RE: TAS-106 TILE UPLIFT TESTS
Proposed Roof
Pappas Residence
582 NE 107tt' Street
Miami Shores, Florida
Dear Sir or Madam:
4/
ENGINEERING &
TESTING, INC.
Phone: (866) 781-6889 *Fax: (866) 78 4-8550
ii-ww.floridaengineeringandtesting.com
250 S.W. 13t1' Avenue
Pompano Beach, FL 33069
Job Order No.: 21-6376
Permit No.: RF-07-21-1716
In accordance with your authorization, Florida Engineering & Testing Inc., has
performed Tile Uplift Testing in compliance with Testing Application Standards TAS-
106 and the Florida Building Code High Velocity Hurricane Zone on November 12,
2021, at the above referenced project.
The purpose of our inspection was to determine the uplift capacity of the roof tiles for the
above referenced project. The subject roof consisted of concrete flat tile foam set. The
pitch of the subject roof is 3/12.
Our field engineer's representative visited the site and conducted sixty six (66) uplift tests
on the roof tiles. All tests were performed according to the Florida Building Code High
Velocity Hurricane Zone and protocol TAS-106 using an Intercomp scale model CS200.
The following is a summary of results:
Field Test Results
Test Number
Test Location
Field Uplift Pull Test
Test Result
1 - 15 Corner
See Attached Diagram
35 15 pounds
Passed
16 - 37 Perimeter
See Attached Diagram
35 ± 5 pounds
Passed
38 - 39 Field
See Attached Diagram
35 15 pounds
Passed
40 - 66 Ridge & Hip
See Attached Diagram
35 � 5 pounds
Passed
er '!%
Q:cality �4 A, .Flsstcrance
Page 2, November 16, 2021, Job Order No. 21-6376
All American Roofing, Inc. FLQ I A
Pappas Residence
582 NE 107th Street
Miami Shores, Florida:
All test results were found to be in compliance with TAS-106 and the Florida Building
Code (see attached field sketch).
The test results are limited to the tested areas. If other roof areas exhibit different
conditions, it should be brought to our attention for remedial work. This uplift test is not
a final roof inspection. A final roof inspection must be conducted by the building official
for approval.
The test results presented reflect the condition of the roof system at the time of the test.
These results are time and sample dependent since roof conditions are continuously
changing due to exposure to the elements.
Florida Engineering & Testing, Inc. (FE&T) is an independent third party providing un-
biased testing information and results. FE&T is not affiliated with our client nor do we
have any financial interest in the project or determination of the test results.
As mutual protection to clients, the public and ourselves, all reports are submitted as the
confidential property of clients, and authorization for publication of statements,
conclusions or extracts from or regarding our reports is reserved pending our written
approval.
Florida Engineering & Testing, Inc., appreciates the opportunity to be of service to you at
this phase of your project. If you have any questions or comments, please give us a call.
We would be pleased to help in any way we can. It has been a pleasure working with you
and look forward to doing so again in the near future.
Sincerely, ��okill'$' I1uso,
' pR ZA GAFF •'Will
RezDkcidan, P.E. w
Flori gin * &FTest -Inc.
FloriA N 60223 • ,
C erti fi cei rl ji 1�,'0.6923
,l AAAl rrtll�ofYt'�1`.