Issue Date: 02/04/2020
Parcel Number
1132050070130
Permit NO.: PL-01-20-235
Permit Type: Plumbing - Residential
Work Classification: Gas
Permit Status: Approved
Expiration: 08/03/2020
PAUL WEIMER Owner EMPIRE PLUMBING COMPANY Contractor
960 NE 95 ST, MIAMI SHORES, 33138 ALBERT V ELBAZ
1853 W WEST AVE
Business: 3055317017 ysoto@empireplumbing.com
Inspection Requests:
Description: SUPPLY AND INSTALL 2LB GAS SYSTEM FROM Valuation: $ 863.17 Inspec1305-762-4949i
METER TO STRUCTURE SUPPLING GAS COOK TOP AND GAS
TANKLESS WATER HEATER MOUNTED ON FLORIDA ROOM Total Sq Feet: 1,000.00
EXTERIOR WALL.
Fees
Amount
Application Fee - Other
$50.00
CCF
$0.60
DBPR Fee
$2.00
DCA Fee
$2.00
Education Surcharge
$0.20
Permit Fee
$50.00
Scanning Fee
$3.00
Technology Fee
$2.50
Total:
$110.30
Payments
Date Paid Amt Paid
Total Fees
$110.30
Credit Card
02/04/2020 $110.30
Amount Due:
$0.00
Building Department Copy
In consideration of the issuance to me of this permit, I agree to perform the work covered hereunder in compliance with all ordinances and regulations
pertaining thereto and in strict conformity with the plans, drawings, statements or specifications submitted to the proper authorities of Miami Shores
Village. In accepting this permit I assume responsibility for all work done by either myself, my agent, servants, or employes. I understand that separate
permits are required for ELECTRICAL, PLUMBING, MECHANICAL, WINDOWS, DOORS, ROOFING and SWIMMING POOL work.
OWNERS AFFIDAVIT: I certify that all the foregoing information is accurate and that all work will be done in compliance with all applicable laws
reaulatim cons uctim andtzoning. Futhermore, I authorize the above named contractor to do the work stated.
A
/ Applicant /
I.JGG T-►1;fi, .fix
Contractor / Agent
February 04, 2020 Page 2 of 2
Miami Shores Village
Building Department
10050 N.E.2nd Avenue, Miami Shores, Florida 33138
Tel: (305) 795-2204 Fax: (305) 756-8972
INSPECTION LINE PHONE NUMBER: (305) 762-4949
nNTERED
JAN 8M20
SY:
FBC 20 h L4
BUILDING Master Permit No. KC,-05-14-17-g[P.
PERMIT APPLICATION Sub Permit No`a' "' '" ""
—� - - - Z S
❑BUILDING ❑ ELECTRIC -- ❑ ROOFING ❑ REVISION ❑ EXTENSI0 ❑RENEWAL
OPLUMBING ❑ MECHANICAL PUBLIC WORKS ❑ CHANGE OF ❑ CANCELLATION ❑ SHOP
CONTRACTOR DRAWINGS
JOB ADDRESS: 960 NE 95 ST
City: Miami Shores County: Miami Dade Zip: 3313 a
Folio/Parcel#:1132050070130 Is the Building Historically Designated: Yes NO
Occupancy Type: Load: Construction Type: Flood Zone: BFE: FFE:
OWNER: Name (Fee Simple Titleholder): Paul Weimer Phone#:
��.960 NE 95 ST
City: Miami Shores
State: FL
Tenant/Lessee Name: Phone#:
Email
33138
CONTRACTOR: Company Name: Empire Plumbing Company Phone#: 3055317017
Address: 1754 Bay Road ,�, ^ Li Zr- 1 1 leI A4-JA
City: Miami Beach State: FL Zip: 33139
Qualifier Name: Albert V Elbaz Phone#: 3055317017
State Certification or Registration #: CFCO27516
Certificate of Competency #:
DESIGNER: Architect/Engineer: Phone#:
Address
State: Zip:
Value of Work for this Permit: $ Square/Linear Footage of Work:
Type of Work: ❑ Addition W Alteration ❑ New ❑ Repair/Replace ❑ Demolition
Description of Work: 'Supply and install 21b gas system from meter to structure suppling
I.1) Gas cook top 0) Gas tankless water heater mounted on Florida room exterior wall.
