPORT No. SPECIAL-010 CN: GDZ: ASD Page 4 of 7 cc: 1 − Job Site; 1 − Client; 1 The Original of this Report was Signed and Impressed Sealed by the Above Registered Engineer in Accordance with Rule 21H-18.11, Chapter 471, Florida Statute 8050 NW 77th Street · Miami, FL 33166 · P: 305.249.8434 · F: 305.249.8479 Project No.: 2110.2100049 Report No.: 345761 Date: January 27, 2023 STRUCTURAL OBSERVATION REPORT No. SPECIAL-010 CN: GDZ: ASD Page 5 of 7 cc: 1 − Job Site; 1 − Client; 1 The Original of this Report was Signed and Impressed Sealed by the Above Registered Engineer in Accordance with Rule 21H-18.11, Chapter 471, Florida Statute 8050 NW 77th Street · Miami, FL 33166 · P: 305.249.8434 · F: 305.249.8479 Project No.: 2110.2100049 Report No.: 345761 Date: January 27, 2023 STRUCTURAL OBSERVATION REPORT No. SPECIAL-010 CN: GDZ: ASD Page 6 of 7 cc: 1 − Job Site; 1 − Client; 1 The Original of this Report was Signed and Impressed Sealed by the Above Registered Engineer in Accordance with Rule 21H-18.11, Chapter 471, Florida Statute 8050 NW 77th Street · Miami, FL 33166 · P: 305.249.8434 · F: 305.249.8479 Project No.: 2110.2100049 Report No.: 345761 Date: January 27, 2023 STRUCTURAL OBSERVATION REPORT No. SPECIAL-010 CN: GDZ: ASD Page 7 of 7 cc: 1 − Job Site; 1 − Client; 1 The Original of this Report was Signed and Impressed Sealed by the Above Registered Engineer in Accordance with Rule 21H-18.11, Chapter 471, Florida Statute 8050 NW 77th Street · Miami, FL 33166 · P: 305.249.8434 · F: 305.249.8479 Reviewed by: Universal Engineering Sciences Certificate of Authorization No. 549 Carlos Naumann, P.E., S.I. Florida Professional Engineer No. 18594 Florida Special Inspector No. 181