Loading...
RC-09-22-2275 Engineering Ltrs 10560 NE 2 CtGEOTECHNICAL I ENVIRONMENTAL I MATERIALS TESTING I ASBESTOS I ROOF TESTING I INSPECTION SERVICES I DRILLING SERVICES 1 . , DY�NATECH ENGINEERING CORP. WWWDYNATECHENGINEERING,COM ti, ,VF E f-, I I '17 0 CLIENT: luan VaZqU07. INVOICE 95518 PINECREST GROUP INC. PHONE: 786-3167-9200 18672 SW 93 Court Cutler Bay. FL-'33 157-7952 FAX: PROJECT.- Proposed Addition ALT PHONE JOB ADDRESS: 10560 NE 2 Court E-MAIL: pinecrestgroup,,c bells — Miami Shores, FL 331 138 j�r - Oq - ?? - Z?7-15 Service Description Qty Amount I >t ()tic Pr,rtc I c`t ami rke 1)cnsil) 'I est for Underslab on 300.00 No�cwhcr IT 2c1l.2-1 J r, Total $300.00 750 WEST 84TH STREET, HIALEAH, FL 33014 PHONE (305) 828-7499 FAX (305) 828-9598 EMAIL:INPO(dDYNATECHENGINEERING,COM GEOTECHNICAL I ENVIRONMENTAL I MATERIALS TESTING I ASBESTOS I ROOF TESTING I INSPECTION SERVICES 1 DRILL114G SERVICES t; o�c DYNATECH ENGINEERING CORP. WWW.IDYNATECHENGINEERING.CC)I'%*I Miami, November 17,2022 GROUP, INC. 18672SW Q.3`� Colirt Proiro.wd Addition (i-" 10560 NE 2"" Court Nfiarni Shores. Ft. ' )3 138 Dear Mr. Vazquez: Pursuant to your request, Dynatech 14'noincerincy Corp. (DEC) performed a Compaction Test on November 17, 2022 at the above referenced prqject. DEC was authorized to perfonn a compaction test only, The purpose; of our test \vas to determine the degree of compaction of the tested layer of material only. In no way shall a compaction test replace a demucking inspection, soil bearing capacity determination, or a pad certification. A soil boring test must be performed by client if not yet done, prior to construction to verify subsoil conditions. Underlying soils below test levels must be verified to prevent future settlements. (DEC) was not authorized to perf'orin supervision and certification of the building; pad preparation. This is not a pad certification. 0or report,-, ii'mst be provided to all involved parties for their approval. 0n- I-Andings are relative to the (late and areas of our site work and should not be relied upon to 1,1101'eWill. on other areas or dates. Any subsequent site disturbances due to water s .,tonn atitters discharoing at footing ' construction activities. excavations, must be re - traffic and other disturbances will void this test and the site n confsacted and re -tested prior to construction. t'nviroamental analysis of the soil materials is not part of the scope of services. If environmental analysis of the soils is required, we can provide a proposal for performing an environmental analysis of the soil materials. No other analysis is implied or war -ranted. As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for use, publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval. Enclosed find copies of the compaction test re-AdtS. It has been a pleasure working with you and look for %vard to do so in the near ftiture. Sincerely Yours, L&A V,nNYSsan i1. 1) f)YNA'J-I'.,"Cl I F.NUlN1:.`.HRlNG CORP -is p No. 757 .ertiiicate o I'A Ulliorization No.: CA 5491 E % Z' No.39584 :a STATE OF 144 % a- R I GECITECH N ICA.L. ; ENVIRONMENTAL l MATERIALS TESTING 1 ASBESTOS I ROOF TESTING I INSPECTION SERVICES l DRILLING SERVICES _DEC DYNATECH ENGINEERING CORP. MOIST"URE-DENSITY .RELATIONS OF SOILS PROCTOR COMPACTION TEST DATE: November 17, 2022 CLIENT: PINE('1ZI ST GR0U;P. INC. 1lai-71�1:45: 10560 NI: "' Court. Vliami Shores. FL, l '4�"I`R.