Miami Shores 12-1ESRNovember 15, 2012
Mr. D. Ray Eubanks
Barbara A. Estep, MIJC
Village Clerk
Miami Shores Vill age
10050 N.E. 2nd Avenue
Miami Shores, FL 3:3135
a c
'oi;' µ . .�
itfit II I
Plan Processing Administrator
State Land Planning Agency
107 East Madison — MSC 160 Department of Eic: mondc C-Ippi:,runity
Divisic n of C•cir rr unip� Devo Ivro cent
Tallahassee, FL 32399 Bum;iu of c:crr, rnunity planr:ii g
Re: Miami Shores Village Transmittal of Proposed Comprehensive Plan Amendment
Dear Mr. Eubanks:
Pursuant to Florida State Statutes, please accept this package proposing to amend the 2025 Mianni Shares Villal;;e
Comprehensive Plan. The proposed amendment represents an exempt amendment from the two (2'.) per ralen aar year
criteria in that the amendment updates the Village's Five Year Capital Improvement Budget J Y2013-2017), as viell as the
County School Work Plan. During the regular meeting of November 6, 2012, the Village Council held a public hearing
and subsequently passed Ordinance No. 697-12, approving the proposed amendments and i ithcrizin; transmittal of
the amendment to the Department of Economic Opportunity.
De minimis impact records do not apply to this submittal by Miami Shores Village. Existing I ire Year Capital
Improvement Budget Pages, numbered 159 —188 should be deleted and new pages, numbered 1.59 — 165 of the Five
Year 2013-2017 Capital Improvement Budget pages should be added. I have attached the C tizer Cou -test/ Infornnation
List which contains no requests from interested parties. The Miami Daily Business Review is the local ,publication in
which the Notice of Intent should be advertised. Copies of the Comprehensive Plan Amends ent aresirr?Ultaneou. , y
being submitted to the agencies listed in Rule 9J-11.009(6), F.A.C.
The proposed Comprehensive Plan Amendment package was adopted without revision from the ',proposed am mdrnent
package and no objections were raised by an affected party, the amendment was not reviewed by the Department: or if
reviewed, no objections were raised. Based upon these facts, we request expedited publiczt on of a Notice of s!t:ent
pursuant to Section 163.3184(8), Florida Statutes.
Should you have any questions regarding this submittal, please do not hesitate to contact nn,, office.
Sincerely,
Barbara A. Estep, MMC
Village Clerk
BAE
Cc: Tom Benton, Village Manager
David Dacquisto, Planning & Zoning Director
Distribution List as Attached
Phone: (305) 795-2207 Fax: (305) 756-8972 E-Mail: estepb@mianiishoresvdIage.:um
DISTRIBUTION LIST
Tracy D. Suber
Educational Consultant
Department of Education
Office of Educational Facilities
325 West Gaines Street, Suite 1014
Tallahassee, FL 32399-0400
Susan Harp
Historic Preservation Planner
Department of State
Bureau of Historic Preservation
500 South Bronough Street
Tallahassee, FL 32399-0250
Rachel M. Kalin
South Florida Regional Planning Council
3440 Hollywood Boulevard
Hollywood, FL 33021
Jack Osterholt, Director
Miami Dade County Planning Department
11805 S.W. 261h Street
Miami, FL 33175
Jim Quiinn
Environmental Manager
Dept. of Environmental Protection
Intergovernmental Programs Office
3900 Commonwe 31th Blvd.
Mail Station 47
Tallahassee, FL 32399-30D0
Phil Ste!inmiller
Planning Section
Department of Transpor'Laition
District VI
1000 N.W. 111th Avenue
Miami, FL 33172
Terry Manning, A.I.C.P.
Senior (Planner
South Florida Water IV1grni, Distrie-:
3301 Gun Club Road, MSC 2640
W. Palm Beach, FL. 33,406
ORDINANCE NO. 697-12
AN ORDINANCE OF MIAMI SHORES VILLAGE, FLORIDA, AMENDING
THE MIAMI SHORES VILLAGE 2025 COMPREHENSIVE PLAN BY
UPDATING THE CAPITAL IMPROVEMENTS ELEMENT WITH THE
ADOPTED 5 YEAR CAPITAL PROJECTS PROGRAM FOR FY 2013-2017;
AND ADOPTING THE PUBLIC SCHOOLS FIVE YEAR WORK PLAN;
PROVIDING FOR TRANSMITTAL. TO THE DEPARTMENT OF
ECONOMIC OPPORTUNITY.
