Miami Shores Traffic Calming Study Final ReportMiami Shores Village-Wide
7raIÀF &almiQg SWXd\
PREPARED FOR:
Miami Shores Village
PREPARED BY:
Marlin Engineering Inc.
1:WK$YH6XLWH
3ODQWDWLRQ)/
ZZZPDUOLQHQJLQHHULQJFRP 2FWREHU 2016
)LQDO6XEPLWWDO
MARLIN | 1700 NW 66th Ave, Suite 106 | Plantation, FL33313 | www.marlinengineering.com i
Miami Shores Village – Traffic Calming Study
Table of Contents
1.0INTRODUCTION ................................................................................................... 1
6WXG\$UHD ...................................................................................................................... 1
2EMHFWLYHVDQG$SSURDFK ............................................................................................. 1
2.0TRAFFIC CALMING ANALYSIS METHODOLOGY ............................................. 3
*HQHUDO5HTXLUHPHQWVDQG&RQVWUDLQWV .................................................................... 3
7UDIILF&DOPLQJ2SWLRQV ................................................................................................ 4
3XEOLF,QSXW ..................................................................................................................... 5
'DWD&ROOHFWLRQ ............................................................................................................... 6
3.0FIELD OBSERVATIONS ...................................................................................... 8
4.0DATA ANALYSIS ............................................................................................... 15
5.0TRAFFIC CALMING PLAN ................................................................................. 18
6.0TRAFFIC CALIMING RECOMMENDATIONS .................................................... 22
3UHOLPQDU\&RVW(VWLPDWHV ......................................................................................... 31
$OWHUQDWLYHV ................................................................................................................... 32
6FRULQJDQG3ULRULWL]DWLRQ6\VWHP ............................................................................. 38
7.0CONCLUSIONS .................................................................................................. 40
List of Tables
7DEOH±7UDIILF&DOPLQJ7KUHVKROGV
7DEOH±([LVWLQJ7UDIILF&DOPLQJ'HYLFHV
7DEOH±5HFRPPHQGHG7UDIILF&DOPLQJ3ODQ
7DEOH±3UHOLPLQDU\&RVW(VWLPDWHV
7DEOH±$OWHUQDWLYHV&RPSDULVRQ0DWUL[
7DEOH±5HFRPPHQGHG7UDIILF&DOPLQJ$OWHUQDWLYHV
7DEOH6FRULQJ6\VWHPIRU3ULRULWL]LQJ:DUUDQWHG7UDIILF&DOPLQJ/RFDWLRQV
7DEOH±3ULRULWL]HG6HJPHQW/LVW
MARLIN | 1700 NW 66th Ave, Suite 106 | Plantation, FL33313 | www.marlinengineering.com ii
Miami Shores Village – Traffic Calming Study
List of Figures
)LJXUH±6WXG\$UHD
)LJXUH±7UDIILF'DWDFROOHFWLRQGHYLFHVORFDWLRQV
)LJXUH±([LVWLQJ5RDGZD\&ORVXUHVDQG6WRS6LJQV$UHD
)LJXUH±([LVWLQJ5RDGZD\&ORVXUHVDQG6WRS6LJQV$UHD
)LJXUH±([LVWLQJ5RDGZD\&ORVXUHVDQG6WRS6LJQV$UHD
)LJXUH±([LVWLQJ5RDGZD\&ORVXUHVDQG6WRS6LJQV$UHD
)LJXUH±WK3HUFHQWLOH6SHHGV
)LJXUH±$'7RYHUYHKLFOHVSHUGD\DQG3HDNKRXURYHUYHKLFOHVSHU
KRXU
)LJXUH±5HFRPPHQGHG7UDIILF&DOPLQJ3ODQ$UHD
)LJXUH±5HFRPPHQGHG7UDIILF&DOPLQJ3ODQ$UHD
)LJXUH±5HFRPPHQGHG7UDIILF&DOPLQJ3ODQ$UHD
)LJXUH±5HFRPPHQGHG7UDIILF&DOPLQJ3ODQ$UHD
Appendix
Appendix A±5HVLGHQWV&RPPHQW&DUGV
Appendix B±5DZKRXU7UDIILF9ROXPH&RXQWV'DWDDQG5DZ6SHHG'DWD
Appendix C±0LDPL'DGH7UDIILF)ORZ0RGLILFDWLRQV6WUHHW&ORVXUHV3URFHGXUH
MARLIN | 1700 NW 66th Ave, Suite 106 | Plantation, FL33313 | www.marlinengineering.com
Miami Shores Village – Traffic Calming Study
1
1.0 INTRODUCTION
0$5/,1ZDVUHWDLQHGE\WKH0LDPL6KRUHV9LOODJHWRHYDOXDWHWKHORFDOVSHHGYROXPH
DQGRYHUDOOWUDIILFSDWWHUQVWRGHWHUPLQHORFDWLRQVZLWKLQWKH9LOODJHZKHUHWUDIILFFDOPLQJ
PHDVXUHVVKRXOGEHUHFRPPHQGHG$VSDUWRIWKLVVWXG\0$5/,1ZLOODOVRGHYHORSD
9LOODJHZLGH 7UDIILF &DOPLQJ 0DVWHU 3ODQ LQFRUSRUDWLQJ SROLFLHV WR LPSOHPHQW WKH
SDUWLFXODUW\SHRIWUDIILFFDOPLQJPHDVXUHVWREHUHFRPPHQGHGIRUHDFKRIWKHLGHQWLILHG
FRQFHUQV
1.1. Study Area
7KH9LOODJHLVORFDWHGHDVWRI,DQGERXQGHGE\1(1:6WUHHWWRWKHVRXWK
1(1:6WUHHWWRWKHQRUWK1:$YHQXHWRWKHHDVWDQG%LVFD\QH%D\WRWKH
ZHVWZLWKVRPHSRFNHWVLQWKH1:DQG6:FRUQHUVRIWKH9LOODJHDVIDUZHVWDV1:
$YHQXH%DVHGRQWKHGLIIHUHQWWUDIILFFKDUDFWHULVWLFVDQGODQGXVHVWKHVWXG\DUHDZDV
GLYLGHGLQWRIRXUGLIIHUHQWVXEDUHDV6HHFigure 1
1.2. Objectives and Approach
%DVHGRQLQSXWIURP9LOODJHUHVLGHQWVWKHPDMRUWUDIILFSUREOHPVDUHH[FHVVLYHVSHHGLQJ
YROXPHFXWWKURXJKWUDIILFDQGVDIHW\WKHREMHFWLYHRIWKLV7UDIILF&DOPLQJ6WXG\LVWR
DGGUHVVWKHVHFRQFHUQVDWFULWLFDOORFDWLRQVWRUHGXFHWKHHIIHFWVRIPRWRUYHKLFOHVRQWKH
UHVLGHQWLDOQHLJKERUKRRGVSURPRWHSHGHVWULDQDQGELF\FOHXVHDQGLQFUHDVHWKHTXDOLW\
RI OLIH WKURXJKRXW WKH 9LOODJH 7KH IROORZLQJ VWHSV ZLOO EH SHUIRUPHG WR PHHW WKHVH
REMHFWLYHV
x 0HHWZLWKUHVLGHQWVWRJHWLQSXWRQLVVXHVDQGDUHDVRIFRQFHUQ
x 5HYLHZDQGFRQVROLGDWHFRQFHUQV
x 3HUIRUPWUDIILFGDWDFROOHFWLRQ
x 'HWHUPLQHFULWLFDOORFDWLRQVZLWKLQWKHVWXG\DUHD
x 3HUIRUPWUDIILFFDOPLQJDQDO\VLV
x 'HYHORSSUHOLPLQDU\UHFRPPHQGDWLRQVIRU&LW\UHYLHZ
x 3UHVHQWVWXG\UHVXOWVWR0LDPL'DGH&RXQW\IRUDSSURYDO
NN
'HDG(QG
N
H@LHGNQDRHKK@FDHRB@XMDKUC´±SGS
¬«®QCS
´°SGSMCUD±SGUDMCUDHKK@FDHLHSR
NB@SHNM@O
HKK@FDNTMC@QX
OO)LJXUH/RFDWLRQ0DS
0LDPL6KRUHV9LOODJH7UDIILF&DOPLQJ6WXG\
NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNBBBBBBB@@@@@@@@@@@@@@SSSSSSSSSSSSSSSSSSSSSHHHHHHHHHHHHHHHHHHHHHNNNNNNNNNNNNNNNNNNNMMMMMMMMMMMM@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@OOOOOOOOOOOOO
0$5/,1_1:WK$YH6XLWH_3ODQWDWLRQ)/_ZZZPDUOLQHQJLQHHULQJFRP
MARLIN | 1700 NW 66th Ave, Suite 106 | Plantation, FL33313 | www.marlinengineering.com
Miami Shores Village – Traffic Calming Study
3
2.0 TRAFFIC CALMING ANALYSIS METHODOLOGY
7KHPHWKRGRORJ\DQGFULWHULDGHILQHGLQWKLVVWXG\DUHFRQVLVWHQWZLWKWKHWUDIILFFDOPLQJ
SURFHGXUHV HVWDEOLVKHG E\ 0LDPL'DGH &RXQW\¶V 7UDIILF )ORZ 0RGLILFDWLRQV6WUHHW
&ORVXUH3URFHGXUHV
2.1. General Requirements and Constraints
%DVHGRQ0LDPL'DGH&RXQW\*XLGHOLQHVWKHIROORZLQJRSHUDWLRQDOFULWHULDPXVWEHPHW
LQRUGHUIRUDURDGZD\VHJPHQWWREHFRQVLGHUHGIRUWUDIILFFDOPLQJLPSURYHPHQWV
Table 1 – Traffic Calming Thresholds
$IIHFWHGUHVLGHQWVSURSHUW\RZQHUVWREHGHWHUPLQHGRQDFDVHE\FDVHEDVLV
,QDGGLWLRQWRWKHOLVWHGRSHUDWLRQDOFULWHULDWKHIROORZLQJUHVWULFWLRQVDUHDOVRLPSRVHG
x 5RDGZD\VKDOOEHORFDOUHVLGHQWLDOVWUHHWVDQGJHQHULFUHVLGHQWLDOFROOHFWRUV
x 7KHSRVWHGVSHHGOLPLWPD\QRWEHPRUHWKDQPSKORFDOUHVLGHQWLDOVWUHHWVRU
PSKUHVLGHQWLDOFROOHFWRUV
x 5RDGZD\VKDOOEHVWUHHWVZLWKRQO\WZRODQHVRIWUDYHO
x 5RDGZD\VKDOOQRWEHXVHGDVDSULPDU\URXWHIRUHPHUJHQF\RUILUHUHVFXHYHKLFOHV
x 5RDGZD\VKDOOQRWKDYHFXUYHVRUREVWDFOHVWKDWZRXOGFUHDWHDQXQVDIHFRQGLWLRQIRU
PRWRULVWVGULYLQJDWWKHGHVLUHGVSHHGOLPLWXQGHUQRUPDOGULYLQJFRQGLWLRQV
x 5RDGZD\VKDOOQRWEHDWKURXJKWUXFNURXWHXQOHVVDQDFFHSWDEOHDOWHUQDWLYHURXWHLV
LGHQWLILHG
#Traffic Criteria Minimum Threshold
Residential Local Streets Residential Collector Streets
185th Percentile
Speed
*UHDWHUWKDQPLOHSHUKRXUPSK
RYHUWKHSRVWHGVSHHGOLPLW
*UHDWHUWKDQPLOHSHUKRXUPSK
RYHUWKHSRVWHGVSHHGOLPLW
2Peak Hour ([FHHGVYHKLFOHVSHUKRXUYSK ([FHHGVYHKLFOHVSHUKRXUYSK
3Average Daily
Traffic ([FHHGVYHKLFOHVSHUGD\YSG ([FHHGVYHKLFOHVSHUGD\YSG
4Crashes 6WUHHWDYHUDJHVPRUHWKDQFUDVKHVSHU\HDURQUHVLGHQWLDOVWUHHWVRUPRUHWKDQ
FUDVKHVSHU\HDURQUHVLGHQWLDOFROOHFWRUV
5
Concurrence from
affected resident/
property owners*
RIWKHUHVLGHQWVSURSHUW\RZQHUVRIWKHEORFNVFRQFXUZLWKWKHLQVWDOODWLRQRI
WKHGHYLFHV
MARLIN | 1700 NW 66th Ave, Suite 106 | Plantation, FL33313 | www.marlinengineering.com
Miami Shores Village – Traffic Calming Study
4
x 3HGHVWULDQVDQGRUELF\FOHVVDIHW\VKDOOQRWEHDGYHUVHO\DIIHFWHG
x 5RDGZD\GUDLQDJHVKDOOQRWEHDGYHUVHO\DIIHFWHG
2.2. Traffic Calming Options
7UDIILFFDOPLQJLVDSK\VLFDOUHWURILWRIWUDIILFRSHUDWLRQVDQGPDQDJHPHQWVWUDWHJLHVRQ
H[LVWLQJ VWUHHWV GHVLJQHG WR UHGXFH DGYHUVH WUDIILF LPSDFWV VXFK DV VSHHGLQJ DQG
H[FHVVLYH YROXPHV DQG WR LPSURYH VDIHW\ 7KHUH DUH WZR W\SHV RI WUDIILF FDOPLQJ
PHDVXUHVSDVVLYHWKHOHDVWUHVWULFWLYHDQGDFWLYHWKHPRVWUHVWULFWLYHLGHDOO\WKHOHDVW
UHVWULFWLYH PHDVXUHV ZRXOG EH HPSOR\HG ILUVW EHIRUH FRQVLGHULQJ D PRUH SK\VLFDOO\
UHVWULFWLYHGHYLFH
,WVKRXOGEHQRWHGWKDWGXHWRWKHHPSKDVLVSODFHGRQDHVWKHWLFVZLWKLQWKH0LDPL6KRUHV
9LOODJHHYHU\HIIRUWZLOOEHPDGHHQVXUHWKDWDQ\UHFRPPHQGHGWUDIILFFDOPLQJGHYLFHV
DOVREOHQGVLQWRDQGDFFHQWXDWHWKHFRPPXQLW\ODQGVFDSLQJ
1. Speed Control Measures:
6SHHG+XPSVDQG6SHHG7DEOHV
7UDIILF&LUFOHVDQG5RXQGDERXWV
5DLVHGLQWHUVHFWLRQV
+RUL]RQWDO$OLJQPHQW&KDQJHV
/DQGVFDSLQJ
2. Volume Control Measures:
6WUHHW&ORVXUHV
'LDJRQDO'LYHUWHUV
6HPL'LYHUWHUV
7XUQ5HVWULFWLRQV
5LJKWLQ5LJKWRXW'LYHUWHU
MARLIN | 1700 NW 66th Ave, Suite 106 | Plantation, FL33313 | www.marlinengineering.com
Miami Shores Village – Traffic Calming Study
5
2.3. Public Input
$NLFNRIIPHHWLQJZDVRUJDQL]HGE\WKH0LDPL6KRUHV9LOODJHVWDIIWRREWDLQLQSXWIURP
WKH UHVLGHQWV RQ WKH WUDIILF UHODWHG LVVXHV LQ WKH QHLJKERUKRRG 7KH PHHWLQJ ZDV
SHUIRUPHGRQ$SULOVRPHRIWKHFRQFHUQVDQGWUDIILFLVVXHVPHQWLRQHGE\WKH
UHVLGHQWVLQFOXGH
x ,QVWDOOFURVVZDONVDORQJ1($YHQXHDW1(6WUHHWDQG1(6WUHHW
x &URVVZDONVQHHGHGDORQJ1(6WUHHWEHWZHHQ1($YHQXHWR1($YHQXH
x 6SHHGKXPSVVKRXOGEHSODFHGLQRQ1:WK6WUHHWDVLWLVXVHGDVDGULYH
WKURXJKWRJRZHVWDQGWKHQQRUWKWRVWUHHW,WLVWKHRQO\WKURXJKVWUHHW
EHWZHHQWKDQGUGVWUHHWWKDWJRHVVWUDLJKWWKURXJKZLWKQRVWRSVLJQVIURP
0LDPL$YHQXHWR1:QG$YHQXH
x +LJKWUDIILFYROXPHDQGVSHHGLQJGXULQJUXVKKRXUDORQJ1($YHQXH1(
$YHQXHLVXVHGDVDQDOWHUQDWLYHWR86%LVFD\QH%RXOHYDUG7UDIILF&DOPLQJ
QHHGHG
x 6SHHGKXPSVVKRXOGDOVREHLQVWDOOHGRQ1:0LDPL&RXUWWRVORZWKHIORZRIWKRVH
PDNLQJWKH³VKRUWFXW´7KHUHDUHQRVWRSVLJQVEHWZHHQWK6WUHHWDQGUG
6WUHHW3HUKDSVVLJQVLQGLFDWLQJ³/RFDO7UDIILF2QO\´ZRXOGEHRIEHQHILWLQWKLV
UHJDUGDVZHOO
x 5HVLGHQWVFRQFHUQHGDERXWVSHHGLQJDORQJ1:6WUHHW
x 7KHVWUHHWVZRXOGEHPXFKVDIHULIVSHHGOLPLWVZHUHORZHUHGWR03+RQ1RUWK
0LDPL$YHDQGSRVWHG03+RQVWUHHWVZLWKRXWVLGHZDONV
x 5RXQGDERXWDW1($YHQXHDQG1:6WUHHWLQVWDOOFURVVZDONDW1:6WUHHW
DFURVV1RUWK0LDPL$YHQXHDQG1($YHQXH
x ,QVWDOOVSHHGKXPSVRQWKHIROORZLQJVWUHHWVQHDUWKHVFKRROVWRVORZWKHSDUHQWV
GRZQ7ZRVSHHGKXPSVRQ1(6WUHHWEHWZHHQ1($YHQXHDQG1(
$YHQXHDQG1($YHQXHEHWZHHQ6WUHHWDQG6WUHHWQHDUWKHDOOH\ZD\V
x 5HVLGHQWVDUHYHU\FRQFHUQHGDERXWWKHVSHHGLQJDQGYROXPHDORQJ1(6WUHHW
EHWZHHQ1($YHQXHWR1($YHQXH
$FRS\RIWKHUHVLGHQWVFRPPHQWFDUGVLVLQFOXGHGDVAppendix A
MARLIN | 1700 NW 66th Ave, Suite 106 | Plantation, FL33313 | www.marlinengineering.com
Miami Shores Village – Traffic Calming Study
6
2.4. Data Collection
%DVHGRQWKHVWXG\REMHFWLYHVDFRPSUHKHQVLYHUDQJHRIWUDIILFGDWDZDVSHUIRUPHGDV
SDUWRIWKHVWXG\DQGLQFOXGHGWKHIROORZLQJGDWD
xWK3HUFHQWLOH6SHHG'DWD
x +RXU$YHUDJH'DLO\7UDIILF
x &UDVK'DWD6XPPDU\
6SHHGDQGWUDIILFYROXPHVZHUHFROOHFWHGDWORFDWLRQVWKURXJKRXWWKH9LOODJHGXULQJ
WKHPRQWKVRI0DUFKDQG$SULORQDW\SLFDOZHHNGD\7XHVGD\:HGQHVGD\DQG
7KXUVGD\7KHORFDWLRQVRIWKHKRXUWUDIILFGDWDFROOHFWLRQGHYLFHVDUHVKRZQLQFigure
27KHUDZKRXUWUDIILFYROXPHFRXQWVGDWDDQGWKHUDZVSHHGGDWDDUHLQFOXGHGLQ
Appendix B
444444444
NN
/(*(1'
$75¶V'HYLFHV
6WXG\$UHD
6WXG\$UHD
6WXG\$UHD
6WXG\$UHD
S VILLAGEEGEOOORORESESSSHOMIAMI SMM SSSSSSSSOOOOOOOOESVILLAGOES VILLAGAAESVILLAGEEESVILLAGEERRRRHHMIAMIMIAMILLALLAR
)LJXUH7UDIILF'DWD&ROOHFWLRQ'HYLFH/RFDWLRQV
0LDPL6KRUHV9LOODJH7UDIILF&DOPLQJ6WXG\
0$5/,1_1:WK$YH6XLWH_3ODQWDWLRQ)/_ZZZPDUOLQHQJLQHHULQJFRP
