Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
DEMO-19-2129
Miami Shores Village 10050 NE 2 Ave Miami Shores FL 33138 305-795-2204 cl r) Issue Date:10/28/2019 Location Address Parcel Number 1298 NE 95TH ST, Miami Shores, FL 33138 1132060144030 Contacts Permit NO.: DEMO-09-1`9-2129 Permit Type: Demolition Work Ctass/f'cation: residential Permit Status: Approved Expiration: 04/27/2020 YURI MORALEZ Owner ALLIED DEMOLITION INC Contractor 302 NE 92ND ST, Miami Shores, FL 33138 JORGE CEDENO Home: 3057903849 yurimorales@gmail.com 8195 NW 54 ST, MIAMI, FL 33166 Business: 3055134994 Other:9548689990 Description: TOTAL DEMOLITION OF HOUSE & POOL Valuation: $ 12,000.00 Ins 305-ectiRequests: tion Total Scl Feet: 3,200.00 Fees Amount Application Fee - Other $50.00 Building Demoloition Fee $500.00 CCF $7.20 DBPR Fee $8.25 DCA Fee $5.50 Education Surcharge $2.40 Notary Fee $5.00 Scanning Fee $9.00 Technology Fee $13.75 Total: $601.10 Payments Date Paid Amt Paid Total Fees $601.10 Credit Card 09/13/2019 $50.00 Credit Card 10/28/2019 $551.10 Amount Due: $0.00 Building Department Copy In consideration of the issuance to me of this permit, I agree to perform the work covered hereunder in compliance with all ordinances and regulations pertaining thereto and in strict conformity with the plans, drawings, statements or specifications submitted to the proper authorities of Miami Shores Village. In accepting this permit I assume responsibility for all work done by either myself, my agent, servants, or employes. I understand that separate permits are required for ELECTRICAL, PLUMBING, MECHANICAL, WINDOWS, DOORS, ROOFING and SWIMMING POOL work. OWNE FID VIT: I certify that the oregoing information is accurate and that all work will be done in compliance with all applicable laws regulati co stru tion and zoning. Fu ermore I authorize the above named contractor to do the work stated. 0 (2- -T- , 22, Z Authorized n ure: Owner / Applicant / Contractor / Agent Date October 28, 2019 Page 2 of 2 ALLIED DEMOLITIONS INC. LICENSED & INSURED CGC: 1 50651 2 WAIVER AND RELEASE OF LIEN UPON FINAL PAYMENT THE UNDERSIGNED LIENOR, IN CONSIDERATION OF THE FINAL PAYMENT IN THE ,OG AMOUNT OF $ 10 �Q , HEREBY WAIVES AND RELEASES IT LIEN AND RIGHT TO CLAIM A LIEN FOR LABOR, SERVICES, OR MATERIALS FURNISHED TO �,t� / OM (CONTRACTOR/OWNER) FOR THE FOLLOWING PROPERTY: DATED ON: /7 7+ BY: (LIENOR) ALLIEDXEMOLITION, INC. /Qw � �-lw � � )fj'q ARETHA C CARRINGTON � Notary Public - State of Florida ° Commission # GG 278693 My Comm. Expires Nov 25, 2022 A f/ 7950 NW 53RD STREET, SUITE 337 DORAL, FL 331 66 (� 305 51 3-4994 ,. ALLIEDDEMOLITION@BELLSOUTH.NET V6i(,QrmcrI ] Iplol) uj ll BUILDING Miami Shores Village 7B. EVE Building Department EP 1 2019 10050 N.E.2nd Avenue, Miami Shores, Florida 33138 Tel: (305) 795-2204 Fax: (305) 756-8972 INSPECTION LINE PHONE NUMBER: (305) 762-4949 -FBC 20 Master Permit No-V-eRe) ` 09-11 -ZI 2-1 PERMIT APPLICATION AUILDING ❑ ELECTRIC ❑ ROOFING Sub Permit No. ❑ REVISION ❑ EXTENSION ❑RENEWAL ❑PLUMBING ❑ MECHANICAL ❑PUBLIC WORKS ❑ CHANGE OF ❑ CANCELLATION ❑ SHOP CONTRACTOR DRAWINGS JOB ADDRESS: 1 2-` U ' "'IC- T5 S T City: Miami Shores County: Miami Dade Zip: 33115�? Folio/Parcel#: 1 l - 3 2D6 - 014 - 4D3 D Is the Building Historically Designated: Yes NO Occupancy Type: Load: Construction Type: Flood Zone: BFE: FFE: OWNER: Name (Fee Simple Titleholder): YV to 1 10©24V6 Phone#: .3 o5-2q J?� 7,3&q Address: 302.- NE Q ?_ S r-tEG- t City: AA 14,41 ( 5 MOte-S State: 1=L— Zip: Tenant/Lessee Name: Phone#: Email: 0214 QM Ai . GO CONTRACTOR: Company�Name: f�� , ( d Lf !!" ` &1A01 Phon Address: 7 ?So w w 53 AD STD 4 .3.3 -7 e 3a% .7i,3- 9� City: State: Zip: ✓,3 41C Qualifier Name: o���APhone#: State Certification or Registration #: C 6C. ISO6SlL Certificate of Competency #: DESIGNER: Architect/Engineer: Phone#: Address: City: State: Zip: Value of Work for this Permit: $ / Z/ ' Square/Linear Footage of Work:3 Z"0 o Type of Work: ❑ Addition ❑ Alteration ❑ New �❑ Repair/Replace / Demolition _'—, Description of Work: /�� ���a�t�tl✓ p� '1'%/'f J / DJL. Specify color of color thruu tile: Submittal Fee $ 50?0 i C Permit Fee $ CCF $ CO/CC $ Scanning Fee $ Radon Fee $ DBPR $ Notary $ Technology Fee $_ Structural Reviews $ ,, Training/Education Fee $ Double Fee $ Bond $ (Revi sed02/24/2014) TOTAL FEE NOW DUE $ S' ) , 10 Bonding Company's Name (if applicable) Bonding Company's Address City State Mortgage Lender's Name (if applicable) Mortgage Lender's Address City State Zip Zip Application is hereby made to obtain a permit to do the work and installations as indicated. I certify that no work or installation has commenced prior to the issuance of a permit and that all work will be performed to meet the standards of all laws regulating construction in this jurisdiction. I understand that a separate permit must be secured for ELECTRIC, PLUMBING, SIGNS, POOLS, FURNACES, BOILERS, HEATERS, TANKS, AIR CONDITIONERS, ETC..... OWNER'S AFFIDAVIT: I certify that all the foregoing information is accurate and that all work will be done in compliance with all applicable laws regulating construction and zoning. "WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT." Notice to Applicant: As a condition to the issuance of a building permit with an estimated value exceeding $2500, the applicant must promise in good faith that a copy of the notice of commencement and construction lien law brochure will be delivered to the person whose property is subject to attachment. Also, a certified copy of the recorded notice of commencement must be posted at the job site for the first inspection which occurs seven (7) days after the building permit is issued. In the absence of such posted notice, the inspection will not be approved and a reinspection fee will be charged. 4 Signature OWNER or AGENT 1 , The foregoing instrument was acknowledged before me this day of AL04A , 20 1 I re- by %l n '-ldIQS who is personally known to me or who has produced° ✓r'(a Orl ra- r' IGehlw— as identification end Vho did take an oath. a NOTARY PUBLIC: ' Print: I iyorin-y LAnaj- t Seal: u,:,ao, IVONNE LANDERO Notary Public - State of Florida •o�; Commission # GG 006859 ,•F OF FI•,, MV Corn m.r Jj11e*Sl( ##############rlkYrR#### w �qvs ###### ## # APPROVED BY 4 Signature , ` A e CONTRACTOR "I - s i The foregoing instrument was acknowledged before me this 2���,_ day of V 6U • ' 20 by rlr 7% - o is personal y known to me or who has producedF-C--�D6A 1F�P✓ identificAion*anoi who did take an oath. NOTARY PUBLIC: Print: Seal: ';2oY'.,: SINDIA ALVAREZ MY COMMISSION 9 GG 238273 d EXPIRES: September 3, 2022 ��FOF FLOP` Bonded Thm Notary Public Underwriters ##################### ZVI mil. Plans Examiner Structural Review Zoning Clerk (Revised02/24/2014) STATE OF FLORIDA DEPARTMENT OF HEALTH ONSITE SEWAGE TREATMENT AND DISPOSAL SYSTEM CONSTRUCTION PERMIT FOR: OSTDS Abandonment APPLICANT: (Andrea D Suarez Yury Humberto Morales) PROPERTY ADDRESS: 1298 NE 95 St Miami, FL 33138 LOT: BLOCK: SUBDIVISION: PERMIT #:13-SC-2006369 APPLICATION # : AP 1447081 DATE PAID: FEE PAID: RECEIPT #: DOCUMENT #: PR1265641 PROPERTY ID #: 11-3206-014-4030 [SECTION, TOWNSHIP, RANGE, PARCEL NUMBER] [OR TAX ID NUMBER] SYSTEM MUST BE CONSTRUCTED IN ACCORDANCE WITH SPECIFICATIONS AND STANDARDS OF SECTION 381.0065, F.S., AND CHAPTER 64E-6, F.A.C. DEPARTMENT APPROVAL OF SYSTEM DOES NOT GUARANTEE SATISFACTORY PERFORMANCE FOR ANY SPECIFIC PERIOD OF TIME. ANY CHANGE IN MATERIAL FACTS, WHICH SERVED AS A BASIS FOR ISSUANCE OF THIS PERMIT, REQUIRE THE APPLICANT TO MODIFY THE PERMIT APPLICATION. SUCH MODIFICATIONS MAY RESULT IN THIS PERMIT BEING MADE NULL AND VOID. ISSUANCE OF THIS PERMIT DOES NOT EXEMPT THE APPLICANT FROM COMPLIANCE WITH OTHER FEDERAL, STATE, OR LOCAL PERMITTING REQUIRED FOR DEVELOPMENT OF THIS PROPERTY. SYSTEM DESIGN AND SPECIFICATIONS T [ ] GALLONS / GPD CAPACITY A [ ] GALLONS / GPD CAPACITY N [ J GALLONS GREASE INTERCEPTOR CAPACITY [MAXIMUM CAPACITY SINGLE TANK:1250 GALLONS] K [ ] GALLONS DOSING TANK CAPACITY [ ]GALLONS @[ ]DOSES PER 24 HRS #Pumps [ ] D [ ] SQUARE FEET R [ ] SQUARE FEET A TYPE SYSTEM: [ ] STANDARD I CONFIGURATION: [ ] TRENCH N F LOCATION OF BENCHMARK: I ELEVATION OF PROPOSED SYSTEM SITE SYSTEM SYSTEM [ ] FILLED [ ] MOUND [ ] BED [ ] [ ][ / ][ABOVE/BELOW] BENCHMARK/REFERENCE POINT E BOTTOM OF DRAINFIELD TO BE [ ][ / ][ABOVE/ BELOW] BENCHMARK/REFERENCE POINT L D FILL REQUIRED: [ 0.001 INCHES EXCAVATION REQUIRED: [ ] INCHES Have the tank abandoned in accordance with the following procedures:(a) The tank shall be pumped out.