- C C OIZ: 111ttecrest (iroul). Inc. - .i" '�I�;`�;(';;1E'"C C(3N: Tan send .'. vI PI. LD BY: W D TESTED BY: WD 'ITEST RESULTS Sample Number 1 17he following compaction test was conducted in accordance with the Standard Methods for Moisture Density Relations of soil using a 10 lb. Hammer and an 18" drop AS'UM D-1557. % MOISTURE DRY DENSITY 5.6 100,1 6.7 103.8 7.4 105.1 108 11.1 104.8 106 104 10639 lbs.isu.fil 102 sicve 96 Ycrccn4 100 98 Sampled By w-D rested By: u'D Checked By W1ti ,',1,tt� 10 14 .•���yQ jC•EHS '` Respectively submitte , As a mutual protection to clicm, the public and ourselves_ all report, N, are submitted as the contsdcnliai property of clicnts, and authorir311011 = �; . No_ 39554 .• � for use:, publication u1'statemcnts, convlutsions or rxtracts frdml or regardutg* r ISSam N�inani, �PE. our repurt_s is reserved pending our urn wn approval. _ * g7YNATECH ENGINEERING CORP. ,p STATE OF = Florida Reg. No. 39584 r 4� Certificate of Authorization No.: CA 5491 OR 110 ;, S/r r INA D R Y D E N S 1 Y 2 G Y�:OJ'kiCHNI AI„ 1 EN'v tRONII-1EN`t'AL ; MATEM A.L.S TESTING I A-98ESTOS I HOOF TESTING I INSPECTION SERVICES DRILLING SERVICES ,.tow �1 '0 U E Cl °NATECH ENGINEERING CORP. pi tRIWW.r%YNATr—'CHENGINEERING.COM FIELD DENSITY TEST OF COMPACTED SOILS DATE: November 17 CLIENT: PINECItES`l' GROUP. INC. PROJECT: Proposed Addition ADDRESS: 10560 NE 2nd Court. Miami Spores, FL CONTRACTOR: Pinecrest Grot.tp. Inc.. Test No. I Location: Last side of south addition underslab I-esi No. ? L.ocatlon: Center of'south addition undersl i est No. 3 LocationWest side of south addition underslab 1,octttioll: East side ol`south addition underslab Ioocc dll ,n: West side ol'south addition underslab 1 cl'iptuon of Material: Tan sand TEST NO. 1 ? 3 4 5 DEPTIJ 12" 12,' 12" 12„ 12" FIELD DENSITY 1052 104.9 105.6 105.3 105.8 MOISTURE CONTENT 7.1 6.8 7.4 7,1 7.7 MAX. DENSITY IN 'I'I-IE FIELD % 98.4 98.1 98.8 98,5 99.0 COMPACTION REQUIREMENTS % OF MAXIMUM 98% 98% 98�'r'o 98% 98% 100% MAXIMUM DF..NSITY (LAB) 106.9 106,9 106.9 106.9 106.9 RF MARKS: ALL . \ B 0 V E TEST R FISULTS C0N4P1.;Y WITH COMPACTI ON RE UIREMENTS I'i. ,... ruotc t :,s nt3t a jtacl cur ii i <ttitu . ,1 soil horing Inttst ; e herlornic l to detcr nilw subsoil conditions below the tasted compaction layer prior cons'rucllon, '0wilttllttiirlf', ��,•�'. SHAD �'�f.Respectfully submitted. B K t No. 39584 �Iissarnmarai, P.E. z;DYNA7'ECH E-NGINFERlNG CORP. STATE OF :' .- i lorida Reo. No. 39584 p ,�`� lip .- �y{cr`.• Certificate of Authorization No.: CA 5491 `'';l5SOf - 111NAL"Nx.��`` *A density test determines the degree of unnpacnon of the tested Iayerof mate ial unit, to no way shah a density lust replace a soil bearing capacity determination. A soil baring test must be provided by client, prior to construction to verify subsoil conditions_ As a mutual protection to the ciiems, the public wd ourselves, all reports are submitted as the confidential property of clients, and authorization fnr publication t;t SGttenlc'stt conclusions or extracts from or regarding our reports is reserved pending oil our written approval.