Loading...
RC-11-19-2642 Plans 100 NE 101 STa m i; J0nson-Thhomas Renovation 100 NE 101st Street Miami Sh6 res, FL 3313Y The scope of work for the project includes new exterior doors and windows, New roofing finishes, a replacement air handler under a separate permit, new interior finishes, replacment of fixtures and minor changes to bathrooms and relocated laundry equipment, an( general finishes throughout. No structural work will be performed under this permit. Sheet List - Architectural Sheet Number Sheet Name 1-Architecure A-000 Cover A-100 Project Information A-101 Site Plan D-200 Demolition Plan D-201 Demolition Plan D-202 Demolition Plan A-200 Floor Plans Sheet List - Architectural Sheet Number Sheet Name A-201 Floor Plans A-400 Roof Plans A-500 Elevations A-501 Elevations A-502 Elevations A-503 Elevations A-700 Wall Sections & Details A-800 Door & Windows Details JOIW'ktudiu LLC Ano"6'hit tti- 6 :.x c. =emsE I A UDIO c No. Description Date 1 Revision 1 12-06-2019 V V V V �i V V V �JUV ;j V V V u V <<�,�., V �E4 V V V U •J V V V U V `.8 V U V ": V V V V u U) V V V V�IV V V V V nS E U VUUU U VVUV V V u 1)V UVU uuuu VVVVVU V V C J U u U Q V V V V V V U VU jV AR 96398 AR 92953 NOT USED F SUSTAINABILITY NOTES USE Ac) APPLICABLE BASED ON SCOPE OF WORK. CONTACT ARCHITECT OR SUSTAINABLE CONSULTANT FOR CLARIFICATION AS NEEDED. 1. CONSTRUCTION WASTE MANAGEMENT PLAN - 95% PERCENT OF WASTE GENERATED TO BE DIVERTED FROM LANDFILL; ALL SUBCONTRACTORS TO PARTICIPATE IN ONSITE WASTE MANAGEMENT PROGRAM, INCLUDING DIRECTING ON SITE PERSONNEL TO SORT RECYCLABLES BY CATEGORY (WOOD, PLASTIC, CONCRETE, GWB, STEEL, ASPHALT, MASONRY, CARDBOARD, RUBBLE, GENERAL MIXED WASTE, ETC). 2. EROSION AND SEDIMENTATION CONTROL PLAN - SUBMIT EROSION AND SEDIMENTATION CONTROL PLAN THAT CONFORMS WITH LOCAL MUNICIPALITY (DERM) AND FOLLOW CODE GUIDELINES AS APPLICABLE FOR SITE WORK. 3. WHITE CONCRETE SIDEWALK - MINIMUM SRI 85 4. LANDSCAPING - USE ALL NATIVE AND DRAUGHT TOLERANT PLANTS OR APPROVED EQUIVALENT. 5. CONCRETE - PROVIDE DETAILED DATA ON COMPANY LETTERHEAD INDICATING POST CONSUMER AND POST INDUSTRIAL RECYCLING PERCENTAGES OF STEEL REINFORCING; THE PRODUCTS SUPPLIED ARE MANUFACTURED/FABRICATED WITHIN A RADIUS OF 500 MILE FROM THE PROJECT SITE AND THE MANUFACTURED PRODUCTS ARE EXTRACTED OR RECOVERED WITHIN 500 MILES OF THE PROJECT SITE; PROVIDE DATA INDICATING COMPLIANCE WITH CEMENT SUBSTITUTION PERCENTAGE BY WEIGHT OF POST -CONSUMER AND PRE -CONSUMER RECYCLED CONTENT; INCLUDE STATEMENT INDICATING COSTS FOR EACH PRODUCT HAVING RECYCLED CONTENT; USE ANY TREATMENT WITH LOW TOXICITY AND EMIT LOW LEVELS OF VOLATILE ORGANIC COMPOUNDS (VOC); USE FLY ASH, PDXXOLAN, GROUND GRANULATED BLAST -FURNACE SLAG, AND SILICA FUME AS NEEDED TO REDUCE THE TOTAL AMOUNT OF PORTLAND CEMENT BY NOT LESS THAN 40 PERCENT. INDICATE AMOUNT AND VALUE OF MATERIAL USED. 6. STRUCTURAL STEEL - FOR EACH STEEL PRODUCT SPECIFIED A DOCUMENT SIGNED BY THE MANUFACTURER/FABRICATOR STATING COMPLIANCE WITH THE REQUIREMENT OF THE ENVIRONMENTAL OBJECTIVES; FOR PRODUCTS HAVING RECYCLED CONTENT DOCUMENTATION INDICATING PERCENTAGES BY WEIGHT OF POST -CONSUMER AND PRE -CONSUMER RECYCLED CONTENT. INCLUDE STATEMENT INDICATING COSTS FOR EACH PRODUCT HAVING RECYCLED CONTENT; E19; PROVIDE DATA INDICATING POST -CONSUMER AND POST INDUSTRIAL PERCENTAGES OF STEEL REINFORCING AND STEEL EMBEDMENT'S; ALL STEEL SHALL USE STEEL MADE IN AN ELECTRIC ARC FURNACE (EAF); PROVIDE PRODUCTS WITH AN AVERAGE RECYCLED CONTENT OF STEEL SO POST -CONSUMER RECYCLED CONTENT PLUS ONE HALF PRE -CONSUMER RECYCLED CONTENT IS NOT LESS THAN 50 PERCENT; WHERE APPLICABLE, PRIMING TO BE VOC COMPLIANT. 7. STEEL JOISTS - FOR PRODUCTS HAVING RECYCLED CONTENT, DOCUMENTATION INDICATING PERCENTAGES BY WEIGHT OF POST -CONSUMER AND PRE -CONSUMER RECYCLED CONTENT; INCLUDE STATEMENT INDICATING COSTS FOR EACH PRODUCT HAVING RECYCLED CONTENT; PROVIDE PRODUCTS WITH AN AVERAGE RECYCLED CONTENT OF STEEL SO POST -CONSUMER RECYCLED CONTENT PLUS ONE HALF OF PRE -CONSUMER RECYCLED CONTENT IS NO LESS THAN 60 PERCENT; WHERE APPLICABLE, PRIMING TO BE VOC MINIMUM LEVEL COMPLIANT. 8. ALUMINUM - WALKWAY COVERS MINIMUM SRI 29. 9. ARCHITECTURAL WOODWORK AND ROUGH CARPENTRY - ALL ADHESIVE AND SEALANTS USED ON THE INTERIOR OF THE BUILDING SHALL COMPLY WITH THE SCAQMD VOC LIMITS, AS REFERENCED IN LEED FOR NEW CONSTRUCTION - LATEST EDITION; LIST ALL ADHESIVE, SEALANTS AND PRIMERS TO BE USED IN THIS PROJECT; COMPOSITE WOOD, AGRIFIBER PRODUCTS AND VENEER (MDF, PLYWOOD, PARTICLEBOARD, ETC.) TO BE URETHRA -FORMALDEHYDE FREE; PROVIDE MANUFACTURER'S SPECIFICATION AND PROOF OF PURCHASE TO SHOW COMPLIANCE WITH THE LIMITS. COMPLY WITH FSC CERTIFIED WOOD REQUIREMENTS. 10. ROOFING SYSTEM - ROOF SURFACE MUST BE REFLECTIVE WITH MINIMUM SRI 78. 11, BUILDING INSULATION - THE PRODUCTS SUPPLIED ARE MANUFACTURED/FABRICATED WITHIN A RADIUS OF 500 MILE FROM THE PROJECT SITE AND THE MANUFACTURED PRODUCTS ARE EXTRACTED OR RECOVERED WITHIN 500 MILES OF THE PROJECT SITE; PROVIDE DATA INDICATING COMPLIANCE WITH 30% MINIMUM BY WEIGHT OF RECYCLED CONTENT; INCLUDE STATEMENT INDICATING COSTS FOR EACH PRODUCT HAVING RECYCLED CONTENT; USE ANY TREATMENT WITH LOW TOXICITY AND EMIT LOW LEVELS OF VOLATILE ORGANIC COMPOUNDS (VOC). 12. SPRAY APPLIED FIRE RESISTIVE MATERIALS - STRUCTURAL GLAZING ADHESIVES USED ON THE INTERIOR OF THE BUILDING SHALL COMPLY WITH THE SCAQMD VOC LIMITS, AS REFERENCED IN LEED FOR NEW CONSTRUCTION - LATEST EDITION; LIST ALL ADHESIVES TO BE USED IN THIS PROJECT; PROVIDE MANUFACTURER'S SPECIFICATION AND PROOF OF PURCHASE TO SHOW COMPLIANCE WITH THE LIMITS. 13. WOOD DOORS - FSC (FOREST STEWARDSHIP COUNCIL) CERTIFIED; USE A MINIMUM OF 50 PERCENT WOOD BASED MATERIALS AND PRODUCTS THAT ARE CERTIFIED IN ACCORDANCE WITH THE FSC; PROVIDE 95 PERCENT WOOD BASED MATERIALS AND PRODUCTS THAT ARE FSC CERTIFIED AND COST DIFFERENTIAL; PROVIDE A LIST OF ITEMS AND/OR COMPONENTS OF PRODUCTS INCLUDING PRODUCT TYPE, MANUFACTURER AND APPROPRIATE CERTIFICATION NUMBER. 14. GYPSUM WALLBOARD - FOR PRODUCTS HAVING RECYCLED CONTENT, DOCUMENTATION INDICATING PERCENTAGES BY WEIGHT OF POST -CONSUMER AND PRE -CONSUMER RECYCLED CONTENT; INCLUDE STATEMENT INDICATING COSTS FOR EACH PRODUCT HAVING RECYCLED CONTENT; PROVIDE PRODUCTS WITH AN AVERAGE RECYCLED CONTENT SO POST -CONSUMER RECYCLED CONTENT PLUS ONE HALF OF PRE -CONSUMER RECYCLED CONTENT IS NO LESS THAN 70 PERCENT. WHEN POSSIBLE, THE PRODUCTS SUPPLIED SHOULD BE MANUFACTURED/FABRICATED WITHIN A RADIUS OF 500 MILE FROM THE PROJECT SITE AND THE MANUFACTURED PRODUCTS ARE EXTRACTED OR RECOVERED WITHIN 500 MILES OF THE PROJECT SITE; SHOULD BACKING BE REQUIRED FOR INSTALLATION OF EQUIPMENT/FIXTURES/ACCESSORIES, COMPLY WITH FSC CERTIFIED WOOD. 15. PAINTS & COATINGS - ALL PAINTS AND COATINGS USED ON THE INTERIOR OF THE BUILDING SHALL COMPLY WITH THE SCAQMD VOC LIMITS, AS REFERENCED IN LEED FOR NEW CONSTRUCTION - LATEST EDITION; LIST ALL PAINTS, PRIMERS AND COATINGS TO BE USED IN THIS PROJECT; PROVIDE MANUFACTURER'S SPECIFICATION AND PROOF OF PURCHASE TO SHOW COMPLIANCE WITH THE LIMITS. 16. CARPET - PROVIDE MANUFACTURER'S SPECIFICATION AND PROOF OF PURCHASE TO SHOW COMPLIANCE WITH THE LIMITS; PROVIDE CARPET THAT COMPLIES WITH GREEN LABEL PLUS PROGRAM. 17. ACOUSTICAL CEILING - FOR PRODUCTS HAVING RECYCLED CONTENT, DOCUMENTATION INDICATING PERCENTAGES BY WEIGHT OF POST -CONSUMER AND PRE -CONSUMER RECYCLED CONTENT; INCLUDE STATEMENT INDICATING COSTS FOR EACH PRODUCT HAVING RECYCLED CONTENT; PROVIDE PRODUCTS WITH AN AVERAGE RECYCLED CONTENT SO POST -CONSUMER RECYCLED CONTENT PLUS ONE HALF OF PRE -CONSUMER RECYCLED CONTENT IS NO LESS THAN 70 PERCENT. WHEN POSSIBLE, THE PRODUCTS SUPPLIED SHOULD BE MANUFACTURED/FABRICATED WITHIN A RADIUS OF 500 MILE FROM THE PROJECT SITE AND THE MANUFACTURED PRODUCTS ARE EXTRACTED OR RECOVERED WITHIN 500 MILES OF THE PROJECT SITE; ALL ADHESIVES USED ON THE INTERIOR OF THE BUILDING SHALL COMPLY WITH THE SCAQMD VOC LIMITS, AS REFERENCED IN LEED FOR NEW CONSTRUCTION VERSION 2.2 (SEE ATTACHED); LIST ALL ADHESIVES USED IN THIS PROJECT; PROVIDE MANUFACTURER'S SPECIFICATION AND PROOF OF PURCHASE TO SHOW COMPLIANCE WITH THE LIMITS. 18. PLUMBING FIXTURES - DUAL FLUSH TOILETS; WATERLESS URINALS; SHOWER HEADS WITH 1.6 GPF OR LESS, FAUCETS WITH 1.6 GPF OR LESS. 19. HVAC EQUIPMENT - HVAC EQUIPMENT CANNOT USE CFC BASED REFRIGERANT; SELECT MINIMUM IMPACT REFRIGERANTS; AVERAGE REFRIGERANT IMPACT BASED ON OZONE DEPLETION POTENTIAL AND GLOBAL WARMING POTENTIAL MUST BE BELOW 100. 20. FILTERS - PROVIDE IN ACCORDANCE WITH SMACNA CHAPTER 3 (MIN DURING CONSTRUCTION MERV 8 AND BEFORE OCCUPANCY MERV 13). 21. CO2 DETECTORS - FURNISH AND INSTALL CO2 MONITORS AND SET TO SOUND ALARM AT 10 PERCENT CHANGE. 22. MANUFACTURED ITEMS - FOR ALL LEED RELATED MANUFACTURED ITEMS CONTRACTOR AND/OR SUB -CONTRACTOR SHALL PROVIDE MANUFACTURER'S PRODUCT INFORMATION AND DOCUMENTATION AS WELL AS PROOF OF PURCHASE IN ORDER TO SHOW LEED COMPLIANCE. 13 N.T.S. SUSTAINABILITY NOTES 1. ALL WORK TO CONFORM WITH APPLICABLE LOCAL, STATE AND FEDERAL CODES AND REGULATIONS. 