(b) The bottom of O the tank shall be opened or ruptured, or the entire tank collapsed so as to prevent the tank from retaining water, and(c) The T tank shall be filled with dean sand or other suitable material, and completely covered with soil.Have the system inspected H by the health department after it has been pumped , ruptured and filled with sand and covered. E R SPECIFICATIONS BY: APPROVED BY: TITLE: TITLE: Engineering Specialist II DATE ISSUED: 10/08/2019 DH 4016, 08/09 (Obsoletes all previous editions which may not be used) Incorporated: 64E-6.003, FAC v 1.1.4 AP1447081 Dade CHD EXPIRATION DATE: 01/06/2020 SE-1 Page 1 of 3 11:23 -V all, ^ �==. 0 ... ,9 YURI MORALES Account#: 9418284262 yurimorales@gmail.com Update Email top � e�rv�ice rrn.atC) ir Your request to stop service has been submitted. Please remember to turn off your circuit breakers on the way out to avoid additional charges and ensure that we have access to the meter. We hope to be your energy provider again in the future. Remember, starting service online is quick and easy at FPL.com/moving. Account Information Stop Service Date: September 20, 2019 Service Address 1298 NE 95TH ST MIAMI SHORES, FL 33138 Final Bill Address 302 NE 92ND ST MIAMI SHORES, FL 33138 Account Number ---------- Forwarded message --------- From: FPL Account Management <FPL_AcCount_Management@email.fpl.com> Ddte: Fri, Sep 6, 2019 at 12:44 PM Subject: FPL: New project application received To: <yurimorales@gmail.com> Yuri Morales 1298 NE 95TH ST MIAMI SHORES, FL.33138 Project #: 9032772 P�roi�ect Applicakt-i_on Relcyev�ed Hello Yuri, Thank you for using our FPL Project Portal to begin your electric service project. Your application for Disconnect at 1298 NE 95ST, Project # 9032772 was successfully submitted. We're reviewing your information and an FPL project manager will be assigned to your project within two business days. We will contact you with additional information. Remember you can check your application status anytime online. We look forward to working with you. CHECK STATUS M Gmail Yuri Morales <yurimorales@gmail.com> FPL: New project application received Piacquadio, Miguel <Miguel.P@fpl.com> To: Yuri Morales <yurimorales@gmail.com> Wed, Sep 11, 9:26 AM The disconnection has been released. It will take 7 to 10 business days to be completed on the field. Once it gets completed, I will send you the letter. Best regards, Miguel Piacquadio FPL Associate Engineer I North Dade Service Center (305)-626-2794 1 miguel.p@fpl.com Power Delivery Tr. ii-fcrrnr•c:jca>>rhm! Recognize an eniployee today Visit the new FPL Project Portal at FPL. com/construction to manage your FPL Residential and Commercial construction projects Get information on construction services and project types, apply for your construction project, track project milestones, pay your construction fees online, manage your project team and more. From: Yuri Morales <yurimorales@gmail.com> Sent: Wednesday, September 11, 2019 9:18 AM To: Piacquadio, Miguel <Miguel.P@fpl.com> Subject: Re: FPL: New project application received Hi Miguel, I just called and requested the take service. I spoke to Angel, employee number 232045. 1 look forward to hearing from you with the confirmation. Best, Yuri On Wed, Sep 11, 2019 at 8:56 AM Piacquadio, Miguel <Miguel.P@fpl.com> wrote: Return to: Eric van de "ugt, Esq, Clear Title Services, Inc. 1111 Kane Concourse, Suite 209 Bay Harbor Islands, Florida 33154 Instrument Prepared By: Christopher P. Kelley, Esquire Christopher P. Kelley, P.A. 11098 Biscayne Boulevard, Suite 205 Miami, Florida 33161 Folio No.11-3206-014-4030 WARRANTY DEED CFN: 20190027139 BOOK 31289 PAGE 4217 DATE:01/15/2019 08.52:01 AM DEED DOC 8,070.00 HARVEY RUVIN. CLERK OF COURT, MIA-DADE CTY M THIS INDENTURE, Made this ---� day of c +c.r.. , 2019, Between LESLEY A. NORTHUP, a single woman, and EDITH DAYLE PECK, a single woman, as joint tenants with right of survivorship, GRANTORS, and ANDREA D. SUAREZ and YURI HUMBERTO MORALES, wife and husband, whose post office address is 1298 NE 95 Street Miami Shores, Florida 33138, GRANTEES, WITNESSETH, That said GRANTORS, for and in consideration of the sum of Ten and NO/100 Dollars, and other good and valuable considerations to said GRANTORS in hand paid by said GRANTEES, the receipt whereof is hereby acknowledged, have granted, bargained and sold to the said GRANTEES, and GRANTEES' heirs and assigns forever, the following described land, situate, lying and being in Miami -Dade County, Florida to -wit: All of Lots 1 and 2, Block 85, MIAMI SHORES SECTION NO. 3, according to the Plat thereof, as recorded in Plat Book 10, Page 37, of the Public Records of Miami -Dade County, Florida; less that part lying West of the following described line; from a point in the North line of Lot 1, a distance of 75.00 feet East of the Northwest comer of said Lot 1, run Southerly 100.2 feet to a point in the South line of Lot 2, lying 82.12 feet East of the Southwest comer of said Lot 2. Commonly known as: 1298 NE 95 Street, Miami Shores, Florida 33138 Page 1 of 2 CFN-. 20190027139 BOOK 31289 PAGE 4218 Warranty Deed Northup & Peck s/t Suarez $ Morales SUBJECT TO: Applicable zoning and/or restrictions and prohibitions imposed by governmental authority; Conditions, Restrictions limitations, reservations, easements, and other matters appearing on records, if any; Utility easements of record, and taxes for the year 2019 and subsequent years. and said GRANTORS do hereby fully warrant the title to said land, and will defend the same against the lawful claims of all persons whomsoever. IN WITNESS WHEREOF, GRANTORS have hereunto set their hands and seals the day and year first above written. sealed, a9d delivered in our St. Petersburg, Florida 33701 rint Name .o C EDITH DAYL CK---- Grantor 657 1 st Street NE St. Petersburg, Florida 33701 STATE OF FLORIDA COUNTY OF I—)) [a t- A k I HEREBY CERTIFY that on this day, before me, an officer duly authorized in the State and County aforesaid to take acknowledgments, personally appeared LESLEY A. NORTHUP, a single woman, an4 ED1TH DAYLE PECK, a single woman, who plDouced } C a 1" 1Y�i'�'� t 1 f ��C�2 and C1 'I t tYl, _, respectively, as identification, and who executed the foregoing instrument and acknowledged before me that they executed the same. �3-C Witness my hand and official seal in the day of , a�l�JuLY /' , 2019. `. My commission expires: and State last aforesaid this IC State of FLORIDA at Large ALEXUS PALMER State of Florida -Notary Public Commission 4 GG 155550 My Commission Expires October 29, 2021 A-TEK PEST CONTROL C EPA 13 A019 B'Y: \I—/ Al ' August 27, 2019 To Whom It May Concern: This letter is to certify that the property address; 1298 NE 95 Street, Miami Shores, F133138 has been treated, inspected, and cleared of any pest infestation. If you have any questions in regards to the services provided, please contact our office @ 786-287-2514. Thank you, Tito Bonila A-Tek Pest Specialist �` 931 NW 41 Ave PHONE 786-287-2514 A TEK Miami, FI 33126 PEST CONTROL Miami -Dade EMAIL atekpestcontrol@gmail.com RESIDFNTIAL COMMERCIAL WEBSITE Atekpestcontrol.com EP 10 �019 Miami, August 28, 2019 Miami Shores Village Building Department Re: Authorization to demolish property at 1298 NE 95 Street I, Yuri Morales, owner of the property located at 1298 NE 95 Street, Miami Shores, FL 33138, hereby authorize Allied Demolition, Inc. to demolish said property. You may contact me with any questions at (305)790-3849. Respectfully, Yuri orales �-ul lain r r� t ns i7'�.tn,�2r�.1' �/�%? �, �al ff .& 154- Zo 1 q b T Pj,ok-ed r16hda IJyryw VIVONNE LANDERO Notary Public - State of Florida Commission # GG 006859 My Comm. Expires Jun 28, 2020 Miami, August 28, 2019 Miami Shores Village Building Department Re: Notification of date to demolish property at 1298 NE 95 Street To Whom It May Concern: This is to notify that the pr% at 1298 NE 95 Street, Miami Shores, FL 33138, will be fully demolished on u1 "IED lY' 1 SEP 113 019 mm Cedeno lied Demolition, Inc RESIDENTIAL WATER ONLY, On ne 115er, REMOVE METER (FIELD), Completed, kv Scheduled 10-15-2019 12:OOAM YID 523531216R. ky RESIDENTIAL WATER ONLYJMeter Road Of&1161131111290 ME 95TH ST, MWII SHORES, ��®�® 'pp F1. 33138-2550, Residence - y,c REMOVE METER (FIELD) C—tW on 10-11-2019 2:06PM by user E306596. 3otetFkne 1 l'r.1J19 100AN, A7 cal w Competed Y Punta, Pr AY:T« E•gde. for la path a-lp MIV�i. -�„ Feld work Inte0ration(FWr)via Field Work PIP r if., No Fdd Order Information 3 1 0.3Q.i9313i 637i8ial(SY132 IM—i,-te 5tatuv I`v PLEA FRWP.TMETFP FOR DPMO PERMIT.09-19-2129 MUWI SHORFi YR1AWSC wbmnwve mdm ploy eat sd � , idd Actitrirty - RESIDENTIAL WATER ONLY, On-line tier, REMOVE METER (FIELD), Coarpeted, Scheduled 10-15-i01912:00AM wAj'c-'-)0 b0C--� NOT 1 Q vA� i �IO,C9L_C-S Fidel Ar*Ay LD �CC� r �V7- C8 l\( Fi4 1;14 T 015�1 ....... . .. • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • ��wnPuuwr V ,�• Sync Requct Fidel Acb Ay C—plebon, Proceasal, 10-14-2019 12:05PM < .> Favorite links Control Central -A 11: formation CUM— Contact + i?J Social Security Lock Up Mims Dade Property Appraser 141 SUHOt2 IS]. CLIENTCONSOLE ACH (EIMUNG) I CLLEHTCONSOLE-CC(CREDIT I?] ARD) It —Dade Sera . 