Loading...
RC-08-22-2106 Compliance Ltr 74 NW 108 StRCD1i E N G I N E E R I N G RDG Engineering, Inc. Ryan Goolabsingh, P.E. Florida CA #32850 951 Brickell Avenue, #3605 Miami, FL 33131 February 6, 2023 Contractor: Solar Construction LLC Phone: 954-228-4902 Project: Cory Mullinare 74 NW 108 St, RC -• O `1$ — Z 2 -- Z N O (o Miami Shores, FL 33168 System: Solar PV System RE: Joist Penetration Compliance Letter To whom it may concern: The solar panel system for the above referenced project was visually observed. Per coordination, the mount and panel layout had to be revised due to the existing roof joist orientation. The plans were updated and the calculations were revised. The observed components included the 5/16" diameter anchor bolts, which were installed into the roof trusses, and the mounting hardware. Based on our visual observation, we find that the components noted above to be in general conformance with the contract documents and do not have any objections. GOQ Regards �.. • ;.►�NsF ' ryGz I No. 82345 02/06/2023 STATE OF RyUGoolabsin ''�LaRfn�. •'�'