MARLIN | 1700 NW 66th Ave, Suite 106 | Plantation, FL33313 | www.marlinengineering.com
Miami Shores Village – Traffic Calming Study
8
3.0 FIELD OBSERVATIONS
)LHOG UHYLHZV ZHUH SHUIRUPHG WR HYDOXDWH WKH H[LVWLQJ WUDIILF FKDUDFWHULVWLFV RI WKH
QHLJKERUKRRGVDQGWRGHWHUPLQHWKHORFDWLRQVZKHUHH[LVWLQJWUDIILFFDOPLQJGHYLFHVDUH
DOUHDG\ LQVWDOOHG WKURXJKRXW WKH 9LOODJH $Q LQYHQWRU\ RI WKH H[LVWLQJ WUDIILF FDOPLQJ
GHYLFHVLVVXPPDUL]HGLQTable 2 DQGSLFWXUHVWDNHQGXULQJWKHILHOGUHYLHZDUHSUHVHQWHG
RQWKHIROORZLQJSDJHV
Table 2 – Existing Traffic Calming Devices
Street Name Location Existing Measure
1(WK6WUHHW IURP1(
QG$YHQXHWR*UDQG&RQFRXUVH 6SHHG+XPS
1(WK$YHQXH IURP1(
WK6WUHHWWR1(WK6WUHHW 6SHHG+XPS
3DUN'ULYH IURP1(
WK6WUHHWWR1(VW6WUHHW 6SHHG+XPS
3DUN'ULYH IURP1(
WK6WUHHWWR1(WK6WUHHW 6SHHG+XPS
3DUN'ULYH IURP1(
WK6WUHHWWR1(WK6WUHHW 6SHHG+XPS
3DUN'ULYH IURP1(
WK6WUHHWWR1(WK6WUHHW 6SHHG+XPS
3DUN'ULYH IURP1(
WK6WUHHWWR1(WK6WUHHW 6SHHG+XPS
3DUN'ULYH IURP1(
WK6WUHHWWR1(WK$YH5G 6SHHG+XPS
3DUN'ULYHIURP1(WK$YH5GWR*UDQG
&RQFRXUVH6SHHG+XPS
*UDQG&RQFRXUVH IURP1(
QG$YHQXHWR1(WK6WUHHW &KRNHUVZLWKSDUNLQJODQH
1(WK6WUHHWIURP%LVFD\QH%RXOHYDUGWR1(WK
$YHQXH&KRNHUVZLWKSDUNLQJODQH
1(VW6WUHHW IURP1:
QG&RXUWWR1(WK$YHQXH *UHHQ6KDUURZ/DQH
1:VW$YHQXH IURP1:
VW6WUHHWWR1:WK6WUHHW *UHHQ6KDUURZ/DQH
1(WK$YHQXH IURP1(
WK6WUHHWWR1(VW6WUHHW *UHHQ6KDUURZ/DQH
1(WK$YHQXH IURP1(
WK$YHQXH5RDGWR3DUN'ULYH *UHHQ6KDUURZ/DQH
Figures 3, 4, 5 and 6 DUHVKRZLQJWKHORFDWLRQRIWKHH[LVWLQJURDGFORVXUHVDQGRIVWRS
VLJQVWKURXJKRXWWKH9LOODJH
Area 1 N
LEGEND
Existing Stop Signs
Existing Roadway Closures
)LJXUH([LVWLQJ5RDGZD\&ORVXUHVDQG6WRS6LJQV
0LDPL6KRUHV9LOODJH7UDIILF&DOPLQJ6WXG\
MARLIN | 1700 NW 66th Ave, Suite 106 | Plantation, FL 33313 | www.marlinengineering.com
Area 2 N
LEGEND
Existing Stop Signs
Existing Roadway Closures
)LJXUH([LVWLQJ5RDGZD\&ORVXUHVDQG6WRS6LJQV
0LDPL6KRUHV9LOODJH7UDIILF&DOPLQJ6WXG\
MARLIN | 1700 NW 66th Ave, Suite 106 | Plantation, FL 33313 | www.marlinengineering.com
N
Area 3
LEGEND
Existing Stop Signs
Existing Roadway Closures
)LJXUH([LVWLQJ5RDGZD\&ORVXUHVDQG6WRS6LJQV
0LDPL6KRUHV9LOODJH7UDIILF&DOPLQJ6WXG\
MARLIN | 1700 NW 66th Ave, Suite 106 | Plantation, FL 33313 | www.marlinengineering.com
Study Zone 1
Study Zone 2
Study Zone 3
Study Zone 4
N
Area 4
LEGEND
Existing Stop Signs
Existing Roadway Closures
)LJXUH([LVWLQJ5RDGZD\&ORVXUHVDQG6WRS6LJQV
0LDPL6KRUHV9LOODJH7UDIILF&DOPLQJ6WXG\
MARLIN | 1700 NW 66th Ave, Suite 106 | Plantation, FL 33313 | www.marlinengineering.com
MARLIN | 1700 NW 66th Ave, Suite 106 | Plantation, FL33313 | www.marlinengineering.com
Miami Shores Village – Traffic Calming Study
13
&KRNHUV&XUEH[WHQVLRQVDUHSURYLGHGDORQJ1(6WUHHW6KRUHODQG%OYGIURP%LVFD\QH
%RXOHYDUGWR1($YHQXHEXWQRWZLGHHQRXJKWRVORZWUDIILFGRZQ (See Below)
1(6WUHHWIURP%LVFD\QH%RXOHYDUGWR
'HDG(QGORRNLQJZHVW
1(6WUHHW'HDG(QGORRNLQJHDVWDW
6KRUHV3ULYDWH3URSHUW\
/DQGVFDSHGLVODQGVEHWZHHQ1($YHQXH
DQG*UDQG&RQFRXUVH
1($YHQXHORRNLQJQRUWKIURP1(
7HUUDFHURDGFORVXUHV
MARLIN | 1700 NW 66th Ave, Suite 106 | Plantation, FL33313 | www.marlinengineering.com
Miami Shores Village – Traffic Calming Study
14
1:6WUHHWORRNLQJZHVWIURP1RUWK
0LDPL$YHQXH
6SHHGKXPSVDORQJ1($YHQXHEHWZHHQ
1(6WUHHWDQG1(6WUHHW
6SHHGKXPSVDORQJ1(6WUHHWEHWZHHQ
1($YHQXHDQG1($YHQXH
*UHHQVKDUURZPDUNLQJVDW1($YHQXH
DQG1(6WUHHW
3HGHVWULDQVREVHUYHGZDONLQJDORQJ1(
$YHQXH
MARLIN | 1700 NW 66th Ave, Suite 106 | Plantation, FL33313 | www.marlinengineering.com
Miami Shores Village – Traffic Calming Study
15
4.0 DATA ANALYSIS
7KHSXUSRVHRIWKHGDWDDQDO\VLVLVWRLGHQWLI\ORFDWLRQVZLWKLQWKHVWXG\DUHDZKHUH
H[LVWLQJ WUDIILF FRQGLWLRQV FRXOG ZDUUDQW WUDIILF FDOPLQJ LPSURYHPHQWV EDVHG RQ WKH
WKUHVKROG YDOXHV IURP WKH 0LDPL'DGH 7UDIILF )ORZ 0RGLILFDWLRQV6WUHHW &ORVXUHV
PDQXDO
3HUWKH0LDPL'DGH7UDIILF)ORZ0RGLILFDWLRQV6WUHHW&ORVXUHVWUDIILFYROXPHVRQ
UHVLGHQWLDOORFDOVWUHHWVVKRXOGQRWH[FHHGYHKLFOHVSHUGD\RUYHKLFOHVLQWKH
SHDN KRXU IRU UHVLGHQWLDO FROOHFWRU VWUHHWV WUDIILF YROXPHV VKRXOG QRW H[FHHG
YHKLFOHVSHUGD\RUYHKLFOHVLQWKHSHDNKRXU)XUWKHUPRUHWKHWKSHUFHQWLOHVSHHG
VKRXOGQRWH[FHHGWKHSRVWHGVSHHGOLPLWE\PSKPSKIRUORZYROXPHVWUHHWV7KH
ORFDWLRQV LGHQWLILHG DV KDYLQJ GDLO\ YROXPHV SHDN KRXU YROXPHV DQG
WK SHUFHQWLOH
VSHHGVDERYHWKHSUHVFULEHGWKUHVKROGYDOXHVDUHGHSLFWHGLQFigure 7 DQGFigure 8DQG
DFRS\RIWKH0LDPL'DGH7UDIILF)ORZ0RGLILFDWLRQV6WUHHW&ORVXUHV3URFHGXUHLV
SURYLGHGLQAppendix C
10+ mph above speed limit
5+ mph above speed limit
)LJXUHWK3HUFHQWLOH6SHHG
0LDPL6KRUHV9LOODJH7UDIILF&DOPLQJ6WXG\
0$5/,1_1:WK$YH6XLWH_3ODQWDWLRQ)/_ZZZPDUOLQHQJLQHHULQJFRP
NN
ADT 1,500+ data
Peak Hour 150+ data
)LJXUH$'7!9HKSHU'D\DQG!YHKSHU+5
0LDPL6KRUHV9LOODJH7UDIILF&DOPLQJ6WXG\
0$5/,1_1:WK$YH6XLWH_3ODQWDWLRQ)/_ZZZPDUOLQHQJLQHHULQJFRP
NN
MARLIN | 1700 NW 66th Ave, Suite 106 | Plantation, FL33313 | www.marlinengineering.com
Miami Shores Village – Traffic Calming Study
18
5.0 TRAFFIC CALMING PLAN
7KH GDWD FROOHFWLRQ DQDO\VLV SHUIRUPHG ZLWKLQ WKH VWXG\ DUHD LQGLFDWHG WKDW VHYHUDO
ORFDWLRQVWKURXJKRXWWKH9LOODJHPHHWWKHWKUHVKROGVYDOXHVIRUWUDIILFFDOPLQJEDVHGRQ
WUDIILFYROXPHVDQGWKSHUFHQWLOHVSHHGV$GHVFULSWLRQRIWKHSRWHQWLDOWUDIILFFDOPLQJ
PHDVXUHV WR EH LPSOHPHQWHG LV SUHVHQWHG EHORZ LQFOXGLQJ WKH DGYDQWDJHV DQG
GLVDGYDQWDJHVRIHDFKGHYLFH
Roundabout and Traffic circle
&LUFXODUUDLVHGLVODQGORFDWHGDWLQWHUVHFWLRQVZKLFKUHGXFHVVSHHGDWDSSURDFKHVDQG
WKURXJKWKHLQWHUVHFWLRQ7UDIILFIORZVDURXQGLQDFRXQWHUFORFNZLVHGLUHFWLRQ&LUFXODWLQJ
YHKLFOHV KDYH WKH ULJKW RI ZD\ 'HIOHFWRU LVODQGV DUH LQVWDOOHG RQ DSSURDFKHV
5RXQGDERXWVL]HUDQJHIURP¶WR¶UHJXODUO\DQG7UDIILF&LUFOHLVVPDOOHULQVL]HWKDQ
URXQGDERXWVW\SLFDOO\QRPRUHWKDQ¶¶'HIOHFWRULVODQGVDUHQRWFRQVLGHUHG
Advantages:
xReduces traffic speed (typically designed
to accommodate traffic speeds of 15 to 22
mph)
xReduces intersection collisions and
opportunity for landscaping
xParticularly effective at multi-leg/odd
shaped intersections and helps reduce cut-
through traffic
Disadvantages:
xReduces response times for
emergency vehicles
xRequires safety and directional signs.
xMay cause the loss of some parking
spaces near the intersection.
xNot very safe for bicyclists unless
bicycle facilities are provided.
MARLIN | 1700 NW 66th Ave, Suite 106 | Plantation, FL33313 | www.marlinengineering.com
Miami Shores Village – Traffic Calming Study
19
Short Median Adjacent to Intersection
$UDLVHGPHGLDQORFDWHGRQWKHDSSURDFKHVRIDQLQWHUVHFWLRQWRUHGXFHODQHZLGWKDQGRU
GHWHUWKHSDWKRIWUDYHOZKLOHHQWHULQJWKHLQWHUVHFWLRQ
Diagonal diverter
$ SK\VLFDO EDUULHU SODFHG GLDJRQDOO\ DFURVV D IRXU ZD\ LQWHUVHFWLRQ WR FUHDWH WZR
XQFRQQHFWHGLQWHUVHFWLRQV'LDJRQDOGLYHUWHUUHGXFHVFXWWKURXJKWUDIILFDQGVORZVWUDIILF
Advantages:
xReduces speed within the vicinity of the measure
xProvides opportunity for landscaping
xProvides a refuge for pedestrians to shorten crossing
distance
xCan accommodate bicycle through traffic
Disadvantages:
xMay require right-of-way
Advantages:
xReduces cut-through traffic
xCan provide a refuge for pedestrians to
shorten crossing distance
xProvides opportunity for landscaping
xHelps reduce speed within the vicinity of
the measure
Disadvantages:
xRestricts residents access as well
MARLIN | 1700 NW 66th Ave, Suite 106 | Plantation, FL33313 | www.marlinengineering.com
Miami Shores Village – Traffic Calming Study
20
Truncated diagonal diverter
$SK\VLFDOEDUULHUSODFHGGLDJRQDOO\DFURVVDIRXUZD\ZLWKRQHHQGRSHQWRDOORZ
DGGLWLRQDOWXUQLQJPRYHPHQWVFRPSDUHGZLWKWKH'LDJRQDO'LYHUWHU
Right-in / right-out diverter
$QLVODQGORFDWHGDWLQWHUVHFWLRQVDVDIRUPRIWUDIILFFKDQQHOL]DWLRQZKLFKSUHYHQWVOHIW
WXUQVDQGWKURXJKPRYHPHQWVWRDQGIURPWKHVWUHHWZKHUHLVLQVWDOOHG
Advantages:
xReduces cut-through traffic
xCan provide a refuge for pedestrians to
shorten crossing distance
xProvides opportunity for landscaping
xHelps reduce speed within the vicinity of
the measure
Disadvantages:
xRestricts residents access as well
Advantages:
xReduces cut-through traffic
xCan provide a refuge for pedestrians to
shorten crossing distance
xProvides opportunity for landscaping
xHelps reduce speed within the vicinity of
the measure
Disadvantages:
xRestricts residents access as well
MARLIN | 1700 NW 66th Ave, Suite 106 | Plantation, FL33313 | www.marlinengineering.com
Miami Shores Village – Traffic Calming Study
21
Semi-Diverter
3K\VLFDOEDUULHUWKDWSUHYHQWWUDYHOLQRQHGLUHFWLRQRQDVWUHHWE\EORFNLQJKDOIWKHVWUHHW
6HPLGLYHUWHUVKHOSUHGXFHFXWWKURXJKWUDIILFDQGVSHHGRQDSSURDFKHV
Speed hump
$UDLVHGVXUIDFHRQWKHURDGZD\WKDWLVW\SLFDOO\WRLQFKHVLQKHLJKWDQGWRIHHW
LQOHQJWK7KHVHPHDVXUHVDUHPRVWO\ORFDWHGDWPLGEORFN
Advantages:
xReduces cut-through traffic
xCan provide a refuge for pedestrians to
shorten crossing distance
xProvides opportunity for landscaping
xHelps reduce speed within the vicinity of
the measure
Disadvantages:
xRestricts residents access as well
Advantages:
xReduces vehicle speeds
xDeters cut-through traffic
xOne of the least expensive traffic calming
devices
Disadvantages:
xReduces response times for emergency
vehicles
xInterferes with pavement overlays
xPossible noise increase due to braking and
acceleration of vehicles
xMay cause discomfort for drivers with
disabilities
MARLIN | 1700 NW 66th Ave, Suite 106 | Plantation, FL33313 | www.marlinengineering.com
Miami Shores Village – Traffic Calming Study
22
Speed table
/RQJHUVSHHGKXPSZLWKDIODWVHFWLRQDERXWWHQIHHWZLGHLQWKHPLGGOHZKLFKPD\
LQFOXGHDFURVVZDONRQWKHIODWVHFWLRQVRPHWLPHVFRQVWUXFWHGZLWKEULFNRURWKHUWH[WXUHG
PDWHULDOV
6.0 TRAFFIC CALIMING RECOMMENDATIONS
&RQVLVWHQW ZLWK WKH GDWD FROOHFWLRQ HIIRUWV D VHW RI UHFRPPHQGHG WUDIILF FDOPLQJ
LPSURYHPHQWVZDVGHYHORSHGLQGHSHQGHQWO\IRUHDFKRIWKHVXEDUHDVDQGLVSURYLGHGLQ
Table 3 DQGJUDSKLFDOO\SUHVHQWHGLQFigures 9, 10, 11 DQG 12 ,WVKRXOGEHQRWHGWKDW
ZH GR QRW UHFRPPHQG DQ\ GHYLFHV WKDW PD\ UHTXLUH WKH FRQVWUXFWLRQ RI DGGLWLRQDO
SDYHPHQWZLWKLQVZDOHDUHDVZKLFKPD\LPSDFWSDUNLQJULJKWRIZD\DQGGULYHZD\V
7KHUHIRUHZHDUHPDNLQJWKHVHUHFRPPHQGDWLRQVVXFKDVVSHHGKXPSVVSHHGWDEOHV
GLDJRQDODQGWUXQFDWHGGLYHUWHUVHPLGLYHUWHUURXQGDERXWVDQGVKRUWPHGLDQDGMDFHQW
WRLQWHUVHFWLRQ:HDUHQRWPDNLQJUHFRPPHQGDWLRQVIRUFKLFDQHVFKRFNHUVPLGEORFN
PHGLDQDQJOHVORZSRLQWDQGLQWHUVHFWLRQPHGLDQEHFDXVHWKHVWUHHWVLQ0LDPL6KRUHV
9LOODJHDUHQRWZLGHHQRXJKWRVXSSRUWWKHVHW\SHVRIDPHQLWLHV
Advantages:
xReduces vehicle speeds
xDeters cut-through traffic
xIncreases visibility for pedestrians by installing a
crosswalk on the flat top
Disadvantages:
xReduces response times for emergency vehicles
xInterferes with pavement overlays
xPossible noise increase due to braking and
acceleration of vehicles
xMay cause discomfort for drivers with disabilities