121g Citation Searck- MD Clerk (.9a Case+ Alerls Prese Note Ca - Adwe - [uffenlcmt•xt 1290 NE 951 H ST, MIAMI SHORES, FL, 331.38-2550, j Redolence p% o v�-8c-Q T��i 0 FPL September 25, 2019 Yuri Morales. 1298 NE 95TM ST Miami, FL 33138 Re:1298 NE 95TM ST, MIAMI FL 33138 M. CT 214 Z019 Effective 09114/2019, FPL has removed the meter and disconnected the FPL service wire to the above referenced address. If there are any questions, or if I may be of further assistance in this matter, please contact me at the telephone number below. Sincerely, Miguel Piacquadio Associate Engineer 305.626.2794 An FPL Group Company • , ' •• rtrtt •tttt, • • , •tt• • • •ttrt ttrtr• ••rtt• � • •rtrt• •ttst• •• •• • • • •• •• • • • • • • • • • PROJECT INFORMATI©N•:'• • Goo : • • . . . Location • • • •wilding owner • Program user 'Company Comments .. By Dataset name Calculation time TRACE® 700 version Location Latitude Longitude Time Zone Elevation Barometric pressure Air density Air specific heat Density -specific heat product Latent heat factor Enthalpy factor Summer design dry bulb Summer design wet bulb Winter design dry bulb Summer clearness number Winter clearness number Summer ground reflectance Winter ground reflectance Carbon Dioxide Level Design simulation period Cooling load methodology Heating load methodology 1:lserver2lCalculations\TRACE-700-20151Morales Residence.trc 04:56 PM on 06/03/2019 6.2.10 Miami, Florida 25.0 deg 80.0 deg 5 7 ft 29.9 in. Hg 0.0760 0.2444 1.1151 4,908.6 4.5619 91 78 47 0.95 0.95 0.20 0.20 Ib/cu ft Btu/Ib-°F Btu/h-cfm-OF Btu-min/h-cu ft lb-min/hr-cu ft OF OF OF 400 ppm January - December TETD-TA1 UATD %RACEm .ad,•.nom T,.m T • • • • • • • • • • • •• •• • • • •• •• • ... . ..... . ••• . . . ... • • • . ... 1ST FLOOR System Checksums By .... COOLING COJLPEAK .: .: JOI.G SPACE PEAK Peaked at Time: : : -: 146/1-14 9 / 1%. • : ! •: Mo/Hr: Sum of Outside Air: ' .6AQ6A1VB/HJ4 $99 J6 / 114 :. ; .' OADB: Peaks Space Plenum Net Percent Sens. + Lat. SerW,. +1 at Total Af.Total Btu/h '. BC41 PtLth :. (yy) Envelope Loads • • • • • • • • Jr Skylite Solar 0 .. : c '.' : 0.0:.. .Q� Skylite Cond 0 0 0 0 Roof Cond 0 0 0 0 Glass Solar 19,034 0 19,034 36 i Glass/Door Cond 6,376 0 6,376 12 Wall Cond 4,010 1,742 5,752 11 Partition/Door 0 0 0 Floor 0 0 0 Adjacent Floor 0 0 0 0 Infiltration 4,866 4,866 9 Sub Total =_> 34,285 1,742 36,027 68 Internal Loads Lights 3,276 819 4,096 8 People 2,000 0 2,000 4 Misc 8,191 0 8,191 15 Sub Total =_> 13,468 819 14,287 27 Ceiling Load 505 -505 0 0 Ventilation Load 0 0 3,041 6 Adj Air Trans Heat 0 0 0 i Dehumid. Ov Sizing 0 0 Ov/Undr Sizing 0 0 0 i Exhaust Heat -115 -115 0! Sup. Fan Heat 0 0 i Ret. Fan Heat 0 0 0 i Duct Heat Pkup 0 0 0 Underflr Sup Ht Pkup 0 0 Supply Air Leakage 0 0 0 Grand Total =_> 48,257 1,941 53,239 100.00: Variable Temperature Constant Volume HEATING COIL PEAK Mo/Hr: Heating Design OADB: 47 Space Percent i Sensible Of Total i Btu/h (%) j Envelope Loads 0 0: Skylite Solar 0 0: Skylite Cond 0 0: Roof Cond 24,813 56 : Glass Solar 3,181 7 i Glass/Door Cond 2,442 6: Wall Cond 0 0 : Partition/Door 0 0: Floor 0 0: Adjacent Floor 803 2 ! Infiltration 31,238 71 Sub Total =_> Internal Loads 3,276 7 ! Lights 1,000 2: People 8,191 19 ; Misc 12,468 28 Sub Total =_> 369 1 Ceiling Load 0 0: Ventilation Load 0 0 ; Adj Air Trans Heat Ov/Undr Sizing 0 0 ; Exhaust Heat i OA Preheat Diff. i RA Preheat Diff. Additional Reheat i Underflr Sup Ht Pkup Supply Air Leakage 44,075 100.00' Grand Total ==> COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR Leave DBfWB/HR ton MBh MBh cfm °F °F gr/lb °F °F gr/lb Main Clg 4.4 53.2 46.8 2,682 76.0 63.1 65.8 60.3 56.6 62.5 Aux Clg 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Total 4.4 53.2 Space Peak Space Sens Btu/h 0 0 0 0 -11,212 -5,102 0 0 0 -2,462 -18,777 0 0 0 0 -442 0 0 0 -19,219 Coil Peak Percent Tot Sens Of Total Btu/h (%) 0 0.00 0 0.00 0 0.00 0 0.00 -11,212 49.93 -7,345 32.71 0 0.00 0 0.00 0 0 -2,462 10.96 -21, 019 93.60 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 -1,539 6.85 0 0 0 0.00 101 -0.45 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 -22,457 100.00 AREAS Gross Total Glass Floor 2,400 Part 0 Int Door 0 ExFlr 0 Roof 0 0 0 Wall 2,070 738 36 Ext Door 0 0 0 TEMPERATURES Cooling Heating SADB 60.3 76.4 Ra Plenum 75.7 69.4 Return 75.7 69.4 ReVOA 76.0 68.9 Fn MtrTD 0.0 0.0 Fn BIdTD 0.0 0.0 Fn Frict 0.0 0.0 AIRFLOWS Cooling Heating Diffuser 2,682 2,682 Terminal 2,682 2,682 Main Fan 2,682 2,682 Sec Fan 0 0 Nom Vent 60 60 AHU Vent 60 60 Infil 96 96 MinStop/Rh 0 0 Return 2,778 2,778 Exhaust 156 156 Rm Exh 0 0 Auxiliary 0 0 Leakage Dwn 0 0 Leakage Ups 0 0 ENGINEERING CKS Cooling Heating % OA 2.2 2.2 cfm/ft2 1.12 1.12 cfm/ton 604.44 Tton 540.96 u/heft= 22.18 -9.36 No. People 4 HEATING COIL SELECTION CapacityCoil Airflow Ent Lvg MBh cfm °F °F i Htg -22.5 2,682 68.9 76.4 Htg 0.0 0 0.0 0.0 seat 0.0 0 0.0 0.0 iidif 0.0 0 0.0 0.0 Vent 0.0 0 0.0 0.0 d -22.5 Project Name: TRACE® 700 v6.2.10 calculated at 04:56 PM on 06/03/2019 Dataset Name: Morales Residence.trc Alternative - 1 System Checksums Report Page 1 of 2 F , . • •i• • • . •.• ... . ... . . . ..•. • 2ND FLOOR System Checksums - By .... COOLING QQJLJP�AK.; ••; .; ^13 SPACE PEAK Peaked at Time: : : • .: N%/Hr: 8 / 11. • : !.: Mo/Hr: Sum of Outside Air: ' .(5Ap8NV6/HX.871 JS / 11 Z ; ; • • OADB: Peaks Space Plenum Net Percent: Space Percent Sens. + Lat. Serys,+I-at Iatal L3fJotaj: Sensible Of Total Btu/h ' • BUJ : : rtlah : • ('/y� j Btu/h (%) Envelope Loads • • • • • •. Skylite Solar 0 .. • ; Q '.' ; ;0 e • • , D+ 0 0 Skylite Cond 0 0 0 0 i 0 0 Roof Cond 0 0 0 0 i 0 0 Glass Solar 16,560 0 16,560 35: 16,560 43 Glass/Door Cond 1,761 0 1,761 41 1,761 5 Wall Cond 5,925 1,701 7,626 16 : 5,925 15 Partition/Door 0 0 0 0 0 Floor 0 0 0 0 0 Adjacent Floor 0 0 0 0 0 0 Infiltration 4,430 4,430 9 1,251 3 Sub Total =_> 28,676 1,701 30,377 64 25,497 66 Internal Loads Lights 3,276 819 4,096 9 ! 3,276 8 People 2,000 0 2,000 4 i 1,000 3 Misc 8,191 0 8,191 17; 8,191 21 Sub Total =_> 13,468 819 14,287 30 ; 12,468 32 Ceiling Load 598 -598 0 0 598 2 Ventilation Load 0 0 2,769 6 0 0 Adj Air Trans Heat 0 0 0! 0 0 Dehumid. Ov Sizing 0 0 Ov/Undr Sizing 0 0 0; 0 0 Exhaust Heat -137 -137 0 Sup. Fan Heat 0 0 Ret. Fan Heat 0 0 0 Duct Heat Pkup 0 0 0 Underflr Sup Ht Pkup 0 0 Supply Air Leakage 0 0 0 Grand Total ==> 42,742 1,785 47,296 100.00- 38,563 100.00 COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR ton MBh MBh cfm °F °F gr/lb Main Clg 3.9 47.3 41.1 2,095 76.1 63.2 66.1 Aux Clg 0.0 0.0 0.0 0 0.0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 Total 3.9 47.3 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total =_> nternal Loads Variable Temperature Constant Volume HEATING COIL PEAK Mo/Hr: Heating Design OADB: 47 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 -4,224 -4,224 23.47 -7,659 -9,890 54.97 0 0 0.00 0 0 0.00 0 0 0 -2,462 -2,462 13.68 -14,345 -16,576 92.12 Lights People Misc Sub Total =_> veiling Load /entilation Load \dj Air Trans Heat )v/Undr Sizing Exhaust Heat )A Preheat Diff. to Preheat Diff. \dditional Reheat Jnderflr Sup Ht Pkup Supply Air Leakage ;rand Total ==> Leave DB/WB/HR °F °F gr/lb 58.5 55.7 62.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0 0 0 -530 0 0 0 -14,874 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 -1,539 8.55 0 0 0 0.00 121 -0.67 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 -17,994 100.00 AREAS Gross Total Glass ft2 (%) Floor 2,400 Part 0 Int Door 0 ExFlr 0 Roof 0 0 0 Wall 2,070 278 13 Ext Door 0 0 0 TEMPERATURES Cooling Heating SADB 58.5 76.4 Ra Plenum 75.8 69.3 Return 75.8 69.3 Ret/OA 76.1 68.7 Fn MtrTD 0.0 0.0 Fn BIdTD 0.0 0.0 Fn Frict 0.0 0.0 AIRFLOWS Cooling Heating Diffuser 2,095 2,095 Terminal 2,095 2,095 Main Fan 2,095 2,095 Sec Fan 0 0 Nom Vent 60 60 AHU Vent 60 60 Infil 96 96 MinStop/Rh 0 0 Return 2,191 2,191 Exhaust 156 156 Rm Exh 0 0 Auxiliary 0 0 Leakage Dwn 0 0 Leakage Ups 0 0 ENGINEERING CKS Cooling Heating % OA 2.9 2.9 cfm/ft2 0.87 0.87 cfm/ton 531.50 ft2/ton 608.93 Btu/heft' 19.71 -7.50 No. People 4 HEATING COIL SELECTION CapacityCoil Airflow Ent Lvg MBh cfm °F °F i Htg -18.0 2,095 68.7 76.4 Htg 0.0 0 0.0 0.0 eat 0.0 0 0.0 0.0 idif 0.0 0 0.0 0.0 Vent 0.0 0 0.0 0.0 1 -18.0 Project Name: (RACE® 700 v6.2.10 calculated at 04:56 PM on 06/03/2019 Dataset Name: Morales Residence.trc Alternative - 1 System Checksums Report Page 2 of 2 . . . . ... . . . ... . . . . . . . . . . BUILDING U-FACTORS .... .. . .. .. . .. ... . ... .• Internal Exposed Description • : ; Pshiog • :door. � � Floor Alternative 1 . . . . • _- ,... . ....,.... 