Loading...
CC-17-2849TCO -l"r-c-c- Miami Shores Village Building Department 10050 N.E.2nd Avenue, Miami Shores, Florida 33138 Tel: (305) 795-2204 Fax: (305) 756-8972 UNIFORM MUNICIPAL TCO/TCC INSPECTION REPORTING FORM Master Permit No. 2 ,(� Miami -Dade County from Municipality: ;? I g 0 3,? 0Municipal Permit No. (MELD): RE CEV C AUG 17 LJ id Job Address: _ `%j 00 �� L�-,�V e. Unit: Project Name: j Qualifier's Name: �-' CA1 -,A? e ��/11,i' d AQualifier's Phone: Email: i'J Q& �QCF , UU C Owner's Name: a%� YL02 Owner's Phone: �f05L � '-7549nail: r� ;fps G°'� This Uniform Municipal TCO/TCC Inspection Reporting Form is used to gather trade approvals for Temporary Certificate of Occupancy (TCO) or Completion (TCC). Once validated by the Municipal Building Department personnel, the form must be present at the job site for the field inspectors. When all approvals have been obtained, take the signed form back to the Municipal Building Department for TCO/TCC issuance. A 1 Form Validated by MOG) Df 01 b Date: Bldg Dept Personnel: Print Name e OAll "Required" TCO/TCC inspections indicated below must be signed "Approved" before certificate issuance. Req'd. Trade Inspector's Name Approval Sign ture Date Comments Building '..i1W �OCU I T ❑ Electrical 60, ❑ Fire a�( �• �� �L .UDId, 1� ❑ Mechanical ❑ 1 Plumbing ❑ Public Works ❑ Zoning ❑ Other Important Note: The TCO/TCC is not valid and building and/or space may not be occupied unless signed by the Building Official. Occupying the building and/or space without obtaining a TCO/TCC issued by the Municipal Building Department is prohibited and is in violation of the Florida Building Code Section 110.3. OBuilding Official's Approval: ❑ In TCO/TCC ❑ Extension Conditions of TCO/TCC: Date: TCC/TCO Duration: • If Master Permit expires, the TCO/TCC will automatically be revoked and the space must be vacated. • A TCO/TCC may be revoked if any action by the contractor, owner or tenant creates any code violation affecting the proper occupancy of the area. • Any TCO/TCC that expires without renewal or has been revoked can result in a notice of violation, civil violation and/or disconnection of utility services. • Other conditions: Sri* (1wi d 04/09D I.OSFBOA • development inc m L U N O IL TCO/TCC REQUEST Date: 08-15-18 Miami Shores Village Building Department 10050 NE 2nd Ave Miami Shores, FL 33138 Re: REQUEST FOR TEMPORARY CERTIFICATE OF OCCUPANCY Miami Shore Permit Number: #CC17-2849 Miami Dade Fire Department Permit # 2018032034 Miami Dade Process Number: # M201800319 Business Name: Dunkin Donuts Business Address: 11300 NE 2 AVE. Miami Shores, FL. General Contractor: Ventura Architecture Development, Inc Qualifier Name: Michael Ventura To Ismael Naranjo, Please accept this correspondence as a Formal request for Temporary Certificate of Occupancy for the above referenced job. This request is for commencement of regular business including retail sales to the public while the fire Alarm revisions as well as the "A-1" permit set Sheet are reviewed and approved as per Fire Inspectors request. Also we are pending Final Roof Warranty Inspection as well as Final Roof Inspection. We are requesting 90 days for the TCO, and within this time, every attempt will