1Miami Shores Village – Traffic Calming Study 1Table 3 – Recommended Traffic Calming Plan Table 3. Traffic Calming Plan Area 1 Street Name LocationProblemAddressed Improvement/countermeasureRankingsub-area 1.1 1:WK6WUHHW DW1:QG$YHQXH6SHHGLQJPSK 9ROXPH5RXQGDERXW 1:WK6WUHHW IURP1(QG$YHQXHWR1:QG$YHQXH6SHHGLQJPSK 9ROXPH6SHHG 7DEOHV IHHW ZHVW IURP 10LDPL $YHQXH IHHW HDVW IURP 10LDPL$YHQXHDQGIHHWZHVWIURP1($YHQXH1:WK6WUHHW DW1:QG$YHQXH 6SHHGLQJPSK6HPLGLYHUWHURQVRXWKVLGHRI1:WK6W1:WK6WUHHW IURP1:QG$YHQXHWR10LDPL$YHQXH 6SHHG 7DEOHV IHHW ZHVW IURP 10LDPL$YHQXHIHHWHDVWIURP1:$YHQXHRQERWKVLGHVRIWKHPHGLDQ1:WK6WUHHW DW1:QG$YHQXH 6HPLGLYHUWHURQVRXWKVLGHRI1:WK6Wsub-area 1.2 1:WK6WUHHW IURP10LDPL$YHQXHWR1:QG$YHQXH 6SHHGLQJPSK6SHHG7DEOHVIHHWIURP10LDPL$YHQXHDQGIHHWHDVWIURP1:$YHQXH1:WK6WUHHW IURP10LDPL$YHQXHWR1:QG$YHQXH 6SHHGLQJPSK6SHHG7DEOHVIHHWIURP10LDPL$YHQXHDQGIHHWHDVWIURP1:$YHQXH1:WK6WUHHW IURP10LDPL$YHQXHWR1:QG$YHQXH 6SHHGLQJPSK6SHHG7DEOHVIHHWZHVWIURP10LDPL$YHQXHDQGIHHWHDVWIURP1:$YHQXH1:WK6WUHHW IURP10LDPL$YHQXHWR1:QG$YHQXH 6SHHGLQJPSK6SHHG7DEOHVIHHWZHVWIURP10LDPL$YHQXHDQGIHHWHDVWIURP1:$YHQXHMARLIN | 1700 NW 66th Ave, Suite 106 | Plantation, FL33313| www.marlinengineering.com23
2Miami Shores Village – Traffic Calming Study 2Table 3. Traffic Calming Plan (Cont.)Area 2 Street Name LocationProblemAddressed Improvement/countermeasureRankingsub-area 2.1 1(QG6WUHHW IURP0LDPL$YHQXHWR1(QG$YHQXH 6SHHGLQJPSK6SHHG7DEOHVDWPLGEORFNHDVWDQGZHVWIURP1(VW$YH1(VW6WUHHW DW1(VW$YHQXH 9ROXPH'LDJRQDO'LYHUWHUDFURVV6: 1(FRUQHUVZELNHDQGSHGVUHIXJH1(WK6WUHHW IURP0LDPL$YHQXHWR1(QG$YHQXH 6SHHGLQJPSK6SHHG7DEOHVZFXUE
HDVW ZHVWIURPWKHLQWHUVHFWLRQ1(WK6W 1(VW$YH1(WK6WUHHW IURP0LDPL$YHQXHWR1(QG$YHQXH 6SHHGLQJPSK6SHHG7DEOHVZFXUE
HDVW ZHVWIURPWKHLQWHUVHFWLRQ1(WK6W 1(VW$YH1(WK6WUHHW IURP0LDPL$YHQXHWR1(QG$YHQXH 6SHHGLQJPSK6SHHG7DEOHVDWPLGEORFNHDVWDQGZHVWIURP1(VW$YHsub-area 2.2 1(VW6WUHHW IURP1(QG$YHQXHWR1(WK$YHQXH 6SHHGLQJPSK6SHHG7DEOHV
HDVW ZHVWIURPWKHLQWHUVHFWLRQ1(VW6W 1(UG$YH1(QG6WUHHW IURP1(QG$YHQXHWR1(WK$YHQXH 6SHHGLQJPSK6SHHG7DEOHV
HDVW ZHVWIURPWKHLQWHUVHFWLRQ1(QG6W 1(UG$YHsub-area 2.3 *UDQG&RQFRXUVH IURP1(WK6WUHHWWR1(WK$YHQXH 6SHHGLQJPSK/DQHUHGXFWLRQWRWUDIILFODQHELNHODQH SDUNLQJVSDFHVZLWKFXUEH[WHQVLRQVLQERWKVLGHVRIDODQGVFDSHG0HGLDQ1(WK$YHQXH5RDG IURP1(WK6WUHHWWR1(WK$YHQXH 6SHHGLQJPSK6SHHG7DEOHVRQ1(WK$YH5GDWIHHWVRXWKIURP1(WK$YHDQGIHHWQRUWKIURP1(WK$YH1(WK$YHQXH5RDG IURP1(WK$YHQXHWR1(WK$YHQXH 6SHHGLQJPSK6SHHG 7DEOHV DW PLGEORFN EHWZHHQ 1(WK$YHDQG1(WK$YH MARLIN | 1700 NW 66th Ave, Suite 106 | Plantation, FL33313| www.marlinengineering.com24
3Miami Shores Village – Traffic Calming Study 3Table 3. Traffic Calming Plan (Cont.)Area 3 Street Name LocationProblemAddressed Improvement/countermeasureRankingsub-area 3.1 1:UG6WUHHW IURP1:QG$YHQXHWR0LDPL$YHQXH 6SHHGLQJPSK6SHHG7DEOHVRQERWKVLGHVRI1:UG6WDWIHHWIURP1:VW$YH1:WK6WUHHW IURP1:QG$YHQXHWR0LDPL$YHQXH 6SHHGLQJPSK6SHHG7DEOHVRQERWKVLGHVRI1:WK6WDWIHHWIURP1:VW$YH1:WK6WUHHW DW1(VW$YHQXH 9ROXPH7UXQFDWHG'LDJRQDO'LYHUWHUIURP6:FRUQHU1:UG6WUHHW IURP0LDPL$YHQXHWR1(QG$YHQXH6SHHGLQJPSK 9ROXPH6SHHG7DEOHDWPLGEORFNRQWK6WEWZQ0LDPL$YH 1(VW6W1:QG6WUHHW DW1(VW$YHQXH 6SHHGLQJPSK6HPLGLYHUWHUVRQERWKVLGHRIQG6W 1(VW$YH1: 6(FRUQHUVDORQJ6Wsub-area 3.2 1:QG6WUHHW IURP1(QG$YHQXHWR1(WK$YHQXH 6SHHGLQJPSK6SHHG7DEOHVZFXUE
HDVW
ZHVWIURPWKHLQWHUVHFWLRQ1(UG$YH 1(QG6WMARLIN | 1700 NW 66th Ave, Suite 106 | Plantation, FL33313| www.marlinengineering.com25
4Miami Shores Village – Traffic Calming Study 4MARLIN | 1700 NW 66th Ave, Suite 106 | Plantation, FL33313| www.marlinengineering.com25MARLIN | 1700 NW 66th Ave, Suite 106 | Plantation, FL33313| www.marlinengineering.com26Table 3. Traffic Calming Plan (Cont.)Area 4 Street Name LocationProblemAddressed Improvement/countermeasureRanking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sub-area 4.1 1(WK$YHQXH 9ROXPH5HIXUELVK6SHHG+XPS0DUNLQJVIHHWIURP1(6WUHHW1(WK6WUHHWIURP1(VW6WUHHWWR1(QG6WUHHWIURP&OXE'ULYHWR1(WK$YHQXH6SHHGLQJPSK6SHHG7DEOHVIHHWIURP&OXE'ULYHDQGIHHWIURP1($YHQXH&OXE'ULYH IURP1(WK6WUHHWWR1(QG6WUHHW 6SHHGLQJPSK6SHHG7DEOHVEHWZHHQ1(6WUHHWDQG1(6WUHHWEHWZHHQ1(6WUHHWDQG1(6WUHHW
Figure 7 - Recommended Traffic Calming Devices
$UHDNN
Short Median
Adjacent to Int
Speed Hump
Speed Table
Dead-End
LEGEND
Diagonal Diverter
Semi-Diverter
Truncated Diagonal
Diverter
)LJXUH5HFRPPHQGHG7UDIILF&DOPLQJ'HYLFHV
0LDPL6KRUHV9LOODJH7UDIILF&DOPLQJ6WXG\
0$5/,1_1:WK$YH6XLWH_3ODQWDWLRQ)/_ZZZPDUOLQHQJLQHHULQJFRP
Roundabout
$UHDNN
Lane reduction to: 1 traffic lane, 1bike lane & parking
spaces with curb extensions in both sides of a
landscaped Median
Short Median
Adjacent to Int
Speed Hump
Speed Table
Dead-End
LEGEND
Diagonal Diverter
Semi-Diverter
Truncated Diagonal
Diverter
)LJXUH5HFRPPHQGHG7UDIILF&DOPLQJ'HYLFHV
0LDPL6KRUHV9LOODJH7UDIILF&DOPLQJ6WXG\
0$5/,1_1:WK$YH6XLWH_3ODQWDWLRQ)/_ZZZPDUOLQHQJLQHHULQJFRP
Roundabout
NN$UHD
Figure 7 - Recommended Traffic Calming Devices
Short Median
Adjacent to Int
Speed Hump
Speed Table
Dead-End
LEGEND
Diagonal Diverter
Semi-Diverter
Truncated Diagonal
Diverter
)LJXUH5HFRPPHQGHG7UDIILF&DOPLQJ'HYLFHV
0LDPL6KRUHV9LOODJH7UDIILF&DOPLQJ6WXG\
0$5/,1_1:WK$YH6XLWH_3ODQWDWLRQ)/_ZZZPDUOLQHQJLQHHULQJFRP
Roundabout
Figure 7 - Recommended Traffic Calming Devices
Zone 3
6WXG\=RQH
6WXG\=RQH
6WXG\=RQH
6WXG\=RQH
NN
$UHD
Short Median
Adjacent to Int
Speed Hump
Speed Table
Dead-End
LEGEND
Diagonal Diverter
Semi-Diverter
Truncated Diagonal
Diverter
)LJXUH5HFRPPHQGHG7UDIILF&DOPLQJ'HYLFHV
0LDPL6KRUHV9LOODJH7UDIILF&DOPLQJ6WXG\
0$5/,1_1:WK$YH6XLWH_3ODQWDWLRQ)/_ZZZPDUOLQHQJLQHHULQJFRP
Roundabout
MARLIN | 1700 NW 66th Ave, Suite 106 | Plantation, FL33313 | www.marlinengineering.com
Miami Shores Village – Traffic Calming Study
31
6.1. Preliminary Cost Estimates
7KHSUHOLPLQDU\FRVWHVWLPDWHVIRUDOOWUDIILFFDOPLQJPHDVXUHVLGHQWLILHGIRUHDFKURDGZD\
VHJPHQWZLWKLQWKHVWXG\DUHDDUHVKRZQLQTable 47KHVHSUHOLPLQDU\FRVWHVWLPDWHV
DUH EDVHG RQ UHFHQW XQLW FRQVWUXFWLRQ DQG SULFHV IRU VLPLODU WUDIILF FDOPLQJ GHYLFHV
LQVWDOOHGZLWKLQPDQ\PXQLFLSDOLWLHVLQWKH6RXWK)ORULGD7KHHVWLPDWHGWRWDOFRQVWUXFWLRQ
FRVWIRULPSOHPHQWLQJWKHWUDIILFFDOPLQJGHYLFHVLV1,595,655. 00.
Table 4 – Preliminary Cost Estimates
Type Unit Cost Quantities Total Cost
6SHHG7DEOHV
'LDJRQDO'LYHUWHU
7UXQFDWHG'LDJRQDO'LYHUWHU
6KRUW 0HGLDQ $GMDFHQW WR
,QWHUVHFWLRQ
6HPL'LYHUWHU
5RXQGDERXW
/DQH5HGXFWLRQLQFOXGLQJPHGLDQ
ELNHODQHDQGSDUNLQJVSDFHV
6XE7RWDO
&RQWLQJHQF\
TOTAL COST
*IncludesArchitecturalPaversandLandscape
MARLIN | 1700 NW 66th Ave, Suite 106 | Plantation, FL33313 | www.marlinengineering.com
Miami Shores Village – Traffic Calming Study
32
6.2. Alternatives
&RQVLGHULQJ WKH EXGJHWDU\ FRQVWUDLQWV W\SLFDOO\ LPSRVHG RQ D PXQLFLSDOLW\ ZKHQ
GHYHORSLQJ FDSLWDO LPSURYHPHQWV D UDQJH RI FRVW DVVRFLDWHG ZLWK HDFK RI WKH
UHFRPPHQGHGGHYLFHVLVSURYLGHGLQTable 5 WRDVVLVWWKH9LOODJHLQPDNLQJSURYLVLRQV
IRU IXWXUH FDSLWDO LPSURYHPHQWV. ,Q DGGLWLRQ EDVHG RQ SDUWLFXODU SUHIHUHQFHV DQG
XQIRUHVHHQULJKWRIZD\FRQVWUDLQWV DVHFRQGVHWRIDOWHUQDWLYHVZDVDOVRGHYHORSHGDQG
LVVXPPDUL]HGLQTable 6.
33Miami Shores Village – Traffic Calming Study 33 MARLIN | 1700 NW 66th Ave, Suite 106 | Plantation, FL33313| www.marlinengineering.com33Table 5 – Alternatives Comparison MatrixAddressing Volume & Cut-through problems Cost Range Addressing Speed problemsCost Range 'LDJRQDO'LYHUWHU 5RXQGDERXW 7UXQFDWHG'LDJRQDO'LYHUWHU 7UDIILF&LUFOHV 6HPL'LYHUWHU 6KRUWPHGLDQDGMDFHQWWRLQWHUVHFWLRQ6SHHG7DEOHV 6SHHG7DEOHV /DQH5HGXFWLRQPHGLDQELNHODQHDQGSDUNLQJVSDFHV
Miami Shores Village – Traffic Calming Study Table 6 – Recommended Traffic Calming AlternativesTable 6. Traffic Calming Alternative Area 1 Street Name LocationAlternative A Improvement/countermeasureAlternative B Improvement/countermeasuresub-area 1.1 1:WK6WUHHW 6SHHG7DEOHIHHWHDVWIURP1:$YHQXH 1:WK6WUHHWIURP1(QG$YHQXHWR1:QG$YHQXHIURP1(QG$YHQXHWR1:QG$YHQXH6SHHG 7DEOHV IHHW ZHVW IURP 1 0LDPL$YHQXHIHHWHDVWIURP10LDPL$YHQXHDQGIHHWZHVWIURP1($YHQXH1:WK6WUHHW IURP10LDPL$YHQXHWR1:QG$YHQXH6SHHG 7DEOHV IHHW ZHVW IURP 1 0LDPL$YHQXHIHHWHDVWIURP1:$YHQXH1:WK6WUHHW 1:WK6WUHHW6SHHG 7DEOHV IHHW ZHVW IURP 1 0LDPL$YHQXHIHHWHDVWIURP1:$YHQXHsub-area 1.2 1:WK6WUHHWIURP10LDPL$YHQXHWR1:QG$YHQXH1:WK6WUHHWIURP10LDPL$YHQXHWR1:QG$YHQXH1:WK6WUHHWIURP10LDPL$YHQXHWR1:QG$YHQXH1:WK6WUHHWIURP10LDPL$YHQXHWR1:QG$YHQXHMARLIN | 1700 NW 66th Ave, Suite 106 | Plantation, FL33313| www.marlinengineering.com34IURP10LDPL$YHQXHWR1:QG$YHQXHIURP10LDPL$YHQXHWR1:QG$YHQXH
Miami Shores Village – Traffic Calming Study MARLIN | 1700 NW 66th Ave, Suite 106 | Plantation, FL33313| www.marlinengineering.com35Table 6. Recommended Traffic Calming Alternative Area 2 Street Name LocationAlternative A Improvement/countermeasureAlternative B Improvement/countermeasuresub-area 2.1 1(QG6WUHHW IURP0LDPL$YHQXHWR1(QG$YHQXH 1(VW6WUHHW DW1(VW$YHQXH6HPLGLYHUWHUVRQERWKVLGHRIVW6W 1(VW$YH1: 6(FRUQHUVDORQJ6W1(WK6WUHHW 1(WK6WUHHW 1(WK6WUHHWIURP0LDPL$YHQXHWR1(QG$YHQXHIURP0LDPL$YHQXHWR1(QG$YHQXH sub-area 2.2 1(VW6WUHHW IURP1(QG$YHQXHWR1(WK$YHQXH 1(QG6WUHHW IURP1(QG$YHQXHWR1(WK$YHQXH sub-area 2.3 *UDQG&RQFRXUVH IURP1(WK6WUHHWWR1(WK$YHQXH&KLFDQH6HWRIWKUHHDOWHUQDWHFXUEH[WHQVLRQVWRGHYLDWHWKHWZRFHQWHUWUDYHOODQHVRQHDFKERXQG7KHRXWVLGHODQHVRQERWKVLGHRIWKHURDGZD\DUHWXUQHGLQWRSDUNLQJVSDFHV6SHHGWDEOHVHYHU\PLGEORFNZODQHQDUURZLQJDQGZDUQLQJVLJQ 1(WK$YHQXH5RDGIURP1(WK6WUHHWWR1(WK$YHQXHIURP1(WK$YHQXHWR1(WK$YHQXH IURP10LDPL$YHQXHWR1:QG$YHQXH1(5WK$YHQXH5RDG
Miami Shores Village – Traffic Calming Study MARLIN | 1700 NW 66th Ave, Suite 106 | Plantation, FL33313| www.marlinengineering.com35MARLIN | 1700 NW 66th Ave, Suite 106 | Plantation, FL33313| www.marlinengineering.com36Table 6. Recommended Traffic Calming Alternative Area 3 Street Name LocationAlternative A Improvement/countermeasureAlternative B Improvement/countermeasuresub-area 3.1 1:UG6WUHHW IURP1:QG$YHQXHWR0LDPL$YHQXH 1:WK6WUHHW IURP1:QG$YHQXHWR0LDPL$YHQXH 1:WK6WUHHW DW1(VW$YHQXH6HPLGLYHUWHUVRQERWKVLGHRIWK6W 1(VW$YH1: 6(FRUQHUVDORQJ6W6SHHGKXPSDWPLGEORFNRQ6WEWZ1(VW6W 1(QG6W1:UG6WUHHW IURP0LDPL$YHQXHWR1(QG$YHQXH 1:QG6WUHHWfrom N. Miami Avenue to 1(2nd $YHQXH6SHHGKXPSDWPLGEORFNRQ6WEWZ1(VW6W 1(QG6Wsub-area 3.2 1:QG6WUHHW IURP1(QG$YHQXHWR1(WK$YHQXH
Miami Shores Village – Traffic Calming Study MARLIN | 1700 NW 66th Ave, Suite 106 | Plantation, FL33313| www.marlinengineering.com37Table 6. Recommended Traffic Calming Alternative Area 4 Street Name LocationAlternative A Improvement/countermeasureAlternative B Improvement/countermeasure1(WK6WUHHW IURP%LVFD\QH%RXOHYDUGWR'HDG(QG 1(WK6WUHHW IURP1(WK$YHQXHWR'HDG(QG 1(WK6WUHHW IURP1(WK$YHQXHWR'HDG(QG 1(WK$YHQXH IURP1(VW6WUHHWWR1(VW6WUHHW 1(WK$YHQXH IURP1(WK6WUHHWWR1(WK6WUHHW 1(WK$YHQXH DW1(WK6WUHHW 1(WK$YHQXH IURP1(WK6WUHHWWR1(WK6WUHHW 1(WK6WUHHW IURP%D\VKRUHWR1(WK$YHQXH 1(WK$YHQXH DW1(UG6WUHHW sub-area 4.1 1(WK$YHQXH5HFRQVWUXFW6SHHG+XPSIHHWIURP1(6WUHHW1(WK6WUHHWfrom 1(VW6WUHHWto NE 92nd Street IURP&OXE'ULYHWR1(WK$YHQXH &OXE'ULYH IURP1(WK6WUHHWWR1(QG6WUHHW
MARLIN | 1700 NW 66th Ave, Suite 106 | Plantation, FL33313 | www.marlinengineering.com 38
Miami Shores Village – Traffic Calming Study
6.3. Scoring and Prioritization System
$VFRULQJV\VWHPZDVGHYHORSHGWRKHOSWKH9LOODJHSULRULWL]HIXQGLQJ,WVKRXOGEHQRWHG
WKDWWKHSULRULWL]DWLRQZDVFRPSOHWHGIRUHDFKRIWKHVXEDUHDVLQGHSHQGHQWO\DQGWKDW
UHVLGHQWFRQFHUQVZHUHDOVRLQFOXGHGDVSDUWRIWKHVFRULQJ,WVKRXOGEHQRWHGWKDWRQO\
WKHFRPSODLQWVFRUUHVSRQGLQJWRDQLGHQWLILHGFRQFHUQZHUHLQFOXGHGLQWKHVFRULQJ7KH
VFRULQJPHWKRGRORJ\LVSUHVHQWHGLQ Table 7 DQGWKHSULRULWL]HGOLVWRIVHJPHQWVSHU
VXEDUHDWKDWPHHWWKHWUDIILFFDOPLQJFULWHULDLVSUHVHQWHGLQ Table 8.