1 st FLOOR - Zone 0.000 0.000 0.000 1 ST FLOOR - System 0.000 0.000 0.000 2ND FLOOR - Zone 0.000 0.000 0.000 2ND FLOOR - System 0.000 0.000 0.000 ROOM U-FACTORS Summer Winter Skylight Skylight Roof 0.000 0.000 0.000 0.000 Btu/h-ft2-°F Summer Winter Window Window Room Room External Mass Capacitance Door Wall Ceiling I Ib/ft2 Btu/Ib•°F 12.1 0.000 0.000 0.650 0.661 0.000 0.242 0.317 60.1 0.000 0.000 0.650 0.661 0.000 0.242 0.317 60.1 12.1 0.000 0.000 0.650 0.661 0.000 0.242 0.317 76.2 15.4 0.000 0.000 0.650 0.661 0.000 0.242 0.317 76.2 15.4 Overall U-Factors Overall Thermal Transfer Values Roof 0.000 Btu/h-ft2-OF Roof (OTTVr) 0.00 Btu/hr-ft2 Wall 0.342 Btu/h-ft2.°F Wall (OTTVw) 20.86 Btu/hrft2 Building 0.342 Btu/h•ft2.°F Project Name: TRACE® 700 v6.2.10 calculated at 04:56 PM on 06/03/2019 Dataset Name: Morales Residence.trc Building LI-Factors Report Page 1 of 1 FORM R405-2017 RESIDENTIAL ENERGY CONSERVATION CODE DOCUMENTA Florida Department of Business and Professional Re "o Simulated Performance Alternative (Performance) Applications for compliance with the 2017 Florida Building Code, Energy Conservation via the residential Simulated Performance Method shall include: This checklist '....' Cf A Form R405 report that documents that the Proposed Design complies with Suction ...... R405.3 of the Florida Energy Code. This form shall include a summary page • • • • • indicating home address, a -ratio and the pass or fail status along with summary ":" ...... areas and types of components, whether the home was simulated as a worst-caSp • ; • • • • ; :""' orientation, name and version of the compliance software tool, name of individual • • •' ..... completing the compliance report (one page) and an input summary checklist tNV.&&t . • • • • • • • .. .. be used for field verification (usually four pages/may be greater). .. .. ...... • . . . . ...... 12( Energy Performance Level (EPL) Display Card (one page) • HVAC system sizing and selection based on ACCA Manual S or per exceptions provided in Section R403.7 E� Mandatory Requirements (five pages) Required prior to CO for the Performance Method: ❑ Air Barrier and Insulation Inspection Component Criteria checklist (Table R402.4.1.1 - one page) ❑ A completed Envelope Leakage Test Report (usually one page) ❑ If Form R405 duct leakage type indicates anything other than "default leakage" then a completed Form R405 Duct Leakage Test Report (usually one page) 8/20/2019 1:57:15 PM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 1 of 1 FORM R405-2017 FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION Florida Department of Business and Professional Regulation - Residential Performance Method Project Name: Morales Residence Builder Name: Street: 1298 NE 95th Street Permit Office: City, State, Zip: Miami Shores , FL, 33138 Permit Number: Owner: Jurisdiction: Design Location: FL, Miami County: Miami -Dade (Florida Climate Zone 1 ) 1. New construction or existing New (From Plans) 9. Wall Types (3312.0 sqft.) Insulation Area 2. Single family or multiple family Single-family a. Concrete Block - Int Insul, Exterior R=4.1 3312.00 ft2 b. N/A R= ft2 3. Number of units, if multiple family 1 c. N/A R= ft2 4. Number of Bedrooms 6 d. N/A R= ft2 5. Is this a worst case? No 10. Ceiling Types (4800.0 sqft.) Insulation Area a. Knee Wall (Unvented) R=19.00 • •W@0.00 ft2 6. Conditioned floor area above grade (ft2) 4800 b. N/A • • R= 00060 ft2 • • • • • • Conditioned floor area below grade (ft2) 0 c. N/A 11. Ducts ' • •' • .. ft2 :R= ...... '.;.•0 ft2....;. 7. Windows(849.0 sqft.) Description Area a. Sup: 1st Floor, Ret: 1st Floor, AH: 1St Floor 6 120 a. U-Factor: Sgl, U=0.65 849.00 ft2 b. Sup: 2nd Floor, Ret: 2nd Floor Ann. lnd Floor ' 6 120;..00; SHGC: SHGC=0.50 •����• :•••:• b. U-Factor: N/A ft2 12. Cooling systems • • • • kBtu/ht Efficiency • • 6 • • SHGC: a. Central Unit • • 0 • • : 48.0 •SEEW 17.00 • + • • • b. Central Unit .. .. 60.11.51%1:17.00. c. U-Factor: N/A ft2 SHGC: 13. Heating systems : �: �: kBtu/hr *Efficiency ' • d. U-Factor: N/A ft2 a. Electric Strip Heat ' ' 2':,, J:LP:1.00 """ SHGC: b. Electric Strip Heat ; • 22.6 COP:1.00 : Area Weighted Average Overhang Depth: 0.000 ft. 0 ... •• • • •• • • Area Weighted Average SHGC: 0.500 14. Hot water systems • • • • 8. Floor Types (4800.0 sqft.) Insulation Area a. EF: 0.000 a. Slab -On -Grade Edge Insulation R=0.0 4800.00 ft2 b. Conservation features b. N/A R= ft2 c. N/A R= ft2 15. Credits None Glass/Floor Area: 0.177 Total Proposed Modified Loads: 166.53 PASS Total Baseline Loads: 181.95 I hereby certify that the plans.adcif atioris covered by Review of the plans and STgl� this calculation are inicomplia ce ' ith � e:Fl hda Energy specifications covered by this Oi-04E J+ a 0 Code. - calculation indicates compliance � y4i` n,, '' _is " f �_�� with the Florida Energy Code. PREPARED BY: y Before construction is completed 11 _ _ - -_ _ DATE: = t' *. this building will be inspected for compliance with Section 553.908 4ti, - r a = ��',�.. r`/, •. �.�� V •` "' I hereby certify that this buildirag; es,desigried;;is'in compliance Florida Statutes. with the Florida Energy Code? , : +'` COD WIE i �^ y OWNER/AGENT: - _- BUILDING OFFICIAL: DATE: DATE: - Compliance requires certification by the air handler unit manufacturer that the air handler enclosure qualifies as certified factory -sealed in accordance with R403.3.2.1. - Compliance requires an Air Barrier and Insulation Inspection Checklist in accordance with R402.4.1.1 and this project requires an envelope leakage test report with envelope leakage no greater than 7.00 ACH50 (R402.4.1.2). 8/20/2019 1:57 PM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 1 of 4 FORM R405-2017 INPUT SUMMARY CHECKLIST REPORT PROJECT Title: Morales Residence Bedrooms: 6 Address Type: Street Address Building Type: User Conditioned Area: 4800 Lot # Owner Name: Total Stories: 2 Block/Subdivision: # of Units: 1 Worst Case: No PlatBook: Builder Name: Rotate Angle: 0 Street: 1298 NE 95th Street Permit Office: Cross Ventilation: County: Miami -Dade Jurisdiction: Whole House Fan: City, State, Zip: Miami Shores , Family Type: Single-family FL , 33138 New/Existing: New (From Plans) Comment: CLIMATE V Design Temp Int Design Temp Heating Design Daily Temp Design Location TMY Site 97.5 % 2.5 % Winter Summer Degree Days Moisture Range FL, Miami FL_MIAMI_INTL_AP 51 90 70 75 149.5 00 Ott• Low • • •••• •••••• BLOCKS000006 Number Name Area Volume • • • • • • • ' • 1 Blockl 2400 19200 •••• ' ' • • • • • • ••••• 2 Block2 2400 19200 • • • • • • • • • • • • • SPACES ` Number Name Area Volume Kitchen Occupants Bedrooms Infi6lD *Finished; 0 •'Coded • Heated 1 1st Floor 2400 19200 Yes 3 2 1 " lies : •Yes `Yes ' •••• 2 2nd Floor 2400 19200 No 4 4 1 Yes Yes Yes FLOORS # Floor Type Space Perimeter Perimeter R-Value Area Joist R-Value Tile Wood Carpet 1 Slab -On -Grade Edge Insulatio 1st Floor 207 ft 0 2400 ft' 0 0 1 2 Slab -On -Grade Edge Insulatio 2nd Floor 207 ft 0 2400 ftZ 0 0 1 ROOF V Roof Gable Roof Rad Solar SA Emitt Emitt Deck Pitch # Type Materials Area Area Color Barr Absor. Tested Tested Insul. (deg) 1 Flat Concrete 2408 ft' 100 ft' White N 0.1 No 0.1 No 30 4.8 ATTIC / v # Type Ventilation Vent Ratio (1 in) Area RBS IRCC 1 No attic Unvented 0 2400 ftZ N N 8/20/2019 1:57 PM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 2 of 4 FORM R405-2017 INPUT SUMMARY CHECKLIST REPORT CEILING # Ceiling Type Space R-Value Ins Type Area Framing Frac Truss Type 1 Knee Wall (Unvented) 1 st Floor 19 Blown 2400 ftz 0.11 Wood 2 Knee Wall (Unvented) 2nd Floor 19 Blown 2400 ftZ 0.11 Wood WALLS Adjacent Cavity Width Height Sheathing Framing Solar Belo w # Ornt Space To Wall Type 1 N Exterior Concrete Block - Int Insul 1st Floor 4.0999 42 8 336.0 ft' 0 0.200000 0 2 E Exterior Concrete Block - Int Insul 1st Floor 4.0999 55 8 440.0 ft' 0 0.200000 0 3 S Exterior Concrete Block - Int Insul 1st Floor 4.0999 52 8 416.0 ft' 0 0.200000 0 4 W Exterior Concrete Block - Int Insul 1st Floor 4.0999 58 8 464.0 ft' 0 0.200000 0 5 N Exterior Concrete Block - Int Insul 2nd Floor 4.0999 42 8 336.0 ft' 0 0.200000 0 6 E Exterior Concrete Block - Int Insul 2nd Floor 4.0999 55 8 440.0 ft' 0 0.200000 0 7 S Exterior Concrete Block - Int Insul 2nd Floor 4.0999 52 8 416.0 ftz 0 .'tlfto00 0 8 W Exterior Concrete Block - Int Insul 2nd Floor 4.0999 58 8 464.0 ft2 ' •.' ; 0 0.