Specify color of color thru tile:
Submittal Fee $ Permit Fee $ CCF $ CO/CC $
Scanning Fee $
Technology Fee $
Structural Reviews $
Radon Fee $
Training/Education Fee $
DBPR $
Notary $
Double Fee $ _
Bond $
(Revised02/24/2014)
TOTAL FEE NOW DUE $ L `O - 30
Bonding Company's Name (if applicable)
Bonding Company's Address
City
State
Mortgage Lender's Name (if applicable)
Mortgage Lender's Address
City
State
Zip
Zip
Application is hereby made to obtain a permit to do the work and installations as indicated. I certify that no work or installation has
commenced prior to the issuance of a permit and that all work will be performed to meet the standards of all laws regulating
construction in this jurisdiction. I understand that a separate permit must be secured for ELECTRIC, PLUMBING, SIGNS, POOLS,
FURNACES, BOILERS, HEATERS, TANKS, AIR CONDITIONERS, ETC.....
OWNER'S AFFIDAVIT: I certify that all the foregoing information is accurate and that all work will be done in compliance with all
applicable laws regulating construction and zoning.
"WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY
RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND
TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING
YOUR NOTICE OF COMMENCEMENT."
Notice to Applicant: As a condition to the issuance of a building permit with an estimated value exceeding $2500, the applicant must
$promise in good faith that a copy of the notice of commencement and construction lien law brochure will be delivered to the person
whose property is subject to attachment. Also, a certified copy of the recorded notice of commencement must be posted at the job site
for the first inspection which occurs seven (7) days after the building permit is issued. In the absence of such posted notice, the
inspection will not be approved and a reinspection fee will be charged.
Signature �-*x� Signature
OWNER or AGENT CONTRACTOR
The foregoing instrument was acknowledged before me this The foregoing instrument was acknowledged before me this
30 day of 11 20 20 by day of 20 2-D _,by
who is personally known to �i�e��- IL01--Z w is personally known to
me or who has produced
identification and who did take an oath.
NOTARY PUBLIC:
Sign!
Print:`{' \Q I�P
Seal: h MY COMMISSION # GG 136485
LL
``op EXPIRES: December2l, 2021
`_ Bonded Thru Notary Public Underw, iters
as me or who has produced
identification and who did take an oath.
NOTARY PUBLIC:
Sign:
�,Qv:P'• �ELIS�t Dv iv
Print:
Seal: EXPIRES: December 21, 2021
�2rF'o'F F��e' Bonded Thru Notary Public Underwriters
n-1
APPROVED BY '0�11 Plans Examiner Zoning
Structural Review Clerk
(Revised02/24/2014)
,EMPIRE
�pLUMBING
EMPIRE PLUMBING COMPANYCFC 027516
Proposal Submitted To:
Framework Construction
Anthony Carter
Tel.: 651-231-4552
Email: frameworkconstruction(&-Yahoo.com
PROPOSAL/CONTRACT
Estimate: 101629
Date: May 6, 2019
Rep: Albert Elbaz/vmv
JOB NAME/LOCATION
Weimer Residence Remodel
960 NE 95 Street
Miami Shore, FL
Empire Plumbing shall perform work as described in the following proposal as per Plans dated
5/1 /2019, plumbing sheet P1.01, P1.02, P2.01, P2.02, P3.01, P3.02. Job scope limited to details
provided below.
Rough in drain waste vent, domestic water, ac condensate, gas piping and fixture connection as
follows:
- First Floor
o Install new 1" PVC water service from meter to structure. To include house shut off
and
o (1) Hose bib prior to entering home.
o (1) Hose bib behind lavatory of powder room
o (1) Hose bib mounted to main structure adjacent to patio structure. We shall also
terminate one valve to supply water to mister. Connection to mister and any related
work to mister not included.
• Water supply to rear structure shall be to existing %" exposed copper line where pipe
enters said structure.
• Sewer tie in connection to be made on the exterior back wall of kitchen to inlet side of the
4" clean out located in the sidewalk
- Gas
Supply and install 21b gas system from meter to structure (1" poly ethylene) within structure
1" propress copper pipe and fittings suppling
■ (1) Gas cook top
■ (1) Gas tankless water heater mounted on Florida room exterior wall.
Clearances permitting.
