Loading...
RC-19-518 (4)44 Nly Certificate of Completion Val Miami Shores Village 1OO50NE2ndAve, Miami Shores, Florida 33138 Tel: 3O5795-2204Fax: 305750-8972 Building Inspection Department Description: INTERIOR RENOVATION 0FKITCHEN AND LAUNDYROOM Permit Type Building (Residential) Bldg. Permit No. RC-03'10-518 Owner ROBB|E&KARLASINGER Contractor |FYD8AFLORIDA BUILDING PERFORMANCE Subdivision/Project Date Issued 0905/2019 ConstruutionTxpe t-B Occupancy Single Family Type Square Footage 37000 Flood Zone X Location |fthe building ialocated inospecial flood hazard area documentation nfthe as -built lowest floor 79NE91STST elevation or lowest horizontal structural member has been provided and is retained in the records of Miami Shores, FL33138 K4iamiShoreaVi||ag* This certificate issued pursuant to the requirements of the Florida Building Code certifying that at the time of issuance this structure was in compliance with the various ordinances of the jurisdiction ORE regulating building construction oruse. //3 1 2, Building Officials Approval Ismael Naranjo, 000 ES I RID Not Transferable .� POST IN A CONSPICUOUS PLACE SNORES ! Miami Shores Village :Ffl ! m� Building Department R ` 10050 NE 2 Ave Miami Shores FL 33138 FLORID INSPECTION REQUESTS: (305)762-4949 or log on at https://bldg.msvfl.gov/energov-prod/selfservice Requests must be received by 3:30pm WORK IS ALLOWED: MONDAY TN ROUGH FRIDAY, 8:00AM - 7:OOPM SATURDAY 8:OOAM - 6:OOPM. NO WORK IS ALLOWED ON SUNDAY OR HOLIDAYS BUILDING AND ROOFING INSPECTIONS ARE DONE MONDAY THROUGH FRIDAY NO INSPECTION WILL BE MADE UNLESS THE PERMIT CARD IS DISPLAYED AND HAS BEEN APPROVED . PLANS ARE READILY AVAILABLE. IT IS THE PERMIT APPLICANT'S RESPONSIBILITY TO ENSURE THAT WORK IS ACCESSIBLE AND EXPOSED FOR INSPECTION PURPOSES. NEITHER THE BUILDING OFFICIAL NOR THE CITY SHALL BE LIABLE FOR EXPENSE ENTAILED IN THE REMOVAL OR REPLACEMENT OF ANY MATERIAL REQUIRED TO ALLOW INSPECTION . POST ON SITE 1132060130130 Owner's Narne: ROBBIE & KARLA SINGER Owner's Phone: Job Address: 79 NE 91 ST ST Total Square Feet: 370 Miami Shores, FL 33138 dotal Job Valuation: $ 108,000.00 Contractor(s) Phone Address HABIFY DBA FLORIDA BUILDING PERF( (305)443-4900 , FL Description: INTERIOR RENOVATION OF -KITCHEN AND LAUNDY ROOM .�,.clQ/ �-�-fG✓.I � ��/ � � C� v..r eti� U�.cs c9-�-� ti4_0-'9 SQL -744PO - - Ile G-J L WARMING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE COMMENCING WORK OR RECORDING YOUR NOTICE OF COMMENCEMENT. Page 1 of 1 INSPECTION RECOR[�' STRUCTURAL INSPECTION DATE INSP Foundation Stemwall Slab Columns (1st Lift) Columns (2nd Lift) Tie Beam - Truss/Rafters c Roof Sheathing Bucks Interior Framing Insulation , Ceiling Grid Drywall Firewall Wire Lath Pool Steel Pool Deck Final Pool Final Fence Screen Enclosure Driveway Driveway Base Tin Cap In -Progress Roof Installation Roofing Final Shutters Attachment Final Shutters Rails and Guardrails ADA compliance DOCUMENTS Soil Bearing Cert Soil Treatment Cert Floor Elevation Survey Reinf Unit Mas Cert Insulation Certificate Spot Survey Final Survey Truss Certification STRUCTURAL COMMENTS WINDOWSDOORS INSPECTION TE INSP Attachment v INSPECTION WORKSPUBLIC DATE INSP Excavation ELECTRICAL INSPECTION DATE INSP Temporary Pale 30 Day Temporary Pool Bonding Pool Deck Bonding Pool Wet Niche Underground Footer Ground Slab Wall Rough y Ceiling Rough Z Rough L Telephone Rough Telephone Final TV Rough TV Final Cable Rough Cable Final Intercom Rough Intercom Final Alarm Rough Alarm Final Fire Alarm Rough Fire Alarm Final Service Work With ELECTRICAL COMMENTS INSPECTION DATE INSP Final Sprinkler Final Alarm INSPECTION PLUMBING DATE INSP Rough Water Service 2,d Rough Top Out Fire Sprinklers Septic Tank Sewer Hook-up Roof Drains Gas n -' LP Tank Well Lawn Sprinklers Main Drain Pool Piping Backflow Preventor Interceptor Catch Basins Condensate Drains HRS Final f' PLUMBING COMMENTS MECHANICAL INSPECTION DATE INSP Underground Pipe /T Rough SIX Ventilation Rough Hood Rough Pressure Test Final Hood Final Ventilation Final Pool Heater Final Vacuum MECHANICAL COMMENTS