2, ALL WORK SHALL BE IN STRICT ACCORDANCE WITH THE BEST PRACTICES OF THE CONSTRUCTION TRADE. 3. VERIFY ALL DIMENSIONS INDICATED ON DRAWINGS WITH FIELD CONDITIONS BEFORE PERFORMING ANY WORK, OR BEFORE FABRICATING OR ORDERING ANY MATERIALS OR PRODUCTS. DO NOT SCALE DRAWINGS. REPORT ANY DISCREPANCIES TO THE ARCHITECT BEFORE PROCEEDING. 4. ALL DETAILS SECTIONS, DIAGRAMS, ETC. ARE INTENDED TO BE TYPICAL AND SHALL BE CONSTRUCTED TO APPLY TO ANY SIMILAR SITUATION ELSEWHERE IN THE PROJECT. 5. ALL CONTRACTORS ARE TO FAMILIARIZE THEMSELVES WITH, AND CONFIRM ALL EXISTING MATERIALS, QUANTITIES, DIMENSIONS AND CONDITIONS PRIOR TO SUBMITTING THEIR BID. 6. ALL TRADE CONTRACTORS SHALL VERIFY ALL UTILITIES, AND PLACEMENT LOCATIONS OF PIPE CONDUIT, EQUIPMENT, DUCTWORK, ETC., PRIOR TO SUBMITTING BIDS, COORDINATE TO SCHEDULE WALK-THRU, 7. ALL MATERIALS FURNISHED ON THE JOB SITE SHALL BE NEW AND STORED IN SUCH A MANNER AS TO PROTECT THEM FROM DAMAGE 1N ANY FORM. 8. ALL CONTRACTORS ARE TO KEEP THE JOB SITE CLEAN AND FREE OF ALL DEBRIS AT ALL TIMES. 9. THE CONTRACTOR SHALL ARRANGE FOR ALL INSPECTIONS BY THE BUILDING AUTHORITIES. COST OF SPECIAL INSPECTORS SHALL BE INCLUDED IN THE PROJECT COST IF NECESSARY. 10. WARRANTY AND SERVICE ALL WORK IN CONTRACT. 11. CONTRACTOR AND SUBCONTRACTOR SHALL PRODUCE ALL REQUIRED PROOF OF LICENSES AND INSURANCE. 12, PROVIDE TERMITE PROTECTION WHERE APPLICABLE PER CODE AND LOCAL REGULATIONS. 13. ALL NEW WALL/CEILING FINISHES AND INSULATION MATERIALS TO HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 25 AND A SMOKE - DEVELOPED INDEX OF NOT MORE THAN 450 14. ALL WORK, MATERIALS AND EQUIPMENT ARE TO BE RETAINED INSIDE PRIVATE PROPERTY 15. ANY WORK, AND/OR IMPROVEMENTS AND/OR USE OF EQUIPMENT WITHIN THE RIGHT OF WAYS INCLUDING LANDSCAPING AND IRRIGATION WILL REQUIRE A SEPARATE CMB PUBLIC WORKS DEPARTMENT RIGHT OF WAY CONSTRUCTION PERMIT "PRIOR TO START OF CONSTRUCTION" 16. MATERIAL TYPES, FINISHES, COLORS, PANELS, TEXTURES, ETC. TO BE COORDINATED WITH OWNER/ARCHITECT AND REFERENCED TO CONSTRUCTION MANUAL. Drawina # scale: FT S, GENERAL NOTES CONSTRUCTION (VOTES: 1. Structural drawings shall be worked together with Architectural, Mechanical, Electrical and Plumbing drawings to locate depressed slabs, slopes, drains, outlets, recesses, openings, reglets, bolt settings, sleeves, dimensions, etc. Discrepancies shall be brought to the attention of the architect before proceeding with any and all work. 2. Contractor to verify all dimensions and conditions at the job site before starting any work. Bring all discrepancies to the attention of the architect before beginning any work. 3. Contractor to verify the location of any and all underground and overhead utility lines in the area of proposed work, 4. NO deviations of these plans are to be made, in any way, without the express WRITTEN permission of the architect. Alternate equipment may only be substituted with written approval of the architect. 5. Review of ALL shop drawings is required by the architect and the general contractor. The owner, contractor or sub- contractor is required to submit all shop drawings in order that the architect can check layout concept. The architect shall then accept the shop drawings as substantially conforming to the design intent or reject the shop drawings. All shop drawings approved by the architect shall bear the signature of the same. 6. All shop drawings shall be submitted on 24" X 36" BOND PAPER ONLY. Submit six (6) copies for approval. Truss drawings shall be at the same scale as that of the floor plan, and all shop drawings shall be sealed and signed with calculation by a Florida registered engineer in order to be approved. 7. These drawings are diagrammatic only. It is not the intent of these drawings to show every minor detail of construction. 8. The contractor shall furnish and install all items for a complete building system and provide all requirements necessary for equipment to be placed in proper working order, 9. The contractor shall promptly notify the architect in writing of the existence of any observed variations between the contract documents and the applicable codes or ordinances. 10. Comply with sustainable notes and guidelines as appropriate for the project scope. SITE PREPARATIONS A) GENERAL 1. Fill and backfill to be compacted to a minimum of 95% of the maximum density at optimum moisture as determined by the standard proctor test. 2. Fill material to be clean course sand and crushed limerock free of organic or deleterious material, of a minimum dry density of 110 pounds per cubic ft. 3. Material excavated from the site may be reused for fill provided it is free from blacktop, organic or deleterious material and is combined with a limerock fill to give a suitable fill material of minimum dry density of 110 pounds per cubic foot and will compact to 95% of the maximum dry density. 4. After removal of any top soil, debris, and organic or deleterious material, compact existing material with a heavy self-propelled vibratory roller (min. static weight of 10 tons) with a minimum of 1 passes overlapping 6". B) GRADING 1. Contractor shall provide a sub grade to within 6" of final grade specified on the site or grading plan. If landscape drawings are provided as part of this drawing set, information on landscape drawings supersede all other drawings. C) LANDSCAPING 1. All disturbed grass to be replaced with matching turf. 2. All existing trees to remain to be protected as per Municipal guidelines and applicabie arbor practices. SOIL STATEMENT: soil at this site is sand & rock adequate to support the design load of 2000 psf. after excavation signed and sealed letter will be submitted by the architect or the engineer attesting that the site has been observed and the foundation conditions are similar to those upon which the design is based on. TERMITE PROTECTION STATEMENT: In accordance with FBC 2014, Upon completion of the application of the termite protective treatment, a Certificate of Compliance shall be issued to the building department by the licensed pest control company that contains the following statement: "The building has received a complete treatment for the prevention of subterranean termites. Treatment is in accordance with rules and laws established by the Florida_ Department of Agriculture and Consumer Services." A weather resistant jobsite posting board shall be provided to receive duplicate treatment certificates as each required protective treatment is completed, providing a copy for the person the permit is issued to and another copy for the city of Miami building permit files. The treatment certificate shall provide the product used, identity of the applicator, time and date of the treatment, site location, area treated, chemical used, percent concentration and number of gallons used, to establish a verifiable record of protective treatment. If the soil chemical barrier method for termite prevention is used, final exterior treatment shall be completed prior to final building approval. In addition, a permanent sign which identifies the termite treatment provider and need for re -inspection and treatment contractor, DEMOLITION 1. All demolition and construction debris shall be properly disposed of with all recyclable material separated and delivered to the appropriate agencies 2. It is the responsibility of the General Contractor to notify architect/owner of conditions discovered during demolition that effect the existing structures to remain and to coordinate with architect/owner for resolution. 3. All necessary precautions shall be utilized to maintain the environmental, structural, electrical, mechanical and plumbing integrity of the building and all systems so that the habitability of the residence outside the scope of work, remains. 4. All trades to clean up jobsite daily of all demolished debris. 