Table 7 - Scoring System for Prioritizing Warranted Traffic Calming Locations
VOLUME (65 Points)
Vehicles Points
9HKLFOHVSHUKRXU
WR
!WR
!WR
!WR
!WR
!
$1'25
9HKLFOHVSHUGD\
!WR
!WR
!
RESIDENT CONCERNS (10 Points)
Complaints Points
PRUH
85th PERCENTILE SPEED (25 Points)
MPH over Speed Limit Points
$WRWDORISRLQWVKDYHEHHQGHGXFWHGIURPWKHXUEDQFROOHFWRUVWUHHWV
MARLIN | 1700 NW 66th Ave, Suite 106 | Plantation, FL 33313 | www.marlinengineering.com
0LDPL6KRUHV9LOODJH7UDIILF&DOPLQJ6WXG\
7DEOH3ULRULWL]HG6HJPHQW/LVW
Speed Volume Complaints
1:WK67 6SHHG7DEOHV5RXQGDERXW
1:WK67
1:WK67
1:WK67
1:WK67
1:WK67
1:WK67
1:WK67
IURP1(QG$YHQXHWR1:QG$YHQXH
IURP10LDPL$YHQXHWR1:QG$YHQXH
IURP10LDPL$YHQXHWR1:QG$YHQXH
DW1:QG$YHQXH
IURP10LDPL$YHQXHWR1:QG$YHQXH
IURP10LDPL$YHQXHWR1:QG$YHQXH
DW1:QG$YHQXH
IURP10LDPL$YHQXHWR1:QG$YHQXH
8UEDQ&ROOHFWRU
/RFDO5HVLGHQWLDO
/RFDO5HVLGHQWLDO
/RFDO5HVLGHQWLDO
/RFDO5HVLGHQWLDO
/RFDO5HVLGHQWLDO
/RFDO5HVLGHQWLDO
/RFDO5HVLGHQWLDO
6SHHG7DEOHV
6SHHG7DEOHV
6HPLGLYHUWHU
6SHHG7DEOHV
6SHHG7DEOHV
6HPLGLYHUWHU
6SHHG7DEOHV
Speed Volume Complaints
1(VW67 DW1(
VW$YHQXH
IURP0LDPL$YHQXHWR1(QG$YHQXH
Recommended devices
'LDJRQDO'LYHUWHU
6SHHG7DEOHV
1(QG67
1(QG67
1(VW67
1(WK67
1(WK67
1(WK67
1(WK$9(5'
IURP1(QG$YHQXHWR1(WK$YHQXH
IURP1(QG$YHQXHWR1(WK$YHQXH
IURP0LDPL$YHQXHWR1(QG$YHQXH
IURP0LDPL$YHQXHWR1(QG$YHQXH
IURP0LDPL$YHQXHWR1(QG$YHQXH
IURP1(WK6WUHHWWR1(WK$YHQXH
6SHHG7DEOHV
6SHHG7DEOHV
6SHHG7DEOHV
6SHHG7DEOHV
6SHHG7DEOHV
6SHHG7DEOHV
*5$1&21&2856( IURP1(
WK6WUHHWWR1(WK$YHQXH
1(WK$9(5'IURP1(WK$YHQXHWR1(WK$YHQXH
Classification
/RFDO5HVLGHQWLDO
/RFDO5HVLGHQWLDO
/RFDO5HVLGHQWLDO
/RFDO5HVLGHQWLDO
/RFDO5HVLGHQWLDO
/RFDO5HVLGHQWLDO
/RFDO5HVLGHQWLDO
/RFDO5HVLGHQWLDO
8UEDQ&ROOHFWRU
/RFDO5HVLGHQWLDO
/DQHUHGXFWLRQ
6SHHG7DEOHV
Speed Volume Complaints
1(UG67
1(WK67
1(UG67
1(QG67
1:WK67
1(QG67
Location
IURP0LDPL$YHQXHWR1(QG$YHQXH
DW1(VW$YHQXH
IURP1:QG$YHQXHWR10LDPL$YHQXH
IURP1(QG$YHQXHWR1(WK$YHQXH
IURP1:QG$YHQXHWR0LDPL$YHQXH
DW1(VW$YHQXH
Classification
/RFDO5HVLGHQWLDO
/RFDO5HVLGHQWLDO
/RFDO5HVLGHQWLDO
/RFDO5HVLGHQWLDO
/RFDO5HVLGHQWLDO
/RFDO5HVLGHQWLDO
Recommended devices
6SHHG7DEOHV
7UXQFDWHG'LDJRQDO'LYHUWHU
6SHHG7DEOH
6SHHG7DEOHV
6SHHG7DEOHV
6HPLGLYHUWHU
Speed Volume Complaints
1(WK$9(
1(WK$9(
1(WK$9(
Recommended devices
6SHHG7DEOHV
6SHHG7DEOHV5RXQGDERXW
6KRUW0HGLDQ$GMDFHQWWR,QWHUVHFWLRQ
6SHHG7DEOHV
1(WK$YHQXH
1(WK67
&OXE'5
1(WK67
1(WK6WUHHW
1(WK67
1(UG67
Location
IURP1(VW6WUHHWWR1(VW6WUHHW
IURP1(WK6WUHHWWR1(WK6WUHHW
at 1(UG6WUHHW
IURP1(VW6WUHHWWR1(QG6WUHHW
IURP1(WK$YHQXHWR'HDG(QG
IURP1(WK6WUHHWWR1(QG6WUHHW
IURP%LVFD\QH%RXOHYDUGWR'HDG(QG
IURP%D\VKRUHWR1(WK$YHQXH
IURP&OXE'ULYHWR1(WK$YHQXHIURP
1(WK$YHQXHWR'HDG(QG
Classification
/RFDO5HVLGHQWLDO
/RFDO5HVLGHQWLDO
8UEDQ&ROOHFWRU
/RFDO5HVLGHQWLDO
/RFDO5HVLGHQWLDO
/RFDO5HVLGHQWLDO
/RFDO5HVLGHQWLDO
/RFDO5HVLGHQWLDO
/RFDO5HVLGHQWLDO
/RFDO5HVLGHQWLDO
6SHHG7DEOHV
6SHHG7DEOHV
6SHHG7DEOHV
6SHHG7DEOHV
6SHHG7DEOHV
6SHHG7DEOHV
Recommended devices
Area 1
Area 2
Area 3
Area 4
RankingStreet Name Location
Street
Classification
Points per category
Total points
RankingStreet Name Location
Street Points per category
Total points
Points per category
Total pointsStreet Name
Street
Points per category
Total points RankingStreet Name
Street
Ranking
MARLIN | 1700 NW 66th Ave, Suite 106 | Plantation, FL33313 | www.marlinengineering.com 40
Miami Shores Village – Traffic Calming Study
7.0 CONCLUSIONS
0$5/,1ZDVUHWDLQHGE\WKH0LDPL6KRUHV9LOODJHWRHYDOXDWHWKHORFDOVSHHGYROXPH
DQGRYHUDOOWUDIILFSDWWHUQVWRGHWHUPLQHORFDWLRQVZLWKLQWKH9LOODJHZKHUHWUDIILFFDOPLQJ
PHDVXUHVVKRXOGEHUHFRPPHQGHG$VSDUWRIWKLVVWXG\0$5/,1DOVRGHYHORSHGD
9LOODJHZLGH 7UDIILF &DOPLQJ 0DVWHU 3ODQ ZKLFK LPSOHPHQWHG GLIIHUHQW DOWHUQDWLYH
LPSURYHPHQWVIRUHDFKRIWKHLGHQWLILHGFRQFHUQV%DVHGRQWKHVWXG\REMHFWLYHVD
FRPSUHKHQVLYHUDQJHRIWUDIILFGDWDZDVSHUIRUPHGDVSDUWRIWKHVWXG\DQGLQFOXGHG
+RXU $YHUDJH 'DLO\ 7UDIILF WK 3HUFHQWLOH 6SHHG 'DWD &UDVK 'DWD 6XPPDU\ DQG
3HGHVWULDQ%LNH&UDVK'DWD
7KHGDWDFROOHFWLRQDQDO\VLVLQGLFDWHGWKDWVHYHUDOORFDWLRQVWKURXJKRXWWKH9LOODJHPHHW
WKHWKUHVKROGYDOXHVIRUWUDIILFFDOPLQJEDVHGRQWUDIILFYROXPHVDQGWKSHUFHQWLOH
VSHHGV&RQVLVWHQWZLWKWKHGDWDFROOHFWLRQHIIRUWVDVHWRIUHFRPPHQGHGWUDIILFFDOPLQJ
LPSURYHPHQWVZHUHGHYHORSHGLQGHSHQGHQWO\IRUHDFKVXEDUHD
,W VKRXOG EH QRWHG WKDW ZH GR QRW UHFRPPHQG DQ\ GHYLFHV WKDW PD\ UHTXLUH WKH
FRQVWUXFWLRQRIDGGLWLRQDOSDYHPHQWZLWKLQVZDOHDUHDVZKLFKPD\LPSDFWSDUNLQJULJKW
RIZD\DQGGULYHZD\V7KHUHIRUHZHDUHPDNLQJWKHVHUHFRPPHQGDWLRQVVXFKDVVSHHG
KXPSVVSHHGWDEOHVGLDJRQDODQGWUXQFDWHGGLYHUWHUVHPLGLYHUWHUURXQGDERXQWVDQG
VKRUWPHGLDQDGMDFHQWWRLQWHUVHFWLRQ:HDUHQRWPDNLQJUHFRPPHQGDWLRQVIRUFKLFDQHV
FKRFNHUVPLGEORFNPHGLDQDQJOHVORZSRLQWDQGLQWHUVHFWLRQPHGLDQEHFDXVHWKHVWUHHWV
LQ0LDPL6KRUHV9LOODJHDUHQRWZLGHHQRXJKWRVXSSRUWWKHVHW\SHVRIDPHQLWLHV
&RQVLGHULQJ WKH EXGJHWDU\ FRQVWUDLQWV W\SLFDOO\ LPSRVHG RQ D PXQLFLSDOLW\ ZKHQ
GHYHORSLQJ FDSLWDO LPSURYHPHQWV D UDQJH RI FRVW DVVRFLDWHG ZLWK HDFK RI WKH
UHFRPPHQGHGGHYLFHVZDVDOVRSURYLGHGWRDVVLVWWKH9LOODJHLQPDNLQJSURYLVLRQVIRU
IXWXUHFDSLWDOLPSURYHPHQWV DQG EDVHGRQSDUWLFXODUSUHIHUHQFHVDQGXQIRUHVHHQULJKW
RIZD\FRQVWUDLQWV DVHFRQGVHWRIDOWHUQDWLYHVZDVDOVRGHYHORSHG
,WLVDQWLFLSDWHGWKDWWKHWUDIILFFDOPLQJSODQGHYHORSHGDVDUHVXOWRIWKLVDQDO\VLVZLOO
HIIHFWLYHO\ ORZHU WUDYHO VSHHGV DQG YROXPHV WKURXJKRXW WKH UHVLGHQWLDO DUHDV DQG
FRQVHTXHQWO\HQKDQFHWKHVDIHW\DQGTXDOLW\RIOLIHIRUWKHUHVLGHQWV
MARLIN | 1700 NW 66th Ave, Suite 106 | Plantation, FL33313 | www.marlinengineering.com 41
Miami Shores Village – Traffic Calming Study
Next Step:
x 0$5/,1ZLOOFRRUGLQDWHZLWK0LDPL'DGH&RXQW\RQPLOHSHUKRXUPSKVSHHG
UHGXFWLRQWKURXJKRXWWKH9LOODJH
x 'HVLJQ DQG VXEPLW W\SLFDO WUDIILF FDOPLQJ GHYLFHV WR 0LDPL 'DGH &RXQW\ IRU
DSSURYDO
x 3UHSDUHHQJLQHHULQJVSHFLILFDWLRQV
x $VVLVW9LOODJHVWDIIZLWKWKHFDSLWDOLPSURYHPHQWSODQ&,3
x 3HUIRUPSRVWGHVLJQVHUYLFHV
Miami Shores Village-Wide
7raIÀF &almiQg SWXd\
PREPARED FOR:
Miami Shores Village
PREPARED BY:
Marlin Engineering Inc.
1:WK$YH6XLWH
3ODQWDWLRQ)/
ZZZPDUOLQHQJLQHHULQJFRP 2FWREHU 2016
$SSHQGLFHV
MARLIN | 1700 NW 66th Ave, Suite 106 | Plantation, FL33313 | www.marlinengineering.com
Miami Shores Village – Traffic Calming Study
Appendix A –
Residents Comment Card
1
James Spinks
From:+HUWD+ROO\
Sent:)ULGD\$SULO$0
To:MVSLQNV#PDUOLQHQJLQHHULQJFRP
Subject:)ZG7UDIILF&DOPLQJ:HVW0LDPL6KRUHV
AnotherconcernedresidentWithbestwishes,Herta
SentfrommyiPhone
Beginforwardedmessage:
From:TomBenton<BentonT@miamishoresvillage.com>
Date:April5,2016at9:36:54AMEDT
To:"sb1706@aol.com"<sb1706@aol.com>,AliceBurch<AliceBurch@miamishoresvillage.com>,Steven
Zelkowitz<StevenZelkowitz@miamishoresvillage.com>,HertaHolly
<hertaholly@miamishoresvillage.com>,IvonneLedesma<ivonneledesma@miamishoresvillage.com>,
MacGlinn<MacGlinn@miamishoresvillage.com>,BarbaraEstep<estepb@miamishoresvillage.com>
Subject:RE:TrafficCalmingWestMiamiShores
GoodMorning,
Thankyouforyourcommentsontrafficcalming.Iwillensurethatyourconcernsgettoourtraffic
calmingconsultants.
TomBenton
VillageManager
MiamiShoresVillage
10050N.E.SecondAvenue
MiamiShores,FL33138
(305)795Ͳ2207PhoneExt.2
(305)754Ͳ6522Fax
BentonT@miamishoresvillage.com
From:sb1706@aol.com [mailto:sb1706@aol.com]
Sent: Monday, April 04, 2016 7:32 PM
To: Alice Burch; Steven Zelkowitz; Herta Holly; Ivonne Ledesma; Mac Glinn; Tom Benton; Barbara Estep
Subject: Traffic Calming West Miami Shores
April4,2016
ToWhomItMayConcern,
IamunabletoattendthemeetingonApril6th,2016.
AslongtimeMiamiShoresresidents,therearesomeconcernsthatwewouldliketohaveaddressed.In
WestMiamiShoresthereareveryfewsidewalkssobikers,walkers,runners,andfamilieswithbaby
strollersmustusethestreets.Therearemanyvehiclesthatspeeddownourstreets,someofthemare
usingthebackstreetsasanalternativeorshortcutfromMiamiAvenueto103rdStreetorviceversa.
Thestreetswouldbemuchsaferifspeedlimitswereloweredto30MPHonNorthMiamiAveand
posted20MPHonstreetswithoutsidewalks.
2
SpeedhumpsshouldbeputinonNW100thStreetasitisusedasadrivethroughtogowestandthen
northto103rdstreet.Itistheonlythroughstreetbetween100thand103rdstreetthatgoesstraight
throughwithnostopsignsfromMiamiAvenuetoNW2ndAvenue
sothereisalargeamountoftraffictothisarea.SpeedhumpsshouldalsobeinstalledonNWMiami
Courttoslowtheflowofthosemakingthe“shortcut”.Therearenostopsignsbetween100thStreetand
103rdStreet.Perhapssignsindicating“LocalTrafficOnly”wouldbeofbenefitinthisregardaswell.
Thankyouforyouranticipatedconsideration.
Sincerely,
RobertandSusanBoundy
18NW100thStreet
MiamiShores,FL
33150
1
James Spinks
From:7RP%HQWRQ
Sent:7XHVGD\$SULO$0
To:MVSLQNV#PDUOLQHQJLQHHULQJFRP
Cc:6FRWW'DYLV
Subject:):7UDIILF&DOPLQJ:HVW0LDPL6KRUHV
Follow Up Flag:)ROORZXS
Flag Status:)ODJJHG
James,
IrecentlyreceivedthefollowingconcernsregardingtrafficcalmingandspeedingintheVillage.Pleaseincludethese
commentsinyouranalysisofthisarea.Thanks!