be made to obtain the Final CO. If the final CO is not obtained; another Fire Inspection and request for TCO Extension will be obtained. During this time We Hereby certify that all means of egress shall be kept clear and accessible, and all life safety systems will be maintained and operable at all times. Ventura Architecture Development, inc. will "Hold Harmless" and release Miami Shores Building Department and the Miami -Dade Fire Rescue 7nt from any Liability that may occur from the occupancy during the TCO period. Respectfully, h Michael Ve 16ra, ArWiite'dt, General Ventura Arc itecture Development AR 001615Z CGC 060048 Miami Shores Village Building Department 10050 N.E.2nd Avenue, Miami Shores, Florida 33138 Tel: (305) 795-2204 Fax: (305) 756-8972 Website: www.miamishoresvillaite.com TEMPORARY CERTIFICATE OF OCCUPANCY APPLICATION (T.C.0) Please be advised that the TCO expiration date is based on conditions from Miami -Dade County Fire Dept. Date: ( (�o / I e, Folio#: 11- a 13 (P r 00l)" (5V 50 Master Building Permit #: J�J - 30 4 Square Footage of Space: lf, Miami -Dade Municipal Process#: Hk Miami -Dade Municipal Permit#: ' 01 9Qa2_0 q LContracting Company: f Owner/Tenant: NR:RY 6V Lot: Block: Subdivision: Street Address: V-3 yo H z, Ise Signature of applicant verifies the above Information is true and correct. The Temporary Certificate of Occupancy Is issued to the above named for building at the above location only upon the express provisions that the applicant will be able by and comply with all conditions of the Zoning ordinances and all ordinances of Miami ores Village id/or FF a Building Code pertaining to erection, construction or remodeling of buildings or structures. This also ertifies that a rical wiring and or equipment, and the plumbing work has been inspected and approved. Print Name of Applicant or Qualifier i t o pplicant or Quay i FOR OFFICE USE ONL TCO Number: Fee: Expiration Date: Technology Fee: Approved Use for Occupancy: Total: Remarks: Building Official/Designee: Inspections: Zoning Yes/No Plumbing Yes/No Building Yes/No Fire Sprinkler Yes/No Electrical Yes/No Fire Yes/No Mechanical Yes/No MIAMI-DADE COUNTY FIRE RESCUE _. FIRE PREVENTION DIVISION TEMPORARY CERTIFICATE OF OCCUPANCY (T.C.0) STATUS FORM PROJECT•• • Municipal Permit #: WS-6-18-1770 Miami -Dade Process # M2018003319 Miami -Dade Permit #: 2018032034 Owner/Contractors Name:CARLOS Business Name: DUNKIN DONUTS Owner/Contractor Phone#:786 486 6972 Contact Name: Phone # 954 937 5850 Address: 11300 NE 2 AVE City: MIAMI SHORES State: zip Code: T.C.O. INFORMATION ,t REASON REVISION OF FIRE ALARM AND LIFE SAFETY A-1 PAGE t .j Length: E130 Days 11 60 Days ®90 Days Other (# of days) Required: 0 Yes No RESTRICTIONS/COMMENTS (If Applicable) SUBSIDIARY PERMITS (Fire Alarm, Sprinkler, etc.) I FIRE ALARM 2018-072281 tF4 v, FOLLOW UP INSPECTIONS FIRE ALARM FINAL, LIFE SAFETY FINAL A k NOTE: Submit this completed TCO Status form with a TCO Hardship letter (not applicable for municipalities), Fire Inspection Report, and a TCO Application from Miami -Dade County Building or Municipality Building Department to The Fire Prevention New Construction Bureau OIC or designee for approval. T. JABALI i Inspector's