5. Provide demolition and construction schedule to owner and architect before commencing any work. 6. Coordinate with owner on work to be performed. Obtain all necessary approvals and/or permits prior to commencing with any work, 7. Contractor to provide for trash and debris removal and is not allowed to use any existing trash receptacles on the site. 8. Any damage occurring during demolition shall be fixed or replaced by this contractor to match existing. wing # scale: N.T.S. CONSTRUCTION NOTES SEBASTIAN EILERT, AIA, LEED DANIEL G. LEWIS, AIA SUSTAINABLE ARCHITECTURE Architects Studio, LLC A o3°A o902 NE 101st Street Site Qi c N ui w Z Z NE 100 St Street 17 N.T.S. SITE MAP 3 DETAIL NO. A600 CONSTRUCTION DETAIL/PLAN SYMBOL SHEET NO. +0'-0" A.F.F. BUILDING ELEVATION HEIGHT SYMBOL XXX DOOR SYMBOL OWINDOW / LOUVER TAG DETAIL NO. BUILDING, PARTIAL & DETAIL SECTION A-7 SHEET NO. SYMBOL IV _J 1 D N.T.S. SYMBOL NOTATION Drawinc # If N.T.S. NOT USED e:1:0 ASTU ms. ., :9 100 NE 101 st Street Miami Shores, FL 33138 Scope of Work: The scope of work for the project includes new exterior doors and windows, New roofing FS finishes, a replacement air handler under a separate permit, new interior finishes, replacment of fixtures and minor changes to bathrooms and relocated laundry equipment, and general finishes throughout. No structural work will be performed under this permit. Legal Description: MIAMI SHORES SEC 1 AMD PB 10-70 LOTS 13 & 14 BLK 15 LOT SIZE IRREGULAR OR 20710-1074 09 2002 1 Occupant Loads Total for entire site: Plumbing Fixtures Zoned: k .1 Loft Shower Shower #2 Sink Kitchen -Island Sink Vanity -Round Toilet-Domestic-31D Tub-Rectangular-3D Grand total: 12 1 1 1 5 3 1 Total Parking Area Occupancy Type: Construction Type: Classification of Work: Code References: Florida Building Code 6th Edition, Building (2017) Existing Building (2017), Residential (2017) swing # Scale: 16 N.T,S. PROJECT INFORMATION V U U U U ouQuou O UUVUU UVUU V V V V U UUUVVV UU VV VVUUVU U V U V V , j U V e R-17.5, R-18.5 NIA R-3 Type V Unprotected_ Level 2 APPLICABLE CODES AND STANDARDS THE FOLLOWING BUILDING CODES, CURRENT EDITIONS UNLESS OTHERWISE SPECIFIED, WILL BE ADHERED TO: FLORIDA BUILDING CODE - 6TH EDITION (2017) TO THE BEST OF THE ARCHITECT'S KNOWLEDGE, THESE PLANS AND SPECIFICATIONS COMPLY WITH THE APPLICABLE MINIMUM BUILDING CODES AND THE APPLICABLE FIRE -SAFETY STANDARDS AS DETERMINED BY THE LOCAL AUTHORITY IN ACCORDANCE WITH FBC 105.13.4.4 AND 633 FLORIDA STATUTES. NOTE: 2017 FBC 105.10 A WEATHER RESISTANT JOBSITE BOARD SHALL BE PROVIDED TO RECEIVE DUPLICATE TREATMENT CERTIFICATES AS EACH REQUIRED PROTECTIVE TREATMENT IS COMPLETED, PROVIDING A COPY FOR THE PERSON THE PERMIT 1S ISSUED TO AND ANOTHER COPY FOR THE BUILDING DEPARTMENT FILES. THE TREATMENT CERTIFICATE SHALL PROVIDE THE PRODUCT USED, IDENTITY OF APPLICATOR, TIME AND DATE OF THE TREATMENT, SITE LOCATION, AREA TREATED, CHEMICAL USED, PERCENT CONCENTRATION AND NUMBER OF GALLONS USED, TO ESTABLISH A VERIFIABLE RECORD OF PROTECTIVE TREATMENT. IF THE SOIL CHEMICAL BARRIER METHOD FOR TERMITE PREVENTION IS USED, FINAL EXTERIOR TREATMENT SHALL BE COMPLETED PRIOR TO FINAL BUILDING APPROVAL. NOTE: Interior wet areas shall use Densglass Gold 5/8" wallboard or architect approved equivalent. NOTE: All insulation materials to have a flame spread index of not more than 25 and a smoke -developed index of not more than 450 NOTE: All door glazing shall be category II safety glazing. NOTE: All side lites, and glazing adjacent to any door shall be category 11 safety glazing. NOTE: All glazing in or adjacent to tubs, showers shall be category II safety glazing. NOTE: Sound board sheathing to be used for ceilings and as additional surface sheathing on all demising walls, GC to coordinate with owner for specific locations. NOTE:Existing glazing configuration to remain unchanged with existing design pressures. New egress units conform to existing design pressures on record documents. NOTE: All fire rated double doors shall have astragal and coordinator. NOTE: All fire rated doors shall have self closing hardware sets. NOTE: All guardrails shall remain 42" min, above finished floors. I lid PO TACIT H ! Each trade, manufacturer, and/or supplier has the ultimate responsibility to understand its scope of work within this set of plans completely prior to commencing any work. Any discrepancies, questionable, or unclear conditions are to be brought to the architects attention for clarification. wing # Scale: L��T-S- CODE REFERENCES -1 0® Project number 18019 Date November 4, 2019 No. Description Date 1 Revision 1 12-06-2019 J\K AR 96398 AR 92953 "'JU V UU U UVUuu.n U V V V V V U V U V V V VVUVU ii V V U V U VU JV VVVU �UVUVV 4 0 N d' I L O I ^^ O �• U U /. :N. 900 00' 00" W, 1 80.65' � ' .. E UUuuou VU Existing c I o Concrete U p Pathway o h h- 1" = 10'-0" 1 Site Plan SEBASTIAN EILERT, AIA, LEED Site Plan A-101 roiect number 180' ate November 4, 20 11 1 Revision 1 112-06-2019 1 K'k� ��r AR 96398 AR 92953 u'l V CD •]'J U U oUUUuu u UUVUVV U U uUUUu U U U J U U fl}UUUU U u U uU VUUV U V U V V U U U �- .4RIV f Nalil Xx S ROOM NUMBER KI xxx DOOR NUMBER KE WINDOW KEY /Q WALL TYPE KEY NOTE KEY n E}'JIPMENT KEY WALL TYPE SCHEDULE Existing 1 2 - 3.511 Mtl. Mark Description 1 Exterior NUDUHA wall - See D41A-700 213 Interior metal channel GW B wall - See 0141A-700 4 CMU wall w/ rigid insulation & GWB - See D14IA-70D NOTE: Interior wet areas shall use Densglass Gold 5/8" wallboard or architect approved equivalent. NOTE: Shower and bathtubs shall have non absorbent floor and wall finish up to 72" above FFE. NOTE: Wall and ceiling finishes shall have a flame spread index of not greater than 200. Wall and ceiling finishes shall have a smoke -developed index of not greater than 450. All insulation materials to have a flame spread index of not more than 25 and a smoke -developed index of not more than 450 NOTE: All door glazing shall be category 11 safety glazing if greater than 9sf or category I if less than 9sf.. NOTE: All side lites, and glazing adjacent to any door shall be category II safety glazing. NOTE: All glazing in or adjacent to tubs, showers shall be category 11 safety glazing. 1/4" min. framed, 3/8" min. framless. NOTE:Existing glazing configuration to remain unchanged with existing design pressures. . NOTE: Glazing within 60" of floor level in walls surrounding tub or shower, & within 60" horizontally of tub or shower shall be safety glazing cat. 11. 1/4" min. framed, 3/8" min. framless. RM-100 -- Bedroom # 1 — Replace existing light fixture. RM-101 — Closet — No work to be performed in this area. Fill02 — Closet — No work to be performed in this area. RM-103 — Foyer — Replace existing light fixture. RM-104 — Bathroom # 1 — New flooring & wall finishes, relocated new toilet connected to existing plumbing connection, now LED ceiling lights to existing ceiling light circuit, new bathtub in existing location with frameless glass shower door, new two bowl vanity to existing vanity plumbing connection. RM-105 — Den — Now flooring finishes. RM-106 — Laundry Closet — Relocate existing Washer/dryer and all associated connections to laundry closet, new flooring finishes. RM-107 — Living Room — Now flooring finishes. RM-108 — Dining Room — New flooring finishes, new ceiling finishes. RM-109 — Closet — Now flooring finishes. RM-110 -- Kitchen — New flooring finishes, new ceiling finishes. RM-111 — Pantry — New flooring finishes. RM-112 — Bedroom # 2 — Replace existing door with new interior door, includes now Tamarack Technologies transfer grill RM-113 — Bathroom # 2 — New 80 CFM exhaust fan to exterior, includes varmint screen. RM-114 — Closet — No work to be performed in this area. RM-115 — Garage — Existing garage floor slab to be cleaned and degreased and prepared for now liquid applied flooring finish. Replace existing laundry sink in same location. RM-200 — Garage Loft — No work to be performed in this area. RM-201 — Closet — No work to be performed in this area. RM-202 — Kitchenette — No work to be performed in this area. RM-203 — Bathroom — Existing toilet to be replaced in existing location. Existing vanity and sink to be replaced in existing location. Existing light fixture to be replaced. New WB exhaust fan/Light to be installed, exhaust to exterior, includes varmint screen. Floor Plan Legend & Schedule 133rd SEBASTIAN EILERT, AIA, LEED DANIEL G. LEWIS, AIA SUSTAINABLE ARCHITECTURE AND CONSULTING AR 96398 AR 92953, ID 5054, A26001202 Johnison-ThOmas 100 NE 101st Street Miarni Shores, FL 33138 18019 P1...........l...... A —I— r a M!N a N E 0 Z Cn rZ E r F- 0 0 0 �uvau U UUV '»nau U n u -� UUUU n 3 J V V V I 2Asting roof finishes to be removed, under separate permit, GC to coordinate with roofing sub -contractor and owern/architect to repair/replace sub roof components and or structural members as needed. NOTE: GC to coordinate salvage of any and/or all fixtures and equipment with owner and architect. Demolition Component/area NOT USED NOT USED (3 f 5) 2 5 3 - 5 7 81' 13063 SW 133rd Ct Miami, FL 33186 Demolition Notes & Schedule SEBASTIAN EILERT, AIA, LEED DANIEL G. LEWIS, AIA SUSTAINABLE ARCYRTJ. CT V RE AND CONSULTING AR 96398 AR 92953, ID 50541 A26001202 Johnson-'-homas Construction o cuments 100 NE 101 st Street Miami Shores, FL 33138 1 16019 uuuuuu u 0 u U J V V U U `l V U O U L U V U V UU{�U V V fiUUVJ J U`�VUV T u JJVuUV uU V CiUU NLme x ROOM NUMBER KE Zxx DOOR NUMBER KE 9 WINDOW KEY 4 WALL TYPE KEY 1-1 NOTE KEY t:J EQUIPMENT KEY WALL TYPE SCHEDULE 2-3.5"Mtl. Mark Description 1 Exterior NUDURA wall- See 041A-700 2/3 interior metal channel GW13 wall - See ❑141A-700 4 CMU wall wl rigid insulation & GWB - See D147A-700 NOTE: Interior wet areas shall use Densglass Gold 5/8" wallboard or architect approved equivalent. NOTE: Shower and bathtubs shall have non absorbent floor and wall finish up to 72" above FFE. NOTE: Wall and ceiling finishes shall have a flame spread index of not greater than 200. Wall and ceiling finishes shall have a smoke -developed index of not greater than 450. All insulation materials to have a flame spread index of not more than 25 and a smoke -developed index of not more than 450 NOTE: All door glazing shall be category II safety glazing if greater than 9sf or category I if less than 9sf.. NOTE: All side lites, and glazing adjacent to any door shall be category II safety glazing. NOTE: All glazing in or adjacent to tubs, showers shall be category II safety glazing. 