Loading...
CC-01-23-37 Architect Ltr 9705 NE 2 Ave�,7_5 redesign, studoa .architecture + interiors Mr. Ismael Naranjo Miami Shores Village Building Dept. 10050 NE 211 Ave. Miami Shores, FL 33138 Re: 9703 N E 211 Ave. — Permit # CC-01-23-37 10 Feb 2023 Dear Mr. Naranjo, This letter is to certify that the framing at 9703 NE 2nd Avenue was visually inspected prior to construction. There was no evidence of damage either from termites or moisture. I also certify that the construction of all portions of the new 2-hr, fire -rated ceiling at 9703 NE 2nd Avenue has been constructed in accordance with the filed plans and specifications as submitted to your office, the Miami -Dade Building Department and the Miami -Dade Fire Department and, is built according to the 2020 Florida Building Code and current NPFA standards. The 2-hr fire - rated ceiling was then installed as specified by detail UL511 on Sheet A-3. Please see attached photo documentation. Sincerely, Digitally signed by Kimberley Flower DN: cn=Kimberley Flower, o=re:designstudio,p.a., ou, email=flowerk@redesignstud io.net, c=US Date: 2023.02.11 13:24:10-05'00' Kimberley Flower, FL RA#94059, NCARB, LEED-AP Photos of 9703 NE 211 Ave — February 2023 First layer of drywall screw spacing Existing Joists in good condition — no termite or moisture damage Digitally signed by Kimberley Flower • DN: cn=Kimberley Flower, _ o=re:designstudio,p.a., ou, email=flowerk@redesignstudio.net c=US Date: 2023.02.11 13:24:51-05'00' First layer of 5/8" Type X drywall being installed with Staggered joints Photos of 9703 NE 2"d Ave — February 2023 I Resilient channels fastened to VY layer of drywall Digitally signed by Kimberley Flower DN: cn=Kimberley Flower, o=re:designstudio,p.a., ou, email=flowerk@redesignstudio.ne t, c=US Date: 2023.02.11 13:25:17-05'00' 2"d layer of 5/8" Type X drywall being installed perpendicular to resilient channel and with staggered joints