WHEREAS, In July, 2008, the Miami Shores Village Council adopted the 2025
Comprehensive Plan which was found to be in compliance by the IDepartmert of Con-imunity
Affairs (DCA); and,
WHEREAS, the Department of Economic Opportunity requires certain ,annual Jpdate: to
the Plan; and,
WHEREAS, the Department of Economic Opportunity requiires an annual amendment to
update the Public Schools Five Year Work Plan; and,
WHEREAS, in addition to the annual updates required by the State, Miami Shores VilhlfL'E!
desires to amend the Future Land Use Map and apply the future land use de!.ignation of
adjoining property to streets and alleys that are vacated, and setting forth rules regarding
determining the boundaries of any future land use designation; arid,
WHEREAS, the Village Council of Miami Shores Village held a duly noticed public hear' rig
as required by Chapter 163.3184, F.S. on November 6, 2012; .and,
WHEREAS, it is in the best interest of the Village to expeditiously trans>mit these 2025
Comprehensive Plan amendments to the Department of Economic; Opportunity, i3IS well as the
other State and County agencies required to receive the Comprehensive Plan Amendments for
review and comment;
NOW, THEREFORE, BE IT ORDAINED, by the Miami Shores Village Cou 1cil:
Section 1. That the amendments to the Miami Shores 2025 Comprehensive Plan, as
contained in the attachments hereto, are hereby approved by the Council an J shall be
transmitted to the Department of Economic Opportunity in accordance with t 1e laroper
procedures outlined in the Florida Statutes and Florida Administrative Code.
Section 2. The effective date of this plan amendment shall be upon second and finial
reading of an adopting ordinance by the Village Council subsequent to the date a final order is
issued by the Department of Economic; Opportunity or Administrative Comm'ssion finding they
amendment in compliance in accordance with Section 163.3184 (1)(b), F.S., whichever is
applicable. No development orders, development permits, or land uses dependent on this
amendment may be issued or commence before it haS become effective. If a final order of
noncompliance is issued by the Administrative Commission, this amendment Inay nevertWE!ss
be made effective by adoption of a resolution affirming its effective status, a copy of 'rvhich
resolution shall be sent to the Florida Department of Opportunity, Division of 2omn11, nity
Planning, Plan Processing Team.
PASSED: November 6, 2012.
ATTEST:
7 (�
Barbara A. Estep, MM
Village Clerk
APPROVED AS TO FORM:
t
Richard Sarafan
Village Attorney
Ordinance Re Comp Plan Amendment — Nov 2012
1
Jim WCoy, M or
FORM RPM-11SP-EXEIVIP,F-1
RPM:-BSP-EXEMPT REVIEW
Amendments Exempt from State and Regional Review in accordance with Rule: 9J-11.015, FAC.
1. Name of Local Government " S�_
Person completing this form�{�t=
Phone Number 30s-) q s -- alc %_
Name of Newspaper in which notice of amendment was published MtC) A L 0C
Date Publication Noticed 1u
(Please attach copy of notice)
2. Please indicate type of amendment being submitted:
a). a map amendment directly related to proposed small scale development activities that nicet the criteria of ; ;c'aon
163.3187(1)(c), F.S.;
b). a map amendment solely to property within an urban service boundary that meets the ci i .eria of ection
163.3184(17), F.S.;
c). a map amendment solely to property within a designated urban infill and redevelopment area pursuant to 1k,cicion
163.3184(18), F.S.;
d). a plan amendment associated with an area certified pursuant to Section 163.3246, F.S.
Please complete the following information if amendment is submitted under 2(a)i:
3. If amendment contains a residential land use category indicate:
density allowed prior to change _ dwelling unit(s) per acre.
density allowed after change _ dwelling unit(s) per acre.