1/4" min. framed, 318" min. framless. NOTE:Existing glazing configuration to remain unchanged with existing design pressures. . NOTE: Glazing within 60" of floor level in walls surrounding tub or shower, & within 60" horizontally of tub or shower shall be safety glazing cat. II. 114" min. framed, 3/8" min. framless. RM-100 — Bedroom # 1 — Replace existing light fixture. RM-101 — Closet — No work to be performed in this area. RM-102 — Closet — No work to be performed in this area. RM-103 — Foyer -- Replace existing light fixture. RM-104 — Bathroom # 1 — New flooring & wall finishes, relocated new toilet connected to existing plumbing connection, new LED ceiling lights to existing ceiling light circuit, new bathtub in existing location with frameless glass shower door, new two bowl vanity to existing vanity plumbing connection. RM-105 — Den — New flooring finishes. RM-106 — Laundry Closet — Relocate existing Washeridryer and all associated connections to laundry closet, new flooring finishes. RM-107 — Living Room — New flooring finishes. RM-108 — Dining Room — New flooring finishes, new ceiling finishes. RM-109 — Closet — New flooring finishes. RM-110 — Kitchen — New flooring finishes, new ceiling finishes. RM-111 — Pantry — New flooring finishes. RM-112 — Bedroom it 2 — Replace existing door with new interior door, includes new Tamarack Technologies transfer grill RM-113 — Bathroom # 2 — New 80 CFM exhaust fan to exterior, includes varmint screen. RM-114 — Closet — No work to be performed in this area. RM-115 — Garage — Existing garage floor slab to be cleaned and degreased and prepared for new liquid applied flooring finish. Replace existing laundry sink in same location. RM-200 — Garage Loft — No work to be performed in this area. RM-201 — Closet — No work to be performed in this area. RM-202 — Kitchenette — No work to be performed in this area. RM-203 — Bathroom — Existing toilet to be replaced in existing location. Existing vanity and sink to be replaced in existing location. Existing light fixture to be replaced. New WB exhaust fan/Light to be installed, exhaust to exterior, includes varmint screen. Floor Plan Legend & Schedule (3 0 5) 2 5 3 - 5 7 8 13063 SW 133rd Ct Miami, FL 33186 Second Floor Plan SEBASTIAN EILERT, AIA, LEED DANIEL G. LEWIS, AIA SUSTAINABLE ARMTECTURE 1 AND CONSULTING AR 96398 AR 92953, ID 5054, A26001202 100 NE 101st Street Miami Shores, FL 33138 O o� Y w a v a� E m 0 Z V ;isa Vl E u0 E 0 0 U U V U U U (1 U u UuuCi ViJ U V uuuuuu u UUUUU uuvu,j O V U V V U 3 e V U V U U J o U UU `� J November 4, 2019 SEBASTIAN EILERT, AIA, LEEK DANIEL G. LEWIS, AIA SUSTAINABLE ARCHITECTURE AND CONSULTING AR 96398 AR 92953, 1D 5054, A26001202 A-400 :)(0jecL number 18019 AR 96398 )ate November 4, 2019 AR 92953 /T — r+ / / / / /. / / / V f / / / i / ,/ �, / %,-/ / / "I ,;/ I. '"V. /' / %� r/ // / i. ✓. /� / / %' : I , - I 1� . . 11 � - - -1 - �, - - - I -1 " - : � , - I I'- . . . 1, ." — I I - - I — M—/-11.//`/ ��', . / : _ _ _ _ / /f i /i / rrr a m ���� W „� : �� / / / /; ; i / `, /' //' / / /l/ .,. /� / / /11V o'r ,ttr. i, 1 s L. y: J , i , / '' % ' % / 1, I' , / l /" 7' ' '/ / 'I /' / _.�' j / / ; ;'/ / / ;/ / �' i I� 1 / , /' /' / /'' // /" /" T {��/ / ✓/ I/ C / /:' / / / ' / ;' � � , : F: - - - LUI - , I; i ;% / �� / / , / �� /I / / , "I// /,, z , / " ♦ / it !, -I, / /'� / _ — — -- —� —�-- 17/ — / i - � // / / / I i .;;, __)� __.. _ d. . I . is is / I I /// / / / / / /// / // � // //, /;' /:'/ '/ / / �// /'' �, f.-/.'l/ / 'r '/,. / ,/ / r- / ., /-// / / '// `' ';� i / / / �"', /7777;�//!. /'/! /' // / /�i / i•' Gc�G Get /. , ,,, /.%// /"/ ,'/ .% -/ i f /// ,/' // \/'.-/- / ��! / /' ,. —y.+ .ter., �. 7L,�r_.�.:.. '.�r ':T. `,I. // G ' / / //.- /, / // /i/ / /i '/ '// / / / � �/ / /' / / ; l/; I" / /ill UVG•i UE I, / /, , i /V"I"/ / / "/ / /// / /" /i / �,�., T � — / /� //:.. / ,r r / /f / / / UUG -177 U — — --;' �' — .; , /7 / / I / / I I ', / / /, I V i� /' �� /��T / // /,, / e�G,. /�� / j i .-/-;/ '; i./' ';/ ,// /' , /./. , //, /.'/ .'//// / /,1/1,,' / / ///. 1,..,//i` / I I UiiVVV Ii: ii r//' // /' / , ./,//.',, "/ / / //, /. -, // i �' , /Jll / / /, ,j /_ / / // ` ' G V 4�1 /',//' /!i /, / / / // // / / /,/ / �� I/' "/./ / V / / I �// / / / '. � / ''� `/ . / /, / / ; r / j / i / / is // G t �/' / / / '1 /,'.: /J . / /,� : f ';"--/"/ , / ♦ � , / / / ' i. / / r //,r ; , , . / '/ / ',/,./r ,: ,, , , u o u u is// ' , / /// / / i / / ; / / / ./ /,/ / //; / ' r .r .'/ �/ .' / // / /1 / / / ' //. i, / j /; / // / i' /; /' // / / / - l//i7 / T / `!:T // �/r/', /;T,, ,: ;!% ,',/ ///,r/i/ ✓1 /// % / // / / =77 �=� 1, /, / / / / r' I / / ` ,/ I; it T r'i� f 7 i Tom' %; /�/ , /, %'' /, % / /` /;/ ; / /' / // /,; / / r //' / / / �, / / 'r/,r� ems; /'/ / /:',/ ,. /' / / /: k;l ,i / ; / /',, /' /:', / /% / /� �, / // ice- / i r //, / �, i / /111 / d ! it / I' / �/ r'',I i/ / /' // l / 1 ___, �� __ J1 J IR — - .- - /'11, i', _ � . �r /i r C Ii/ % /j '/ ' /'/ /.'// %r / ' : E :f Ei 11 E. 3 E �I - - - r _ _ _ . / // f r ;,. ,�. -� / ,, / " / I/' / , / - I l _/ .\ ... , ' -_ is . '.. ' E _ ........ .............. , -i E_. ... ....... .. .,! - ' / % �/ 'r;: r /, ,/, / / / / r / / / /�' /i / it " I' t - /, / ' / , I / / ii 11 / % / I i ♦ / /' I' I / I I ' /, �. / : i / 1 / i" % / ,. . /' i I: '1 it - - - - - / / /,; // / //�./ / ., /,/, ., / -I., I I L......1 ..... .. . I ; �/ r' r! / I 1 j . �: / : ' / /I I i - - II / / / / '� / I - Y, i , ♦ / / / , /; % // ♦ % / / / /, / /, , ;r! - �" �f r'' / x. I , /, / I - . - , _ . / / / / / // r' E _�-__ .........-..........__.-. ______ - ---_---__ __-._ ____u_____. _. _._-_ __W_ ____ .....-__ _.__ — ; . / o / / % % //' / % / / / / / /r / / / % i �/ ,r 2 1 .. ..I. Ij /�i - r,i/; % // /;/ j;, / ,, ,I , /;. �; / ; /i% i/ /`/';/'11�i ' I% i I I �/, , " //,",- / " "' , , 7V - '' -, �, , -, , I '. - -1. . . '' liv/ " //""/''//, / / /' . , ,,/,/",',,�, - II/ ' !�/ / // i/ , / �j / / / / /i � A, / '/ / // /%I/ " � li - - . : . �/ 1 /i/ / . /// / ,/ / / / / /'r /r / I;r%'%� �/, /�/, 0 / , / / "'i %/♦ i /�// /ij ;.i`�'�:��/ ,% //,; /I �I//j 'll _ , "%i l"� T r..': T /r /11"/' /I/' �"% , ,//, i /�'f l/ !�', �/; /Ij ; �/ / �I /� /-�' / — ,, — � — / / / , // ,1. I� /,/, %, I /� ,�� j /�, ///,//j / �/� / / j ail; �/ I;II : / / /I " �, '1 I j;, I ( .� I I I I ��/, 11 I I , ., /,:/, ,�,,/ , , , , / I I-�/01/� ,/,/i %i 1 /r'�-/�� I /�' /�' / ;�11/j//' // • �/� I /♦' .; / "`� ///I/ 1, / 11 11 I/ /�/ // !/ /,%i;(1 ' ; ' I/, / ' /I j1. +1 II" i l' I '. /%� / i; I' �/2; j I / r / (j ;/II j �. I jai / �/ j;% /� // ,/, ; '/ ''h r, ` j / t♦I/ ♦j i / // % ° // Ij% //� I /� ///�'i/ �� j ; \ /j�j /�i I /j// /; it �� 14! /` !%I/ " ,� �,/// , �,,,/ '♦k'� � r / /1 I I - ,yy - � --�— 1 / /. i/ / ;/ 1 /�/""/,-�, /', / / / / /, " /�,:.� / / I , , / . / � .,./I / " , , -� 1, " , , � . - -- 11.7 'Ir 7- 1 i/ / / / /;//;� /''./ / / .1 I / ' /,, / / /� r ��,�, / / �/ / /11 — — — ;'— wing # Scale: 57 1 /4 = 1 `-0" Demolition Plan - Second Floor 0-0 E:i1,,0",1)rt Lew1b SEBASTIAN EILERT, AIA, LEED DANIEL G. LEWIS, AIA SUSTAINABLE Architects btudio ILG �c�c� AND CONSULTING AR 96398 AR 92953, � ID 5054, A260012O2 -1 -, --1 ,�� ..... 1=��, -7= �=-� =---� L .' �o�_UD.10 �, - L11 , I --w. ". - r� .. 1-1 M , = , F�� �:7,i. -6��..`r` L a A . . �QN=-., ... I .... r,,-... :.1. 1-1 100 NE 101st Street Miami Shores, FL 33138 s Project number 18019 Date November 4, 2019 14-0-- Description Date ff— � . . - I., .-1\ AIN .. \\ ! `AR 96398 AR 92953 ED 00 0 N , , U .0 U U Ju E, U U U U 1G U G V V �. � u U U U U U U UV 1,UU G U G II)U', U.0 U 3 fV U UGu E y r C 1 , � _ _ _ _ I I - 1-1 " 1. - .- � - - �-, � 1-,.1 I 1, . ..1. I - .1 ' / /, i v / / ,, ��/' /, /: /J=// �i: ; / i''/ / ' /' /%/ //%'` .� //I � ` �— :/-r—'-- — -^ram'— —11 - / /%I / 7 i /' / , ,: / / / / T% I' / i I / / / jr ;% T' �� is r,': T i /' i' / / / ,r I / . 11 % / /' / i / — I i I'' / /, f 1, , . /'', / / \ i , r/, , / 'i ' ; // ,/ / C, ,. i i / / / % / /:: / / / /r / I t v ' /, / /� / „� r r ♦ / /l /, i / '/ ;. / / / / I. I / / / / ." I \ \ / / /' / 1 1 / II / ♦ , I, /' / /'�, / / / /! v �. ��//' I' / / ♦' 11 / / I il' / / / i / '/ -i / ; / /. / /i J,/J. /I /' / / ♦ / / / / / / % / / i / / / / / , / /;� ;I' / / /' / / '; /'' r' - / / J ,'' /,�Z� , /"'' /, r /% / / / / ,7 7- �" / / % - / / / . I ; r /. i' I , ; % -. '� /' / /' \ /' �♦ I / /. / / \ / // 1 li': / I; / / r /: / 1. / /' / /' / / / : / . /'/ / . i / % /' / / ;/i % / II / / / / / '/ / / /" / /, / �, / / // I / / // / /' /'/ / '/ / / I ,-- , i / // /::, / , / / /: / — — �'/ // / /, ! I /' / , /.r l% y: �-� T /' l ;; % //' / / // ` r ' %/ J/ / `, 1 /, / #/ /,/ ,, / / // ,/ \ / i / '/ ''/ '/ r1 A ♦ -'/ t i/ / /�/ �/ i'/. / /` , �'�, 1/ i, f / /. ,/ /./. �. i' / I / / ♦. / i / ! , / ! r: r %r jl, / i ; / / / \ / / / , , /; r: , ;i /;/ / , / /, I I �, / / %\ /, / /r r/ J / // / / r, \, / / // /, VDU �/, / / 1 / / / / / / / // r. / \ r /' /" / ,/ I f / � ,, .