TomBenton
VillageManager
MiamiShoresVillage
10050N.E.SecondAvenue
MiamiShores,FL33138
(305)795Ͳ2207PhoneExt.2
(305)754Ͳ6522Fax
BentonT@miamishoresvillage.com
From: sb1706@aol.com [mailto:sb1706@aol.com]
Sent: Monday, April 04, 2016 7:32 PM
To: Alice Burch; Steven Zelkowitz; Herta Holly; Ivonne Ledesma; Mac Glinn; Tom Benton; Barbara Estep
Subject: Traffic Calming West Miami Shores
April4,2016
ToWhomItMayConcern,
IamunabletoattendthemeetingonApril6th,2016.
AslongtimeMiamiShoresresidents,therearesomeconcernsthatwewouldliketohaveaddressed.InWestMiami
Shoresthereareveryfewsidewalkssobikers,walkers,runners,andfamilieswithbabystrollersmustusethe
streets.Therearemanyvehiclesthatspeeddownourstreets,someofthemareusingthebackstreetsasanalternative
orshortcutfromMiamiAvenueto103rdStreetorviceversa.
Thestreetswouldbemuchsaferifspeedlimitswereloweredto30MPHonNorthMiamiAveandposted20MPHon
streetswithoutsidewalks.
SpeedhumpsshouldbeputinonNW100thStreetasitisusedasadrivethroughtogowestandthennorthto103rd
street.Itistheonlythroughstreetbetween100thand103rdstreetthatgoesstraightthroughwithnostopsignsfrom
MiamiAvenuetoNW2ndAvenue
sothereisalargeamountoftraffictothisarea.SpeedhumpsshouldalsobeinstalledonNWMiamiCourttoslowthe
flowofthosemakingthe“shortcut”.Therearenostopsignsbetween100thStreetand103rdStreet.Perhapssigns
indicating“LocalTrafficOnly”wouldbeofbenefitinthisregardaswell.
Thankyouforyouranticipatedconsideration.
Sincerely,
RobertandSusanBoundy
18NW100thStreet
MiamiShores,FL
MARLIN | 1700 NW 66th Ave, Suite 106 | Plantation, FL33313 | www.marlinengineering.com
Miami Shores Village – Traffic Calming Study
Appendix B –
Traffic Volume and Speed Data
NB/EB SB/WB NB/EB SB/WB
3/17/2016 1-01 NW 115th ST BTWN N Miami AVE and NW 2nd AVE Local Residential 2LU 25 2603 245 138 109 202 105 119 34
3/17/2016 1-02 NW 111th ST BTWN N Miami AVE and NW 2nd AVE Urban Collector 2LU 25 5027 414 266 160 443 190 277 37
3/17/2016 1-03 NW 110th ST BTWN N Miami AVE and NW 2nd AVE Local Residential 2LU 25 227 22 10 14 23 14 20 32
3/17/2016 1-04 NW 109th ST BTWN N Miami AVE and NW 2nd AVE Local Residential 2LD 25 287 22 14 12 52 21 31 30
3/17/2016 1-05 NW 108th ST BTWN N Miami AVE and NW 2nd AVE Local Residential 2LU 25 181 16 8 10 25 11 19 29
3/17/2016 1-06 NW 107th ST BTWN N Miami AVE and NW 2nd AVE Local Residential 2LU 25 176 12 6 8 28 12 17 31
3/17/2016 1-07 NW 106th ST BTWN N Miami AVE and NW 2nd AVE Local Residential 2LU 25 205 14 11 5 33 13 29 31
3/17/2016 1-08 NW 105th ST BTWN N Miami AVE and NW 2nd AVE Local Residential 2LU 25 203 17 11 7 23 11 12 33
3/17/2016 1-09 NW 104th ST BTWN N Miami AVE and NW 2nd AVE Local Residential 2LU 25 355 36 24 13 43 13 36 33
3/17/2016 1-10 NW 1st AVE BTWN NW105th ST and NW 106th ST Local Residential 2LU 25 124 15 7 8 15 9 8 25
3/17/2016 1-11 NE 106th ST BTWN NE 5th AVE and NE 6th AVE Local Residential 2LU 25 327 77 55 22 73 38 35 29
3/17/2016 1-12 NE 4th AVE BTWN NE 105th ST and NE 107th ST Local Residential 2LU 25 1769 403 127 281 223 79 147 29
3/17/2016 1-13 NE 107th ST BTWN NE 4th AVE and NE 5th AVE Local Residential 2LU 25 2321 790 556 244 280 156 143 30
3/17/2016 1-14 NE 105th ST BTWN NE 4th AVE and NE 5th AVE Local Residential 2LU 25 1579 784 88 292 212 55 161 25
3/17/2016 1-15 NE 5th AVE BTWN NE 105th ST and NE 107th ST Local Residential 2LU 25 864 268 139 146 148 58 97 25
5/18/2016 1-16 NW 2nd AVE BTWN NW 109th ST and NW 110th ST Urban Collector 2LU 30 3216 415 113 302 350 261 148 34
3/15/2016 2-01 NE 102nd ST BTWN N Miami AVE and NE 2nd AVE Local Residential 2LU 25 438 82 21 64 36 26 20 32
3/17/2016 2-02 NE 101st ST BTWN N Miami AVE and NE 2nd AVE Local Residential 2LU 25 864 268 139 146 148 56 97 25
3/15/2016 2-03 NE 100th ST BTWN N Miami AVE and NE 2nd AVE Local Residential 2LU 25 308 38 14 29 29 19 15 32
3/15/2016 2-04 NE 99th ST BTWN N Miami AVE and NE 2nd AVE Local Residential 2LU 25 328 40 21 19 34 13 24 31
3/15/2016 2-05 NE 98th ST BTWN N Miami AVE and NE 2nd AVE Local Residential 2LU 25 968 84 38 50 105 42 68 33
3/15/2016 2-06 NE 97th ST BTWN N Miami AVE and NE 2nd AVE Local Residential 2LU 25 706 57 27 30 68 28 40 30
3/15/2016 2-07 NE 96th ST BTWN N Miami AVE and NE 2nd AVE Urban Collector 2LD 25 1599 157 63 96 177 60 117 32
3/15/2016 2-08 NE 1st AVE BTWN NW 99th ST and NW 100rd ST Local Residential 2LU 25 190 23 9 16 20 13 9 24
3/29/2016 2-09 NE 102nd ST BTWN NE 3rd AVE and NE 4th AVE Local Residential 2LU 25 702 104 68 39 93 47 50 33
3/29/2016 2-10 NE 101st ST BTWN NE 3rd AVE and NE 4th AVE Local Residential 2LU 25 528 70 37 33 60 24 36 33
3/29/2016 2-11 NE 100th ST BTWN NE 3rd AVE and NE 4th AVE Local Residential 2LU 25 243 30 19 15 27 15 17 30
3/29/2016 2-12 NE 99th ST BTWN NE 3rd AVE and NE 4th AVE Local Residential 2LU 25 483 43 21 28 53 28 30 30
3/29/2016 2-13 NE 98th ST BTWN NE 3rd AVE and NE 4th AVE Local Residential 2LU 25 494 49 27 26 47 32 25 32
3/29/2016 2-14 NE 97th ST BTWN NE 2nd AVE and NE 3rd AVE Local Residential 2LU 25 681 65 37 32 75 43 36 29
3/29/2016 2-15 NE 3rd AVE BTWN NE 99th ST and NE 100 ST Local Residential 2LU 25 265 29 11 21 32 17 18 24
3/29/2016 2-16 NE 4th AVE BTWN NE 99th ST and NE 100 ST Local Residential 2LU 25 1320 144 62 89 129 61 70 32
3/29/2016 2-17 NE 4th AVE RD BTWN NE 5th AVE and NE 6th AVE Local Residential 2LU 25 537 71 39 32 67 42 27 31
3/29/2016 2-18 GRAN CONCOURSE BTWN NE 5th AVE and NE 6th AVE Urban Collector 2LU 30 1351 95 69 38 201 44 157 41
3/29/2016 2-19 NE 5th AVE RD BTWN NE 5th AVE and NE 6th AVE Local Residential 2LU 25 149 12 8 8 17 13 10 30
3/31/2016 3-01 NW 94th ST BTWN NW 1st AVE and NW 2nd AVE Local Residential 2LU 25 386 52 39 17 68 17 54 37
3/31/2016 3-02 NW 1st AVE BTWN NE 93rd ST and 94th ST Local Residential 2LU 25 248 33
40 26 15 26
4/5/2016 3-03 NW 92nd ST BTWN NW 2nd AVE and NW 1st AVE Local Residential 2LU 25 110 14 12 6 20 11 9 26
3/31/2016 3-04 NE 93rd ST BTWN NORTH MIAMI AVE and NE 1st AVE Local Residential 2LU 25 672 49 22 33 219 55 170 33
3/31/2016 3-05 NE 1st AVE BTWN NE 93rd ST and NE 94th ST Local Residential 2LU 25 223 12 9 7 88 26 63 26
3/31/2016 3-06 NE 94th ST BTWN NE 1st AVE and NE 2nd AVE Local Residential 2LU 25 1353 73 27 52 457 136 326 29
3/31/2016 3-07 NE 92nd ST BTWN NE 2nd AVE and NE 1st AVE Local Residential 2LU 25 877 73 36 37 140 82 59 35
3/31/2016 3-08 NE 94ST ST BTWN NE 2nd AVE and GRAN CONCOURSE Local Residential 2LU 25 761 50 22 31 252 220 32 32
3/31/2016 3-09 NE 92nd ST BTWN NE 3rd AVE and NE 2nd AVE Local Residential 2LU 25 299 33 20 13 41 24 20 31
3/31/2016 3-10 GRAN CONCOURSE BTWN NE 94th ST and NE 95th ST Urban Collector 2LD 30 2875 220 61 160 565 447 124 35
3/31/2016 3-11 NE 93rd ST BTWN NE 4th AVE and NE 3rd AVE Local Residential 2LU 25 214 19 10 15 23 19 11 33
3/31/2016 3-12 NE 4th AVE BTWN NE 93rd ST and NE 94th ST Local Residential 2LU 25 403 36 20 17 50 31 23 33
3/31/2016 3-13 NE 5th AVE BTWN NE 94th ST and NE 93rd ST Local Residential 2LU 25 399 32 17 18 51 28 24 26
4/5/2016 3-14 PARK DR BTWN NE 95th ST and NE 94th ST Local Residential 2LU 25 320 104 40 67 58 36 28 30
3/31/2016 3-15 PARK DR BTWN NE 91st ST and NE 92nd ST Local Residential 2LU 25 1720 180 51 133 146 73 81 31
4/18/2016 4-01 NE 105th ST BTWN Biscayne BLVD and Dead End Local Residential 2LU 30 1068 71 33 54 85 52 39 38
4/14/2016 4-02 NE 104th ST BTWN NE 12th AVE and Dead End Local Residential 2LU 25 405 40 16 27 30 20 15 31
4/14/2016 4-03 NE 103rd ST BTWN NE 13rd AVE and Dead - End Local Residential 2LU 25 893 84 36 48 90 53 42 30
4/14/2016 4-04 NE 102nd ST BTWN NE 12th AVE and NE 13th AVE Local Residential 2LU 25 259 29 13 16 28 16 15 30
4/14/2016 4-05 NE 101st ST BTWN NE 12th AVE and NE 13th AVE Local Residential 2LU 25 369 38 17 22 39 19 20 31
4/14/2016 4-06 NE 100th ST BTWN NE 12th AVE and NE 13th AVE Local Residential 2LU 25 126 15 6 10 12 7 8 28
4/7/2016 4-07 NE 100th ST BTWN NE 9th AVE and NE 10th AVE Local Residential 2LU 25 844 133 23 110 112 40 76 35
4/14/2016 4-08 NE 12th AVE BTWN NE 100th ST and NE 99th ST Local Residential 2LU 25 2216 179 70 120 177 98 93 35
4/7/2016 4-09 NE 99th ST BTWN NE 8th AVE and NE 9th AVE Local Residential 2LU 25 186 20 10 14 24 13 13 29
4/14/2016 4-10 NE 99th ST BTWN NE 12th AVE and NE 13th AVE Local Residential 2LU 25 92 14 9 8 11 5 8 28
4/14/2016 4-11 NE 98th ST BTWN NE 12th AVE and NE 13th AVE Local Residential 2LU 25 121 12 7 8 15 8 8 28
4/7/2016 4-12 NE 98th ST BTWN NE 8th AVE and NE 9th AVE Local Residential 2LU 25 267 26 13 14 31 18 19 28
4/14/2016 4-13 NE 97th ST BTWN NE 12th AVE and NE 13th AVE Local Residential 2LU 25 185 15 6 12 16 11 8 25
4/7/2016 4-14 NE 97th ST BTWN NE 8th AVE and NE 9th AVE Local Residential 2LU 25 173 17 6 12 20 13 12 27
4/14/2016 4-15 NE 96th ST BTWN NE 10th AVE and NE 12th AVE Urban Collector 2LU 30 5261 423 156 286 437 232 225 34
4/4/2016 4-16 NE 96th ST BTWN BISCAYNE BLVD and NE 10th AVE Urban Collector 2LD 25 10162 842 523 320 763 497 300 30
4/7/2016 4-17 NE 8th AVE BTWN NE 96th ST and NE 97th ST Local Residential 2LU 25 299 30 10 20 30 15 20 25
4/14/2016 4-18 NE 95th ST BTWN NE 12th AVE and N Bayshore DR Local Residential 2LU 25 232 19 8 13 22 8 16 28
4/7/2016 4-19 NE 12th AVE BTWN NE 95th ST and NEth 94 ST Local Residential 2LU 25 1532 121 79 54 123 60 76 33
4/7/2016 4-20 NE 94th ST BTWN NE 12th AVE and N BAYSHORE DR Local Residential 2LU 25 284 25 13 13 24 13 17 22
4/7/2016 4-21 NE 93rd ST BTWN NE 12th AVE and N BAYSHORE DR Local Residential 2LU 25 493 36 14 30 50 32 21 29
4/7/2016 4-22 NE 10th AVE BTWN NE 94th ST and NE 93rd ST Local Residential 2LU 30 10908 905 386 521 843 541 340 36
4/5/2016 4-23 Club DR BTWN NE 94th ST and NE 93rd ST Local Residential 2LU 25 1276 89 48 64 117 73 54 37
4/7/2016 4-24 NE 92nd ST BTWN NE 12th AVE and N BAYSHORE DR Local Residential 2LU 25 194 16 10 7 24 12 13 28
4/5/2016 4-25 NE 92nd ST BTWN NE 8th AVE and NE 9th AVE Local Residential 2LU 25 222 18 10 12 22 17 10 30
4/5/2016 4-26 NE 8th AVE BTWN NE 92nd ST and NE 93rd ST Local Residential 2LU 25 2150 260 73 187 191 80 142 30
4/5/2016 4-27 NE 92nd ST BTWN BISCAYNE BLVD and CLUB DR Local Residential 2LU 25 975 88 46 42 95 49 49 27
4/5/2016 4-28 NE 91st ST BTWN BISCAYNE BLVD and NE 8th AVE Local Residential 2LU 25 1920 149 69 82 170 98 78 26
5/4/2016 4-29 NE 90ST ST BTWN NE 8th AVE and BISCAYNE BLVD Local Residential 2LU 25 910 77 35 42 79 56 35 30
85th Percentile
Speed (MPH)
PM PEAK Date LocationStreet NameArea STreet
Classification
No. of
through
Lanes
Posted
Speed Limit
MPH
A.D.T. AM Peak
Hour Flow
AM PEAK PM Peak
Hour Flow
MARLIN | 1700 NW 66th Ave, Suite 106 | Plantation, FL33313 | www.marlinengineering.com
Miami Shores Village – Traffic Calming Study
Appendix C –
Miami Dade Traffic Flow Modification(s)
Street Closure(s) Procedure
TRAFFIC FLOW MODIFICATION(S)/
STREET CLOSURE(S) PROCEDURE
PUBLIC WORKS DEPARTMENT
TRAFFIC ENGINEERING DIVISION
Revised January 2009
Traffic Flow Modification(s)/Street Closure(s) Procedure Page 2
T:\TFM\Street Closures\Procedure R4 01 09.doc
TRAFFIC FLOW MODIFICATION(S)/
STREET CLOSURE(S) PROCEDURE
TABLE OF CONTENTS
Table of Contents Page 2
Introduction Page 3
Phase 1: Summary of Procedure Page 4
Phase 2: Summary of Procedure Page 5
Phase 1: Procedure Details Page 8
Phase 2: Procedure Details Page 15
Appendices:
I. Policy on Traffic Calming Measures Page 26
II. Policy on Traffic Calming for Low Volume Narrow Streets Page 27
III. Policy on Speed Humps Page 28
IV. Report on Speed Humps Page 29
V. Traffic Flow Modification/ Street Closure Application Form Page 34
VI. Interdepartmental Review Page 36
VII. Sample Ballot 1: Traffic Circles, PWD Use Page 37
VIII. Sample Ballot 2: Traffic Calming Devices, PWD Use Page 38
IX. Sample Ballot 3: Residents/Property Owners and HOA Use Page 39
Traffic Flow Modification(s)/Street Closure(s) Procedure Page 3
T:\TFM\Street Closures\Procedure R4 01 09.doc
IINNTTRROODDUUCCTTIIOONN
The Public Works Department and Metropolitan Planning Organization obtained the professional
engineering services of Frederic R. Harris, Inc. to conduct a Street Closure/Traffic Flow Modification
Study that was completed in July 1996.
The primary objectives of the study were to:
• Evaluate and recommend traffic control alternatives to street closures;
• Develop a uniform set of guidelines or warrants to be followed by local
municipalities, the County and the State for implementing neighborhood and
localized area traffic control; and
• Develop a standardized set of procedures to be followed by local applicants
desiring enhanced neighborhood traffic control.
A Steering Committee was assembled and periodically convened to meet with the Consultant to
provide input throughout the study process. The Steering Committee consisted of representatives
from the Florida Department of Transportation, Miami-Dade County and local municipalities; some of
whom had previous experience with citizen requests for street closures. The draft report was
developed as a series of Technical Memorandums that were reviewed by the steering committee
and later compiled to form the final report.
The Steering Committee developed standardized procedures and guidelines for use by the public,
local officials, or other private sector interests requesting traffic flow modifications that may affect
local neighborhoods as well as other roadway traffic patterns. The intent of these procedures was to
provide Miami-Dade County and municipalities with a uniform approach to facilitate government
action in response to requests to restrict local traffic access via street closures, other physical
modifications or traffic calming alternatives. These proposed procedures were also intended to
ensure that such issues are given appropriate study and timely response, and that the full range of
traffic and community impacts is considered.
