201 NW 91 ST UPLIFTCIVIL Reileh Engineering Corp.
(Consulting Engineer)
2370 Southwest 123`d Avenue
Miami, Florida 33175-1174
Tel: 305-823-8008 / 305-397-6414j�I
ENGINEER Fax:305-823-3300
April 29, 2022
CPT Construction Services
3020 Southwest 64 Avenue
Miramar, F133023
Project: ROOF TILE UPLIFT TEST REPORT
Residential Home
201 Northwest 91 Street
Miami Shores, Florida
Information provided by client:
Permit Number: Not Provided
Date Completion: April 26, 2022
Roofing Contractor: CPT Construction Services
Project Number: 22-0690
(Testing Laboratory Certificate # 16-0602.01)
Dear Sirs:.
In accordance with your request and authorization, a representative of Reileh Engineering
Corporation completed the Roof Tile Uplift Test at the above referenced project. This testing was
performed in general accordance with Roofing Application Standard TAS No.106 -- Standard
procedure for field verification of the bonding of mortar or adhesive set tile system and mechanically
attached, rigid, discontinuous roof systems.
The total of the tested roof surface area was less than 10000 square feet, and the mean height of the
roof is less than 40 feet above ground surface. The type of tile used for this project was reported to
be Clay Roof Tile. This tile was reported to have been foamed in place.
At the time of our inspection, the entire area of the roof was examined for loose tiles. Not less than
one (1) the in ten (10) of all components in the field area and one (1) the in five (5) of all tiles in the
perimeter and corner areas were physically examined. A minimum of one (1) test per every two (2)
squares in the field, one (1) test per square in the perimeter area, ridge caps and one (1) test in each
corner were conducted.
Based on our test results, we conclude that the installation of the roof tile at the above referenced
project meets the test requirement outlined in the above -mentioned protocol. Attached please find
a copy of our test report for your review.
Reileh Engineering Corporation appreciates the opportunity of assisting you in this project. If you
have any questions or if we may be of further assistance, please do not hesitate to contact the
undersigned.
Respectfully submitted;
Reileh Engineering Corporation
Mohamad Sonny Salleh, P.E.49014
Project Manager
TILE UPLIFT TEST
Residential Home
201 Northwest 91 Street
Miami Shores, Florida
Submittals:
Cover Page
Page 2 thru 4 of 4
Drawing 22-0690
Reileh Engineering Corporation -- Project Number - 22-0690 — Page 2 of 4
Report of
TILE UPLIFT TEST
for
Residential Home
201 Northwest 91 Street
Miami Shores, Florida
Project Number: 22-0690
Test Number
Test Load Obq
Test Status
1
35
Pass
2
35
Pass
3
35
Pass
4
35
Pass
5
35
Pass
6
35
Pass
7
35
Pass
8
35
Pass
9
35
Pass
10
35
Pass
11
35
Pass
12
35
Pass
13
35
Pass
14
35
Pass
15
35
Pass
16
35
Pass
17
35
Pass
18
35
Pass
19
35
Pass
20
35
Pass
21
35
Pass
22
35
Pass
23
35
Pass
24
35
Pass
Reilch Engineering Corporation -- Project Number - 22-0690 — Page 3 of
Test Number
Test Load (Ibn
Test Status
25
35
Pass
26
35
Pass
27
35
Pass
28
35
Pass
29
35
Pass
30
35
Pass
31
35
Pass
32
35
Pass
33
35
Pass
34
35
Pass
35
35
Pass
36
35
Pass
37
35
Pass
38
35
Pass
39
35
Pass
40
35
Pass
41
35
Pass
Test 1-12 Corner, 13-15 Ridge Caps, 16-29 Perimeter, 30-41 Field