RF-11-21-2841 UPLIFTDocuSign Envelope ID: 72F62A92-6698-4FB6-9C2C-OE2CC2ABB300
Lab Report No.
FLORIDA TFC
PROVIDING SOLUTIONS TO THE ROOFING INDUSTRY
C.A. # 30448
Lab Certificate # 18-1114.01
CONCENTRATED UPLIFT LOAD TESTING ON ROOF TILE
TO COMPLY WITH FBC PROTOCOL TAS-106
PRUPERTYADDREss: 117 NE 95`h St., Mianii Shores PERMIT Na: RF-1 1-21-2841
PROPERTY OWNER: ROOFING sQuAREs: 29
coNTRACTOR: Miami Roofing ROOFPITCH• 3:12
TILE TYPE: Double Roll INSPECTOR INITIALS: AA
ATTACHMENT METHOD: Foam Adhesive TEST DATE: 02/17/2022
Testing Equipment: Uplift Gauge FGE-10OX Test Tabulation Required Testing Force: 35 Ibs
No.
RESULT
No.
RESULT
No.
RESULT
No.
RESULT
No.
RESULT
1-9
Passed
10-19
Passed
20-29
Passed
30-39
1 Passed
THIS ROOF HAS PASSED THE STATIC UPLIFT IN ACCORDANCE WTTH FBC PROTOCOL TAS-106.
"ROOF SKETCH"
Sincerely,
Yan L. Solis, P.E.
Lic. No. 75423
Deen3f�ned h7r.
IV
�.•
sas2sresan2ca�i
2/18/2022
49'
11 121? 14
1 23 4
' 15
8 1
0 7
\V 9
38 16
29 9 27 24 49'
25
32
33
The method and software that have
been utilized to sign and seal the
report, comply with the intent of the
Board Rules. Specifically, with
reference to Florida Statutes 471 and
the Florida Administrative Code Rule
61 G1 5-23.003for Engineers.
u l l l r t
<< ... Spy �r
*� No. 75423
—0 STAT E O F 4
ORID
YONALV
t'tfilill"O
10735 SW 216" St. Unit 404 Tel: 305-256-4550
Miami FL 33170 Page 1 of 1 Fax: 305-256-6833
www.FloridaTEC.net