Loading...
RC-02-21-466 COMPACTION TESTg-cam. I l" L l 4 GEOTECHNICAL I ENVIRONMENTAL I MATERIALS TESTING I ASBESTOS I ROOF TESTING I INSPECTION SERVICES I DRILLING SERVICES _o EC' DYNATECH ENGINEERING CORP. WWW DYNATECHENGINEERING.COM Miami, November 30, 2021 Mr. Meir Fellig CENTURY BUILDERS & RESTORATION 1414 Lenox Avenue Miami Beach, FL 33139 Re: Proposed Renovation @ 10626 NE 11 " Court Miami Shores, FL Dear Mr. Fellig: Pursuant to your request, Dynatech Engineering Corp. (DEC) performed a Compaction Test on November 30, 2021 at the above referenced project. DEC was authorized to perform a compaction test only. The purpose of our test was to determine the degree of compaction of the tested layer of material only. In no way shall a compaction test replace a demucking inspection, soil bearing capacity determination, or a pad certification. A soil boring test must be performed by client if not yet done, prior to construction to verify subsoil conditions. Underlying soils below test levels must be verified to prevent future settlements. (DEC) was not authorized to perform supervision and certification of the building pad preparation. This is not a pad certification. Our reports must be provided to all involved parties for their approval. Our findings are relative to the date and areas of our site work and should not be relied upon to represent conditions on other areas or dates. Any subsequent site disturbances due to water erosion, rain, storm gutters discharging at footings, construction activities, excavations, overgrown, vegetation, traffic and other disturbances will void this test and the site must be re - compacted and re -tested prior to construction. Environmental analysis of the soil materials is not part of the scope of services. If environmental analysis of the soils is required, we can provide a proposal for performing an environmental analysis of the soil materials. No other analysis is implied or warranted. As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for use, publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval. Enclosed find copies of the compaction test results. It has been a pleasure working with you and look forward to do so in the near future. Sincerely yours, Wissam Naamani, P. E. DYNATECH ENGINEERING CORP. Florida Reg. No. 39584 Special Inspector No. 757 Certificate of Authorization No.: CA 5491 �11�11111111f��� `���1`•PM.SAA D ��+�rfrrrr * ; No. 39584 y= .p STATE OF 4.: •• NAL ���Ilftlil[I111ti���,1 GEOTECHNICAL I ENVIRONMENTAL I MATERULLS TESTING I ASBESTOS I ROOF TESTING I INSPECTION SERVICES I DRILLING SERVICES _Q EC DYNATECH ENGINEERING CORP. W W W.DYNA.T ECHEr4GINEERING.COM MOISTURE -DENSITY RELATIONS OF SOILS PROCTOR COMPACTION TEST DATE: November 30.2021 CLIENT: CENTURY BUILDERS PROJECT: Proposed Renovations t`ea. _ ADDRESS: 10626 NE I Ith CourtMiami Shores. FL CONTRACTOR: Century Builders MATERIAL DESCRIPTION: Tan sand SAMPLED BY: WD TESTED BY: WD TEST RESULTS Sample Number 1 The following compaction test was conducted in accordance with the Standard Methods for Moisture Density Relations of soil using a 10 lb. Hammer and an 18" drop ASTM D-1557. % MOISTURE 4.1 5.8 7.5 12.1 DRY DENSITY 100.2 103.1 105.3 104.8 Optimum Moisture 9.2 Percent 100% Maximum Dry Density106.8 lbs./cu.ft. % Passing'/a" Sieve 96 Percent Sampled By: WD Tested By: WD 108 106 104 102 100 98 Checked By: WN ■�■��tltI1111t1r�1r�• 4 6 8 10 12 14 ,��,,■■� SAA D N� ••.f,,F 5Q. '• jC E Ns'• 9 '' Respectively submitted, As a mutual protection to clients, the public and ourselves, all reports %E ] ' � , are submitted as the confidential property ofelients. and authorization ► AV No. 39584 ed •'' for use, publication of statements, conclusions orextracts from or regar4 ?—Wissam aamani, P.E. our reports is reserved pending our written approval. — * PYNATECH ENGINEERING CORP. .p STATE OF r�� Florida Reg. No. 39584 � = Certificate of Authorization No.: CA 5491 0 R 1O""'�{v� D R Y D E N S 1 T Y 2 GEOTECHNICAL I ENVIRONMENTAL I MATERIALS TESTING I ASBESTOS I ROOF TESTING I INSPECTION SERVICES I DRILLING SERVICES �j �Kmw EC DYNATECH ENGINEERING CORP, WWW.DYNATECHENGINEERING.COM FIELD DENSITY TEST OF COMPACTED SOILS DATE: CLIENT: November 30.2021 CENTURY BUILDERS PROJECT: ADDRESS: Proposed Renovations (a. _ 10626 NE 1 Ph Court. Miami Shores, FL CONTRACTOR: Century Builders Test No. 1 Test No. 2 Test No. 3 Location: East side of interior underslab Location: Center of interior underslab Location: West side of interior underslab Test No. Location: Test No. Location: Description of Material: Tan sand TEST NO. 1 2 3 DEPTH 12" 12" 12" FIELD DENSITY 105.2 104.9 105.6 MOISTURE CONTENT % 7.0 6.8 7.4 MAX. DENSITY IN THE FIELD % 98.5 98.2 98.9 COMPACTION REQUIREMENTS % OF MAXIMUM 98% 98% 98% 100% MAXIMUM DENSITY (LAB) 106.8 106.8 106.8 REMARKS: ALL ABOVE TEST RESULTS COMPLY WITH COMPACTION REQUIREMENTS * Please note this is not a pad certification. A soil boring must be performed to determine subsoil conditions below the tested compaction layer prior to construction. ,<<,�t■�1►SAAD �.q%`F�� Respecth.illy submitted, z- S Tested By: WD _ Checked By: WN yt ; No. 39584 ti , = issarn amani. P.E. EDYNATECH ENGINEERING CORP. .Q STATE OF Florida Leg. No. 39584 Q; • F 0 Certificate of Authorization No.: CA 5491 ���r►rr r I I I I n t►►►► *A density test determines the degree of compaction of the tested layer of material only. In no way shall a density test replace a soil bearing capacity determination. A soil boring test must be provided by client, prior to construction to verify subsoil conditions. As a mutual protection to the clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statement conclusions or extracts from or regarding our reports is reserved pending on our written approval.