° / j / ,; / / / / , t / ;/ / / / / I / // i /" / /' /'" /, /, / / ,, /" i / // / /' / / I / // ! / / r i / / // / I / % /; / / /` 3 / / ,� / f /, / / % / /, /' /'' \� / ,', r II // // / r/ / / /// �/' ,, /, // ,/ / / %. i; / /. ...... �f / / / �� / / / / / %/ % ; r f / ♦ / /// '/ ♦' / ' i , I� / / %�. / ! % / / % i' \ / I' ' / / ' I' Y' % / �' -! /' / ;/ // r / / % / , / �' / i i' r/ /, i' / /i, /' �- I''' J / / / / /! / . /, // /. / /. //; / /' / / // /% / / / I / / I �I % ,a , —7 -�7' — / // // % / 1. / `; i i ,, . �/' /' / / / � / / � / � � ! ' it / li /'' /' / r ' / /, / , ! / /, /I / //. / /// /, / / / / / / / r /, \ , r - / I/ / / / i 1 / / / % % / /� / � I / / / " is / / is1. % — — — L i'' — � / /� , / / / i, / / / / % % is !' / / / �` / , ♦ 77 —77, /77 / % �' -� �- / % '% I I 7 r %,T \ ii/, /, / I 11, /; / / /: /, / / % I, / / / /: /' / /., / /i' // % I / /r ; All i /ii / ' / / /' - % / / f / % / Y/ —/ 1 / /' _ / / /I I- /I / / r / / L € IT - / /` / it /. /, /. / i11 rl / / / i / I r: / / ; � / i, ' /i" / i / / / /' / /',� I / / % /i / / I i I. / r i -\ / / II - , _ _ -_ _________ .. __. _._- __ _ ._. _. I /� ;/ /r / / I / / / , / / /,; ;1 ; / / /j //, , / /j /,,r ; r, �' / % // / /'/ / / �/j / 1 �� I , -, ,_1 I I , , , - IV,, —�/ , " , � — // , / - �;:""/:,/;""-,/X , ,4�, / / -LJ\ I - • - li jl/ t, /// / ' , /'r, / , / /;;- i. ; , = /�j ` , ;�- f;T '� ♦ / r /1I— t / / �.-�//', f �.-'. // /'/ / r/ / / T �,T F /--F 1 /4" = 1--0 - Demolition Plan - Roof � 4 ,00%, E ga (3 05)253-578 'f Eilurt Lewis r3063-S Miami, , "uts 8 I ur A I MM=M r uAow%k i luo"k Aft& 0 5 SEBASTIAN EILERT, AIA, LEED DANIEL G. LEWIS, AIA SUSTAINABLE lawmuARCHITECTURE AND CONSULTING AR 96398 AR 92953, ID 5054, A26001202 /� � /' / � ' , I j / - - , i,, , /I, r!: / / "/'/, / %,,,/ ! / ; ,!' `/I �j I;I I / /- .'� i/ "/I �/; i - 11 /% ,/ / / ,,/ r/ / % �/ '1 14 �. / ;/ !;, %. / I/i�/j / / // / //' / '///�/� /I/I/ �� // /// I'i/I'll /�/ . /�j ' /�I/ I /�/ -FI ' • - , , . . '1.1 ,/ "I-,1/ �/ /// /l l ./ / /�, ,� I, ll / I/ �� // ,, / ' /j / /r� �/ 1 Il//j /r,,�/ /jj //j�//�� I'i /�' /i /// /f�j,,/;I /. , , " it/ ,/t/ I//, - /j// r1 //j // ' ; j"(r /,/ /; it lr' 1�/ ` i / ', / �/i /I 1; � j ", i/ j;' '; pi t , /� %11 ---- if //% !i% / 10 / ' �l i'r: // j /, j %//i r, , i , /. 1. /rj /� / / ,ilk / ;,/ /i I J/i/;I lj/ /I;f/ // / /,/, J ilr// 1/ ///� '�//' '. Sri////:�/ / , !// -f-"!/Il //, j / ri //j: ', I/j , 1, i j •,' � /j „�/j - %// ji % Il �I 'I j' // /�,'// / - /, /� j ! it j i ,,!I.,-- /� ilk j//I/ /� /j i'/ /j %, � / ;%/'/ / " ! sj . 1� /� / j,/�./�,�,�:ion �� /' ; / /� `/ / `J�� i �// ' /f s / / ��, '/f' '� �, i.j / / / r ,I /r.� / // -,/ /-, /; �v 1j ./II �►!% � ; ;, // //,� '/ '�";/// ; , /// / / / / , � lit/ r /.I // 7- , Ili j//�`/ , /,T , / - T' . �� v/ ./ 11 , I 11. .:: r-1�11 �� I 0 ..P.1�n.L-ri , .-_ 100 NE 101st Street Miami Shores, FL 33138 Project number 16019 Date November 4, 2019 No. Description Date , V J U J J U l J `J J J U U J U i J J JJJ U J , 0 V Q'! J J l J a J 'J 3000f3 J J 3 J U J J 1\12\ . �, L \ 9 AR 96398 ; AR 92953 J 'J,J 0? J J J J UJ L) I f]rawinn # NOT N.T.S. O ULD28SED r)ra 4—.1 E [�� NOT USED 1. New window 2. New door 3. New roofing finishes under separate permit, roofing contractor to coordinate with owner/architect for required repairs of existing ranting elements upon discovery. - Demolition (typ.) # scale: EH� Elevation Schedule 19 1/4" = 1'-0" North -New �Y-_.�•- fir.-_`�""'� ��� O ZONE-5 +39.0, Slider fI � �■ I i \ 1 � -A) ZONE ZONE 4 4p 0 7 I I ZONE-4 j ZONE-4 ZONE-4 +39.0, I +39.0, +39.0, -42.0 -42.0 -42.0 T.O. Roof - Existin 20' -1 314" T.O.T.B. - Existin 16' - 8- 710 I 1- l r t1 V V , I I U V V u Second Floor \ F 1 . I 1 U UVU VUu I ZONE-5 ZONE-5 I +39.0, I +39:0, � 1 f I I �' i / -51.0 -51.0 VJ` U Y I I r 1( 3I 2[ 13i 2[ 12i 12� 13( 31( 2( 12 T.O. Roof - Existin 20' - 1 314" T.O.T.B. - Existing_ 1 61 - 8" Second Floor 8'-4" -- ' �l k T/ i ♦ ' Y.���./O/ i /kL I f �_L € -:I� / I �:. '/ � ♦Ill r/ �� '/' / -:�P � / f �/ �_ ` [„� � i /♦✓ .� � it r 7,..� "-� l �I € �' / I/ F � rtl �—zIl _i/; � �''/ I 'iL �: , Ground Floor r 1 0l n�F T T'.� - - / T, — - % ? i COR _ -- -.. _ • : 11.4 ""l 8 North -Existing SEBASTIAN EILERT, AIA, LEED DANIEL C. LEWIS, AIA SUSTAINABLE ARCHITECTURE LLUAND CONSULTING_ AR 96398 AR 92953, ID 5054, A2600I202 Elevations A-500 Project number 18019 Date November 4, 2019 No. Description Date AR 96398 AR 92953 a 00 it r z 1, New window 2. New door 3. New roofing finishes under separate permit, rooting contractor to coordinate with owner/architect for required repairs of existing roofing elements upon discovery. Demolition t Yp'1 T.O. Roof - Existina A- _ ... _ N E 39.0�,j - N E N E N�JE� 3�.0; 3,9r.O J 3� 0, J ��524J' # Some: Elevation Schedule E-T=-S- NOT USED �L6 114" = 1'-0" West - Existing (305)253-5786 Eilu-sft--rt Lewis 13063 SW 133rd Ct a Miami, FL 33186 A rc h i tect. St u d i o ul[ _ r] I { L Ir _ Or T. SEBASTIAN EILERT, AIA, LEEDQt DANIEL G. LEWIS, AIA SUSTAINABLE � -8 A 0 ARCHITECTURE " AND CONSULTING ; AR 96398 AR 92953L L ID 5054, A26001202 Elevations A-501 Project number 18019 Date November 4, 2019 No. Description Date ,d Floor 4 QI - 0� \ CO�R 11.44' ' �- AR 96398 AR 92953 T 0 co 1. New window 2. New door 3. New roofing finishes under separate permit, roofing contractor to coordinate with owner/architect for required repairs of existing roofing elements upon discovery. Demolition (typ,) L Lff ; 1'-0" Elevation Schedule q F3_1� , 3 1 South - New South - Existing O ZONE-5 +39.0, Slider -52.0 rI / I�1 I IL 7�i i i f I II— 1 F3 C� � ZONE-5 +39.0, _r10 n I I I_I I I-1 I I_I 1=1 I I 1I- A-502 roject number 1801 late November 4, 201 T.O. Roof - Existin) 20' - 1 3/4" �r T.O.T.B. - Existing 16'-8" 0 m E �w V V U Q V U u V U i U 1z; m UU JUUV U Second Floos,; ;_ a 81 - 4" VV Vt V U V J•;rr ... lie,g O V V V V U °levee U V UJ )' U U U U U! UUU'VU'J U U U U U U U U ! J ­ U U U UU U U JUE � f o c 0 c Ground Floor 01-011 COR T.O. Roof - Existing 20' - 1 3/4" T.O.T.B. - Existin .16'-8„ Second Floor 8'-4,1 70 AR 96398 AR GOGrIq K 1. New window 2. New door 3. New roofing finishes under separate permit, roofing contractor to coordinate with owner/architect for required repairs of existing roofing elements upon discovery. - Demolition (typ.) Fl/=-V-0" Elevation Schedule # Scale: N.T.S. NOT USED East - New ving # Scale: 6 1I4" = 1'-0" East -Existing r �.. ill I �- i SEBASTIAN EILERT, AIA, LEED DANIEL G. LEWIS, AIA SUSTAINABLE ARCMTECTURE AND CONSULTING LLC AR 96398 AR 92953, ID 5054, A26001202 ee Po gEl ge _ :Fu DO B ag. O ZONE 4 ZONE 4 ZONE-4 }42.0 oJ +42,0 _3939.o, .0 I / 17 ,l-% � Elevations -53 Project number 18019 Date November 4, 2019 T.O. Roof - Existing 20' - 1 314" 5� T.O.T.B. - Existing 16-8" Q U U U U U J fa 11 '! UUVU U •VUV �U Second Floor 8'-4" J oouuu�r U V U U U V uVVUUU U U V V V U fl U U U VU U Ground Floor nl _ Ofl AF c_ AA1 I I I I= 11.44 T.O. Roof - Existing 20' - 1 314" T.O.T.B. - Existin 16'-8 Second Floor O 1 — (11 No. Description Date AR 96398 AR 92953 0 N d' suuJor � I4 z U U U U � "J I U IJ iwi 111 �UUVV 0 U V I p U 11 U IJ m ,� u J U ee• V E JVVV" o c 0 14 (305)253-57 8 6 Ebert Lewis 13063 SW 133rd Ct 11 Miami, FL 33186 Architects Studio Vapor Barrier / 5/8" DensGlass panels attached per manufacturers recomendations & code -': 4" bait insulation (sound batt) \' Tile over thin set (floors, walls .. and ceiling) " r Waterproofing (JAMO waterproof) at walls, floors and ceiling, appllied per manufacturers specs. Provide marine grade plywood backing where required for all fixtures, grab bars, wall - mounted fixtures, ETC; typical all toilet rooms, treatment w d /I rooms, etc. r J 3-5/8" Galvanized Metal channel .,,. runner (top & bot.) and vertical -� @ 16" O.G. to underside of structure / Acoustical sealant, (top & bot. both sides) LL ri Monolithic waterproofing over all interior surfaces of restoom & shower, to be applied before any finish materials installed. 