The procedures addressed traffic issues in an incremental fashion with the least restrictive
measures applicable to a particular situation tested first, then monitored and supplemented,
modified or replaced with more stringent measures, if necessary. W hen non-traffic issues enter into
the decision process, the procedures weigh both the traffic and non-traffic implications of a street
closure or traffic flow modification. Although each citizen request is unique, the process applies
equally to any residential traffic control situation and provides government officials with an objective
tool to address neighborhood traffic control issues.
On May 20, 1997, the Miami-Dade County Board of County Commissioners approved Resolution
No. R-545-97 authorizing an eighteen-month pilot program to implement and evaluate traffic flow
modification/street closure study recommendations. A subsequent extension was granted under
Resolution No. R-66-00 on January 25, 2000. Since then, County staff has been using this
procedure. It has been enhanced over the span of the last twelve years and updated and revised to
appropriately address the needs of residents of Miami-Dade County in order to improve their safety
as well as their livability standards.
Traffic Flow Modification(s)/Street Closure(s) Procedure Page 4
T:\TFM\Street Closures\Procedure R4 01 09.doc
SSUUMMMMAARRYY OOFF PPRROOCCEEDDUURREE
Phase 1: INITIAL TRAFFIC STUDY BY MIAMI-DADE COUNTY PUBLIC WORKS
1.1 All applicants, whether residing within unincorporated Miami-Dade County or a municipality,
may submit a request for a traffic flow modification(s)/street closure(s) to the Miami-Dade
County Public Works Department (PWD) in the form of a letter or complete the application
in Appendix V.
1.2 PWD will conduct the initial traffic study to confirm the applicant’s concerns and to identify
and recommend traffic calming measures. Should the request be initiated through or by a
municipality or the Florida Department of Transportation, then these agencies, at their
option, may conduct traffic studies utilizing their staff or a traffic consultant.
1.3 PWD will make the determination of whether the location(s) falls within unincorporated
Miami-Dade County or a municipality, and coordinate the review with the respective
municipality.
1.4 PWD will make the determination of whether the review from various affected entities, such
as Police, Fire, etc., is required. If review is not required, proceed to Step 1.6.
1.5 Should review be required, PWD will request the affected entities, including but not limited
to, Police, Fire, respective municipality, etc., to review the request and provide comments. If
review by any of the entities results in a denial as a result of concerns which cannot be
resolved, or if the proposed traffic flow modification(s)/street closure(s) does not meet all
criteria outlined under this process or applicable County and State laws, then the application
will be denied.
1.6. PWD will make the determination if concurrence from the required affected residents and/or
property owners is required. If concurrence is not required, proceed to Step 1.8.
Required Concurrence:
Traffic Circles: Requires 100% concurrence of affected residents and/or property
owners from four (4) corners adjacent to the proposed circles. This may be extended to
the full block should a larger representation be desired by the District Commissioner.
Traffic Flow Modifications other than Traffic Circles: Requires concurrence of two-
thirds (2/3) of the affected residents and/or property owners, who elected to vote (ballots
received). Non-voters are not counted (ballots not returned).
Municipal Jurisdictions: In lieu of concurrence from the affected residents and/ or
property owners, a municipality may pass a resolution after a public hearing requesting
PWD to consider the proposed traffic flow modification(s)/street closure(s).
1.7 PWD will mail out ballots to obtain concurrence from the affected residents and/or property
owners. Should the required concurrence be secured, PW D will proceed to the next step.
Should the affected residents and/or property owners fail to reach a consensus to implement
the proposed improvement, then the process ceases.
Traffic Flow Modification(s)/Street Closure(s) Procedure Page 5
T:\TFM\Street Closures\Procedure R4 01 09.doc
Reinitiating the balloting process: Should residents and/or property owners desire to
reinitiate the balloting process, it can be initiated after ninety (90) calendar days from the
date that ballots were opened, provided that the applicant is willing to pay the processing
and mailing cost for the ballots.
1.8 PWD will schedule the construction of temporary or permanent traffic calming device as
funds and contracts are identified.
1.9 PWD will assess the traffic impact and determine if the improvements are acceptable to the
affected area residents and/or property owners.
1.9.1 Should the determination be made by PWD staff that temporary devices have
caused adverse impact, such devices will be removed by PWD.
1.9.2 If improvements are not acceptable to affected area residents and/or property
owners:
1.9.2.1 Residents and/or property owners may request removal of temporary traffic
calming devices as per a requirement of Step 1.6. Such request must be
initiated in the form of a petition signed by 10% of the affected residents
and/or property owners. 100% of the adjacent affected residents and/or
property owners is required for the traffic circles petition. Or
1.9.2.2 Residents and/or property owners may proceed to Phase 2 procedure,
Step 2.1.
1.9.3 Improvements did not cause adverse impact and are acceptable to residents:
proceed to Step 1.10.
1.10 PWD will initiate the design.
1.11 PWD will install permanent traffic calming devices as funds and contracts are identified.
PHASE 2: TRAFFIC STUDY BY APPLICANT’S CONSULTANT
2.1 In the event that the action taken by PWD in accordance with Phase 1 procedure is
unacceptable to the municipal jurisdiction, or the affected area residents and/or property
owners, they have the option of engaging a traffic consultant, at their cost, in order to
perform an independent traffic study. Should the request be initiated through or by a
municipality or the Florida Department of Transportation, then these agencies, at their
option, may conduct traffic studies utilizing their staff or a traffic consultant.
2.2 The consultant conducts a pre-implementation traffic study to identify and confirm traffic
concerns (i.e., traffic intrusion, excessive traffic volume, speeding, traffic accidents, etc.) and
to determine if the collected traffic data meets the PWD criteria for traffic calming devices.
2.3 The consultant identifies traffic calming alternatives and generates staged alternative plans.
Traffic Flow Modification(s)/Street Closure(s) Procedure Page 6
T:\TFM\Street Closures\Procedure R4 01 09.doc
2.4 The consultant performs pre-implementation study to determine potential impacts of
proposed traffic calming devices on roadways within and outside of the study areas, and
documents findings in the form of a report.
2.5 PWD makes the determination whether the location is within a municipality or
unincorporated Miami-Dade County and coordinates the review with the respective
municipality.
2.6 PWD makes determination if the review from various affected entities, such as Police, Fire,
etc., is required.
2.7 PWD requests various affected entities, to include Police, Fire, etc., to review the request
and provide their comments.
2.8 PWD reviews comments from various entities and makes determination whether to approve
or deny the request.
2.9 PWD makes determination if concurrence from the affected residents and/or property
owners is required. If concurrence is not required, proceed to Step 2.11.
Required Concurrence from affected Residents and/or Property Owners:
Traffic Circles: Requires 100% concurrence of affected residents and/ or property owners
from four (4) corners adjacent to the proposed circles. This may be extended to the full block
should a larger representation be desired by the District Commissioner.
Traffic Flow Modifications excluding Traffic Circles: Requires concurrence of two-thirds
(2/3) of the affected residents and/or property owners, who elected to vote (ballots received).
Non-voters are not counted (ballots not returned).
Municipal Jurisdictions: In lieu of concurrence from the affected residents and/or property
owners, a municipality may pass a resolution after a public hearing requesting PWD to
consider the proposed traffic flow modification(s)/street closure(s).
2.10 Applicant obtains concurrence from the affected residents and/or property owners, if
required. In the event that the affected residents and/or property owners do not approve the
proposed improvements, return to Step 2.3.
2.11 Applicant’s contractor installs temporary traffic calming devices upon securing approvals and
permits from appropriate entities.
2.12 Applicant’s consultant conducts post-implementation study to determine if traffic calming
measures are operating at an acceptable level to the residents and/or property owners.
2.13 If the post-implementation study results, as well as the traffic calming devices are acceptable
to residents and/or property owners, the process is completed unless residents and/or
property owners desire further aesthetic enhancements. Should further aesthetic
enhancements be required, proceed to the next step. If the post-implementation study
results are unacceptable, return to Step 2.3.
Traffic Flow Modification(s)/Street Closure(s) Procedure Page 7
T:\TFM\Street Closures\Procedure R4 01 09.doc
2.14 Applicant’s consultant designs permanent traffic calming devices if the temporary devices
are installed.
2.15 Applicant’s contractor installs permanent traffic calming devices upon securing approvals
and permits from appropriate entities.
Traffic Flow Modification(s)/Street Closure(s) Procedure Page 8
T:\TFM\Street Closures\Procedure R4 01 09.doc
PROCEDURE DETAILS
PHASE 1: INITIAL STUDY BY MIAMI-DADE COUNTY PUBLIC WORKS (PWD)
1.1 Submittal of Application for Traffic Flow Modification(s)/Street Closure(s)
In order for an applicant to submit an application for a traffic flow modification(s)/street
closure(s), including the re-opening of a previously closed street(s), the applicant,
whether residing in unincorporated Miami-Dade County or within a municipality, shall follow
the procedures outlined herein:
1.1.a Submit the request in the form of a letter or complete the application form in
Appendix V , and
1.1.a.1 Identify any traffic concerns, such as:
• Traffic intrusion
• Excessive traffic volume
• Speeding
• Traffic accidents
• Other
1.1.a.2 Explain how long these problems have existed and the conditions
that have caused these problems.
1.1.a.3 Identify the type of traffic control measure that is being requested and
include a map illustrating the location(s) of proposed traffic flow
modification(s)/street closure(s).
1.1.a.4 Identify on whose behalf the application is being made.
• Homeowners’ Association
• Individual
• Other
1.1.a.5 All applicants, whether residing in unincorporated Miami-Dade
County or within a municipality, must submit their letter or a
completed application to PWD at the following address:
Chief, Traffic Engineering Division
Miami-Dade County Public Works Department
111 N.W. First Street, Suite 1510
Miami, Florida 33128-1970
Traffic Flow Modification(s)/Street Closure(s) Procedure Page 9
T:\TFM\Street Closures\Procedure R4 01 09.doc
1.1.b. If the request for traffic flow modification(s)/street closure(s) is due to
reasons other than traffic, such as crime, etc., the following procedures shall
be utilized:
1.1.b.1 Creation of a Special Taxing District: Contact PWD, Special Taxing
District Division to obtain procedure details.
1.1.b.2 Reverting of the Public Right-of-way to Adjacent Property Owners:
1.1.b.2.1 If the location falls within unincorporated Miami-Dade County,
please contact PWD, Right-of-Way Division to obtain additional
information.
1.1.b.2.2 If the location falls within a municipality, contact the respective
municipality and follow their established procedures.
1.1.b.3 Converting of a public roadway to a private street to be maintained by
the Homeowners’ Association (HOA):
See 1.1.b.2.1 and 1.1.b.2.2
Miami-Dade County has exclusive jurisdiction over traffic control within a
municipality. As such, the municipal jurisdictions are required to submit a traffic
study to PWD for their review and approval. The study must support the proposed
traffic flow modification(s)/street closure(s) and show that County and State roadways
would not be adversely impacted as a result of such traffic flow modification(s)/street
closure(s); creating a Special Taxing District or due to reverting of the right-of-way or
converting a public street to a private street.
1.2 Initial Traffic Study by PWD
PWD will conduct an initial study to confirm traffic concerns and to identify and recommend
the traffic calming measures. Should the request be initiated through or by a municipality or
the Florida Department of Transportation, then these agencies, at their option, may conduct
traffic studies utilizing their staff or a traffic consultant.
The scope of the initial study, depending on the nature of the complaint, may include twenty-
four (24), forty-eight (48), or seventy-two (72) hour counts, turning movement counts, license
plate survey, spot speed studies, etc.
Requests for traffic flow modification(s)/street closure(s) and reopening of previously closed
streets, will be considered by PWD on a case-by-case basis, for streets meeting the
following criterion.
1.2.a The streets for which modification(s) are proposed must be local or collector
residential street(s) and not arterial roadways or part of the State Highway
System.
Traffic Flow Modification(s)/Street Closure(s) Procedure Page 10
T:\TFM\Street Closures\Procedure R4 01 09.doc
1.2.b The proposed closure(s) shall not create street(s) longer than 600 feet, as per
Miami-Dade County Code, Section 28-14.6.
1.2.c The street(s) proposed for closure shall have sufficient right-of-way to adequately
construct T-turn around or cul-de-sacs as per PWD Standards Details.
1.2.d Pre-implementation data confirms that a problem exists.
1.2.e The traffic study reveals that the proposed traffic flow modification(s)/street closure(s)
meets the criteria for the installation of traffic calming devices on Appendices I, II and
III, and the proposed measures will not adversely affect the traffic on nearby streets,
by the diverted traffic.
1.2.f The projected vehicular volumes on any other adjoining street do not exceed the
threshold limits stated in Phase 2, Step 2.4.a.
1.2.g The changes in traffic flow will not create any liability to the County.
1.3 Requests within a Municipality
1.3.a If the request for traffic flow modification(s)/street closure(s) falls within
unincorporated Miami-Dade County, PWD coordinates the review as per
Step 1.5.a.
1.3.b If request for traffic flow modification(s)/street closure(s) falls within a municipality,
PWD will request affected entity to coordinate the review, as per Step 1.5.b.
1.4 Review Required from Various Entities
PWD will make the determination if the proposed traffic calming measures will impact other
entities and if review is required from affected entities, to include Police, Fire, etc.
If review is required, then proceed to next step. If review is not required, proceed to
Step 1.6.
1.5 Preliminary Review by Various Entities
1.5.a If the request for traffic flow modification(s) or street closure(s) falls within
unincorporated Miami-Dade County, then PWD, Traffic Engineering Division, shall
coordinate a review with agencies potentially affected by the traffic flow
modification(s)/street closure(s), which may include, but not be limited to, the
following entities:
• Miami-Dade County Fire Rescue (MDFR).
• Affected Municipal Fire Department.
• Miami-Dade Police Department (MDPD).
• Affected Municipal Police Department.
• Miami-Dade County Planning and Zoning Department (MDP&Z).
• Miami-Dade County Public Schools (MDCPS).
• Miami-Dade Transit (MDT).
Traffic Flow Modification(s)/Street Closure(s) Procedure Page 11
T:\TFM\Street Closures\Procedure R4 01 09.doc
• Florida Department of Transportation (FDOT).
1.5.a.1 PWD, Traffic Engineering Division, shall review all comments brought forth
by the aforementioned entities. If all agencies and departments concur, then
the Director of PWD will approve the application. However, under the
following conditions the application for traffic flow modification(s)/street
closure(s) will be denied.
1.5.a.1.1 Comments made by any entity revealed concerns, which cannot be
resolved.
1.5.a.1.2 The proposed traffic flow modification(s)/street closure(s) or
extenuating circumstances do not meet all criteria outlined under
this process or applicable State laws. These reviews shall be
relevant to the agency reviewing the proposed traffic flow
modification(s)/street closure(s). The scope of the traffic review
shall be determined on a case-by-case basis by PWD.
1.5.b If the request affects local streets within a municipality, then PWD will request
the municipality to coordinate the review with agencies potentially affected by the
traffic flow modification(s)/street closure(s), which may include, but not be limited to,
the following entities:
Municipal Fire Department.
Miami-Dade County Fire & Rescue (MDFR).
Municipal Police Department.
Miami-Dade County Police Department (MDPD).
Miami-Dade County Planning and Zoning Department (MDP&Z).
Miami-Dade County Public Schools (MDCPS).
Miami-Dade Transit (MDT).
Florida Department of Transportation (FDOT).
PWD, Traffic Engineering Division.
These reviews shall be relevant to the agency reviewing the proposed traffic flow
modification(s)/street closures(s). The scope of the traffic review shall be determined
on a case-by-case basis by PWD.
1.5.b.1 The municipal representative shall review all comments brought forth by the
aforementioned entities. The municipality, under the following conditions,
shall deny the application for traffic flow modification(s)/street closure(s):
1.5.b.1.1 Comments made by any entity revealed concerns, which cannot
be resolved.
1.5.b.1.2 The proposed locations or extenuating circumstances do not meet
all criteria outlined under this process or applicable State laws.
1.5.c If the preliminary review performed by the various affected entities results in denial of
the request, then the process ceases.
Traffic Flow Modification(s)/Street Closure(s) Procedure Page 12
T:\TFM\Street Closures\Procedure R4 01 09.doc
1.5.d If the preliminary review performed by the various affected entities results in
concurrence with the request, then the municipality endorses the request and
forwards it to PWD, Traffic Engineering Division, for their review and approval. If the
request is approved by PWD, proceed to the next step.
1.6. Is Concurrence from the Affected Residents and/or Property Owners
Required?
PWD, depending on the proposed traffic calming devices, will determine if concurrence from
the affected residents and/or property owners is required.
Required Concurrence:
Traffic Circles: Requires 100% concurrence of affected residents and/or property
owners from four (4) corners adjacent to the proposed circles. This may be extended to
the full block should a larger representation be desired by the District Commissioner.
Traffic Flow Modifications other than Traffic Circles: Requires concurrence of two-
thirds (2/3) of the affected residents and/or property owners, who elected to vote (ballots
received). Non-voters are not counted (ballots not returned).
Municipal Jurisdictions: In lieu of concurrence from the affected residents and/or
property owners, a municipality may pass a resolution after a public hearing requesting
PWD to consider the proposed traffic flow modification(s)/street closure(s).
The affected area within unincorporated Miami-Dade County will be established by the
County’s staff. If the location falls within a municipality, the affected area will be established
by both the City’s and the County’s staff.
The affected area may include, but is not limited to, those properties where normal travel
routes to and from the affected area are to be altered by the traffic flow modification(s)/street
closure(s) and/or properties that are significantly impacted by the diverted traffic.
1.6.a If concurrence from the required affected residents and/or property owners is
required, proceed to next step.
1.6.b If concurrence from the required affected residents and/or property owners is not
required, proceed to Step 1.8.
1.7. Approval of the Plan by Homeowners
1.7.a PWD, under certain circumstances, may elect to obtain concurrence from the
affected residents and/or property owners.
1.7.b PWD will mail out ballots to obtain concurrence of the affected residents and/or
property owners.
1.7.c If the location is within a municipality, that jurisdiction, in lieu of the concurrence from
the affected residents/property owners may elect to have their elected body vote on
the proposed traffic flow modification(s)/street closure(s) after a public hearing and
may submit the resolution to PWD requesting consideration of the proposed traffic
Traffic Flow Modification(s)/Street Closure(s) Procedure Page 13
T:\TFM\Street Closures\Procedure R4 01 09.doc
flow modification(s)/street closure(s).
1.7.d If the required number of affected residents and/or property owners as per Step 1.6
do not approve the proposed improvements by PWD, then the process ceases.
1.7.e If the residents and/or property owners desire to reinitiate the process, such process
can be reinitiated after ninety (90) calendar days from the previous opening date of
the ballots. However, the applicant will be charged with the mailing and processing
cost, which will be determined on a case-by-case basis.
1.8 Implementation of Temporary Traffic Calming Measures
1.8.a If the request for traffic flow modification(s)/street closure(s) falls within
unincorporated Miami-Dade County, PWD will implement the improvements as
funding and contracts are identified.
1.8.b If the request falls within a municipality, PWD will coordinate with the municipality
for the installation of the traffic calming devices.
