Loading...
RF-07-21-1716 UPLIFTFUO November 16, 2021 All American Roofing, Inc. 944 West Prospect Road Oakland Park, Florida 33309 RE: TAS-106 TILE UPLIFT TESTS Proposed Roof Pappas Residence 582 NE 107tt' Street Miami Shores, Florida Dear Sir or Madam: 4/ ENGINEERING & TESTING, INC. Phone: (866) 781-6889 *Fax: (866) 78 4-8550 ii-ww.floridaengineeringandtesting.com 250 S.W. 13t1' Avenue Pompano Beach, FL 33069 Job Order No.: 21-6376 Permit No.: RF-07-21-1716 In accordance with your authorization, Florida Engineering & Testing Inc., has performed Tile Uplift Testing in compliance with Testing Application Standards TAS- 106 and the Florida Building Code High Velocity Hurricane Zone on November 12, 2021, at the above referenced project. The purpose of our inspection was to determine the uplift capacity of the roof tiles for the above referenced project. The subject roof consisted of concrete flat tile foam set. The pitch of the subject roof is 3/12. Our field engineer's representative visited the site and conducted sixty six (66) uplift tests on the roof tiles. All tests were performed according to the Florida Building Code High Velocity Hurricane Zone and protocol TAS-106 using an Intercomp scale model CS200. The following is a summary of results: Field Test Results Test Number Test Location Field Uplift Pull Test Test Result 1 - 15 Corner See Attached Diagram 35 15 pounds Passed 16 - 37 Perimeter See Attached Diagram 35 ± 5 pounds Passed 38 - 39 Field See Attached Diagram 35 15 pounds Passed 40 - 66 Ridge & Hip See Attached Diagram 35 � 5 pounds Passed er '!% Q:cality �4 A, .Flsstcrance Page 2, November 16, 2021, Job Order No. 21-6376 All American Roofing, Inc. FLQ I A Pappas Residence 582 NE 107th Street Miami Shores, Florida: All test results were found to be in compliance with TAS-106 and the Florida Building Code (see attached field sketch). The test results are limited to the tested areas. If other roof areas exhibit different conditions, it should be brought to our attention for remedial work. This uplift test is not a final roof inspection. A final roof inspection must be conducted by the building official for approval. The test results presented reflect the condition of the roof system at the time of the test. These results are time and sample dependent since roof conditions are continuously changing due to exposure to the elements. Florida Engineering & Testing, Inc. (FE&T) is an independent third party providing un- biased testing information and results. FE&T is not affiliated with our client nor do we have any financial interest in the project or determination of the test results. As mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval. Florida Engineering & Testing, Inc., appreciates the opportunity to be of service to you at this phase of your project. If you have any questions or comments, please give us a call. We would be pleased to help in any way we can. It has been a pleasure working with you and look forward to doing so again in the near future. Sincerely, ��okill'$' I1uso, ' pR ZA GAFF •'Will RezDkcidan, P.E. w Flori gin * &FTest -Inc. FloriA N 60223 • , C erti fi cei rl ji 1�,'0.6923 ,l AAAl rrtll�ofYt'�1`.