1>- Mortar bed, slope max. 1/4":12" toward drain Floor Slab 4 Adjacent Restroom & Room I Shower GC to submit specifications for any deviations from above awing # Scale: 18 3" = 1'-0" Wall Assembly - Wet Wall I 0 <V 0 _r 4x4 Nominal wood post, preservative or decay and termite resistant @ 4'-0" O.C. 2x4 Nominal wood Rail, preservative or decay and termite resistant. WI (4) hot dipped galvanized 16d nails min. — Wood cladding, min 5/8" thickness, Nails shall penetrate wood rail equal to the thickness of the rail, no less than (2) nails in any connection Wood Fence Detail SEBASTIAN EILERT, AIA, LEED DANIEL G. LEWIS, AIA SUSTAINABLE ARCHITECTUREcz AND CONSULTINGL L 8 AR 96398 AR 92953, ID 5054, A26001202 Fasteners @ 16" O.C. Horizontal Wood Blocking @ 96" AFF 5/8" Gypsum Wallboard On Each Side Of 2x4 Wood Studs @ 16" O.C., primer, painted two coats finish min. Latex based Wood Base Fasteners @ 16" O.C. 1'-0" Wail Assembly - Interior Wood Frame ' u^^ `eft tin -capped @12" jer #90 membrane with # 10x21/2" nails 10 3" = 1'-0" i Roofing - Drip Edge 8D Nails At Boundary And Support Edges At 4" O.C. 8D Nails At Intermediate Framing At 6" O.C. 19/32" CDX Plywood sheathing Galvanized metal drip edge 1x3 P.T. Wood nailer 2x Wood fascia loof truss/Joist (wood soffit een vent 19/32" CDX Plywood Decking Fasten To Joists With 8D Galvanized Ring Shank Nails At 6" O.C. Field And 4" O.C. Corners And End Provide Blocking Between Framing For 1st Sheet i Joist/Trusses (Typical) wing # Scale: l� Roofing - Sheathing Detail Fasteners @ 16" O.C. 5/8" Gypsum Wallboard On Each Side Of 2x Metal Channel Studs, 25 ga min. Non-structural @ 16" Q.C., primer, painted two coats finish min. Latex based 1/2" Stucco, I primer, painted JJ two coats finish min. Latex based 2" Nominal Horizontal Wood firestop 00 Blocking @ 96" AFF f R-4.2 Rigid Insulation Between 1x Furring �r 5/8" Gypsum Wall -Board On 1 x Wood Furring @ 16" O.C., r I', primer, painted two coats o f- finish min. Latex based N 8" CMU Wall ;� •J /' �, _ U V V �] V U U i— Bentonita-wator LL LL J uE, proofing-fr, l r on alll o J Y concre:& cur`aces U _ below gradc.to a LL LL' �- rein. of 6"«-1 we J V V U J 17.1J V V UUuuVJ _? — Baseboard' s (Owner Selected} U U U ia: U u / I.. U V V Cd E Wood Base Fasteners @ 16" O.C. 4 a. NOTE: R-Value supplied is for typical CMU insulated wall assembly. R-Value Calculation - (Stucco R=0.2oxIN)+(CMU TYPICAL 8" R=1.04)+ (3/4" FOIL BACK RIGID INSULATION R=4.2)+(1/2" GWB 19=0.45)= R-5.79 awing # Scale: Drawing # Scale. 16 [_3'Wall Assembly - Interior Metal Channel L5 E3"_ =V-0. Wall Assembly - CMU Wall Detail x4" Wood Bracing Top id Bottom Of Cabinet ibinet 16" X 2" Screw/Washer WALL HUNG FIXTURES: 1. Studs In Bearing Walls, Exterior Walls, Partitions Or Wall Cabinets Supporting Wall Hung Plumbing Fixtures And Shall Not Be Less Than 2X4, Where Spaced Not More Than 16" O.C. Or Not Less Than 2X6 Where Spaced Not More Than 24" O.C. 2. A Horizontal Wood Member (Minimum 2X4), Shall Be Installed For The Cabinetry Walls And Securely Fastened To Not Less Than 2 Studs. wing # scale: 9 ==NTS Cabinetry Attachment Detail Fasteners At Boundary And Support Edges At 4" O.C. - Fasteners At Intermediate Framing At 6" O.C. � Sheathing Fasten At 6" O.C. Field And 4" O.C. Corners And End it � ' 1 I I I f Joisi/Trusses/Framing/ Furring (Typical) wing # Scale: Sheathing Detail Wall Sections Details A-700 Project number 18019 Date November 4, 2019 i ving # Scale: Cabinetry Section No. Description Date I Blocking At )f Cabinet. Nith 3/16"(x Staffer inet 0 0 CV I AR 96398 AR 92953 oou0'J LL U J J Ul3Vc/U J J SUUU'� u u U V u V JULL V V'J U V J V V V 'J 'J LL -)UULLUc1 s � y- Flrawinn tk �7 [N�.�T.S] NOT USED IN Door Schedule Fenestration Fenestration Mark Floor Width Height Type Int/Ex# Pressures zone NOA Manufacturer Model U-Value SHGC impact Comments 106-A Ground Floor 36'° 80" Bifold-2 Panel Int. NA NA NA NA NA NA 107-A Ground Floor 39" 82" Single -Glass Ext. +39.0, -42.0 ZONE-4 FL-21469 Eco Window Systems, LLC Eco Series 850 0.75 0.25 Y Frosted -Privacy 108-A Ground Floor 38" 85'° Single -Glass Ext. +39.0, -42.0 ZONE-4 FL-28367 Eco Window Systems, LLC Eco Series 600 0.75 0.25 Y _ 110-A Ground Floor 32" 81 " Single -Glass Ext. +39.0, -51.0 ZONE-5 FL-28367 Eco Window Systems, LLC Eco Series 600 0.75 0.25 Y Frosted -Privacy 112-A Ground Floor 30" 80"' Single -Flush Int. NA NA NA NA NA NA Includes new Tamarack Technologies transfer grill 200-A Second Floor 34'° 80" Single -Glass Ext. +39.0, -51.0 ZONE-5 FL-28367 Eco Window Systems, LLC Eco Series 600 0.75 0.25 Y Frosted -Privacy Window Schedule Type Mark Count Floor [Head Height Width Height Type Fenestration Pressures Fenestratio n zone NOA Manufacturer Model U-Value SHGC Impact Comments u v Ground Floor O U V 1 J` Jr f J( J J 1 Ground Floor 6'- Second Floor 1 A 4 Ground Floor 6' - 8" 37" 62 112" Fixed +39.0,-51.0 ZONE-5 FL-28367 Eco Window Systems, LLC Eco Series 450 0.75 0.25 Y �" �" 6VVV Q 1 Second Floor 6' - 8" 74" 51 " Two Panel Slider +39.0, -42.0 ZONE-4 18-1220.07 Eco Window Systems, LLC Eco Series 200 0.75 0.25 Y Q 1 Second Floor 6'- 8" 74" 51" Two Panel Slider +39.0, -52.0 ZONE-5 18-1220.07 Eco Window Systems, LLC Eco Series 200 0.75 0.25 Y R 1 Second Floor 6' - 8" 112" 51 " Three Panel Slider +39.0, -52.0 ZONE-5 t�rawmg # �caie: 19 N.T.S. Door &Window Schedules flrawinn 8 E L.AL'STUD 10 5 N.T.S. NOT USED SEBASTIAN EILERT, AIA, LEED DANIEL G. LEWIS, AIA SUSTAINABLE Architects;Architectsfftudio, LLC ARCHITECTURE AND CONSULT G AR 96398 AR 92953, ID 5054, A26001202 3 � 1" = 1'-0" Door Standard 100 NE 101st Street Miami Shores, FL 33138 GWB Interior Finish ix PT Furring Window Unit Anchor (See NOA Details for Specific anchorage Requirements) Peel &Stick Vapor Barrier ix Min. PT Wood Buck Silicone Sealant (Inside &Outside) Window Unit Exterior Stucco - includes drip recess Exterior Stucco Window Unit Silicone Sealant (Inside &Outside) ix Min. PT Wood Buck Window Unit Anchor (See NOA Details for Specific anchorage Requirements) Pee{ &Stick Vapor Barrier 1x PT Furring GWB Interior Finish 3" = 1'-0" Opening -Window -Concrete ®or Windows Details -goo Project number 18019 Date November 4, 2019 Concrete (CMU) Header 1 Jamb � Exterior Stucco Full Perimeter Sealant �- Full Glazed Door Unit (Install Per Approved NOA For Applicable Wind Pressures) � Gypsum Wallboard Header/Jamb - Full Glazed Door Unit (Install Per Approved NOA For Applicable �f ] Wind Pressures) Provide Threshold Drawing # Scale: �1 3" = 1'-0" Opening -Door -Concrete No. Description Date AR 96398 Ala 92953 w y JUU Uu l U'JVU U J V U V V JUUU JU» J DE3UU UV a J 9 U V O V J IiuVJ u .4 co a N N_ Y cu E n IT M 0 0 0 C a� U L LLI m f\ s Q w _,1 cn 0 SN u (D 0 ^^L n J 0 ZONE-! +39.0, -52.0 ZONE-5 ZONE-4 ZONE-4 ZONE-5 +39.0, +39.0, +39.0, +39.0, -52.0 -52.0 -52.0 -52.0 Wet Bar � �b � Bath Cl. 201 F n 4"0 EXHAUST D UP TO ROOFCF EXIST. AHU Garage Loft 200 I 00- ZONE WIT42. 0 E I -5 MECHANICAL 2ND FLOOR PLAN SCALE: 1/4"= V -0" GENERAL N®TES, 1.- CONTRACTOR SHALL VERIFY ALL SPACE CONDITIONS AT JOB SITE PRIOR TO FABRICATION OF DUCTWORK AND PURCHASE OF EQUIPMENT, NOTIFY ARCHITECT/ENGINEER OF ANY SPATIAL CONFLICTS PRIOR TO INSTALLATION. VERIFY ALL CONNECTION TO EQUIPMENT WITH MANUFACTURER'S CERTIFIED DRAWINGS, PROVIDE TRANSITIONS TO ALL EQUIPMENT AS REQUIRED. 2.- FIELD --VERIFY ALL DIMENSIONS AND COORDINATE WITH OTHER TRADES PRIOR TO PROCUREMENT OR FABRICATION. PROVIDE ALL REQUIRED FIELD MODIFICATIONS SUCH AS OFFSETS IN PIPING OR DUCTWORK (INCLUDING DIVIDED DUCTWORK) NEEDED DUE TO OBSTRUCTIONS OR INTERFERENCES AT NO ADDITIONAL COST, FOR PROJECTS INVOLVING RENOVATION, COORDINATE NEW WORK WITH EXISTING ELEMENTS SUCH AS THE BUILDING STRUCTURE AND ARCHITECTURAL FEATURES, SPRINKLER PIPING, LIGHTS, PLUMBING, AND ELECTRICAL CONDUIT. 3.- DUCT CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE SMACNA HVAC DUCT CONSTRUCTION STANDARD. 4.- DUCT SIZES AND ALL OPENINGS THROUGH BUILDING CONSTRUCTION SHALL SUIT EQUIPMENT FURNISHED, 5.- COORDINATE DIFFUSER, GRILLE AND REGISTER LOCATIONS WITH ARCHITECTURAL CEILING PLANS AND EQUIPMENT OF ALL TRADES. INSTALL ALL AIR DISTRIBUTION OUTLETS/INLETS AT LEAST 12" AWAY FROM WALLS AND CEILINGS TO ALLOW FOR THE INSTALLATION OF CROWN -MOLDINGS WHERE APPLICABLE. 6.- ALL EQUIPMENT, DUCTWORK, ETC., SHALL BE SUPPORTED AS DETAILED AND/OR SPECIFIED, PROVIDE ADDITIONAL SUPPORTS AS REQUIRED TO PROVIDE A VIBRATION -FREE, RIGID INSTALLATION. 7.- ALL DUCT SIZES SHOWN ARE INSIDE CLEAR DIMENSIONS. 8.- REFER TO TYPICAL DETAILS FOR PIPING AND INSTALLATION OF EQUIPMENT. 9.- ACCESS PANELS IN DUCTWORK AND CEILINGS SHALL BE PROVIDED WHERE REQUIRED FOR OPERATION, BALANCING OR MAINTENANCE OF ALL MECHANICAL EQUIPMENT. 10.- MAINTAIN CLEARANCE OF A MINIMUM OF 6" BETWEEN DUCTWORK, PIPING, EQUIPMENT, ETC., AND ALL FIRE RATED AND FIRE/SMOKE RATED PARTITIONS, TO ALLOW FOR INSPECTIONS OF RATED WALLS. 11.- UNLESS OTHERWISE NOTED, ALL EQUIPMENT AND VALVE DRAINS SHALL BE INDEPENDENTLY PIPED FULL SIZE TO THE NEAREST PLUMBING DRAIN. 12.- EQUIPMENT SPECIFIED SHALL BE ADHERED TO; HOWEVER, OWNER HAS THE FINAL DECISION ON THE TYPE AND QUALITY OF EQUIPMENT TO BE SUPPLIED, CONTRACTOR SHALL OBTAIN WRITTEN PERMISSION FROM THE OWNER PRIOR TO PURCHASING SUBSTITUTING EQUIPMENT. CONTRACTOR SHALL BEAR THE COST OF ALL ENGINEERING WORK RELATED TO SUBSTITUTED EQUIPMENT. 13. TOILET EXHAUST DUCT SHALL BE SHALL BE GALVANIZED SHEET STEEL 14. EXHAUST DUCTWORK LOCATED WITHIN RETURN AIR PLENUMS SHALL BE DOUBLE WALL TYPE 'B' CONSTRUCTION. PREFABRICATED DUCT SYSTEM EQUAL TO METALFAB SURELOCK SERIES. L. TRIANA & ASSOCIATES, INC. CONSULTING ENGINEERS CERTIFICATE OF AUTHORIZATION; 26644 9701 SW 56TH STREET MIAMI, FLORIDA 33165 PH: (305)595-9765 FAX: (305)566-1014 WEB: http'.1Amww.ltrlapa.com ❑ LESTER TRIANA, P.E. Florida No. PE65707 ❑ LORENZO TRIANA, P.E. Florida No.PE39657 xx STEEL HANGER WIRE 4" SHEET METAL EXHAUST DUCT tL CEILING CABINET iST FAN WITH BACKDRAFT :R, LOW NOISE LEVEL 10 VIBRATION. FRONT FACE GRILLE WITH FASTENING SCREENS EXHAUST FAN HANGING BRACKET (ADJUSTABLE) CEILING MOUNTED CABINET EXHAUST FAN DETAIL N.