RF-10-21-2820 UPLIFTC I V I L Reileh Engineering Corp. (Consulting Engineer) 2370 Southwest 123`d Avenue Miami, Florida 33175-1174Tel: 305-823-8 EN6INEER 9Fax: 305-823-33000 / 305-397-6414 March 31, 2022 Z Roofing and Waterproofing, Inc. 2525 West 3 Court Hialeah, Florida 33010 Project: ROOF TILE UPLIFT TEST REPORT Residential Home 284 Northeast 96 Street Miami Shores, Florida Information provided by client: Permit Number: RF-10-21-2820 Date Completion: March 28, 2022 Roofing Contractor: Z Roofing and Waterproofing, Inc. Project Number: 22-0556 (Testing Laboratory Certificate # 16-0602.01) Dear Sirs; In accordance with your request and authorization, a representative of Reileh Engineering Corporation completed the Roof Tile Uplift Test at the above referenced project. This testing was performed in general accordance with Roofing Application Standard TAS No.106 -- Standard procedure for field verification of the bonding of mortar or adhesive set tile system and mechanically attached, rigid, discontinuous roof systems. The total of the tested roof surface area was less than 10000 square feet, and the mean height of the roof is less than 40 feet above ground surface. The type of tile used for this project was reported to be concrete/clay Roof Tile. This tile was reported to have been foamed in place. At the time of our inspection, the entire area of the roof was examined for loose tiles. Not less than one (1) the in ten (10) of all components in the field area and one (1) the in five (5) of all tiles in the perimeter and corner areas were physically examined. A minimum of one (1) test per every two (2) squares in the field, one (1) test per square in the perimeter area, ridge caps and one (1) test in each corner were conducted. Based on our test results, we conclude that the installation of the roof tile at the above referenced project meets the test requirement outlined in the above -mentioned protocol. Attached please find a copy of our test report for your review. Reileh Engineering Corporation appreciates the opportunity of assisting you in this project, If you havb any questions or if we may be of further assistance, please do not hesitate to contact the undersigned. Respectfully submitted; Reileh Engineering Corporation Whamad Sonny Salleh, P:E.49014 Project Manager ULF LIPl,lF`I 7'FST P.,dcntia l I;amc 284 Northeast 96 Street Miami Shores, Florida Submittals: Cover Page Page 2 thru 8 of 8 Drawing 22-0556 Reileh Engineering Corporation -- !'r; j:ct Number - 22-0556 — Page 2 of 8 Report of TILE UPLIFT TEST for Residential Home 284 Northeast 96 Street Miami Shores, Florida Project Number: 22-0556 Test Number Test Load Obf) Test Status 1 35 Pass 2 35 Pass 3 35 Pass 4 35 Pass 5 35 Pass 6 35 Pass 7 35 Pass 8 35 Pass 9 35 Pass 10 35 Pass 11 35 Pass 12 35 Pass 13 35 Pass 14 35 Pass 15 35 Pass 16 35 Pass 17 35 Pass 18 35 Pass 19 35 Pass 20 35 Pass 21 35 Pass 22 35 Pass 23 35 Pass 24 35 Pass Reileh Engineering Corporation -- Project Number - 22-0556 — Page 3 of 8 Test Number Test Load (Ibf) Test Status 25 35 Pass 26 35 Pass 27 35 Pass 28 35 Pass 29 35 Pass 30 35 Pass 31 35 Pass 32 35 Pass 33 34 35 Pass 35 Pass 35 35 Pass 36 35 Pass 37 35 Pass 38 35 Pass 39 35 Pass 40 35 Pass 41 35 Pass 42 35 Pass 43 35 Pass 44 35 Pass 45 35 Pass 46 35 Pass 47 35 Pass 48 35 Pass 49 35 Pass 50 35 Pass 51 35 Pass 52 35 Pass 53 35 Pass 54 1 35 Pass Reileh Engineering Corporation -- Project Number - 22-0556 — Page 4 of 8 Test lumber Test Load (Ibq Test Status 55 35 Pass 56 35 Pass 57 35 Pass 58 35 Pass 59 35 Pass 60 35 Pass 61 35 Pass 62 35 Pass 63 35 Pass 64 35 Pass 65 35 Pass 66 35 Pass 67 35 Pass 68 35 Pass 69 35 Pass 70 35 Pass 71 35 Pass 72 35 Pass 73 35 Pass 74 35 Pass 75 35 Pass 76 35 Pass 77 35 Pass 78 35 Pass 79 35 Pass 80 35 Pass 81 35 Pass 82 35 Pass 83 35 Pass 84 35 Pass Reileh Engineering Corporation -- Project Number - 22-0556 — Page 5 of'8 Test lumber Test ad lb )(,oTest Status 85 35 Pass 86 35 Pass 87 35 Pass 88 35 Pass 89 35 Pass 90 35 Pass 91 35 Pass 92 35 Pass 93 35 Pass 94 35 Pass 95 35 Pass 96 35 Pass 97 35 Pass 98 35 Pass 99 35 Pass 100 35 Pass 101 35 Pass 102 35 Pass 103 35 Pass 104 35 Pass 105 35 Pass 106 35 Pass 107 35 Pass 108 35 Pass 109 35 Pass 110 35 Pass 1 11 35 Pass 112 35 Pass 113 35 Pass 114 35 Pass Reileh Engineering Corporation -- Project Number - 22-0556 — Page 6 of 8 Test Number Test Load lb Test Status 115 35 Pass 116 35 Pass 117 35 Pass 118 35 Pass 119 35 Pass 120 35 Pass 121 35 Pass 122 35 Pass 123 35 Pass 124 35 Pass 125 35 Pass 126 35 Pass 127 35 Pass 128 35 Pass 129 35 Pass 130 35 Pass 131 35 Pass 132 35 Pass 133 35 Pass 134 35 Pass 135 35 Pass 136 35 Pass 137 35 Pass 138 35 Pass 139 35 Pass 140 35 Pass 141 35 Pass 142 35 Pass 143 35 Pass 144 35 Pass Rcilch Engineering Corporation —Project Number - 22-0556 —Page 7 of 8 Test Numa ertTestad lb Test Status 1455 Pass 1465 Pass 1475Pass 1485 Pass Test 1-52 Corner, 53-66 Ridge Caps, 67-99 Perimeter, 100-148 Field Reileh Engineering Corporation -- Project Number - 22-0556 — Page 8 of 8 � � � � � � < � � � » » e 8 a p , 2 a - - \ / \ ® f w & \\ ® R a 7 w » . « * , ?O M/ � 77 qo oƒ 2 lye%e Sag2a �o»�g 2ki zz « + 3 8 ; $ � a d