AC Condensate first floor to exterior previous ground
- Powder Room
o (1) Floor outlet water closet
o (1) Lavatory with deck faucet
1754 BAY ROAD. • MIAMI BEACH, FLORIDA 33139 • (305) 531-7017 • FAX: (305) 531-7044
DIRECT ALL E-MAIL: YSOTO(a)EMPIREPLUMBING.COM WEB SITE: WWW.EMPIREPLUMBING.COM PAGE 1 OF
EMPIRE
IpLUM81NG
- Kitchen
EMPIRE PLUMBING COMPANYCFC 027516
o (1) Kitchen sink
o (1) Dishwasher
o (1) Water to fridge
- 2"d Floor
o (1) Clothes washing machine in closet location
- Guest Bathroom
o (1) Water closet floor outlet
o (1) Bath tub with combination tub and shower valve
o (2) lavatories with deck mount faucets
- Master Bath
o (1) Water closet floor outlet
o (1) Shower pan membrane, standard shower drain, shower valve with ceiling rain
head
o (1) Wall hand held
- AC Condensate to first floor exterior previous ground
> Please Review Notes:
• Job Scope/work installation to meet the Florida Building Code Requirements.
• Job areas to be left broom clean.
• When biding work with concealed pipe conditions and poor quality of existing work change
orders may apply.
• No additional work outside of the above written scope will be performed unless discussed
and approved in writing by owner or owner representative.
> Not In Contract
• Fixtures, faucets, fire stopping, permit fees, patching, carpentry, concrete excavations, hot
water circulating system, pipe insulation, step down gas regulators
> Material Supplied
• Drain waste and vent PVC pipe and fittings
• Domestic water interior type M Sweet Copper and or propress copper
• Water service to house SCH 40 PVC pipe and fittings
• AC condensate PVC pipe and fittings
• Gas exterior to structure poly
BUDGET PRICE ............... $44,863.17
1754 BAY ROAD. • MIAMI BEACH, FLORIDA 33139 - (305) 531-7017 - FAX: (305) 531-7044
DIRECT ALL E-MAIL: YSOTO OCiEMPIREPLUMBING.COM WEB SITE: www.EMPIREPLUMBING.COM PAGE 2 of 4
W
.LUMBING EMPIRE COMPANYCFCO27516
ADDITIONAL PROVISIONS- Unless otherwise specified herein, the following additional provisions are expressly incorporated into this contract:
1. Contract, Plans, Specifications, Permits and Fees. The work described in this contract shall be done according to the plans and the plan specifications (if any)
except in the case of conflict when the provisions of this contract shall have control over both the plans and the plan specifications. All required building permits will be
paid for by Owner and obtained by Contractor. All other charges, taxes, assessments, fees etc., of any kind whatsoever, required by any government body, utility
company or the like shall be paid for by Owner.
2. Property Lines. Owner is responsible to locate and inform Contractor of the location of all property lines. At the discretion and direction of Contractor, Owner may
be required to provide at Owner's expense, a licensed surveyor's map of the property showing property lines.
3. Installation. Owner understands that Contractor may or may not install the materials. Contractor has the right to subcontract any part of, or all of, the work herein.
4. Change Orders. Should Owner, construction lender, or any government body or inspector require any modification to the work covered under this contract, any cost
incurred by Contractor shall be added to the contract price as extra work and Owner agrees to pay Contractor his normal selling price for such extra work. All extra work
as well as any other modifications to the original contract shall be specified and approved by both parties in a written change order. All change orders shall become a
part of this contract and shall be incorporated herein.
S. Owner's Responsibility: Insurance etc. Owner is responsible for the following: (1) to see that all necessary water, electrical power, access to premises, and toilet
facilities are provided on the premises. (2) to provide a storage area on the premises for equipment and materials. (3) to relocate and protect any item that prevents
Contractor from having free access to the work areas such as but not limited to furniture, appliances, draperies, clothing and other personal effects, TV or radio
antennas, vehicles, tools or garden equipment. In the event that Owner fails to relocate such items, Contractor may relocate these items as required but in no way is
Contractor responsible for damage to these items during their relocation and during the performance of the work. (4) to obtain permission from the owner(s) of adjacent
property (ies) that Contractor must use to gain access to the work areas. Owner agrees to be responsible and to hold Contractor harmless and accept any risks resulting
from the use of adjacent property (ies) by Contractor. (5) to correct any existing defects which are recognized during the course of the work. Contractor shall have no
liability for correcting any existing defects such as, but not limited to, dry rot, structural defects, or code violations. (6) to maintain property insurance with Fire, Course of
Construction, all Physical Loss with Vandalism and Malicious Mischief clauses attached, in a sum at least equal to the contract price, prior to and during performance of
this contract. If the project is destroyed or damaged by an accident, disaster or calamity, or by theft or vandalism, any work or materials supplied by Contractor in
reconstructing or restoring the project shall be paid for by Owner as extra work.