•r.s. �� FAN SCHEDULE i MECHANICAL FLOOR PLAN SCALE: 1/4" =1' -0" 4"0 DRYER EXHAUST UP TO ROOF CAP WITH BACK -DRAFT DAMPERS (NO SCREEN). DRYER EXAUST DUCT gHAI_L BE MINIMUM 20 GA. GALV. STEEL DRYER EXHAUST; DUCT SHALL BE MINIMUM 2'_0" MIN 20 GA. GALV. STEEL. PROVIDE ABOVE ROOF BACKDRAFT DAMPER. NO SCREEN DRAW BANG BATHROOM EXHAUST: DUCT SHALL BE MINIMUM GALVANIZED SHEET STEEL, PROVIDE METAL HOOD BACKDRAFT DAMPER & $IRDSCREEN J / '— METAL SLEEVE TAG =MODEL('RFLOW EXT.S:). FAN �TYPE FAN MOTOR MOTOR VOLT/ NOISE LVL WEIGHT FAN CFM'S) { W.G. TYPERPM RPMWATTS/HP PHASE SONES (LBS) SERVICE EF-1 FV-05VK3 50 0.1" CENT. DIRECT 1100 1100 25/- 120/1 0.3 15 BATHROOMS NOTES: 1, FAN MODEL BASED ON UNIT AS MANUFACTURED BY: PANASONIC 2. INTERLOCK EXHAUST FAN WITH CORRESPONDING LIGHT SWITCH. COORDINATE WITH HOME AUTOMATION INSTALLER FOR ADDITIONAL INTERLOCKS. 3. PROVIDE A VIBRATION FREE INSTALLATION OF ALL EQUIPMENT AND DUCTWORK, 4. PROVIDE A BACKDRAFT DAMPER ON FAN DISCHARGE. 5. PROVIDE FANS WITH SOLID STATE SPEED CONTROLLER FOR BALANCING AND ADJUSTING PURPOSES. 6. EXHAUST FANS EF-1 & EF-2 SHALL BE UL LISTED FOR WET (SHOWER) LOCATIONS. SEBASTIAN EILERT, AIA, LEE DANIEL G. LEWIS, AIA SUSTAINABLE ARCHITECTURE AND CONSULTING LLC AR 96398 AR 92953, ID 5054, A26001202 I N.T.S. NOTES: 1-- ROOF CAP ANCHORAGE: AND DUCT GAUGE SHALL BE CAPABLE OF SUSTAINING WIND LOAD AS REQUIRED BY FBC. 2— DO NOT USE A SCREEN ON THE DRYER EXHAUST CAPS. Johnson -Thomas Construction Documents 100 NE 101st Street Miami Shores, FL 33138 3'-2" Project Information Project number 18019 Date November 4, 2019 J0 I 3 APPROVED DATE —LE 1. No. Description Date T Q co T rn 0 v E a) U U V o7J 4 UJU O VU V u � U U U U U, Juuu V u V u J UU V U U'JU3V UV cJ VUVVUV r U V U V O U U �.�[ U UVUUVU ' H- U U LiU U J U O D N ' 'd mac®934C3P;•'� ® PIAL AR 92953 J n OZ IuL 2-77 i i -s• l''- ! II I ''j ,(�Ti� li � I'.l i�li 3 I i � TIT Tlf-I►WPTITO A T OT%Tn LET f1liV -DT ANT 0%,.ft G: 1/ `# --L —v poau p U u V U (b�, u p u UU u p UUU V'CV U U U U V V U U U U U UU V U UUU:� U U U U U U U V U V V uu uu uu U U U V U V U O U U p U U p U U U U u U U U U 00 U U U U tl �uu ca E O F- C O N O L. TRIANA & ASSOCIATES, INC. CONSULTING ENGINEERS CERTIFICATE OF AUTHORIZATION: 26644 9701 SW 56TH STREET MIAMI, FLORIDA 33165 PH: {305) 505-97E5 FAX: (305) 596-t814 WEB: h1tp:1'WffWAr1ana.00n' GENERAL NOTES. 1. ELECTRICAL LAYOUT DRAWINGS ARE PARTIALLY DIAGRAMMATIC. REFER TO ARCHITECTURAL, STRUCTURAL, MECHANICAL AND HVAC DRAWINGS FOR GUIDANCE ON DIMENSIONS, CEILING HEIGHTS, DOOR SWINGS, ROOM FINISHES, STRUCTURAL AND ARCHITECTURAL DETAILS, LOCATIONS OF DUCTS, PIPES AND STRUCTURAL STEEL. INSTALL THE ELECTRICAL SYSTEMS WITHOUT INTERFERING WITH DUCTS, PIPES, STRUCTURAL STEEL OR OTHER SYSTEMS. LOCATE LIGHTING SYMMETRICALLY IN PROPER RELATION TO FINISHED AREAS EXCEPT WHERE DIMENSIONED ON THE DRAWINGS OR LOCATED ON REFLECTED CEILING PLANS. 2, THE ELECTRICAL INSTALLATION SHALL BE IN ACCORDANCE WITH THE LATEST EDITION (2014 NFPA 70) OF THE NATIONAL ELECTRICAL CODE (N.E.C.), THE LATEST RULES AND REGULATIONS OF THE SAFETY ORDERS ISSUED BY THE DIVISION OF INDUSTRIAL SAFETY, THE NATIONAL BOARD OF FIRE UNDERWRITERS AND ALL APPLICABLE STATE AND LOCAL CODES ISSUED BY AUTHORITIES HAVING JURISDICTION INCLUDING 2017 FLORIDA BUILDING CODE (F.B.C. 6th EDITION) AND 2017 FLORIDA FIRE PREVENTION CODE (NFPA-101). 3. MAINTENANCE MANUALS AND INSTRUCTIONS: FURNISH THREE (3) SETS OF OPERATING INSTRUCTIONS FOR ANY ELECTRICAL EQUIPMENT INSTALLED AS STATED IN FBC EC 505.7.4.2. THE MANUALS SHALL BE SUBMITTED TO THE BUILDING'S OWNER AND MUST INCLUDED THE FOLLOWING: 3.1. SUBMITTAL DATA STATING EQUIPMENT RATING AND SELECTED OPERATIONS FOR EACH PIECE OF EQUIPMENT REQUIRED MAINTENANCE. 3.2. OPERATION MANUALS AND MAINTENANCE MANUALS FOR EACH PIECE OF EQUIPMENT REQUIRED MAINTENANCE. REQUIRED ROUTINE MAINTENANCE ACTIONS SHALL BE CLEARLY IDENTIFIED. 3.3. NAMES AND ADDRESSES OF AT LEAST ONE (1) QUALIFIED SERVICE AGENCY. 4. ALL, ELECTRICAL EQUIPMENT AND INSTALLATION WORK SHALL HAVE A ONE YEAR (1) WARRANTY. FURNISH WARRANTY SO THE DEFECTIVE MATERIALS AND/OR WORKMANSHIP SHALL BE REPAIRED/REPLACED IMMEDIATELY UPON NOTIFICATION AT NO COST TO THE OWNER FOR THE PERIOD OF THE WARRANTY. 5. PERMITS: OBTAIN AND PAY FOR ALL REQUIRED PERMITS, LICENSES, FEES INSPECTIONS, AND POWER COMPANY AID TO COMPLETE WORK SHOWN. INCLUDE ALL POWER COMPANY COSTS IN BID. 6. CUTTING AND PATCHING, PROVIDE ALL CUTTING REQUIRED TO DO THE WORK. DO NOT CUT ANY STRUCTURAL ELEMENT WITHOUT APPROVAL. PATCHING SHALL BE OF QUALITY EQUAL TO AND MATCHING APPEARANCE OF EXISTING CONSTRUCTION. DO NOT CUT ANY STRUCTURAL ELEMENT WITHOUT APPROVAL. 7, GROUNDING: ALL PARTS OF THE SYSTEM SHALL BE GROUNDED IN STRICT ACCORDANCE WITH ARTICLE 250 OF THE NATIONAL ELECTRICAL CODE. 8. WIRING DEVICES AND PLATES: SWITCHES SHALL BE HUBBELL OR LEVITON 20A 125VOLT AC COMMERCIAL SPECIFICATION GRADE. COLOR WHITE UNLESS NOTED OTHERWISE. USE STEEL COVER PLATES IN UNFINISHED AREAS AND MATCHING PLASTIC COVER PLATES IN FINISHED AREAS. 9. COORDINATION: COORDINATE ALL ELECTRICAL WORK WITH OTHER TRADES AND LOCAL UTILITY COMPANY. COORDINATE METERING REQUIREMENTS WITH LOCAL ELECTRICAL UTILITY COMPANY. 10. EQUIPMENT: CONNECT ALL ELECTRICALLY OPERATED EQUIPMENT. USE NEMA 3R DEVICES OUTDOORS. VERIFY LOADS AND LOCATIONS OF EQUIPMENT BEFORE CONNECTION. SIZE BREAKERS, DISCONNECTS, AND FUSES ACCORDING TO THE EQUIPMENT NAMEPLATE, SIZE WIRE ACCORDING TO THE NEC. THE ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR REVIEWING THE EQUIPMENT SUPPLIED BY OTHER TRADES AND SHALL BE RESPONSIBLE FOR MODIFYING THE CONNECTIONS WIRE, DISCONNECTS, BREAKERS, ETC. SHOWN ON THE DRAWINGS IN ORDER TO MAKE A COMPLETE INSTALLATION AND TO SATISFY THE MANUFACTURER'S REQUIREMENTS, THE ELECTRICAL CONTRACTOR SHALL SUPPLY ALL LABOR AND MATERIALS TO COMPLETE THE INSTALLATION. 11. RECORD DRAWINGS: MAINTAIN A RECORD SET OF ALL CHANGES DURING CONSTRUCTION. RECORD CHANGES ON A CLEAN SET OF CONTRACT CONSTRUCTION DOCUMENTS WHICH SHALL BE TURNED OVER TO THE OWNER WITH IN 30 DAYS OF COMPLETION. RECORD DRAWINGS SHALL INCLUDED A SINGLE -LINE DIAGRAM OF THE BUILDING ELECTRICAL DISTRIBUTION SYSTEM AND FLOOR PLANS INDICATING LOCATION AND AREA SERVED FOR ALL DISTRIBUTION AS PER FBC EC 505.7.4.1. 12. CONDUCTORS: ALL CONDUCTORS SHALL BE THWN COPPER UNLESS OTHERWISE SPECIFIED. GREEN INSULATED GROUND CONDUCTORS SHALL BE INSTALLED IN ALL FEEDER AND BRANCH CIRCUIT WIRING. 13. CONDUITS: ALL INTERIOR CONDUITS SHALL BE EMT, MC CABLE OR ANY APPROVED WIRING METHOD IN STRICT COMPLIANCE WITH NEC ARTICLES. ALL EXTERIOR AND UNDERGROUND CONDUITS SHALL BE RIGID NON-METALLIC CONDUIT (RNC) SCHDEULE 80. ALL FEEDER AND BRANCH CIRCUIT CONDUITS SHALL BE INSTALLED CONCEALED IN FINISHED AREAS, UNLESS OTHERWISE NOTED. 14. VOLTAGE DROP: CONTRACTOR SHALL SIZE CONDUCTORS PROPERLY DEPENDING ON DISTANCE TO ENSURE A MAXIMUM VOLTAGE DROP ON FEEDERS TO BE LESS THAN 2% AND LESS THAN 3% ON BRANCH CIRCUITS. IN NO EVENT SHALL THE TOTAL VOLTAGE DROP TO THE LAST DEVICE BE GREATER THAT 5% OF THE SERVICE VOLTAGE. 15. THE CONTRACTOR, PRIOR TO BIDDING, SHALL VISIT THE JOB SITE TO BECOME ACQUAINTED WITH THE INSTALLATION AND SYSTEMS RELATED TO THE WORK AND SHALL INCLUDE IN THE BID PROPOSAL ALL LABOR AND MATERIALS REQUIRED FOR THE ELECTRICAL INSTALLATION TO BE COMPLETE AND OPERATIVE. THE CONTRACTOR SHALL VERIFY ALL EXISTING SITE CONDITIONS IN THE FIELD BEFORE COMMENCEMENT OF THE WORK AND SHALL REPORT ANY DISCREPANCIES AND/OR INCONSISTENCIES BETWEEN THE DRAWING AND EXISTING FIELD CONDITIONS TO THE ENGINEER FOR CLARIFICATIONS BEFORE COMMENCEMENT OF WORK. 16. UPON COMPLETION OF HIS WORK, THE CONTRACTOR SHALL SCHEDULE AND PERFORM A COMPLETE FUNCTIONAL TEST TO DEMONSTRATE TO THE OWNER THAT THE NEW INSTALLATION IS OPERATING AS INTENDED. ANY DEFECTS OR DEFICIENCIES IN THE MATERIALS OR INSTALLATION WORK SHALL BE CORRECTED IMMEDIATELY BY AND AT THE CONTRACTOR'S EXPENSE. WORKMANSHIP SHALL BE OF THE HIGHEST QUALITY. 29. ALL ELECTRICAL EQUIPMENT SHALL BE NEW, U.L. LISTED AND APPROVED FOR INTENDED USE. ALL ELECTRICAL EQUIPMENT EXPOSED TO WEATHER SHALL BE WEATHERPROOF. 