2024-05-29 CCAB MinutesAdvisory Board Meeting
Wednesday, May 29, 2024
Present: B. Griffith, M. Puglisi, S. Maroon, T. Septembre, T. Halloran, M. Mennes, C. Baetzel,
R. Strickland, P. Arutyunov, and A. Pozzi
Meeting called to order at 5:39 pm
April 241" Meeting Minutes were approved.
A. Pozzi —
• We sent notice to the Village that Professional Course Management will exercise its last option
to renew the contract for 1 more year
• The dry weather pattern that we are experiencing illustrates the shortcomings of our irrigation
system
• We are running as much water as the system will allow and still have multiple hotspots
throughout the golf course, some with loss of turf
B. Griffith — Is the irrigation system working?
A. Pozzi — Yes, the irrigation system is working as well as it can be expected but it just does not provide
coverage to all areas on the golf course
New Business:
B. Griffith —
• Not much progress to report, John Sanford from the N.G.F. is waiting on the plan from South
Water Management in order to complete the report
• Hoping to have the full report from the N.G.F. this summer
• Played the just renovated Miami Springs Country Club and the golf course conditions are not
good
B. Griffith —
• The bunkers are a mess and they paid around 4 million for the course renovations
• Have you finalized the aerification schedule?
• Are you going to change the driving range mats?
A. Pozzi —
• The first round of aerification on tees, collars, approaches and fairways has been completed
• Next Monday and Tuesday we will aerify greens
• We will start the 2,d round of aerification on July 17th, when we will close the golf course for a
day to dryject all greens
• Yes, we will replace the mats in the fall
e ! E O i.
Ili � � i• j �! +, �• �r ] � � � • �� ,c * � ��
W. va" (C"
tamt
I
C. Baetzel —We are looking for alternatives so that we can install the best possible product
S. Maroon — The yellow line by the first tee should be repainted because the golfers do not pay
attention to it
C. Baetzel — Will have the yellow line re -painted and instruct staff to remind golfers to stop before
proceeding to the 11t tee
T. Septembre —
® Things will slow down in the summer, it's a good time to paint and stripe the driveway
® Should look at the bar stools, some are loose
® The food has been excellent
A. Pozzi — We will wait until October to paint and stripe the parking lot, will check the bar stools
T. Halloran —
® Family Night was great, the kids had a fantastic time
® In the process of planning a tournament for August
M. Mennes — It is amazing how fast you put the celebrations of lives together
M. Puglisi — Can you move the royal palm on #6 tee and place it on #3?
A. Pozzi — Looked into it last November and the arborist advised against it
C. Baetzel —
® As of now we have 25 teams signed up for the Father's Day Tournament
® Family Night went very well
P. Arutyunov —
® We will plan another Family Night in August
® Will schedule a taco night in the summer
® Make reservations for Father's Day
® Friday Night Dinners have been very busy
B. Griffith — Have you scheduled the P.C.M. Cup?
C. Baetzel —The next P.C.M. tournament will be at Miami Beach Golf Club, as of now we have not
selected a date
R. Strickland —The next meeting is scheduled for June 26tn
Meeting ended at 6:29pm
OPERATED BY