�00000 DOORS ••••.. • # Omt Door Type Space Storms U-Value • Wrd1% He+9V •:. Area Ft • In Ft • In ••••• _ 1 N Wood 1st Floor None .2 .1 • • 1 • • . .0 ti`• • • • •• •. •• •• WINDOWS • ' Orientation shown is the entered, Proposed orientation. • • • • • • • • / Wall Overhagg.' ; : • • • • # Ornt ID Frame Panes NFRC U-Factor SHGC Imp Area Depth Separation • IntShade• Screening' 1 N 1 Metal Single (Tinted) Yes 0.65 0.5 N 135.0 ft' 0 ft 0 in 0 ft 0 in Drapes/blinds None 2 E 2 Metal Single (Tinted) Yes 0.65 0.5 N 264.0 ft' 0 ft 0 in 0 ft 0 in Drapes/blinds None 3 S 3 Metal Single (Tinted) Yes 0.65 0.5 N 144.0 ft' 0 ft 0 in 0 ft 0 in Drapes/blinds None 4 W 4 Metal Single (Tinted) Yes 0.65 0.5 N 60.0 ft' 0 ft 0 in 0 ft 0 in Drapes/blinds None 5 N 5 Metal Single (Tinted) Yes 0.65 0.5 N 84.0 ft' 0 ft 0 in 0 ft 0 in Drapes/blinds None 6 E 6 Metal Single (Tinted) Yes 0.65 0.5 N 162.0 ft' 0 ft 0 in 0 ft 0 in Drapes/blinds None INFILTRATION # Scope Method SLA CFM 50 ELA EgLA ACH ACH 50 1 Wholehouse Proposed ACH(50) .000356 4480 245.95 462.54 .1906 7 HEATING SYSTEM # System Type Subtype Efficiency Capacity Block Ducts 1 Electric Strip Heat/ None COP:1 22.6 kBtu/hr 1 sys#1 2 Electric Strip Heat/ None COP:1 22.6 kBtu/hr 2 sys#2 8/20/2019 1:57 PM EnergyGaugeO USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 3 of 4 FORM R405-2017 INPUT SUMMARY CHECKLIST REPORT COOLING SYSTEM _ # System Type Subtype Efficiency Capacity Air Flow SHR Block Ducts 1 Central Unit/ Split SEER: 17 48 kBtu/hr 1600 cfm 0.75 1 sys#1 2 Central Unit/ Split SEER: 17 60 kBtu/hr 2000 cfm 0.75 2 sys#2 SOLAR HOT WATER SYSTEM FSEC Collector Storage Cart # Company Name System Model # Collector Model # Area Volume FEF ft2 DUCTS ---- Supply ---- ---- Return ---- Air CFM 25 CFM25 HVAC # v # Location R-Value Area Location Area Leakage Type Handler TOT OUT QN RLF Heat Cool 1 1st Floor 6 120 ft2 1st Floor 240 ft2 Default Leakage 1st Floor (Default) (Default) • • •. 1 1 2 2nd Floor 6 120 ft2 2nd Floor 240 ft2 Default Leakage 2nd Floor • (Default) ;Qgfaul •" 2 •'2 • • TEMPERATURES '••••• �0000� • Programable Thermostat: N Ceiling Fans: • • • • . • • • • • � �V.Cccttt CoolingJan Feb [[ ]] Mar Apr May Jun Jul Au Se Nov [ �D HeatinJan Feb [X] Mar f Apr I I May Jun Jul rl il Au rj �XjSepp�• •; N::D'Ventin Jan Feb [[XX]] Mar [X] A r May Jun Jul Aug • Se . Nos [ ]•De c Thermostat Schedule: HERS 2006 Reference Hours • �: �: ' • Schedule Type 1 2 3 4 5 6 7 8 • 9 ' 10 ;... 1 • '-• •1�..; -- - - - --- Cooling (WD) AM 78 - 78 78 78 -- 78 78 78 78 •a8 • 78. . 8 •?8• • • • PM 78 78 78 78 78 78 78 78 78 789 • 8 078 0 .... Cooling (WEH) AM 78 78 78 78 78 78 78 78 78 78 78 78 PM 78 78 78 78 78 78 78 78 78 78 78 78 Heating (WD) AM 68 68 68 68 68 68 68 68 68 68 68 68 PM 68 68 68 68 68 68 68 68 68 68 68 68 Heating (WEH) AM 68 68 68 68 68 68 68 68 68 68 68 68 PM 68 68 68 68 68 68 68 68 68 68 68 68 MASS Mass Type Area Thickness Furniture Fraction Space Default(8 Ibs/sq.ft. 0 ft2 Oft 0.3 1st Floor Default 8 Ibs/s .ft. 0 ft2 Oft 0.3 2nd Floor 8/20/2019 1:57 PM EnergyGaugeO USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 4 of 4 Florida Building Code, Energy Conservation, 6th Edition (2017) Mandatory Requirements for Residential Performance, Prescriptive and ERI Methods ADDRESS: 1298 NE 95th Street Permit Number: Miami Shores , FL, 33138 MANDATORY REQUIREMENTS See individual code sections for full details. I SECTION R401 GENERAL R401.3 Energy Performance Level (EPL) display card (Mandatory)The building official shall require that an energy performance level (EPL) display card be completed and certified by the builder to be accurate and correct before final approval of the building for occupancy. Florida law (Section 553.9085, Florida Statutes) requires the EPL display card to be included as an addendum to each sales contract for both presold and nonpresold residential buildings. The EPL display card contains information indicating the energy performance level and efficiencies of components installed in a dwelling unit. The building official shall verify that the EPL display card completed and signed by the builder accurately reflects the plans and specifications submitted to demonstrate code compliance for the building. A copy of the EPL display card can be found in Appendix RD. R402.4 Air leakage (Mandatory). The building thermal envelope shall be constructed to limit air leakage in accordance with the requirements of Sections R402.4.1 through R402.4.5. .""� Exception: Dwelling units of R-2 Occupancies and multiple attached single family dwellings shall b8 pemRited to • • • �' comply with Section C402.5. • • • 0 • • `•: •.' • 0 4 •••••• • w of R402.4.1 Building thermal enveld-e building thermal envelope shall comply with Sections R402.4.1.1 ar%P,4.0j%.1.2. • • • • • ' • The sealing methods between dissimilar materials shall allow for differential expansion and contraction. • • • • • • • • ••••• •• •• • • • •• •• •••••• R402.4.1.1 Installation The components of the building thermal envelope as listed in Table R402.4.1.1 she6b(b6istalled in accordance with • the manufacturer's instructions and the criteria listed in Table R402.4.1.1, as applicable to the method of cbnstRiclon. Where required by the ' code official, an approved third party shall inspect all components and verify compliance. • • • • • • ' • • • • • •• • • •• •••••• R402.4.1.2 Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate not exceediRg sever air ' • changes per hour in Climate Zones 1 and 2, and three air changes per hour in Climate Zones 3 through 8. Testing shall be con'ciucted in accordance with ANSI/RESNET/ICC 380 and reported at a pressure of 0.2 inch w.g. (50 pascals). Testing shall be conducted by either individuals as defined in Section 553.993(5) or (7), Florida Statutes, or individuals licensed as set forth in Section 489.105(3)(f), (g) or (i) or an approved third party. A written report of the results of the test shall be signed by the party conducting the test and provided to the code official. Testing shall be performed at any time after creation of all penetrations of the building thermal envelope. Exception: Testing is not required for additions, alterations, renovations, or repairs, of the building thermal envelope of existing buildings in which the new construction is less than 85 percent of the building thermal envelope. During testing: 1. Exterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended weatherstripping or other infiltration control measures. 2. Dampers including exhaust, intake, makeup air, backdraft and flue dampers shall be closed, but not sealed beyond intended infiltration control measures. 3. Interior doors, if installed at the time of the test, shall be open. 4. Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed. 5. Heating and cooling systems, if installed at the time of the test, shall be turned off. 6. Supply and return registers, if installed at the time of the test, shall be fully open. ❑ R402.4.2 Fireplaces. New wood -burning fireplaces shall have tight -fitting flue dampers or doors, and outdoor combustion air. Where using tight -fitting doors on factory -built fireplaces listed and labeled in accordance with UL 127, the doors shall be tested and listed for the fireplace. Where using tight -fitting doors on masonry fireplaces, the doors shall be listed and labeled in accordance with UL 907. R402.4.3 Fenestration air IeakageWindows, skylights and sliding glass doors shall have an air infiltration rate of no more than 0.3 cfm per square foot (1.5 L/s/m2), and swinging doors no more than 0.5 cfm per square foot (2.6 L/s/m2), when tested according to NFRC 400 or AAMA/ WDMA/CSA 101/I.S.2/A440 by an accredited, independent laboratory and listed and labeled by the manufacturer. Exception: Site -built windows, skylights and doors. 8/20/2019 1:57 PM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 1 of 5 MANDATORY REQUIREMENTS - (Continued) ❑R402.4.4 Rooms containing fuel -burning appliances. In Climate Zones 3 through 8, where open combustion air ducts provide combustion air to open combustion fuel burning appliances, the appliances and combustion air opening shall be located outside the building thermal envelope or enclosed in a room, isolated from inside the thermal envelope. Such rooms shall be sealed and insulated in accordance with the envelope requirements of Table R402.1.2, where the walls, floors and ceilings shall meet not less than the basement wall R-value requirement. The door into the room shall be fully gasketed and any water lines and ducts in the room insulated in accordance with Section R403. The combustion air duct shall be insulated where it passes through conditioned space to a minimum of R-8. Exceptions: 1. Direct vent appliances with both intake and exhaust pipes installed continuous to the outside. 2. Fireplaces and stoves complying with Section R402.4.2 and Section R1006 of the Florida Building Code, Residential. ❑ R402.4.5 Recessed lighting. Recessed luminaires installed in the building thermal envelope shall be sealed to limit air leakage between conditioned and unconditioned spaces. All recessed luminaires shall be IC -rated and labeled as having an air leakage rate not more than 2.0 cfm (0.944 L/s) when tested in accordance with ASTM E283 at a 1.57 psf (75 Pa) pressure differential. All recessed luminaires shall be sealed with a gasket or caulk between the housing and the interior wall or ceiling covering. SECTION R403 SYSTEMS R403.1 Controls. 