182 NW 96 St (6)SPECIFICATIONS FOR: MR. & NRS. JAY VAILENCOURT (FILE NO. V-4) - 3 of " lime has been added. This coat shall be applied directly to the masonry and other wall surfaces dilling out all hollow place, brought to a uniform plane and scratched to received second coat. The second or finish coat, shall be without lime but having an approved waterproofing compound mixed according to the manufcturer's directions. TILE AND OTHER FLOOR FINISHES SCOPE OF "10RK: - Under this heading are included all tile work and floor finishes other than wood, cement, linoleum and asphalt tile, and includes: Front steps and stoop - quarry tile, Bathroom floor in Octagonal permastile. Bathroom wainscote - Glazed Tile. Kitchen drainbo.ard, back and sides - Glazed Tile All win,�ow sills - Glazed. Reach porch - Quarry Tile. All glazed the shall be standard grade, color selected by Owner. All tile shall be brought to job in original sealed packages; all tile shall be installed by skilled mechanics throughly competent to execute the work. All tile out on job shall be straight an.` uniform, shall be grouted and pointed with proper grouting mixes, and after pointed, all surfaces shall be thoroughly cleaned in accordance with good practice. Red clay bricks shall be set by tile setter for a comp- lete hearth. Cast stone fireplace shall be set by a the setter. LINOLEUY FLOORS LINOLEUM FLOOR: - Kitchen floors shall be covered with standard gauge linoleum as selected by Owner before the application of shoe mold. The best material and workman- ship are to be employed. MEDICINE CABINET FURNISH AND SET 14" x 26" medicine cabinets of selection as made by the Owner. Allow $12.00. VTVr-1TIAL AS.INDS ,'.TIDES FURNISH AND SET at each window a set of Venetian Blind rece- ssed guides. SHEET 11TAL AND ROOFING ROOF:- Entire roof areas shall be first covered with #30 roofing felt. Felt shall be applied to have at least a 6" horizontal and vertical lap, with vertical joints staggered and nailed with large head copper roofing nails. Felt on ridges shall lap at least 12" both ways. Follow with90# felt swabbed in with pitch. All roof areas shown as having tile shall be covered with white cement tile. All tile to 'e set in cement mortar and any further manner in common practise to insure a permanent roof. No badly broken tile will be accepted and all roofs must be swept down and cleaned of any mortar or other debris and left in good condition. SHEEP METAL: - All flashing, valleys, etc., to be in li oz. copper, edging strips on all sheathing. Furnish drip strip in copper. Other sheet metal work as shown. ,#22 ga. toncan gal. iron if copper is not available. PL ULTI NG SCOPE OF ':iORK: - It is the intent of these specifications to provide for a complete and perfect system of drainage, venting, cold water supply, and incidental to a complete and efficient plumbing installation and water connections to heating plant. This contractor shall be held strictly responsible for the quality of materials furnished and for the proper installation of the system. All work shall conform to the rules and regulations of the E`Sami plumbing code. Yiarri. PERI.O:TS AND CONNECTIONS: - The builder shall obtain all necessary permits and pay for the same. He shall provide water from the beginning of the operations. He shall excavate for all pipes and backfill at completion, removing all excess dirt. MEASUREMENTS AND CHASES: - All ,easurements for plumbing shall be made by this builder. He shall also instruct other trades as to the cutting of all chases and shall be responsible for their proper location. GUARANTEE: - This guilder shall furnish a written guarantee and make good to the Owner any defects in material and workmanship which may develop withing one year after the completion and acceptance of the job. VALVES: - All vlaves shall be Crane. or Jenkins -polished brass valves and of full size of the pipe they control. INDEPENDENT RISERS: - Each column of fixtures shall have independent risers for both not and cold water. CONTROL VALVES: - Approved stop valves to match fittings shall be provided on both hot and cold water supplies beneath each fixture. HOSE COCKS: - Provide two hose cocks where shown. AIR CHAMBERS: - Air chambers shall be placed on hot and cold water supply. HOT WATER SUPPLY: - Connect hot water supply to tank and to all fixtures except water closets and hose bibs. SEPTIC TANK - The septic tank shall be furnished and installed where shown or directed"and shall have a capacity of a least 700 gallons. Laterals of at least 125' in total length shall be installed in trenches where 4" of broken stone had been placed. PLU11BING FIXTURES: - Provide all fixtures necessary as per following "Standard" Company Schedule: STANDARD FIXTURE SCHEDULE ALL EXPOSED BRASS CHRO11ARD BATH (WHITE) Tub & Shower: P-2227 5'0" Master Pembroke acid Resisting enamel iron recess bath. B-75 Diverter spout tub and showe fittings. B-438 Pop-up drain fitting. B-293 510" curtain rods with pins, less curtain. Lavatory: F-167-V 24" x 20" Roxbury vitreous Chia Lavatory No. 48 Metal legs and towel bars. B-708 Combination supply and pop-up drain fitting' B-820 3/8" supplies with stops. 1-1/14" C.P. 17 ga. "P" trap. Closet: F-2100 Cadet vitreous china closet combination, supply to wall with stop, church No. 640 plain colored seat and cover. Kitchen Sink (White) - P-2100 32" x 21" Custom -Line Acid Resisting enamel iron double compartment sink, fitted with B-897 Combination swing spout faucet. B-989 Double sink strainers 1-1/2" C.P. 17 ga. "P" trap. LAWN FAUCSTS B-1671 3 4" Rough N.P. lawn faucets where shown on plans. TRAYS Two part stone with Being faucet. HEATING PLANTS (b-y Owner) WATER HEATING: - Install a complete 30 gal. elec. automatic water heater system. ELECTRIC WIRING SCOPE OF :".ORK - It is the intent of these specifications to provide for a complete and perfect system of electric wiring. Before beginning work, electric contractor shall submit to the Architect a complete layout in duplicate with the stamp of approval of the Florida Power & Light Co. The perfect operation of the system is to be guaranteed by this Builder. This builder shall pap[ for all permits, connections and inspection fees. He shall comply with all local ordinances and with all rules and regulations of the Board of Fire Underwriter. GUARANTEE: - Contractor shall guarantee the installation and make good any defects developing withing one year of acceptance of the work.