Loading...
RF-06-20-1138 UPLIFTAugust 27, 2020 To: Miami Shores Village Building Department 10050 NE 2A Avenue Miami Shores, FL 33138 R4 1 � AD a Engineering & Testing Co. 7450 Griffin Road, Suite 140, Davie, FL 33314 Phone: (954)581-7115, Fax: (954)581-2415 www.cebb.net Roof Tile Uplift Test Report Test Date: August 27, 2020 Permit #; RF-06-20- l l 38 Address: Manzo Residence 9720 Biscayne Blvd, Miami Shores, FL. Contractor: Paul Ban e Roofing Roof Pitch: 5:12 Attachment method: ICP Adhesive Foam AH-160 Monier Vanguard Tile Tv e: Device Used: "IMADA DPS 110" force gauge (Serial # 155879E) Sloped Roof Area: .24 squares All Testing is in strict accordance with the Florida Building Code, 2007 Edition, High Velocity Hurricane Zone — Testing Application Standard (TAS) 106. Roof Area: 2.00 squares Total Number of Tests Number of tests Passed % Passed Field Area (1): 5 5 100% Perimeter Area (2): No. of Corner Areas 3 : Ridge/Hip Areas: 8 pes. Based upon the field tests, I certify that 100% of the static up -lift tests "PASSED" the testing criteria of 35.0 lbf load, and meets the attachment resistance for adhesive Set Systems, as specified in the NOA. Should you have any questions regarding the above, or if require additional information, please do not hesitate to contact this office. Sincerely, CeBB Engineering & Testing Co. (NOA 18-! 79.0 ) 08/27/2020 Eduard C. 3 u, 1'.E. Fla. Reg. No: 9997 Cc: Paul Barge Roofing Enc. Location Sketch Calibration Certificate Job Address 163 NW 101 St, Miami Shores, FL 33150 Permit Number RF-07-20-1549 Roof Drawing 31 30 33 37 11 32 22 28 26 34 0 27 36 23 9 24 14 is 7 i I