0000 R403.1.1 Thermostat provision (Mandatory). At least one thermostat shall be provided for each sepa&ate ^ing and oot* system. • • • .. •• + • ❑ R403.1.3 Heat pump supplementary heat (Mandatory). Heat pumps having supplementary electric -resistance heat shall h4eOrttipIs •• that, except during defrost, prevent supplemental heat operation when the heat pump compressor can meet tie Ua'tTig load. • • • + • • • • • • R403.3.2 Sealing (Mandatory) All ducts, air handlers, filter boxes and building cavities that form the primary Vii gWtainment passageways : • • • •; for air distribution systems shall be considered ducts or plenum chambers, shall be constructed and sea led'ir jai jardance writ• $&ration • • C403.2.9.2 of the Commercial Provisions of this code and shall be shown to meet duct tightness criteria below. ' + • • • • • e • ••••• Duct tightness shall be verified by testing in accordance with ANSI/RESNET/ICC 380 by either individuals IM d8f hed in Section .993(5� 96 •+ • (7), Florida Statutes, or individuals licensed as set forth in Section 489.105(3)(f), (g) or (i), Florida Statutes•tb"tsubstantially jeak free" in • • • • • accordance with Section R403.3.3. + • + • r}i 000000 R403.3.2.1 Sealed air handler. Air handlers shall have a manufacturer's designation for an air leakaze grfo•more then 2 percent of. 0 IJ the design airflow rate when tested in accordance with ASHRAE 193. • • • • • • :' • • • n/ R403.3.3 Duct testing (Mandatory). Ducts shall be pressure tested to determine air leakage by one of the following mettlars:++' Rough -in test: Total leakage shall be measured with a pressure differential of 0.1 inch w.g. (25 Pa) across the system, including the manufi air handler enclosure if installed at the time of the test. All registers shall be taped or otherwise sealed during the test. 2. Postconstruction test: Total leakage shall be measured with a pressure differential of 0.1 inch w.g. (25 Pa) across the entire system, including the manufacturer's air handler enclosure. Registers shall be taped or otherwise sealed during the test. Exceptions: 1. A duct air leakage test shall not be required where the ducts and air handlers are located entirely within the building thermal envelope. 2. Duct testing is not mandatory for buildings complying by Section 405 of this code. A written report of the results of the test shall be signed by the party conducting the test and provided to the code official. ❑ R403.3.5 Building cavities (Mandatory). Building framing cavities shall not be used as ducts or plenums. ❑R403.4 Mechanical system piping insulation (Mandatory). Mechanical system piping capable of carrying fluids above 105°F (41°C) or below 55°F (13°C) shall be insulated to a minimum of R-3. ❑ R403.4.1 Protection of piping insulation. Piping insulation exposed to weather shall be protected from damage, including that caused by sunlight, moisture, equipment maintenance and wind, and shall provide shielding from solar radiation that can cause degradation of the material. Adhesive tape shall not be permitted. ❑ R403.5.1 Heated water circulation and temperature maintenance systems (Mandatory)Heated water circulation systems shall be in accordance with Section R403.5.1.1. Heat trace temperature maintenance systems shall be in accordance with Section R403.5.1.2. Automatic controls, temperature sensors and pumps shall be accessible. Manual controls shall be readily accessible. R403.5.1.1 Circulation systems. Heated water circulation systems shall be provided with a circulation pump. The system return pipe ❑ shall be a dedicated return pipe or a cold water supply pipe. Gravity and thermosiphon circulation systems shall be prohibited. Controls for circulating hot water system pumps shall start the pump based on the identification of a demand for hot water within the occupancy. The controls shall automatically turn off the pump when the water in the circulation loop is at the desired temperature and when there is no demand for hot water. ❑ R403.5.1.2 Heat trace systems. Electric heat trace systems shall comply with IEEE 515.1 or UL 515. Controls for such systems shall automatically adjust the energy input to the heat tracing to maintain the desired water temperature in the piping in accordance with the times when heated water is used in the occupancy. 8/20/2019 1:57 PM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 2 of 5 MANDATORY REQUIREMENTS - (Continued) ❑R403.5.5 Heat traps (Mandatory). Storage water heaters not equipped with integral heat traps and having vertical pipe risers shall have heat traps installed on both the inlets and outlets. External heat traps shall consist of either a commercially available heat trap or a downward and upward bend of at least 3 % inches (89 mm) in the hot water distribution line and cold water line located as close as possible to the storage tank. R403.5.6 Water heater efficiencies (Mandatory). R403.5.6.1.1 Automatic controls. Service water -heating systems shall be equipped with automatic temperature controls capable of adjustment from the lowest to the highest acceptable temperature settings for the intended use. The minimum temperature setting range shall be from 100°F to 140°F (38°C to 60°C). ❑ R403.5.6.1.2 Shut down. A separate switch or a clearly marked circuit breaker shall be provided to permit the power supplied to electric service systems to be turned off. A separate valve shall be provided to permit the energy supplied to the main burner(s) of combustion types of service water -heating systems to be turned off. R403.5.6.2 Water -heating equipment. Water -heating equipment installed in residential units shall meet the minimum efficiencies of Table C404.2 in Chapter 4 of the Florida Building Code, Energy Conservation, Commercial Provisions, for the type of equipment installed. Equipment used to provide heating functions as part of a combination system shall satisfy all stated requirements for t�e'2ppfgpriate water -heating category. Solar water heaters shall meet the criteria of Section R403.5.6.2.1. • . • • • • "";' R403.5.6.2.1 Solar water -heating systems. Solar systems for domestic hot water production are raled by the aAnlspfar energy,. • • • factor of the system. The solar energy factor of a system shall be determined from the Florida SoV t §grty Center Directory of • Certified Solar Systems. Solar collectors shall be tested in accordance with ISO Standard 9806, "felt R%fhods for Solar Collector! • • • • and SRCC Standard TM-1, Solar Domestic Hot Water System and Component Test Protocol. Colleoiors in instaIT9 Nor. � • water -heating systems should meet the following criteria: ' .. • • • • ";". 1. Be installed with a tilt angle between 10 degrees and 40 degrees of the horizontal; and ";"; • • • 2. Be installed at an orientation within 45 degrees of true south. • • • • " ' • R403.6 Mechanical ventilation (Mandatory). The building shall be provided with ventilation that meets the requirements of t 0e Florida Building Code, Residential, or Florida Building Code, Mechanical, as applicable, or with other approved means of vent ieh • • including: Natural, Infiltration or Mechanical means. Outdoor air intakes and exhausts shall have automatic or graviLV dampers that close when the ventilation system is not operating. • • • • R403.6.1 Whole -house mechanical ventilation system fan efficacy. When installed to function as a whole -house mechanical ventilation system, fans shall meet the efficacy requirements of Table R403.6.1. Exception: Where whole -house mechanical ventilation fans are integral to tested and listed HVAC equipment, they shall be powered by an electronically commutated motor. R403.6.2 Ventilation air. Residential buildings designed to be operated at a positive indoor pressure or for mechanical ventilation shall meet the following criteria: 1. The design air change per hour minimums for residential buildings in ASHRAE 62.2, Ventilation for Acceptable Indoor Air Quality, shall be the maximum rates allowed for residential applications. 