6. Delay. Contractor shall not be held responsible for any damage occasioned by delays resulting from: work done by Owner's subcontractors, extra work, acts of
owner or owner's agent including failure of owner to make timely progress payments or payments for extra work, shortages of material and/or labor, bad weather, fire,
strike, war, governmental regulations, or any other contingencies unforeseen by Contractor or beyond Contractors reasonable control.
7. Surplus Materials and Salvage. Any surplus materials left over after this contract has been completed are the property of Contractor and will be removed by same.
No credit is due Owner on returns for any surplus materials because this contract is based upon a complete job. All salvage resulting from work under this contract is
the property of Contractor.
8. Cleanup & Advertising. Upon completion, and after removing all debris and surplus materials, wherever possible, Contractor will leave premises in a neat, broom
clean condition. Owner hereby grants to Contractor the right to display signs and advertise at the job site for the period of time starting at the date of signing of this
contract and continuing uninterrupted until fourteen (14) days past the date the job is completed and payment in full has been made. Owner grants Contractor the right
to publish the project street address on a "references" list which may be given to prospective customers.
9. Unanticipated Conditions & Concealed damage. Expense incurred because of unusual or unanticipated conditions shall be paid for by owner as extra work
(conditions such as, but not limited to, ground conditions that require fill, or unusually hard soil, rocky soil, or the presence of ground water). Contractor will inform Owner
of any dry rot or other deterioration or unanticipated condition which is concealed and is discovered during the course of the work. Contractor is not responsible to repair
any such discovered deterioration or condition and any work done by Contractor to remedy such will only be done as extra work in a written change order.
10. Hazardous Substances. Owner understands that Contractor is not qualified as a Hazardous Material Handler or Inspector or as a Hazardous Material Abatement
contractor. Should any hazardous substances as defined by the government be found to be present on the premises, it is the Owners' responsibility to arrange and pay
for abatement of these substances.
11. Right to Stop Work and to Withhold Payment on Labor and Materials. If any payment is not made to Contractor as per this contract, Contractor shall have the
right to stop work and keep the job idle until all past due progress payments are received. Contractor is further excused by Owner from paying any material, equipment
and/or labor suppliers or any subcontractors (hereinafter collectively called "suppliers"), during the period that Owner is in arrears in making payments to Contractor for
bills received during that same period. If these same "suppliers" make demand upon Owner for payment, Owner may make such payment on behalf of Contractor and
Contractor shall reimburse Owner for this amount at such time that Owner becomes current with Contractor for all past due payments. Owner is responsible to verify the
true amounts owed by Contractor to these same "suppliers", prior to making payment on behalf of Contractor. Owner shall not be entitled, under any circumstances, to
collect as reimbursement from Contractor any amount greater than that exact amount actually and truly owed by Contractor to these same "suppliers", for work done or
materials supplied on Owner's job.
12. Collection. Owner agrees to pay all collection fees and charges including but not limited to all legal and attorney fees that result should Owner default in payment of
this contract. Overdue accounts are subject to interest charged at the rate of 18% per annum or at the highest rate allowed by law.
13. Legal Fees. In the event litigation or arbitration arises out of this contract, prevailing party (ies) are entitled to all legal, arbitration, and attorney fees. The court or
arbitrator shall not be bound to award fees based on any set, fee schedule but shall if it so chooses, award the true amount of all costs, expenses and attorney fees paid
or incurred.
14. Plumbing Fixtures To Be Supplied: All fixtures and trim to be supplied by others, unless otherwise specified. Fixture setting if applicable to this contract was based
on a Standard Fixture installation. The use of High -End or Premium Fixtures will carry an additional installation and special handling charges, unless otherwise noted.
Any trim we are to install under this contract with a furnished other than Chrome (Such as Polished Brass, Antique Brass, Nickel, Pewter, Gold, Polished Gold, Black
Lacquer, etc) will carry additional installation and special handling charges, unless otherwise noted. All showers /tubs to be feed by single valve only. Body sprayers,
hand held showers, thermostatic valves, and/or overhead rain bodies would require specifications and details will carry additional installation and special handling
charges, unless otherwise noted.