1.9 Evaluation of Temporary Traffic Calming Measures:
If the evaluation of the temporary devices by PWD reveals that:
1.9.a The improvements implemented by PWD did not cause an adverse impact to traffic
and are acceptable to the residents and/or property owners, proceed to Step 1.10.
1.9.b The improvements implemented by PWD are unacceptable to the residents and/or
property owners, or create unexpected operational and/or safety concerns, then:
Either the removal of temporary devices are requested through the process as per
step 1.6, or a more restrictive traffic flow modification(s)/street closure(s) may be
considered as per Phase 2, Step 2.1.
1.10 Design of Permanent Traffic Calming Devices
1.10.a If the location falls within unincorporated Miami-Dade County, PWD will
develop construction plans for permanent traffic calming devices as funding and
contracts are identified.
1.10.b If the location falls within a municipality, PWD will coordinate the design of
permanent traffic calming devices with the municipality.
1.11 Installation of Permanent Traffic Calming Devices
1.11.a If the location falls within unincorporated Miami-Dade County, PWD will install
permanent traffic calming devices, as funding and contracts are identified.
1.11.b If the location falls within a municipality, PWD will coordinate the installation with
the municipality.
Traffic Flow Modification(s)/Street Closure(s) Procedure Page 14
T:\TFM\Street Closures\Procedure R4 01 09.doc
PHASE 2: TRAFFIC STUDY BY APPLICANT’S CONSULTANT
2.1. Applicant Engages a Traffic Consultant to Perform a Traffic Study
In the event that the action taken by PWD in accordance with Phase 1 procedures is
unacceptable to the municipal jurisdiction, or the residents and/or property owners, they
have the option of engaging a traffic consultant, at their cost, to conduct an independent
traffic study. Should the request be initiated through or by a municipality or the Florida
Department of Transportation, then these agencies, at their option, may conduct traffic
studies utilizing their staff or a traffic consultant.
2.1.a If the location falls within unincorporated Miami-Dade County, this study is
coordinated by PWD.
2.1.b If the location falls within a municipality, the study is coordinated by the municipality
and reviewed by the PWD.
2.2. Conduct Pre-implementation Traffic Study
The traffic consultant hired by the applicants shall perform a pre-implementation traffic
study. This study shall identify and confirm the applicant’s concerns (i.e., traffic intrusion,
excessive traffic volume, speeding, traffic accidents, etc.) and determine if the collected
traffic data meets PWD traffic calming criteria.
On a case-by-case basis, PWD, Traffic Engineering Division, may require the following
data depending on the type and complexity of the concerns:
2.2.a License Plate Survey: If the reason for the request is due to traffic intrusions, this
survey will be required for confirmation of cut-through traffic. Sampling during the
morning and afternoon peak hour periods will be considered adequate.
2.2.b Average Daily Traffic: If the reason for the request is due to an excessive amount
of traffic in the area, a sampling of twenty-four (24) will be acceptable, and forty eight
(48), or seventy-two (72) hour counts will be preferred.
2.2.c Speed Studies: If the reason for the request is due to speeding, then speed studies
are required to confirm vehicular speed. A speeding problem can be verified when
the 85th percentile speed of all vehicles is at least 10 mph greater than the posted
speed limit. A non-peak hour daytime minimum sampling of 100 vehicles will be
considered acceptable. A twenty-four (24) hour speed study utilizing traditional dual
hoses will be preferred.
2.2.d Traffic Accident History: If the reason for the request is due to traffic accidents,
then traffic accident reports for the last three (3) years are reviewed to confirm
accident history. The proposed traffic calming measure shall mitigate significant
crashes.
2.2.e Other data and/or studies as needed.
Traffic Flow Modification(s)/Street Closure(s) Procedure Page 15
T:\TFM\Street Closures\Procedure R4 01 09.doc
PWD, on a case-by-case basis, may require additional traffic data or studies if
needed.
2.2.f. If the pre-implementation study reveals that the traffic data does not support PWD
Policy for Traffic Calming Measures (Appendices I, II and III) then a final decision of
denial is rendered and the process ceases. PW D will notify the applicant of the
denial.
2.2.g If the pre-implementation study confirms that a problem exists and the traffic data
meets PWD Policy for Traffic Calming Measures (Appendices I, II and III), the
applicant may proceed to the next step.
2.3. Identify Traffic Calming Alternatives
The consultant shall adopt an area-wide systematic approach to the development of traffic
calming alternatives. This approach must work within the overall framework of the existing
roadway classification system and encourage community participation.
There are three (3) levels of traffic calming ranging from I to III to distinguish those least
restrictive (passive) traffic control measures from those that are most restrictive (active).
Among the categories, there could be many design variations unique to each device.
Ideally, the least restrictive measures to address traffic concerns should be employed first,
followed by more active and physical traffic calming devices. This incremental approach
allows a cost-effective opportunity to identify the real traffic problem, if any, and better
evaluate the impact of more restrictive measures.
Keeping the above-staged approach in mind and a handful of traffic calming alternatives
available for use on local roads, a typical request for a traffic flow modification(s)/street
closure(s) might proceed accordingly:
2.3.a The traffic consultant will assess the community’s needs.
2.3.b The consultant will generate staged alternative traffic calming plans, including design
plans for temporary and permanent traffic calming measures, for approval by PWD,
as well as cost estimates.
2.3.b.1 PWD will implement the lowest level of (Level I through Level III) traffic
control measures on a temporary basis that, in the consultant’s opinion, will
satisfy the applicant’s concerns.
2.3.b.2 Allow traffic to stabilize and reevaluate traffic patterns after six (6) months.
2.3.b.3 If Level I measures is selected and its impacts are unacceptable, then
proceed to Level II and reevaluate more restrictive traffic calming
alternatives. If Level II impacts are unacceptable, then proceed to Level III
and reevaluate.
2.3.b.4 If the impacts of Level I, II or III measure, so selected are acceptable, PWD
will implement permanent traffic control measures, as funding and
contracts are identified.
Traffic Flow Modification(s)/Street Closure(s) Procedure Page 16
T:\TFM\Street Closures\Procedure R4 01 09.doc
The following categories of traffic calming alternatives are most effective when used in
combination with each other:
LEVELS OF TRAFFIC CALMING
LEVEL I LEVEL II LEVEL III
Education
Neighborhood Speed Watch
Program
Law Enforcement
Movement Restrictions
One-Way Streets
Multi-Way Stop Control
Textured Pavement
Gateway Treatments
Border Landscaping Treatment
Chokers
Roundabouts
Traffic Circle
Speed Humps
Raised Median through
Intersections (Right Turn Only)
Mid-block Raised Islands/Medians
Semi Diverter
Diagonal Diverter
Street Closure
Speed Humps
The consultant shall also prepare a cost-estimate for the traffic calming alternatives identified
above and proceed to the next step for a pre-implementation study.
2.4. Perform Pre-implementation Study to Determine the Potential Impact of Traffic
Calming Measures on Roadways within and outside of the Study Area
The consultant shall conduct a pre-implementation study to determine the potential impact
of the proposed traffic calming devices/street closure(s), within and outside of the study area.
Depending on the type, complexity and requirements of the area in question, PWD may, on
a case-by-case basis, require analysis per Step 2.4.d and 2.4.e, which must conform to the
following criterion:
2.4.a Volume Criteria:
2.4.a.1 Future traffic volumes due to traffic diversion on any of the Residential
Local Streets may not exceed 1,500 vehicles per day (150 vehicles per
hour (VPH) during the peak hours) if a traffic flow modification(s)/street
closure is implemented. The threshold values define those limits when a
local residential street begins to lose its livability and are used for analysis
purposes only. They do not guarantee that the traffic flow modification(s)
or closure(s) will be approved.
2.4.a.2 Future traffic volumes due to traffic diversion on any of the Residential
Collector Streets may not exceed 3,000 vehicles per day (300 VPH during
the peak hours) if a traffic flow modification(s)/street closure(s) is
implemented. These threshold values define those limits when a
residential collector street begins to lose its livability and are used for
analysis purposes only. They do not guarantee that the traffic flow
modification(s) or closure(s) will be approved.
Traffic Flow Modification(s)/Street Closure(s) Procedure Page 17
T:\TFM\Street Closures\Procedure R4 01 09.doc
2.4.b Level of Service (LOS) Criteria:
2.4.b.l Future overall intersection Level of Service (LOS) must not exceed LOS
“D” or if operating at LOS "E" must not degrade to LOS "F".
2.4.b.2 The same criterion applies for an individual intersection approach within
the critical intersection approach.
2.4.b.3 If intersection or approach is already at LOS “F”, then diverted traffic
volumes must not be more than 10% of the existing traffic volumes without
diversion.
2.4.c Determine Affected Area:
The affected area may include, but is not limited to, those properties where normal
travel routes, to and from the affected area, are to be altered by the traffic flow
modification(s)/street closure(s) and/or properties that are significantly impacted by
the diverted traffic.
2.4.c.1 If the request for traffic flow modification(s)/street closure(s) falls
within unincorporated Miami-Dade County, PWD will establish affected
area boundaries on a case-by-case basis and obtain concurrence from
FDOT if their facilities are impacted.
2.4.c.2 If the request for traffic flow modification(s)/street closure(s) falls
within a municipality, both the City’s, and County’s staff will determine the
boundaries of the affected area on a case-by-case basis, and obtain
concurrence from the Florida Department of Transportation (FDOT), if their
facilities are impacted.
2.4.d Conduct Traffic Analysis within the Study Area:
For critical locations, if any, provide projection of the expected diverted traffic within
the study area. This will require the following steps:
2.4.d.1 Peak-hour turning movement counts (TMC).
2.4.d.2 Twenty-four (24), forty eight (48), or seventy-two (72), hour counts on those
streets that are proposed to be closed or modified.
2.4.d.3 Twenty-four (24), forty eight (48), or seventy-two (72) hour counts on those
streets that may be impacted by proposed traffic flow modification(s)/street
closure(s).
2.4.d.4 LOS analysis at critical locations that will be affected by redistributed traffic.
2.4.d.5 A schematic diagram for both morning and afternoon peak hours showing
existing and redistributed traffic and Average Daily Traffic (ADT).
Traffic Flow Modification(s)/Street Closure(s) Procedure Page 18
T:\TFM\Street Closures\Procedure R4 01 09.doc
2.4.e Conduct Traffic Analysis outside the Study Area
Projection of the expected diverted traffic at critical intersections, if any, adjacent to
and surrounding the affected area. Particular attention shall be paid to the impacts
on the State Highway System and County roadways, including:
2.4.e.1 Peak-hour TMC.
2.4.e.2 Queuing analysis and storage requirements at signalized
intersections.
2.4.e.3 LOS analysis at critical signalized and un-signalized existing intersections.
2.4.e.4 A schematic diagram showing the results of the TMC and ADT analyses for
critical locations.
2.4.e.5 Phasing modification requirements at existing signalized intersection.
2.4.e.6 A detailed evaluation of the impacts caused by the traffic flow
modification(s)/street closure(s) on emergency vehicle response times and
fire hydrant accessibility, as well as other services such as mail delivery,
school bus routing, transit service, trash pick-up, etc.
Each individual case w ill dictate which of the above items are
required, depending on the complexity and requirements of the study
area.
2.4.f The Report:
The consultant will document the study in the form of a report. PWD will require the
following items as part of this report:
• A drawing that shows the exact location of existing and proposed traffic flow
modification(s)/street closure(s).
• Boundary of the affected area.
• Critical intersection geometries.
• Analysis of the critical intersections and roadway links per Section 2.4.d and
2.4.e.
• Comparison of before and after LOS.
The consultant will indicate the optimum traffic calming measure from each of Levels
I, II and III, which adequately satisfies the applicant’s concern. The Level I measure
generally should be implemented first. However, depending on the severity of the
case at hand and/or unusual circumstances a higher level of measures can be
implemented. If the results are not satisfactory, then the next level measure will be
implemented until Level III is reached.
Traffic Flow Modification(s)/Street Closure(s) Procedure Page 19
T:\TFM\Street Closures\Procedure R4 01 09.doc
Any traffic study performed for traffic flow modification(s)/street closure(s) should be
compiled by the traffic consultant in the form of a formal report, signed and sealed
by a Florida Registered Professional Engineer.
If the location falls within unincorporated Miami-Dade County, the applicant
shall submit three (3) copies of the report to PWD, Traffic Engineering Division,
which, in turn, forwards a report to the FDOT if State facilities are impacted.
If the location falls within a municipality, applicant shall submit three (3) copies of
the report to the municipality, which in turn, forwards a report to PWD and the FDOT
if State facilities are impacted.
2.5 Is the Request within a Municipality?
2.5.a If the request for traffic flow modification(s)/street closure(s) falls within
unincorporated Miami-Dade County, PWD coordinates the review as per
Step 2.7.a.
2.5.b If request for traffic flow modification(s)/street closure(s) falls within a municipality,
PWD will request the affected entity to coordinate the review as per Step 2.7.b.
2.6 Is Review from Various Entities Required?
PWD will make the determination if the proposed traffic calming measures will impact other
user entities and if review is required from affected user entities, such as police, fire, etc.
If review is required, proceed to next step. If review is not required, proceed to Step 2.8.
2.7 Preliminary Review by Various Entities
2.7.a If the request for traffic flow modification(s)/street closure(s) falls within
unincorporated Miami-Dade County, then PWD, Traffic Engineering Division, shall
coordinate a review with agencies potentially affected by the traffic flow
modification(s)/street closure(s), which may include, but not be limited to, affected
Municipal Police and Fire Departments, MDFR, MDPD, MDP&Z, MDCPS, MDT,
FDOT.
2.7.a.1 PWD, Traffic Engineering Division, shall review all comments brought forth
by the aforementioned entities. If all agencies and departments concur,
then the Director of PWD will approve the application.
However, under the following conditions, the application for traffic flow
modification(s)/street closure(s) will be denied.
2.7.a.1.1 Comments made by any entity revealed concerns, which cannot
be resolved.
2.7.a.1.2 The proposed locations or extenuating circumstances do not
meet all criteria outlined under this process or applicable State
laws.
Traffic Flow Modification(s)/Street Closure(s) Procedure Page 20
T:\TFM\Street Closures\Procedure R4 01 09.doc
2.7.b If the request affects local streets within a municipality, then the municipality
coordinates review with other agencies potentially affected by the traffic flow
modification(s)/street closure(s), which may include, but not be limited to, affected
Municipal Fire and Police Departments, MDFR, MDPD, MDP&Z, MDCPS, MDT,
FDOT, PWD, Traffic Engineering Division.
2.7.b.1 The municipal representative shall review all comments brought forth by
the aforementioned entities. The municipality, under the following
conditions, shall deny the application for traffic flow modification(s)/street
closure(s):
2.7.b.1.1 Comments made by any entity revealed concerns, which cannot
be resolved.
2.7.b.1.2 The proposed locations or extenuating circumstances do not
meet all criteria outlined under this process or applicable State
laws.
2.7.c If the preliminary review performed by the various affected entities results in denial of
the request, the process ceases.
2.7.d If the preliminary review performed by the various affected entities results in
concurrence of the request, then the municipality endorses the request and forwards
it to PWD, Traffic Engineering Division.
These reviews shall be relevant to the agency reviewing the proposed traffic flow
modification(s)/street closure(s). The scope of the traffic review shall be determined
on a case-by-case basis by PWD.
2.8 Approval or Denial of the Request
2.8.a If the location falls within an unincorporated area, PWD makes the determination
on the traffic flow modification(s)/street closure(s).
2.8.a.1 If the traffic flow modification(s)/street closure(s) is denied by PWD, the
process ceases.
2.8.a.2 If the traffic flow modification(s)/street closure(s) is approved by PWD, then
proceed to the next step.
2.8.b If the location falls within a municipality, that entity makes recommendations on
traffic flow modification(s)/street closure(s).
2.8.b.1 If the municipality denies the traffic flow modification(s)/street closure(s),
the process ceases.
2.8.b.2 If the traffic flow modification(s)/street closure(s) is endorsed by the
municipality, the request is forwarded to PWD for review and approval.
Traffic Flow Modification(s)/Street Closure(s) Procedure Page 21
T:\TFM\Street Closures\Procedure R4 01 09.doc
2.9 Is Concurrence from the Affected Property Owners Required?
Depending on the traffic calming devices, PWD will determine if concurrence from the
affected residents and/or property owners is required.
Required Affected Residents and/or Property Owners:
Traffic Circles: Requires 100% concurrence of affected residents and/or property
owners from four (4) corners adjacent to the proposed circles. This may be extended to
the full block should a larger representation be desired by the District Commissioner.
Traffic Flow Modifications other than Traffic Circles: Requires concurrence of two-
thirds (2/3) of the affected residents and/or property owners, who elected to vote (ballots
received). Non-voters are not counted (ballots not returned).
Municipal Jurisdictions: In lieu of concurrence from the affected residents and/or
property owners, a municipality may pass a resolution after a public hearing requesting
PWD to consider the proposed traffic flow modification(s)/street closure(s).
2.9.a If concurrence of the affected residents and/or property owners is required, proceed
to the next step.
2.9.b If concurrence of the affected residents and/or property owners is not required,
proceed to Step 2.11.
2.10 Approval of Traffic Plan
As a result of the above-referenced steps, the affected residents and/or property owners
must support the traffic calming flow modifications derived. Residents (one per household)
must be either property or business owners, or tenant, within the affected area by the
proposed traffic flow modification(s)/street closure(s).
A public workshop, organized by the applicant’s traffic consultant, will be held and affected
residents and/or property owners and business owners will be invited to participate. The
purpose of the workshop will be to determine the proposed alternative(s) having the greatest
community support. The public workshop should include participation by the municipality,
PWD and FDOT officials.
2.10.a If the location is within unincorporated Miami-Dade County, PWD will mail out ballots
to obtain concurrence from the affected residents and/or property owners.
2.10.b If the location is within a municipality, and PWD is funding the installation of the
devices then the County shall mail out ballots to obtain concurrence from the
required affected residents and/or property owners.
2.10.c If the location is within a municipality, and that municipality is funding the installation
of the devices then such municipality shall mail out ballots to obtain concurrence
from the required affected residents and/or property owners. (see Appendices VII,
VIII and IX for sample ballots).
Traffic Flow Modification(s)/Street Closure(s) Procedure Page 22
T:\TFM\Street Closures\Procedure R4 01 09.doc
2.10.d A municipality, in lieu of the concurrence from affected residents and/or property
owners, may elect to have their elected body vote on the proposed traffic flow
modification(s)/street closure(s) after a public hearing and may submit the resolution
to PWD for review of the proposed traffic flow modification(s)/street closure(s).
2.10.e If the required number of affected residents and/or property owners do not approve
the proposed improvements, then the process ceases.
2.10.f If the residents and/or property owners desire to reinitiate the process, such process
can be reinitiated after ninety (90) calendar days from the previous opening date of
the ballots. However, the applicant will be charged with the mailing and processing
cost, which will be determined on a case-by-case basis.