2. No ventilation or air-conditioning system make-up air shall be provided to conditioned space from attics, crawlspaces, attached enclosed garages or outdoor spaces adjacent to swimming pools or spas. 3. If ventilation air is drawn from enclosed space(s), then the walls of the space(s) from which air is drawn shall be insulated to a minimum of R-11 and the ceiling shall be insulated to a minimum of R-19, space permitting, or R-10 otherwise. R403.7 Heating and cooling equipment (Mandatory). R403.7.1 Equipment sizing. Heating and cooling equipment shall be sized in accordance with ACCA Manual S based on the equipment loads calculated in accordance with ACCA Manual J or other approved heating and cooling calculation methodologies, based on building loads for the directional orientation of the building. The manufacturer and model number of the outdoor and indoor units (if split system) shall be submitted along with the sensible and total cooling capacities at the design conditions described in Section R302.1. This Code does not allow designer safety factors, provisions for future expansion or other factors that affect equipment sizing. System sizing calculations shall not include loads created by local intermittent mechanical ventilation such as standard kitchen and bathroom exhaust systems. New or replacement heating and cooling equipment shall have an efficiency rating equal to or greater than the minimum required by federal law for the geographic location where the equipment is installed. TABLE R403.6.1 WHOLE -HOUSE MECHANICAL VENTILATION SYSTEM FAN EFFICACY FAN LOCATION AIRFLOW RATE MINIMUM (CFM) MINIMUM EFFICACY a (CFM/WATT) AIRFLOW RATE MAXIMUIV (CFM) Range hoods Any 2.8 cfm/watt Any In -line fan Any 2.8 cfm/watt Any Bathroom, utility room 10 1.4 cfm/watt <90 Bathroom, utility room 90 2.8 cfm/watt Any For SI: 1 cfm = 28.3 L/min. a. When tested in accordance with HVI Standard 916 8/20/2019 1:57 PM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 3 of 5 MANDATORY REQUIREMENTS - (Continued) R403.7.1.1 Cooling equipment capacity. Cooling only equipment shall be selected so that its total capacity is not less than the calculated total load but not more than 1.15 times greater than the total load calculated according to the procedure selected in Section 403.7, or the closest available size provided by the manufacturer's product lines. The corresponding latent capacity of the equipment shall not be less than the calculated latent load. The published value for AHRI total capacity is a nominal, rating -test value and shall not be used for equipment sizing. Manufacturer's expanded performance data shall be used to select cooling -only equipment. This selection shall be based on the outdoor design dry-bulb temperature for the load calculation (or entering water temperature for water -source equipment), the blower CFM provided by the expanded performance data, the design value for entering wet -bulb temperature and the design value for entering dry-bulb temperature. Design values for entering wet -bulb and dry-bulb temperatures shall be for the indoor dry bulb and relative humidity used for the load calculation and shall be adjusted for return side gains if the return duct(s) is installed in an unconditioned space. Exceptions: 1. Attached single- and multiple -family residential equipment sizing may be selected so that its cooling capacity is less than the calculated total sensible load but not less than 80 percent of that load. 2. 0000 When signed and sealed by a Florida -registered engineer, in attached single- and multiple -family units, the ca0gP4),a1' • • • • : • equipment may be sized in accordance with good design practice. • • • • R403.7.1.2 Heating equipment capacity. • • • • • •' 000000 R403.7.1.2.1 Heat pumps. Heat pump sizing shall be based on the cooling requirements as calcuWel?,%ctording to Section : • 0 0 •; R403.7.1.1, and the heat pump total cooling capacity shall not be more than 1.15 times greater than the design fooling Igpd ev%n if • • the design heating load is 1.15 times greater than the design cooling load. • • • 00000 • • • • • 0000 • • R403.7.1.2.2 Electric resistance furnaces. Electric resistance furnaces shall be sized within 4 kW of the desa requirements • • •••••• • calculated according to the procedure selected in Section R403.7.1. ; : • 0 • • • •00 : • •...•• • • R403.7.1.2.3 Fossil fuel heating equipment. The capacity of fossil fuel heating equipment with natural draftfatmdspheric bujneors. • shall not be less than the design load calculated in accordance with Section R403.7.1. 0606 R403.7.1.3 Extra capacity required for special occasions. Residences requiring excess cooling or heating equipment capacity on an intermittent basis, such as anticipated additional loads caused by major entertainment events, shall have equipment sized or controlled to prevent continuous space cooling or heating within that space by one or more of the following options: 1. A separate cooling or heating system is utilized to provide cooling or heating to the major entertainment areas. 2. A variable capacity system sized for optimum performance during base load periods is utilized. El and Systems serving multiple dwelling units (Mandatory). Systems serving multiple dwelling units shall comply with Sections C403 and C404 of the IECC—Commercial Provisions in lieu of Section R403. R403.9 Snow melt and ice system controls (Mandatory) Snow- and ice -melting systems, supplied through energy service to the building, shall include automatic controls capable of shutting off the system when the pavement temperature is above 50°F (10°C), and no precipitation is falling and an automatic or manual control that will allow shutoff when the outdoor temperature is above 40°F (4.8°C). ❑ R403.10 Pools and permanent spa energy consumption (Mandatory). The energy consumption of pools and permanent spas shall be in accordance with Sections R403.10.1 through R403.10.5. ❑ R403.10.1 Heaters. The electric power to heaters shall be controlled by a readily accessible on -off switch that is an integral part of the heater mounted on the exterior of the heater, or external to and within 3 feet (914 mm) of the heater. Operation of such switch shall not change the setting of the heater thermostat. Such switches shall be in addition to a circuit breaker for the power to the heater. Gas -fired heaters shall not be equipped with continuously burning ignition pilots. R403.10.2 Time switches. Time switches or other control methods that can automatically turn off and on according to a preset schedule shall be installed for heaters and pump motors. Heaters and pump motors that have built-in time switches shall be in compliance with this section. Exceptions: 1. Where public health standards require 24-hour pump operation. 2. Pumps that operate solar- and waste -heat -recovery pool heating systems. 3. Where pumps are powered exclusively from on -site renewable generation. ❑ R403.10.3 Covers. Outdoor heated swimming pools and outdoor permanent spas shall be equipped with a vapor -retardant cover on or at the water surface or a liquid cover or other means proven to reduce heat loss. Exception: Where more than 70 percent of the energy for heating, computed over an operation season, is from site -recovered energy, such as from a heat pump or solar energy source, covers or other vapor -retardant means shall not be required. ❑ R403.10.4 Gas- and oil -fired pool and spa heaters. All gas- and oil -fired pool and spa heaters shall have a minimum thermal efficiency of 82 percent for heaters manufactured on or after April 16, 2013, when tested in accordance with ANSI Z 21.56. Pool heaters fired by natural or LP gas shall not have continuously burning pilot lights. 8/20/2019 1:57 PM EnergyGaugeO USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 4 of 5 R403.10.5 Heat pump pool heaters. Heat pump pool heaters shall have a minimum COP of 4.0 when tested in accordance with AHRI 1160, Table 2, Standard Rating Conditions -Low Air Temperature. A test report from an independent laboratory is required to verify procedure compliance. Geothermal swimming pool heat pumps are not required to meet this standard. R403.11 Portable spas (Mandator%e energy consumption of electric -powered portable spas shall be controlled by the requirements of APSP-14. SECTION R404 ELECTRICAL POWER AND LIGHTING SYSTEMS R404.1 Lighting equipment (Mandatory). Not less than 75 percent of the lamps in permanently installed lighting fixtures shall be high -efficacy lamps or not less than 75 percent of the permanently installed lighting fixtures shall contain only high -efficacy lamps. Exception: Low -voltage lighting. R404.1.1 Lighting equipment (Mandatory)Fuel gas lighting systems shall not have continuously burning pilot lights. • • • • • • •••••• •••• *400 • •••••• •• • •••••• • • 8/20/2019 1:57 PM EnergyGaugeO USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 5 of 5 2017 - AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA TABLE 402.4.1.1 AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA Project Name: Morales Residence Builder Name: Street: 1298 NE 95th Street Permit Office: City, State, Zip: Miami Shores , FL , 33138 Permit Number: Y U Owner: Jurisdiction: w x Design Location: FL, Miami v COMPONENT AIR BARRIER CRITERIA INSULATION INSTALLATION CRITERIA General A continuous air barrier shall be installed in the building envelope. Air -permeable insulation shall The exterior thermal envelope contains a continuous air barrier. not be used as a sealing material. requirements Breaks or joints in the air barrier shall be sealed. Ceiling/attic The air barrier in any dropped ceiling/soffit shall be aligned with the The insulation in any dropped ceiling/soffit insulation and any gaps in the air barrier shall be sealed. shall be aligned with the air barrier.• • • • ' Access openings, drop down stairs or knee wall doors to • • • •' • • .. • unconditioned attic spaces shall be sealed. • • • • Walls The junction of the foundation and sill plate shall be sealed. hdet fria�fne wall Cavities within comers ang eas . .. .