Signature OIC's Signature 8/17/18 DATE DA E Rev 4-2014 Crook N f I -NSPECTION RECORD lage Permit NO.CC-1 2-17-2849 000 ax: (305)756-8972 Issue Date: 4111 /2018 Permit Type: Commercial Constru Work Classification: Alteration INSPECTION REQUESTS: (305)762-4949 or Log on at https://bidg.miamishoresvillage.corTi/cap REQUESTS ARE ACCEPTED DURING 8:30AM - 3:30PM FOR THE FOLLOWING BUSINESS DAY. Requests must be received by 3 pm for following day inspections. Expires: 10/08/2018 Commercial Construction Parcel #1121360000050-25 `s� Owner's Name: BARRY UNIVERSITY Job Address: 11300 NE 2 Ayenue2uiteGarner Uuildip_Q _ Miami Shores FL 313.8-000d" Bond Number: Contractor(s) Phone P.-im, ' Contractor ary VENTURA ARCHITECTURE DEVEL( (954)423-1362 Yes Owner's Phone: Total Square Feet: 1542 Total Job Valuation: $ 450,000.00 WORK IS ALLOWED: MONDAY THROUGH FRIDAY, 8:OOAM - 7:00PW SATURDAY 8:00AM - 6:OOPM. NO WORK IS ALLOWED ON SUNDAY OR HOLIDAYS. BUILDING AND ROOFING INSPECTIONS ARE DONE MONDAY THROUGH FRIDAY. fill C) N Aw4&- NO INSPECTION WILL BE MADE UNLESS THE PERMIT CARD IS DISPLAYED L,ND HAS BEEN APPROVED. PLANS ARE READLY AVAILABLE. IT IS THE PERMIT APPLICANT'S RESPONSIBILITY TO ENSURE THAT WORK IS ACCESSIBLE AND EXPOSED FOR INSPECTION PURPOSES. NEITHER THE BUILDING OFFICIAL NOR THE CITY SHALL BE LIABLE FOR EXPENSE ENTAILED IN THE REMOVAL OR REPLACEMENT OF ANY MATERIAL REQUIRED TO ALLOW INSPECTION. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION, IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE COMMENCING WORK OR RECORDING YOUR NOTICE OF COMMENCEMENT. —rB a (z) Wee, r�- (o W ja �Mvv'i' i P4414'1 k), "O" INSPECTION RECORD INSPECTION WINDOWS i RS DATE INSP INSPECTION l &ATE I N# U! L JINSPECTION DATE INSP. Foundation Stemwall Slab !. Columns (1st Lift) Columns (2nd Lift) Tie Beam I Truss/Rafters aj�oof Sheathing Bucks Interior Framing I Insulation Ceiling Grid Drywall IFirewall Wire Lath Pool Steel Pool Deck r;. 1 D--1 Final Fence Screen Enclosure Driveway Driveway Base Tin Cap_ _ Roof in Progress Mop in Progress Final Roof Shutters Attachment Final Shutters Rails and Guardrails !ADA compliance DOCUMENTS Soil Bearing Cert Soil Treatment Cert Floor Elevation SurvPv Reinf Unit Mas Cert Insulation Certificate Spot Survey Final Survey Truss Certification Attachment INSPECTION I DATE I INSP Excavation , ,INSPECTION Temporary Pole 30 Day Temporary_ Pool Bonding Pool Deck Bondin€ Pool Wat Niches Underground I�JOter "rvur G Slab Wal ug Ceiling Roug `!A Rough Telephone Rough Telephone Final TV Rough TV Final Cable Rough Cable Final IMLA Intercom Roug Intercom Final Alarm Rough Alarm Final Fire Alarm Rough Fire Alarm Final Service Work With DATE 1 INCD ELECTRICAL COMMENTS /•}-� rt tt �d 1 FIRE i INSPECTION I DATE JINSP Final Sprinkler Final Alarm Rough Water Service 2�d Rough 3 Top Out Fire Sprinklers Septic Tank Sewer Hook-up Roof Drains Gas LP Tank I I rvll n Sprinklers T Main Drain Pool Piping Rarltfln�ni Preunntnr Interceptor --yi i I I 11-� latch basins Condensate Drains HRS Final 21110 PLUMBING COMMENTS INSPECTION 1 DATE Underground Pipe Rough Ventilation Ro . wg, Hood Rough Pressure Test Final Hood Final Ventilation Final Pool Heater Final Vacuum • MECHANICAL tbmMENTS INSP