Loading...
RC-19-1246 (3)N V -3 ON 3, e 4 11V! - "10 'r - , . .4. a-% -J �: Certificate of Completion ��� �a� k ;f t Miami Shores Village 10050 N.E. 2nd Ave, Miami Shores, Florida 33138 Tel: 305-795-2204 Fax: 305-756-8972 Building Inspection Department JOL' 4, i Description: REMODEL KITCHEN, BATHROOM, 2 ROOMS & DEMO Permit Type Building (Residential) Bldg. Permit No. RC-05-19-1246 Owner PAUL WEIMER Contractor ERO NINE CONSTRUCTION MANAGEMENT LLB 7 Date Issued A Subdivision/Project 10/20/2020 Construction Type V-B Occupancy Single Family -A, Type Square Footage 1,000.00 Flood Zone X Location If the building is located in a special flood hazard area documentation of the as -built lowest floor AA 960 NE 95TH ST elevation or lowest horizontal structural member has been provided and is retained in the records of Miami Shores Village. Miami Shores, FL 33138 This certificate issued pursuant to the requirements of the Florida Building Code certifying that at the ORES time of issuance this structure was in compliance with the various ordinances of the jurisdiction AL a e regulating building construction or use. .0 Building Officials Approval Ismael Naranjo, CBO iht Jam' R1 Not Transferable POST IN A CONSPICUOU" 3 4. 'V A., it 1. '.1 - - vol - 4" ' - +- L' "!c ft Permit No. RC-05-19-12 Miami Shores Village - lie 5ttftr% (Re i Building Department - 10050 NE 2 Ave iNQ%r�G(aSS Aft@ t�� Miami Shcres FL 33138 rx ., RsmASfaiw: Approa[Q j issue Date: 7/17/2019 Expires: 01/13/202 INSPECTION REQUESTS: (305)762-4949 or log on at https://blog.msvfl.gov/energov_srod!selfservice Requests must be received by 3:30pm WORK IS ALLOWED: MONDAY THROUGH FRIDAY, 8 OOAM - TCCPIA SATURDAY 8:OOAM - 6:00PM. NO WORK IS ALLOWED ON SUNDAY OR HOLIDAYS BUILDING AND ROOFING INSPECTIONS ARE DONE MONDAY THROUGH FRIDAY . NO INSPECTION WILL BE MADE UNLESS THE PERMIT CARD IS DISPLAYED AND HAS BEEN APPROVED . PLANS ARE READILY AVAILABLE. IT IS THE PERMIT APPLICANTS RESPONSIBILITY TO ENSURE THAT WORK IS ACCESSIBLE AND EXPOSED FOR INSPECTION PURPOSES. NEITHER THE BUILDING OFFICIAL NOR THE CITY SHALL BE LIABLE FOR EXPENSE ENTAILED IN THE REMOVAL OR REPLACEMENT OF ANY MATERIAL REQUIRED TO ALLOW INSPECTION . POST ON SITE 113205007013( Owner's Name: PAUL WEIMER Owner's Phone: Job Address: 960 NE 95TH ST Total Square Feet: 1,000 Miami Shores, FL 33138 Total Job Valuation: $ 51,014.35 Contractor(s) Phone Address ZERO NINE CONSTRUCTION MANAGER (305)809-7644 55 MERRICK WAY STE 402, MIAMI, FL 33134 Description: REMQDEL KITCHEN , BATHROOM, 2 ROOMS & DEMOINI `1%\ l w�� v5 - Co WARNING TOO ER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED ,AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE COMMENCING WORK OR RECORDING YOUR NOTICE OF COMMENCEMENT. L .v(— •i of 1 INSPECTION RECORD kt� C 1�1✓.r. STRUCTURAL INSPECTION DATE INSP Foundation Stemwall Slab Columns (1st Lift) Columns (2nd Lift) Tie Beam Truss/Rafters Roof Sheathing Bucks Interior Framing Insulation Ceiling Grid Drywall -_— k Firewall _ Wire Lath _ Pool Steel Pool Deck Final Pool Final Fence Screen Enclosure Driveway Driveway Base Tin Cap Roof in Progress Mop in Progress AdW Final Roof Shutters Attachment Final Shutters Rails and Guardrails ' ADA compliance DOCUMENTS Soil Bearing Cert Soil Treatment Cert !Floor Elevation Survey �Reinf Unit Mas Cert 'Insulation Certificate ISpotSurvey Final Survey jTruss Certification STRUCTURAL COMMENTS 1 i i 5 WINDOWSDOORS INSPECTION ATE INS Attachment 1 PUBLIC INSPECTION WORKS DATE INSP, Excavation INSPECTION DATE INSP Temporary Pole 30 Day Temporary Pool Bonding Pool Deck Bonding Pool Wet Niche Underground Footer Ground Slab Wall Rough Ceiling Rough Rough Q-1 311 Telephone Rough Telephone Final TV Rough TV Final Cable Rough Cable Final ntercom Rough Intercom Final Alarm Rough Alarm Final Fire Alarm Rough Fire Alarm Final Service Work With �3 ELECTRICAL COM NTS INSPECTION _I DATE INSP I Final Sprinkler Final Alarm PLUMBING INSPECTION DATE Rough /w i _ Water Service 1;, P V. 2nd Rough Top out Fire Sprinklers Septic Tank Sewer Hook-up Roof Drains Gas LP Tank Well ^- ` Lawn Sprinklers Main Drain Pool Piping Backflow Preventor Interceptor Catch Basins _ Condensate Drains Final a4w J Co ! PLUMBING COMMENTS —I INSPECTION DATE INSP Underground Pipe Rough t Ventilation Rough Hood Rough '` f Pressure Test Final Hood Final Ventilation "1 Final Pool Heater Final Vacuum MECHANICAL COMMENTS