•. The junction of the top plate and the top of exterior walls shall be shall be insulated t•y.co*m••pletely filling the cavity with sealed. a material having %illefrRll resistance of R-3 per:. •.: Knee walls shall be sealed. inch minimum. 009000 • • Exterior thermal enve" insulation for framed walls • • • shall be installed is aylasllaintial contact and • • • • continuous align i he air BqFogr.; • • •. • Windows, skylights The space between window/doorjambs and framing, and •. • • •. • • and doors skylights and framing shall be sealed. Rim joists Rim joists shall include the air barrier. Rim joists shall be.insuiated. • • • • • Floors The air barrier shall be installed at any exposed edge of Floor framing cavity insulation shallbA=talled to (including insulation. maintain permanent contact with the underside of above -garage subfloor decking, or floor framing cavity insulation and cantilevered shall be permitted to be in contact with the top side floors) of sheathing, or continuous insulation installed on the underside of floor framing and extends from the bottom to the top of all perimeter floor framing members. Crawl space walls Exposed earth in unvented crawl spaces shall be covered with Where provided instead of floor insulation, insulation a Class I vapor retarder with overlapping joints taped. shall be permanently attached to the crawlspace Shafts, penetrations Duct shafts, utility penetrations, and flue shafts opening to exterior or unconditioned space shall be sealed. Batts in narrow cavities shall be cut to fit, or narrow Narrow cavities cavities shall be filled by insulation that on installation readily conforms to the available cavity spaces. Garage separation Air sealing shall be provided between the garage and conditioned spac s. Recessed lighting Recessed light fixtures installed in the building thermal envelope Recessed light fixtures installed in the building shall be sealed to the drywall. thermal envelope shall be air tight and IC rated. Plumbing and wiring Batt insulation shall be cut neatly to fit around wiring and plumbing in exterior walls, or insulation that on installation readily conforms to available space shall extend behind pipinan wirin . Shower/tub The air barrier installed at exterior walls adjacent to showers and Exterior walls adjacent to showers and tubs shall on exterior wall tubs shall separate them from the showers and tubs. be insulated. Electrical/phone box or The air barrier shall be installed behind electrical or communication exterior walls boxes or air -sealed boxes shall be installed. HVAC register boots HVAC register boots that penetrate building thermal envelope shall be sealed to the sub -floor or drywall. Concealed When required to be sealed, concealed fire sprinklers shall only be sprinklers sealed in a manner that is recommended by the manufacturer. I Caulking or other adhesive sealants shall not be used to fill voids I between fire sprinkler cover plates and walls or cenlenas, a. In addition, inspection of log walls shall be in accordance with the provisions of ICC-400. 8/20/2019 1:57 PM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 1 of 1 2017 EPL DISPLAY CARD ENERGY PERFORMANCE LEVEL (EPL) DISPLAY CARD ESTIMATED ENERGY PERFORMANCE INDEX* = 92 The lower the Energy Performance Index, the more efficient the home. 1. New home or, addition 1. New (From Plans) 12. Ducts, location & insulation level a) Supply ducts R 6.0 2. Single-family or multiple -family 2. Single-family b) Return ducts R 6.0 c) AHU location varies 3. No. of units (if multiple -family) 3. 1 4. Number of bedrooms 4. 6 13. Cooling system: Capacity 108.0 a) Split system SEER.!_ • • 1 .0 5. Is this a worst case? (yes/no) 5. No b) Single package a • SEER• • • • • • c) Ground/water source •SEER/COPeo 6. Conditioned floor area (sq. ft.) 6. 4800 d) Room unit/PTAC ... • • • EEI�• • • - e) Other ...... 7. Windows, type and area .... a) U-factor:(weighted average) 7a. 0.650 ' .... • : • • • • • b) Solar Heat Gain Coefficient (SHGC) 7b. 0.500 14. Heating system: .....(;apacity. 45.2 c) Area 7c. 849.0 a) Split system heat g".• HSPF..•.; b) Single package hegtat"@ HSPF, 8. Skylights c) Electric resistance; . ; COP .1.0 a) U-factor:(weighted average) 8a. NA d) Gas furnace, natural gas. AFU • • •. • b) Solar Heat Gain Coefficient (SHGC) 8b. NA e) Gas furnace, LPG • • • : AFUI� f) Other • 9. Floor type, insulation level: a) Slab -on -grade (R-value) 9a. 0.0 b) Wood, raised (R-value) 9b. 15. Water heating system c) Concrete, raised (R-value) 9c. a) Electric resistance EF b) Gas fired, natural gas EF 10. Wall type and insulation: c) Gas fired, LPG EF A. Exterior: d) Solar system with tank EF 1. Wood frame (Insulation R-value) 10A1. e) Dedicated heat pump with tank EF 2. Masonry (Insulation R-value) 10A2. 4.1 f) Heat recovery unit HeatRec% B. Adjacent: g) Other 1. Wood frame (Insulation R-value) 10131. 2. Masonry (Insulation R-value) 10132. 16. HVAC credits claimed (Performance Method) 11. Ceiling type and insulation level a) Ceiling fans a) Under attic 1 la. b) Cross ventilation No b) Single assembly 11b. c) Whole house fan No c) Knee walls/skylight walls 11 c. 19.0 d) Multizone cooling credit d) Radiant barrier installed 11d. No e) Multizone heating credit f) Programmable thermostat No "Label required by Section R303.1.3 of the Florida Building Code, Energy Conservation, if not DEFAULT. I certify that this home has complied with the Florida Building Code, Energy Conservation, through the above energy saving features which will be installed (or exceeded) in this home before final inspection. Otherwise, a new EPL display card will be completed based on installed code compliant features. Builder Signature: Date: Address of New Home: 1298 NE 95th Street City/FL Zip: Miami Shores, FL 33138 8/20/2019 1:57:30 PM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 1 of 1 Envelope Leakage Test Report (Blower Door Test) Residential Prescriptive, Performance or ERI Method Compliance 2017 Florida Building Code, Energy Conservation, 6th Edition Jurisdiction: Permit #: Job Information Builder: Community: Lot: NA Address: 1298 NE 95th Street City: Miami Shores State: FL Zip: 33138 Air Leakage Test Results Passing results must meet either the Performance, Prescriptive, or ERI Method.. •• • • •• O PRESCRIPTIVE METHOD -The building or dwelling unit shall be tested and verified as having an air leakgpp jgtg pf not e-tc jig j 7 air • • changes per hour at a pressure of 0.2 inch w.g. (50 Pascals) in Climate Zones 1 and 2. • Q PERFORMANCE or ERI METHOD -The building or dwelling unit shall be tested and verified as having an aif "Itage rate Of not exceeding • the selected ACH(50) value, as shown on Form R405-2017 (Performance) or R406-2017 (ERI), section labeled moialilWaiion, sub-cectiom ACH58! ACH(50) specked on Form R405-2017-Energy Calc (Performance) or R406-2017 (ERI): • • +F.000 • • • • x 60 _ 38400 = Method for calculatiwq buildim.g volume: • CFM(50) Building Volume ACH(50) O Retrieved from arch itectUri%IQMs PASS IS Code software calculated When ACH(50) is less than 3, Mechanical Ventilation installation Q Field measured and calculated must be verified by building department. R402.4.1.2 Testing. Testing shall be conducted in accordance with ANSI/RESNET/ICC 380 and reported at a pressure of 0.2 inch w.g. (50 Pascals). Testing shall be conducted by either individuals as defined in Section 553.993(5) or (7), Florida Statues.or individuals licensed as set forth in Section 489.105(3)(f), (g), or (i) or an approved third party. A written report of the results of the test shall be signed by the party conducting the test and provided to thecode official. Testing shall be performed at any time after creation of all penetrations of the building thermal envelope. During testing: 1. Exterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended weatherstripping or other infiltration control measures. 2. Dampers including exhaust, intake, makeup air, back draft and flue dampers shall be closed, but not sealed beyond intended infiltration control measures. 3. Interior doors, if installed at the time of the test, shall be open. 4. Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed. 5. Heating and cooling systems, if installed at the time of the test, shall be turned off. 6. Supply and return registers, if installed at the time of the test, shall be fully open. Testing Company Company Name: Phone: I hereby verify that the above Air Leakage results are in accordance with the 2017 6th Edition Florida Building Code Energy Conservation requirements according to the compliance method selected above. Signature of Tester: Date of Test: Printed Name of Tester: License/Certification #: Issuing Authority: 8/20/2019 1:57:58 PM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 1 of 1