4. Number of acres of small scale development amendments contained in package:
Within Urban Infill, Urban Redevelopment or Downtown Revitalization as defined. by Section l63.3164, FS
o. Within Transportation Concurrency Exception Area pursuant to Section 163.3180(5), FS _
c. Within Regional Activity Centers or Urban Central Business Districts pursuant to Section 380.06(2);e), I' S
d. Within Urban Infill and Redevelopment areas as defined by Section 163.251;', FS
e. Within a Rural Area of Critical Economic Concern pursuant to Section 163.3187(1)(c)4, FS
(Please attach certifying letter to OTTED)
f. Involving the construction of affordable housing units meeting the criteria of Section 420.0004(3 ), FS,
g. Outside categories a.,, b, c, and d. _
5. Cumulative total number of acres of small scale development amendments for the calendar yeaj
a. Categories listed in Item 4 a, b, c, and d above
b. Categories listed in Item 4 e, f, and g above __,__
6. Total number of acres of small scale development amendments in this package that: are located A ithin the coastal hi;;h hazard
area as identified in the comprehensive plan
7. Total number of acres of small scale development within area of critical state concern designated by Sect on 380.155 =, FS
Pursuant to Rule 9J-11.015(1)(b)5, Florida Administrative Code, this form must be mailed with all amendments as d:lined by
Section 9J-11.015(1)(a) Florida Administrative Code to:
DEPARTMENT OF COMMUNITY AFFAIRS
PLAN PROCESSING SECTION
2555 Shumard Oak Boulevard
allahassee, Florida 32399-2100
\850) 488-4925
Form RPM-BSP-EXEMPT-1 (Effective 5-12-10 )
MIAMI DAILY BUSINESS REVIEW
Published Daily except Saturday, Sunday and
Legal Holidays
Miami, Miami -Dade County, Florida
STATE OF FLORIDA
COUNTY OF MIAMI-DADE:
Before the undersigned authority personally appeared
MARIA MESA, who on oath says that he or she is the
LEGAL CLERK, Legal Notices of the Miami Daily Business
Review f/Wa Miami Review, a daily (except Saturday, Sunday
and Legal Holidays) newspaper, published at Miami in Miami -Dade
County, Florida; that the attached copy of advertisement,
being a Legal Advertisement of Notice in the matter of
MIAMI SHORES VILLAGE - NOTICE OF PUBLIC HEARING
REGULAR MEETING - NOVEMBER 6, 2012
in the XXXX Court,
was published in said newspaper in the issues of
10/29/2012
Affiant further says that the said Miami Daily Business
Review is a newspaper published at Miami in said Miami -Dade
County, Florida and that the said newspaper has
heretofore been continuously published in said Miami -Dade County,
Florida, each day (except Saturday, Sunday and Legal Holidays)
and has been entered as second class mail matter at the post
office in Miami in said Miami -Dade County, Florida, for a
period of one year next preceding the first publication of the
attached copy of advertisement; and affiant further says that he or
she has neither paid nor oromised any person, firm or corporation
any discount, re *, t ommission r refund for the purpose
of . w,�rtisement for p blication in the said
subscribed before me this
29 day o OCTOBER�/� -,�-���y �, AD�2012
(SEAL)
MARIA MESA personally known to me
�r..P� i B. THWAS
Commission # DD 937532
_= Expires November 2, 2013
R ,f: •, EI v 7Am Troy Fain tm�rame 800-385-7019
NOTBCE OF PL
PROF
COMPRENENSEKE.=
The Miami Shores Village C6uncI1 of
2012; to be I,el �t7;0o PM at;tlie
Miami Shores;loticfa, will corisider thl
UI FIEAR1NGi
ISO.
LAW AMEIplfillENT
s regufar meeting of November 6,
I`Haj1, .1A05t1 M.E. 2nq Avenue,
E; FLORIDA'
SCI,k,$; FIVE NEW -WC ftLAN; PROVIDING .FOR
TFl11k(t41)C7 TO; THE D 'ARiMENT OF ECONOMIC
Copies of the proposed Comprehe ilve Plan amendments and the
ordinanyt mijy;be inli
spected by thf.pwblip at the Village Clerk's office in.
Village HallAtitere parties may tie: heard With respect to the proposed
Plan andOrdInance.
