Loading...
DOCK-06-21-1618 FOUNDATION CERTIFICATIONLEAF ENGINEERING May 10, 2022 Citi of Miami Shores Village Building Department 10050 NE 2nd Avenue Miami Shores, FL 33138 Re: 1002 NE 105 Miami, FL Permit Number: DOCK-06-21-1618 Contractor: Dock & Marine Construction FOUNDATION CERTIFICATION LETTER Dear Sir/Madam: I, Leandro Fernandez, P.E., having reviewed the installation of the wood piles and the pile log, hereby attest that "To the best of my knowledge and belief, the above described foundation was installed as required and complies with the requirements of such foundation". Should you have any questions or need any additional information, please do not hesitate to contact me. Sincerely, ■■���ypPd yFEgyq+rrr ICEryS mod= r 9: STA pFcc Leandro Fernandez, P.E. FL PE# 71519 Leaf Engineering CA# 29777 Digitally signed by Leandro Fernandez Date: 2022.05.10 08:54:46-04'00' LEAF ENGINEERING 756 NE 79TH STREET, MIAMI, FL 33138 786.390.7493 leafmail.cam LEAF ENGINEERING May 27, 2022 Citi of Miami Shores Village Building Department 10050 NE 2r" Avenue Miami Shores, FL 33138 Re: 1002 NE 105 Miami, FL Permit Number: DOCK-06-21-1618 Contractor: Dock & Marine Construction PILE FOUNDATION INSPECTION CERTIFICATION LETTER Dear Sir/Madam: I, Leandro Fernandez, P.E., having reviewed the installation of the wood piles and the pile log, hereby attest that "To the best of my knowledge and belief, the above described pile foundation was installed in accordance with the approved plans and with the requirements of the 2020 Florida Building Code, Building". Should you have any questions or need any additional information, please do not hesitate to contact me. Sincerely, �;�r Digitally signed by ,.1.9R0FE P� `7 C E A, �:• Leandro Fernandez 7f519 * i* STATE OF Date: 2022.05.27 '•F,4 A 1n •' ,?�� �ffsS�ONA4�¢ 06:54:50-04'00' 1111110% Leandro Fernandez, P.E. FL PE# 71519 Leaf Engineering CA# 29777 LEAF ENGINEERING 756 NE 79TH STREET, MIAMI, FL 33138 786.390.7493Ic&r7 gmajI,rAm