RF-10-21-2820 UPLIFTC I V I L Reileh Engineering Corp.
(Consulting Engineer)
2370 Southwest 123`d Avenue
Miami, Florida 33175-1174Tel: 305-823-8
EN6INEER
9Fax: 305-823-33000 / 305-397-6414
March 31, 2022
Z Roofing and Waterproofing, Inc.
2525 West 3 Court
Hialeah, Florida 33010
Project: ROOF TILE UPLIFT TEST REPORT
Residential Home
284 Northeast 96 Street
Miami Shores, Florida
Information provided by client:
Permit Number: RF-10-21-2820
Date Completion: March 28, 2022
Roofing Contractor: Z Roofing and Waterproofing, Inc.
Project Number: 22-0556
(Testing Laboratory Certificate # 16-0602.01)
Dear Sirs;
In accordance with your request and authorization, a representative of Reileh Engineering
Corporation completed the Roof Tile Uplift Test at the above referenced project. This testing was
performed in general accordance with Roofing Application Standard TAS No.106 -- Standard
procedure for field verification of the bonding of mortar or adhesive set tile system and mechanically
attached, rigid, discontinuous roof systems.
The total of the tested roof surface area was less than 10000 square feet, and the mean height of the
roof is less than 40 feet above ground surface. The type of tile used for this project was reported to
be concrete/clay Roof Tile. This tile was reported to have been foamed in place.
At the time of our inspection, the entire area of the roof was examined for loose tiles. Not less than
one (1) the in ten (10) of all components in the field area and one (1) the in five (5) of all tiles in the
perimeter and corner areas were physically examined. A minimum of one (1) test per every two (2)
squares in the field, one (1) test per square in the perimeter area, ridge caps and one (1) test in each
corner were conducted.
Based on our test results, we conclude that the installation of the roof tile at the above referenced
project meets the test requirement outlined in the above -mentioned protocol. Attached please find
a copy of our test report for your review.
Reileh Engineering Corporation appreciates the opportunity of assisting you in this project, If you
havb any questions or if we may be of further assistance, please do not hesitate to contact the
undersigned.
Respectfully submitted;
Reileh Engineering Corporation
Whamad Sonny Salleh, P:E.49014
Project Manager
ULF LIPl,lF`I 7'FST
P.,dcntia l I;amc
284 Northeast 96 Street
Miami Shores, Florida
Submittals:
Cover Page
Page 2 thru 8 of 8
Drawing 22-0556
Reileh Engineering Corporation -- !'r; j:ct Number - 22-0556 — Page 2 of 8
Report of
TILE UPLIFT TEST
for
Residential Home
284 Northeast 96 Street
Miami Shores, Florida
Project Number: 22-0556
Test Number
Test Load Obf)
Test Status
1
35
Pass
2
35
Pass
3
35
Pass
4
35
Pass
5
35
Pass
6
35
Pass
7
35
Pass
8
35
Pass
9
35
Pass
10
35
Pass
11
35
Pass
12
35
Pass
13
35
Pass
14
35
Pass
15
35
Pass
16
35
Pass
17
35
Pass
18
35
Pass
19
35
Pass
20
35
Pass
21
35
Pass
22
35
Pass
23
35
Pass
24
35
Pass
Reileh Engineering Corporation -- Project Number - 22-0556 — Page 3 of 8
Test Number
Test Load (Ibf) Test Status
25
35 Pass
26
35 Pass
27
35 Pass
28
35 Pass
29
35 Pass
30
35 Pass
31
35 Pass
32
35 Pass
33
34
35 Pass
35 Pass
35
35 Pass
36
35 Pass
37
35 Pass
38
35 Pass
39
35 Pass
40
35 Pass
41
35 Pass
42
35 Pass
43
35 Pass
44
35 Pass
45
35 Pass
46
35 Pass
47
35 Pass
48
35 Pass
49
35 Pass
50
35 Pass
51
35 Pass
52
35 Pass
53
35 Pass
54 1
35 Pass
Reileh Engineering Corporation -- Project Number - 22-0556 — Page 4 of 8
Test lumber
Test Load (Ibq
Test Status
55
35
Pass
56
35
Pass
57
35
Pass
58
35
Pass
59
35
Pass
60
35
Pass
61
35
Pass
62
35
Pass
63
35
Pass
64
35
Pass
65
35
Pass
66
35
Pass
67
35
Pass
68
35
Pass
69
35
Pass
70
35
Pass
71
35
Pass
72
35
Pass
73
35
Pass
74
35
Pass
75
35
Pass
76
35
Pass
77
35
Pass
78
35
Pass
79
35
Pass
80
35
Pass
81
35
Pass
82
35
Pass
83
35
Pass
84
35
Pass
Reileh Engineering Corporation -- Project Number - 22-0556 — Page 5 of'8
Test lumber
Test ad lb )(,oTest Status
85
35 Pass
86
35 Pass
87
35 Pass
88
35 Pass
89
35 Pass
90
35 Pass
91
35 Pass
92
35 Pass
93
35 Pass
94
35 Pass
95
35 Pass
96
35 Pass
97
35 Pass
98
35 Pass
99
35 Pass
100
35 Pass
101
35 Pass
102
35 Pass
103
35 Pass
104
35 Pass
105
35 Pass
106
35 Pass
107
35 Pass
108
35 Pass
109
35 Pass
110
35 Pass
1 11
35 Pass
112
35 Pass
113
35 Pass
114
35 Pass
Reileh Engineering Corporation -- Project Number - 22-0556 — Page 6 of 8
Test Number
Test Load lb
Test Status
115
35
Pass
116
35
Pass
117
35
Pass
118
35
Pass
119
35
Pass
120
35
Pass
121
35
Pass
122
35
Pass
123
35
Pass
124
35
Pass
125
35
Pass
126
35
Pass
127
35
Pass
128
35
Pass
129
35
Pass
130
35
Pass
131
35
Pass
132
35
Pass
133
35
Pass
134
35
Pass
135
35
Pass
136
35
Pass
137
35
Pass
138
35
Pass
139
35
Pass
140
35
Pass
141
35
Pass
142
35
Pass
143
35
Pass
144
35
Pass
Rcilch Engineering Corporation —Project Number - 22-0556 —Page 7 of 8
Test Numa ertTestad lb Test Status
1455 Pass
1465 Pass
1475Pass
1485 Pass
Test 1-52 Corner, 53-66 Ridge Caps, 67-99 Perimeter, 100-148 Field
Reileh Engineering Corporation -- Project Number - 22-0556 — Page 8 of 8
�
�
�
�
�
�
<
�
�
�
» »
e 8
a
p ,
2 a
- -
\
/
\
®
f
w
& \\
®
R
a 7 w »
. «
* ,
?O M/
�
77 qo
oƒ
2
lye%e
Sag2a
�o»�g
2ki zz
«
+
3
8
;
$
�
a
d