Anyperson wishing] to appeal thea%ion of the VMage Council may need
to ensure that a verbatim record _ of this meeting's proceedings is made,
which record includes testimony and'ewonde upon which the appeal is
based: (Chapter28:0105, Fiorida5tafr�te):
Barbara A. Estep, MMC
_Village Clerk
10/29 12-3-20.V 1912266M
LOR
03
W
■:
(V
sa,
C3
u U
r
03
MIAMI SHORES
DEPARTMENT OF PLANNIPIG &ZONING
°F
10050 NE 2"" Avenue
Miami Shores FL 33138
www.niiamishor(!svillage.com
David A. Dacquisto AICP, Director
Main Number: 305-795-2207 Fax Number: 30S-7516-8972
VILLAGE COUNCIL HEARING
STAFF REPORT: David A. Dacquisto AICP, Director, Planning and :Ion ng
HEARING DATE: November 6, 2012
REPORT DATE: October 10, 2012
SUBJECT: Transmittal to DCA of Five Year 2013-20117 Capital
Improvement Budget, Year 2013 Capital Improvement Budget
Program and. Update o-" Schools 2013-2017 W crk Elan
Background
On an annual basis, the State requires that the Village update the School Hement, as we] ,
as the Capital Improvements Element of the Village's Comprehensive flan. to inclu&
the current County School Work Program and the current Village Capi gal Ilnprovelnen
Budget.
Staff is recommending an amendment to allow the automatic design -.ion of vacatei:l
roads and alleys to the firture land use designation of the .adjoining lands.
The proposed amendments to the Miami Shores Village 2025 Comprehensive Plan
require approval by Village Council and must be transmitted 1:0 the State':; Department of,
Community Affairs for review and comment prior to final adoption by the V illag,:,
Council.
Page 1 of 7
Comp Plan Amendment Schools Map Interpretation CIP Element 2012
Analysis
1. Miami -Dade County Public Schools 5-Year District Facilities «ork F'r [)gram
The State of Florida requires that the Village Council amend the Schools Elemen t of the
Comprehensive Plan annually to adopt the County's Schools Work Plai as par( of the
Village's Comprehensive Plan. This is a State mandate that was enactei in 200 S. The
Miami -Dade County School Board adopted a new work plan on Septembei 5, 2012. As a.
result, the Village must adopt and amend our 2025 Comprehensive Plan to incl ade the
"Miami -Dade County Public Schools 5-Year District Facilities Work Program, de ,eloped
by Miami -Dade Public Schools and adopted by the Miami -Dade County',chool B aard on
September 5, 2012".
The adopted Work Plan does not include charter schools, and has little (,:'fect on: Miami.
Shores, as we have only one public elementary school within. the Village and n1:) future
schools are planned for construction within the Village. This provision quid subsequent
mandate is more relevant to growing areas where new schools aic necessary to
accommodate a growing student population. The State, however, cid not make a
provision to treat municipalities like Miami Shores differently from fast gTowing;
communities.
With the Village's conservation efforts in mind, we have not made copies of the County's
Work Plan for inclusion in the packet. We will have the Plan available in pdf format.
Miami Shores Village 2025 Comprehensive Plan Amendment to Adopt: Miami. -
Dade County Public Schools 5-Year District Facilities Work Prograni, developed bl,
Miami -Dade Public Schools and adopted by the Miami -Dade County Schoal Board
on September 5, 2012.
[Recommended Comprehensive Plan Amendments]
CAPITAL IMPROVEMENTS ELEMENT
CAPITAL IMPROVEMENTS ELEMENT GOAL
Objective 2: Maintain Level of Service Standards through sound Capital
Improvement Planning.
Public Schools Facilities Level of Service (LOS):
• Pursuant to Chapter 163, Florida Statutes,, the Miarni-Dade County
Public Schools 5-Year District Facilities Work Prograir,, developed b,,
Miami -Dade Public Schools and adopted September5 .2012. ir,
Page 2 of 7
incorporated by reference into the Village's Capital Imrrwemerl Plan,
as applicable.
[Page 88]
EDUCATION ELEMENT
Educational Element Goal
OBJECTIVE 2:
POLICY 2.7:
Pursuant to Chapter 163, Florida Statutes, the Miarai-Dade County Public; Schools
5-Year District Facilities Work Program, developed by Miami -Dade: Pubhe Schools
and adopted by the Miami -Dade County School Board on Septeriber f;-_144-0 5_,
.an 2012 is incorporated by reference into the village's Capital Impro cement 1)l, as
applicable.
[Page 95]
Page 3 of 7
2. Five Year 2013-2017 Capital Improvement Budget: and Year 2013 ('apital
Lnprovement Budget Program
The inclusion of this information in the Comprehensive Plan is also a State ;mandate.