15. General Conditions: Construction telephone for local calls to be furnished by others at no charge to us. General Contractor or Owner will coordinate framing to
allow Empire Plumbing to proceed with installation of tubs and showers and to allow routing of piping. General Contractor to provide adequate supervision on site. Any
work Empire Plumbing is forced to redo due to inadequate supervision will be billed to Owner/Contractor. Sanitary sewer, storm drainage, and water service shall
terminate outside building wall without fittings or connection (Unless otherwise noted above). Backfill with same soil removed is assumed. Special backfill materials are
excluded; however, we can provide selected backfill material at an additional cost. Backfilling to inspection point only. All ground roughs to be installed in clean
foundation sand (All sand required to be provided by owners). Empire Plumbing is not responsible for drilling, cutting, or notching tile, marble, or granite tops, walls, or
floors. Ice maker connections made when refrigerator is in place. Empire not responsible for moving ice machines or refrigerators. A change
order will apply to any Isometric drawings done by Empire Plumbing, including change on plans or corrections on plans. After the replacement of any water piping
Empire Plumbing will flush out the existing plumbing system for the house, apartment, or building. In the event fixtures are in need of servicing or replacement an extra
shall apply and commence only upon owners Authorization.
16. Not Included: Permit fees, Mechanical Compaction of Trenches, Temporary Water, Temporary Toilets, Dumpster Service and Cartage from Site, Painting and Final
Cleaning of Fixtures or Materials, De -watering (If Applicable), All Concrete Work (Pads, curbs, thrust blocks, etc...), Stud framing removal due to framing errors and
replacement of same, Water tapping, sewer or storm fees, Water Meter, Handling De -crating and setting in place of appliances, Rock excavation and excavation of other
underground obstructions, Access Panels, Patching of Walls, Floors, Ceiling, Roofs, Driveways, Etc..., Any Overtime Work, Repair of any unforeseen piping in concrete
slab (electric, waste, etc), Air Conditioning Condensate Drainage (Unless specifically listed above), Utility Hook Up Fees, Setting of equipment supplied by others,
Kitchen Equipment or Related Trim (faucets, gas regulators, strainers, etc...), Sod or grass replacement, Temporary Utilities, Equipment and Personnel hoisting, Fire
1754 BAY ROAD. • MIAMI BEACH, FLORIDA 33139 • (305) 531-7017 • FAX: (305) 531-7044
DIRECT ALL E-MAIL: YSOTO(U)EMPIREPLUMBING.COM WEB SITE: WWW.EMPIREPLUMBING.COM PAGE 3OF4
EMPIRE
IPLU MBING
EmPIR
E PLUMBING COMPANYCFC 027516
Stopping of Floors, Walls, or Ceilings (Unless specifically listed above), Toilet Room Accessories (grab bars, soap dispensers, paper holder, etc...), Concrete Cutting or
Removal, Cutting or Notching Structural Concrete. If any concrete is to be removed under this contract it will be specifically listed. Should concrete removal be included
in this bid it was based on a 4" slab. Should a thicker slab be encountered additional charges will apply.
17. Empire Plumbing can not warrant any materials furnished by others.
18. Any deviations in the field requiring the redrawing and resubmitting of blueprints to the Building Departments will be responsibility of others.
19. All material is guaranteed to be as specified. All worked to be completed in a professional manner according to standard practices. Any alteration or deviation
from above specifications involving extra cost will be executed only upon written orders and will become extra charges over and above the estimate. All agreements
contingent upon strikes, accidents, or delays beyond our control. Title to all goods listed above remains in the name of Empire Plumbing Co. Until fully paid for C.O.D.
Purchaser agrees to pay all costs of collection, including attorney's fees of any delinquent balance. Purchaser agrees that this transaction shall be governed by the laws
of the State of Florida, and the venue shall be in Miami Dade County, Florida. No returns will be accepted without the written authorization of the management of Empire
Plumbing Co. There will be a 20% restocking fee on all returned material after inspection of said material. All balances are due upon completion of work, unless an
Agreement is in writing. A 1.5% per month service charge shall be applied to all past due balances. All return checks are subject to a $30.00 Service Fee.
This proposal is subject to acceptance within 30 days and is void thereafter at the option of the undersigned.
ACCEPTANCE OF PROPOSAL- The budget prices specifications and conditions are satisfactory and are hereby accepted.
You are authorized to do the work as specified. Payment to be made as outlined above.
OWNER:
By:
Name:
Title:
Date:
EMPIRE PLUMBING COMPANY:
Name: Albert Elbaz
Title: President
Date: May 6, 2019
1754 BAY ROAD. • MIAMI BEACH, FLORIDA 33139 • (305) 531-7017 • FAX: (305) 531-7044
DIRECT ALL E-MAIL: YSOTOCa7EMPIREPLUMBING.COM WEB SITE: WWW.EMPIREPLUMBING.COM PAGE 4OF4