2.10.g If the request for traffic flow modification(s)/street closure(s) falls within
unincorporated Miami-Dade County, then the applicant agrees to pay for all costs
directly associated with the traffic flow modification(s)/street closure(s) beyond the
installation of signs and markings.
2.10.h If the request affects local streets within a municipality, then determination will
be made by the local entity and either the applicant or the municipality will share the
costs directly associated with the traffic flow modification(s)/street closure(s) beyond
the installation of signs and markings.
2.10.i Depending on the complexity of the traffic flow modification(s)/street closure(s),
PWD may direct the Citizens Transportation Advisory Committee (CTAC),
Transportation Planning Technical Advisory Committee (TPTAC), or MPO, to provide
input prior to the final recommendations by PWD.
2.10.j If CTAC, TPTAC or MPO technical reviews recommend against the proposed traffic
calming alternative(s), then that decision will be final.
2.10.k If the location falls within unincorporated Miami-Dade County, then PWD will
notify the applicant of the approval or denial of the traffic flow modification(s)/street
closure(s) request.
2.10.l If the location falls within a municipality, then PWD will notify the applicant and
the municipality, of the approval or denial of the traffic flow modification(s)/street
closure(s) request.
2.10.m If the required number of the affected residents and/or property owners does not
approve the proposed improvements, then the process ceases.
2.10.k If the residents and/or property owners desire to reinitiate the process, such process
can be reinitiated after ninety (90) calendar days from the previous opening date of
the ballots. However, the applicant will be charged with the mailing and processing
cost, which will be determined on a case-by-case basis.
2.10.l If the required number of the affected residents and/or property owners concur with
the traffic flow modification(s)/street closure(s) plan approved by PWD, proceed to
Step 2.11.
Traffic Flow Modification(s)/Street Closure(s) Procedure Page 23
T:\TFM\Street Closures\Procedure R4 01 09.doc
2.11 Installation of Temporary Traffic Calming Devices
2.11.a The applicant’s consultant develops a plan for the temporary and permanent traffic
flow modification(s)/street closure(s).
2.11.b If the jurisdiction falls within unincorporated Miami-Dade County, then the
applicant submits construction plans to PWD, Traffic Engineering Division, for
approval of the temporary traffic flow modification(s)/street closure(s), including all
signs and markings.
2.11.c If the jurisdiction falls within a municipality, then the applicant submits
construction plans to the municipality for approval of the temporary traffic flow
modification(s)/street closure(s) including all signs and markings.
2.11.d Municipality forwards plans to PWD, Traffic Engineering Division, for traffic
engineering review and approval.
2.11.e Applicant engages a contractor to install temporary traffic control devices, which will
be allowed only for a 90-day trial period.
2.11.f At the expiration of the 90-day trial period, the applicant shall remove the temporary
traffic calming devices, unless the Director of the Public Works Department grants
an extension, or constructs permanent devices.
2.12 Conduct Post-implementation Study to Assess if the Impact of Implemented Devices
are Acceptable
Once the temporary traffic calming devices are implemented, they need to be evaluated prior
to the installation of the permanent traffic calming devices.
2.12.a Applicant requests traffic consultant to collect traffic data after the traffic pattern has
been established over a period of thirty (30) days and shall be completed within the
remaining sixty (60) days.
2.12.b Traffic consultant analyzes the data and submits reports either to PWD or the
municipality, whichever has jurisdiction.
2.13 Post-impact Analysis Results
If the study reveals that the impact of the temporary traffic control devices are unacceptable,
then the consultant shall go back to Step 2.3 to identify more restrictive traffic calming
alternatives.
If it is determined that the temporary traffic control devices are ineffective, then the request
for permanent installation shall be denied and the applicant shall direct the contractor to
remove the temporary traffic control devices at the expiration of the 90-day trial
Traffic Flow Modification(s)/Street Closure(s) Procedure Page 24
T:\TFM\Street Closures\Procedure R4 01 09.doc
period.
2.13.a If the location falls within unincorporated Miami-Dade County, then PWD will
notify the applicant of the approval or denial of the permanent traffic flow
modification(s)/street closure(s).
2.13.b If the location falls within a municipality, and if the request is initiated by the
municipality, then PWD will notify the municipality. The municipality, in turn, will notify
the applicant of the approval or denial of the permanent traffic flow
modification(s)/street closure(s).
If the study reveals no adverse impacts and temporary devices are acceptable, then
proceed to Step 2.14.
2.14 Design of Permanent Traffic Control Devices
2.14.a If the location falls within unincorporated Miami-Dade County, then
construction plans are prepared by the applicant’s consultant and are submitted to
PWD for approval of the permanent traffic flow modifications or street closures,
including all signs and markings.
2.14.b If the location falls within a municipality, then construction plans are prepared
by the applicant’s consultant and are submitted to a municipality for approval of the
permanent traffic flow modifications or street closures, including all signs and
markings. The municipality shall then forward plans to PWD, Traffic Engineering
Division, for traffic engineering review and approval.
2.15 Installation of Permanent Traffic Calming Devices
Applicant directs private contractor(s) to install permanent closure, at their expense, upon
obtaining necessary approvals and permits from the appropriate agencies.
In situations where a traffic flow modification(s)/street closure(s) in one municipality affects
an adjacent municipality, then both municipalities shall mutually agree to such
modification(s).
Miami-Dade County has the sole discretion, subject to all applicable laws, to approve,
modify, remove, continue or deny any traffic flow modification(s)/street closure(s) request
regardless of any support or lack thereof via the petition process. The approval or denial
issued by the Director of PWD for a traffic flow modification(s)/street closure(s) is final.
Traffic Flow Modification(s)/Street Closure(s) Procedure Page 25
T:\TFM\Street Closures\Procedure R4 01 09.doc
APPENDICES
Traffic Flow Modification(s)/Street Closure(s) Procedure Page 26
T:\TFM\Street Closures\Procedure R4 01 09.doc
APPENDIX 1
Public Works Department – Traffic Engineering Division
Policy on Traffic Calming Measures
Must meet the first criteria and at least one of the remaining criteria in order for the Public Works
Department to consider traffic calming measures:
Criterion Residential
Local Streets
Residential
Collector Streets
Minimum Traffic Volume >1,500 VPD <3000*** >3,000 VPD <8,000***
>150 VPH <300*** >300 VPH <800
85th Percentile Speed+ 10 MPH> Speed Limit 10 MPH> Speed Limit
Correctable
Accidents per year >3 per year >6 per year
Cut Through Traffic during
the a.m. or p.m. peak hour >25% >50%
Pedestrian Crossing Volume
during the a.m. or p.m. peak
hour
>25 >50
Concurrence from affected
residents/property owners.* 2/3 of returned ballots** 2/3 of returned ballots **
VPD = Vehicles per day;
VPH = Vehicles per hour
+ It is the speed at which 85% of motorists travel.
* Affected residents/property owners to be determined on a case by case basis.
** For traffic circle 100% concurrence from adjacent affected residents and or property
owners is required.
Municipal Jurisdictions: In lieu of concurrence a resolution is acceptable from municipalities.
*** The traffic volume within a municipal boundary could be reduced by a total of 30%,
and speed by 50% at the request of and for those municipalities, which provide
funding for their traffic calming program.
Traffic Flow Modification(s)/Street Closure(s) Procedure Page 27
T:\TFM\Street Closures\Procedure R4 01 09.doc
APPENDIX II
POLICY ON TRAFFIC CALMING DEVICES FOR LOW VOLUME NARROW STREET
General Requirements:
• The street must be a local residential street.
• The street width must be less than 20 feet.
• The posted speed limit must be 30 mph or greater.
• The street is not on an emergency vehicle route.
• The street is not on a school bus route.
• The street must not be on a curve.
• The proposed TCD will have no adverse effect on pedestrians, bicycle safety or drainage.
• The street does not have any sidewalks.
Criteria: The Street must meet the first criteria and any one of the other criteria:
• 85th percentile speed must be 5 mph over the posted speed limit,
• Traffic volume shall not be less than 500 vehicles per day or more than 1000 vehicles per
day.
• Cut-through traffic must be over 25%.
• Pedestrian volume must be over 15 pedestrians per hour.
• Two or more correctable-type accidents per year.
OR
• 85th percentile speed must be greater than or equal to posted speed limit.
• Cut-through traffic must be greater than or equal to 40%.
• Traffic volume shall not be less than 500 vehicles per day or more than 1000 vehicles per
day.
• Pedestrian volume must be over 15 pedestrians per hour.
• Two or more correctable-type accidents per year.
Traffic Flow Modification(s)/Street Closure(s) Procedure Page 28
T:\TFM\Street Closures\Procedure R4 01 09.doc
APPENDIX III
POLICY ON SPEED HUMPS
PURPOSE: The purpose of this policy is to provide guidelines for the installation of speed humps
along local residential streets within Miami-Dade County.
POLICY: Speed humps will be considered, on a case-by-case basis, and only on local
residential streets, which meet the following criterion:
CRITERION:
• The street must be a local residential street. Speed hump shall not be
constructed on collector and arterial roadways.
• The street shall not have more than one traffic lane in each direction.
• The street must be at least 750 feet long, with no intersecting roadways in
between.
• Traffic volumes on the street must equal or exceed 750 vehicles per day.
• The street is posted at or has a speed limit of 30 MPH or less.
• The traffic engineering study has determined that the 85th percentile speed on
the street is at least 10 MPH over the speed limit.
• The speed humps will not be considered within 250 feet of a traffic signal, within
50 feet of an intersection, in front of a driveway, within an intersection or adjacent
to fire hydrants.
• The speed humps will not be considered in, or on the approaches to, a horizontal
or a vertical curve where visibility of the hump is restricted.
• The street should not be located along an emergency response route, regional
transit or school bus route and must be approved by the respective agencies for
the installation of speed humps.
• Installation of these devices shall not cause the traffic to divert to other
neighborhood streets.
• 2/3 of the residents/property owners of the block(s) concur with the installation of
the speed hump.
• The District Commissioner approves the use of PTP funding for the installation.
Traffic Flow Modification(s)/Street Closure(s) Procedure Page 29
T:\TFM\Street Closures\Procedure R4 01 09.doc
APPENDIX IV
REPORT ON SPEED HUMPS
Traffic Flow Modification(s)/Street Closure(s) Procedure Page 30
T:\TFM\Street Closures\Procedure R4 01 09.doc
Traffic Flow Modification(s)/Street Closure(s) Procedure Page 31
T:\TFM\Street Closures\Procedure R4 01 09.doc
Traffic Flow Modification(s)/Street Closure(s) Procedure Page 32
T:\TFM\Street Closures\Procedure R4 01 09.doc
Traffic Flow Modification(s)/Street Closure(s) Procedure Page 33
T:\TFM\Street Closures\Procedure R4 01 09.doc
Traffic Flow Modification(s)/Street Closure(s) Procedure Page 34
T:\TFM\Street Closures\Procedure R4 01 09.doc
APPENDIX V
Traffic Flow Modification/Street Closure
Applicant Form
Applicant: ___________________________________ Date: __________________________
Contact Name: ________________________________ Phone: ________________________
Local Address:
_________________________________________________________________________
Location:
_________________________________________________________________________
1.a.1 Rank your neighborhood’s traffic problems and provide a brief description of each (for
instance, time when the problem is most serious, or specific issue, such as a pothole).
( ) Traffic intrusion____________________________________________________
( ) Excessive traffic volume_____________________________________________
( ) Speeding________________________________________________________
( ) Accidents________________________________________________________
( ) Other (please explain) ______________________________________________
________________________________________________________________
1.a.2 How long have these problems existed? What conditions have caused these problems?
______________________________________________________________________
______________________________________________________________________
1.a.3 Please check the type of action requested.
( ) Traffic Circle
( ) Median Treatment
( ) Street Closure
( ) Special Taxing District
( ) Reverting the right-of-way
( ) Other (please specify)_______________________________________________
________________________________________________________________
List locations where traffic flow modification(s)/street closure(s) is requested and provide
an area map identifying these devices________________________________________
______________________________________________________________________
Traffic Flow Modification(s)/Street Closure(s) Procedure Page 35
T:\TFM\Street Closures\Procedure R4 01 09.doc
1.a.4 This request is made on behalf of homeowners by:
( ) Homeowners Association
( ) Individual
( ) Other (please specify)
______________________________________________
1.a.5 Please return the completed application form to:
Chief, Traffic Engineering Division
Miami-Dade County Public Works Department
111 N.W. First Street, Suite 1510
Miami, Florida 33128-1970
For Office Use Only
Project Number _____________________________ Date Application Received: ____________
Date Preliminary Analysis Completed ______________ Identified Problems: ( ) Exist ( ) Perceived
Date of First Neighborhood Workshop ______________ Traffic Team: ( ) Yes ( ) No
Director Action: ( ) Favorable ( ) Unfavorable Consensus Reached: ( ) Yes ( ) No
Date of Project Implementation _______________________
Project Review Date: _______________________________ Project Successful: ( ) Yes ( ) No
Traffic Flow Modification(s)/Street Closure(s) Procedure Page 36
T:\TFM\Street Closures\Procedure R4 01 09.doc
APPENDIX VI
Traffic Flow Modification/Street Closure
Interdepartmental Review
To: Director, Public Works Department
111 N.W. 1st Street, Suite 1610
Miami, Florida 33128-1970
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
We have reviewed this request and based on the reasoning stated above, we recommend the
following action:
( ) Request Approved ( ) Request Denied
Signature: ____________________________ Date: ___________________
Print Name: _____________________________________________________
Reviewing Agency: _______________________________________________
Address: ________________________________________________________
________________________________________________________
Please attach additional sheets as necessary.
Traffic Flow Modification(s)/Street Closure(s) Procedure Page 37
T:\TFM\Street Closures\Procedure R4 01 09.doc
APPENDIX VII
Sample Ballot 1: Traffic Circles, PWD Use
February 1, 2008
Mr. & Mrs.
0000 SW 00 Street
Miami, Florida 33143-5952
Dear Mr. & Mrs.
OFFICIAL NEIGHBORHOOD TRAFFIC CALMING
RESIDENT AND/OR PROPERTY OWNER BALLOT
The Miami-Dade County Public Works Department (PWD) has completed a traffic study at NW 10 Avenue
and NW 50 Street. As a result of this study, a traffic circle is being proposed for the intersection of NW 10
Avenue and NW 50 Street. (See attached sketch)
Should 100% of the residents and/or property owners adjacent to the proposed traffic circle concur with the
proposed improvement, the PWD will proceed with the installation of this device, at no cost to the residents
and/or property owners.
In the event that 100% of these residents and/or property owners fail to reach a consensus, PWD will not
pursue this matter any further.
Please read through the ballot, check the appropriate box, complete the pertinent information and return this
original ballot to PWD no later than Friday, February 29, 2008. A self-addressed return envelope with pre-
paid postage is enclosed for your convenience. All subm itted ballots (one ballot per lot) must be original,
completed in ink.
Ballot:
I, the undersigned resident and/or property owner do hereby indicate my preference by checking the
appropriate box, FOR or AGAINST the installation of the proposed traffic circle at the intersection of NW 10
Avenue and NW 50 Street.
FOR AGAINST
Signature Property Address
Print Name
Phone Number Date
Your presence is welcome at the opening and tabulation of the received ballot envelopes on Friday, March 7,
2008, at 10:00 a.m., at the Stephen P. Clark Center, 111 NW 1st Street, 15th floor, rear conference room.
Should you have any questions or require additional information, please contact Mr. Muhammed M.
Hasan, P.E., Chief, Traffic Engineering Division, at (305) 375-2030.
Traffic Flow Modification(s)/Street Closure(s) Procedure Page 38
T:\TFM\Street Closures\Procedure R4 01 09.doc
APPENDIX VIII
Sample Ballot 2: Traffic Calming Devices, PWD Use
November 18, 2007
Mr. & Mrs.
0000 SW 00 Street
Miami, Florida 33143-5952
Dear Mr. & Mrs.
OFFICIAL NEIGHBORHOOD TRAFFIC CALMING
RESIDENT AND/OR PROPERTY OWNER BALLOT
The Miami-Dade County Public Works Department (PWD) in response to the request from the residents is
proposing to construct a median diverter along SW 74 Street west of SW 52 Avenue in order to enforce the
existing right turn restriction (See attached sketch).
Should two-thirds (2/3) of the affected residents and/or property owners concur with the proposed median
diverter, PWD will proceed with the installation of this device at no cost to the residents and/or property
owners, upon securing funding from the District Commissioner.
In the event that two-thirds (2/3) of these residents and/or property owners fail to reach consensus, PWD will
not pursue this matter any further.
Please read through the ballot, check the appropriate box, complete the pertinent information, and return this
original ballot to PWD no later than Friday, December 7, 2007. A self-addressed return envelope with pre-
paid postage is enclosed for your convenience. All submitted ballots (one ballot per lot) must be original and
completed in ink.
Ballot:
I, the undersigned resident and/or property owner do hereby indicate my preference by checking the
appropriate box FOR or AGAINST the installation of the proposed median diverter along SW 74 Street west
of SW 52 Avenue.
FOR AGAINST
Signature Property Address
Print Name
Phone Number Date
Your presence is welcomed at the opening and tabulation of the received ballot envelopes on Friday,
December 14, 2007, at 10:00 a.m., at the Stephen P. Clark Center, 111 NW 1st Street, 15th floor, rear
conference room. Should you have any questions or require additional information, please
contact Mr. Muhammed M. Hasan, P.E., Chief, Traffic Engineering Division, at (305) 375-2030.
Traffic Flow Modification(s)/Street Closure(s) Procedure Page 39
T:\TFM\Street Closures\Procedure R4 01 09.doc
APPENDIX IX
Sample Ballot 3: Residents/Property Owners and HOA Use
OFFICIAL NEIGHBORHOOD TRAFFIC CALMING
RESIDENTS’ AND/OR PROPERTY OWNERS’ BALLOT
The Miami-Dade County Public Works Department (PWD), in response to the request for street
closures, is proposing half closures at NE 88 St and NE 90 Street east of NE 10 Avenue that will
prevent vehicles from entering NE 88 Street and NE 90 Street from NE 10 Avenue (See attached
sketch). Please note that initially the half closures will be constructed using signs, plastic batons
and pavement markings in order to receive input from the residents and make any needed
adjustments to the design. It will be revaluated after ninety (90) days. Subsequently, should this
device be acceptable to all parties involved, it will be made permanent utilizing concrete curb and
gutter.
Should two-thirds (2/3) of the affected residents and/or property owners concur with the proposed
half closures, PWD will proceed with the installation of these devices.
All submitted ballots (one ballot per lot) must be original and completed in ink.
Ballot:
We, the undersigned resident and/or property owner do hereby indicate our preference by checking
the appropriate box FOR or AGAINST the installation of the proposed half closure along NE 88 St
and NE 90 Street east of NE 10 Avenue.
Name:
Address:
Signature: FOR AGAINST
Name:
Address:
Signature: FOR AGAINST
Name:
Address:
Signature: FOR AGAINST
Name:
Address:
Signature: FOR AGAINST
Name:
Address:
Signature: FOR AGAINST