30, CONTRACTOR SHALL VERIFY FLOOD CRITERIA LEVEL BEFORE ORDERING ANY EQUIPMENT OR COMMENCING ANY WORK. ELECTRICAL INSTALLATION MUST BE ABOVE FLOOD CRITERIA. (30 5)253-57 8 6 Eilert Lewis i 2nr_2 czar t 22,-,a rr SEBASTIAN EILERT, AIA, LEE DANIEL G. LEWIS, AIA SUSTAINABLE 1 �J V V v i.J Y Y 1 tJ V L l.L t.1. ■ N ARCHITECTURE Miami, FL 33186 Architects Studio LL..0 AND CONSULTING ' AR 96398 AR 92953, ID 50543 A26001202 ELECTRICAL - SYMBOL LEGEND ABBREVIATIONS AFF ABOVE FINISHED FLOOR ATS AUTOMATIC TRANSFER SWITCH BKR BREAKER C, COND. CONDUIT CB. CIRCUIT BREAKER CKT CIRCUIT CLG. CEILING DISC. DISCONNECT EC. EMPTY CONDUIT G, GND. GROUND GFI. GROUND FAULT INTERRUPTER HP. HORSE POWER IG ISOLATED GROUND MCC. MOTOR CONTROL CENTER MDP. MAIN DISTRIBUTION PANEL MLO. MAIN LUGS ONLY MTD. MOUNTED PH. PHASE PB. PULL BOX PNL. PANEL PWR. POWER SP SURGE PROTECTOR SW. SWITCH TEL. TELEPHONE TV. TELEVISION UON. UNLESS OTHERWISE NOTED V. VOLTAGE W. WIRE W/ WITH WP. WEATHER PROOF VP VAPOR PROOF DISTRIBUTION EQUIPMENT PANELBOARD. RESIDENTIAL FIRE SAFETY SYSTEM O SMOKE DETECTOR CEILING OR WALL MOUNTED. ON ARC -FAULT PROTECTED CIRCUIT. INTERCONNECT ALL SMOKE DETECTORS WITHIN UNIT. 120V SOURCE WITH BATTERY BACK UP. CD CARBON DIOXIDE (CO) DETECTOR CEILING OR WALL MOUNTED. ON ARC -FAULT PROTECTED CIRCUIT. INTERCONNECT ALL CO DETECTORS WITHIN UNIT, 120V SOURCE WITH BATTERY BACK UP. MOTORS AND CONTROLS /O/ MOTOR. SWITCHES $a SINGLE POLE TOGGLE SWITCH, 20A., 120/277 VAC. MOUNTED 48" AFF. "a" INDICATES SWITCH LEG, WIRING A-1,3,5 HOMERUN TO PANEL "A".1-3-5 ARE CIRCUIT NO's, TICKS ARE No. OF CONDUCTORS (� INDICATES GROUND WIRE. MAXIMUM 3 CIRCUITS PER CONDUIT EACH ON SEPERATE PHASES. RUN HOMERUNS TO PANELS AS SHOWN ON FLOOR PLANS, DO NOT COMBINE HOMERUNS. INDICATES A CONDUIT RUN CONCEALED IN A CEILING OR WALL. RECEPTACLES GFI GROUND FAULT INTERRUPTER TYPE, DUPLEX RECEPTACLE 2P., 3 WIRE, GROUNDING TYPE, 20A., 120V., MOUNTED 42" AFF. LION. SINGLE RECEPTACLE, , 2P., 3 WIRE, GROUNDING TYPE, 20A., 120V., MOUNTED 18" AFF. UON. 30A OR 50A, 240V, 1 PHASE, 2P., 3 WIRE, �A GROUNDING TYPE, SINGLE RECEPTACLE NOTES: 1. ALL DIMENSIONS ARE TO CENTERLINE UNLESS OTHERWISE NOTED. 2. ALL SYMBOLS SHOWN ON ELECTRICAL SYMBOL LEGEND ARE NOT NECESSARILY USED IN THIS PROJECT. t avk Yu ?x�qJFUID .?! MANUFACTURER: SIEMENS VOLTAGE:1201240 VAC 10 3W TYPE: LOAD CENTER BUS RATING:200 A MOUNTING: FLUSH / SEXIST PANEL 'A r MAIN: M.L.O. NEUTRAL: FULL IDENTIFICATION # LOAD WIRE TRIP CKTCKT TRIP WIRE LOAD # IDENTIFICATION EXIST 1 2 EXIST EXIST WATER HEATER 4 4.50 2P-30A 2P-30A 8.00 6 EXIST RANGE EXIST 3 4 EXIST ##10 -'ra"C 5 6 EXIS r J. DRYER 5 5.00 2P-30R 2P-45A 9.60 8 EXIST AHU-2 U #10 - �/4"C 7 s Errs r EXIST LIGHTS & RECEPTACLES I EXIST 1P-20A 9 10 EXIST 2P-30A 2.50 4 EXIST IRRIGATION PUMP u u EXIST LIGHTS & RECEPTACLES 1 ** I EXIST 1P-20A 11 12 EXIST EXIST LIGHTS & RECEPTACLES 1 ** EXIST 1P-20A 13 14 2P-20A EXIST 5.00 7 ° EXIST CU-1 EXIST LIGHTS & RECEPTACLES 1 EXIS T 1 P-20A 15 16 EXIS T EXIST LIGHTS & RECEPTACLES 1 "* EXIST 1P-20A 17 18 EXIST 2P-20A 5.00 7 EXIST CU-2 u EXIST LIGHTS & RECEPTACLES 1 ** EXIST 1P-20A 19 20 EXIST BATH GFI RECEPTACLES 1 ** #12 -'/2"C 1P-20A 21 22 2P-20A EXIST 2.50 4 J EXIST WATER PUMP � EXIST REFRIGERATOR 4 1.20 EXIST 1 P-20A 23 24 EXIS T EXIST" DISWASHER 4 1.20 EXIST 1P-20A 25 26 1P-20A EXIST "" 1 EXIST LIGHTS & RECEPTACLES EXIST LIGHTS & RECEPTACLES 1 *" EXIST 1P-15A 27 28 1P-20A, EXIST ** 1 EXIST LIGHTS & P.ECEPTACLES *AFCI LIGHTING 1 ** 914 -'/z"C *1 P-15A 29 30 *1 P-15A 414 -'/a"C "* 1 *AFCI LIGHTING EXIST 31 32 *1 P-15A #14 - Y:'C ** 1 "AFCI LIGHTING EXIST O VEN B 5.00 2P-40A EXIST 33 34 IF-15A EXIST ** 1 EXIST LIGHTS & RECEPTACLES EXIST LIGHTS & RECEPTACLES 1 EXIST 1P-15A 35 W *1P-20A #12 - Ys"C 1.50 3 *AFCI I GFCI WASHER 37 38 EXIST SPARE 2P-30A 2P-B0A 9.60 6 EXISTAHU--1 39 40 EXIST CONNECTED KVA LOAD 16.90 1 43.70 CONNECTED KVA LOAD *AFC] CIRCUIT BREAKER **AFCI & GFI COMBO # LOADS: LOAD KVA 1 LIGHTS & RECEPTACLES 8.70 2 SMALL APPLIANCES 0.00 **GENERAL LIGHTINGLOAD: 3 LAUNDRY CIRCUITS LOADS 1.50 SQFT1 VV/FT' KVA 4 APPLIANCES LOADS 11.90 2900 3 r 8.70 5 CLOTHES DRYERS 5.00 6 COO KING APPLIANCES 13.00 SUBTOTAL: 40AQ ACIH.EAT @ 100%: 19.20 TOTAL CONNECTED: 59.30 KVA FIRST 10 KVA @ 1Q0% 10.00 REMAINDER @ 40% 12.04 7 AIR CONDITIONING @ 100% 10.00 8 HEATING @ 65% 12.48 SUBTOTAL: 44.52 SMALLEST ACIHEAT. 10.00 TOTAL DEMAND: 34.52 KVA 1 240 VAC v 143.83 AMPS EXISTING ABOVE GROUND SERVICE TO FPL -^�--- ESE200 I I ESE200 0 I J I I p III I EXIST III GCB III I I PNL'A' I I� I I�= =4 I I I*-1 I I EXIST ELECTRICAL -T I I I I METER TO REMAIN I I I L_J I p1 ELECTRICAL REVIEW �' � EXIST MAIN I I L � DISCONNECT TO I I I /�P"r'FiOV�aCj IRATE � REMAIN I I_ - T - J I E200 L 17_-J Johnson -Thomas Construction Documents 100 NE 101 st Street Miami Shores, FL 33138 EXTERIOR INTERIOR EXISTING ELECTRICAL RISER DIAGRAM N.T.S. FEEDER SCHEDULE TYPE WIRES GROUND CONDUIT E200 EXIST 3#3/0 THWN (Cu) 1#6 (Cu) 2" ESE200 EXIST 3#310 THWN (Cu) - 2" Project Information Project number 18019 Date November 4, 2019 No. Description Date AR 96398 AR 92953 UUUt� VUUV U o a u _ p_ u a N U CJ U UV l'0 UU UE u 'UU 00 z U UU U U U J U us E 0 s IT c 0 0 V U J U U V VU V�3 VU V'.J U V UVUVU y V U V C U UUUUU UU"JUJU V U J U! U U V V J ❑ LESTER TRIANA, P.E. Florida No. PE65707 ❑ LORENZO TRIANA, P.E. Florida No,PE39657 SPECIFICATIONS �1 =�k c� c� kn 6i rn 0 N 00 T N 1. ALL WORK TO BE DONE IN ACCORDANCE WITH THE FLORIDA BUILDING CODE 2017 (6TH EDITION), STATE AND LOCAL ORDINANCES. BUILDING DRAINAGE SYSTEM TO BE SLOPED AT 118" PER FT. MIN. FALL FOR 3" PIPE AND LARGER'/" PER FT. SLOPE FOR 2" PIPE SIZE AND SMALLER DEVIATIONS SHALL BE APPROVED BY ARCHITECTIENGINEER. PROVIDE CLEAN OUTS EVERY 75 FT. AND AT BASE OF EVERY WASTESTACK. ALL CLEAN -OUTS TO BE FLUSH MOUNTED. 4, MATERIALS SHALL BE ALL NEW AND AS FOLLOWS: A. DRAINAGE WASTE AND VENT PIPING UNDERGROUND: PVC (DWV) PIPING SCHEDULE 40 CONFORMING ASTM D-2665. ABOVE GROUND: PVC DRAINAGE WASTE & VENT (DWV) SCHEDULE 40 CONFORMING ASTM D-2665 OR CAST IRON NO HUB PIPE AS PER CISPI STANDARD 301. INSTALL PLASTIC (PVC) PIPES ONLY WHEN ITS APPROVED BY LOCAL AUTHORITIES AND NOT TO BE INSTALLED IN AIR RETURN PLENUM. B. WATER PIPING: COPPER TYPE "L" ASTM B-88 ABOVE GROUND AND COPPER TYPE "K" ASTM 8-88 UNDERGROUND,PROVIDE 1" THICK MIN. FIBERGLASS INSULATION TO ALL HOT WATER AND HOT WATER RECIRCULATION PIPING. C. WALL CLEAN OUTS: JOSAM SERIES 58750 WITH ACCESS COVER OR EQUAL. D. VALVES: 125 PSI NIBCO SCOTT, STOCKHAM OR EQUAL. AIR ADMITTANCE VALVE: STUDORO MINI -VENT® OR APPROVED EQUAL. F. WATER HAMMER ARRESTORS (SHOCK ABSORBERS): AS PER PDI STANDARDS WH-201 "J.R. SMITH" MODEL: HYDROTROL OR APPROVED EQUAL. PROVIDE ACCESS PANEL. PERFORM THE FOLLOWING TEST: A. WATER PIPING SHALL BE SUBJECTED TO HYDROSTATIC PRESSURE TEST OF 100 PSI FOR A PERIOD OF TIME SUFFICIENT TO EXAMINE ENTIRE SYSTEM BUT NOT LESS THAN ONE HOUR. DRAINAGE SYSTEM: BEFORE INSTALLATION OF ANY DRAINS, THE END OF THE SYSTEM SHALL BE CAPPED & ALL LINES FILLED WITH WATER TO HIGHEST POINT & ALLOWED TO STAND UNTIL INSPECTION IS MADE AND WATER LEVELS REMAIN CONSTANT. C. CORRECT ALL DEFECTS DISCLOSED BY ABOVE TESTS. D. COMPLETE SYSTEM FIXTURE & EQUIPMENT SHALL BE GIVEN AN IN-SERVICE TEST AFTER COMPLETION OF THE INSTALLATION. STERILIZE ALL WATER LINES WITH A MIXTURE OF (2) POUNDS OF CHLORINATED LIME TO EACH 1000 gal. OF WATER (50 PPM OF AVAILABLE CHLORINE.) RETAIN MIXTURE IN PIPES FOR 24 HOURS AND FLUSH THOROUGHLY WITH POTABLE WATER BEFORE PLACING IN SERVICE. PLUMBING CONTRACTOR SHALL FURNISH A WRITTEN GUARANTEE THAT ALL PLUMBING WORK SHALL BE FREE FROM DEFECTS OF MATERIALS AND WORKMANSHIP FOR A PERIOD OF ONE YEAR FROM DATE OF FINAL ACCEPTANCE, AND THAT HE WILL, AT HIS EXPENSE, REPAIR AND REPLACE ALL WORK WHICH BECOMES DEFECTIVE DURING GUARANTEE PERIOD. 7, CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION OF EXISTING SANITARY & WATER POINTS OF CONNECTION BEFORE COMMENCING ANY WORK. PLUMBING CONTRACTOR SHALL PAY ALL FEES AND INSPECTION CHARGES REQUIRED. 9, SUBMIT SHOP DRAWINGS TO ENGINEER FOR APPROVAL OF ALL EQUIPMENT, MATERIALS AND LAYOUTS PRIOR INSTALLATION, 10. OFFSET PIPING AS REQUIRED TO CLEAR BUILDING STRUCTURE, DUCTWORK, ETC. AS SHOWN ON DRAWINGS AND AS REQUIRED BY FIELD CONDITIONS. 11. PLUMBING CONTRACTOR SHALL VERIFY ALL SPACE CONDITIONS AND DIMENSIONS AT JOB SITE PRIOR TO FABRICATION AND INSTALLATION OF MATERIALS AND EQUIPMENT, 12. COORDINATE WORK WITH OTHER TRADES. 13. FURNISH AND INSTALL FIXTURE AS SPECIFIED IN PLUMBING FIXTURE SCHEDULE. 14. EACH PLUMBING FIXTURE SHALL BE PROVIDE WITH AIR CHAMBER OR WATER HAMMER ARRESTORS (SHOCK ABSORBER) AS PER FBC 604.9 15. PROVIDE SHUTOFF VALVE FOR EACH FIXTURE, JUST BEFORE CONNECTING TO FIXTURE. 16. WHEREVER DISSIMILAR METALS ARE TO BE JOINED, A DIELECTRIC FITTING SHALL BE PROVIDED TO CONNECT BOTH TYPES OF PIPES. 17. ALL PLUMBING FIXTURES & FAUCETS SHALL COMPLY WITH THE MAXIMUM FLOW RATE & CONSUMPTION STATED ON F.B.C. TABLE 604.4. 18, PLUMBING FIXTURES & EQUIPMENT SHALL CONFORM WITH THE SPECIFICATIONS, CONNECTIONS AND TESTING LABORATORIES APPROVALS AS STATED ON F.B.C. SECTION 406 THRU 421 PLUMBING LEGEND cvhApni I DESCRIPTION ------------ d i COLD WATER PIPE (CW) HOT WATER PIPE (HW) SANITARY WASTE PIPE (SAN) SANITARY VENT PIPE (V) WATER HAMMER ARRESTOR AND TYPE AIR CHAMBER GATE OR BALL VALVE "P" TRAP WALL CLEAN OUT (CO) CONNECT TO EXISTING VENT THRU ROOF FIXTURE UNIT NOTES: 1, CONTRACT[ STYLE, FINIS 2. ALL PLUMBII CONSUMPTI rn 0 N a� E m 0 U J V U Z O J U U U JU U UVODUU V j V U VUVUUU VU V U U V V V V U U V ,U ,,UU V V JU VV VV V V rJUV VV U V U U ti1 N J V J U U V VV V U E 0 0 w c 0 J