Legislation enacted by the Florida Legislature mandates that local governrinenls must
annually update the Capital Improvements Element of the Comprehens ve Plan with a
financially feasible five-year schedule of capital improvements.
The Village Council, as part of the regular budget process, adopted the Five Yea:- 2013-
2017 Capital Improvement Budget and Year 2013 Capital Improvement Budget Program
on September 18, 2012. This five-year schedule of capital improvements must -.iow be
incorporated, through the Comprehensive Plan amendment process, iato the Capital
Improvements Element of the Village's 2025 Comprehensive Plan.
The following pages represent the approved Five Year Capital Improvement 13ud.et in a
format normally accepted by the Department of Community Affairs.
Capital Improvement Budget Program Projects, Fundling Sources and Relevance to
Level of Service
CITT Fund:
Roadway resurfacing: In an effort to maintain and increase the level of servico to our
residents, the Public Works Department budgets funds to resurface det,-riorated streets
and alleys throughout the Village. This resurfacing process eliminates potholes and
provides for a safer roadway system throughout the Village
Repair and upgrade of Railway crossing Village boundary: Funds arc ieing put away
for a future project that -will allow the Village to upgrade the railroad crossing; on NE; 96t1'
Street. At the time of the repair and upgrade, the railroad crossing will be alt a level o-1
disrepair that may affect the streets level of service. Repair will redt.(e potential for
damage to resident's vehicles, allow smoother travel through the Village,, reduc-e noise
and disturbance to residents living, adjacent to the crossing, and will help to maintain the
Level of Service at D for NE 96t4 Street.
Sanitation Fund:
Replace Trash Grabber, Garbage Truck Trash Truck, Loader: It i;; a policy of tihc:
Capital Improvements Element to accommodate annual systematic :vplacements of
vehicles. Replacement will provide for a more efficient and reliable service to our
residents as fewer equipment failures and breakdowns will occur. This J;oa]. is Mcludec.
in the adopted 2025 Comprehensive Plan.
Page 4 of 7
Stormwater Fund:
Street resurfacing to improve the drainage system: Recent years I.,- ve broixght an
increase in flooding of streets and roadways in the Village. In order to r,,-duce f.00ding
and improve drainage the Village will increase the level of service to oar •esicents as
stated in the Capital Improvements Element by repaving streets to bet-ler direct stonn
water flow to newly installed drainage systems. This will prevent standir.g water- which
makes some roadways impassable.
Local Option Gas Tax Fund:
Maintain inventory of sign material: Street signs are scheduled for rep acement when
they deteriorate and/or fade to such a degree as to become illegible or if tf. cry are damaged
due to traffic accidents or storms. This maintains and improves the level of service on
roads for our residents and travelers by having an adequate inventory of sign materials 62,
quickly replace signs providing for a safer roadway system within the Vill z.ge.
Replace broken and damaged sidewalks Village wide: Broken sidewalks pose a
hazard. Under the Capital Improvements Element, annual systematic replace:nent is
specifically authorized and encouraged for sidewalk repair and replacem-,nt. The Public;
Works Department, in an effort to increase the level of service to our residents, :replaces
damaged sidewalks throughout the Village to mitigate hazardous conditier, s. The Village;
annually budgets funds to replace damaged and dangerous sidewalks.
Resurface streets and alleys Village Wide: In an effort to maintain ald increase the
level of service to our residents, the Public Works Department budgets funds to re.suirface
deteriorated streets and alleys throughout the Village. This resu r `aci ng; process
eliminates potholes and provides for a safer roadway system througho at the Village.
Page 5 of
Miami Shores Village 2025 Comprehensive Plan Amendment to Ad apt: Five Year
2013-2017 Capital Improvement Budget and. Year 2013 Capital Impro,�ement
Budget Program.
[Recommended Comprehensive Plan Amendments]
Add new pages 159 — 165 to the Capital Improvements Element, see attac 1 ment A.
Delete pages 159 through 188, see attachment B
3. Future Land Use Map Designations
The future land use designations shown on the future land use map Follow. property
boundaries. Staff is recommending an amendment that would automatically apply the
future land use designation of adjoining properties to streets and alleys that are vacated.
Miami Shores Village 2025 Comprehensive Plan Amendment to: Al►ply the future
land use designation of adjoining; property to streets and alleys that are vacated.
[Recommended Comprehensive Plan Amendments]
FUTURE LAND USE ELEMENT
Objective 12: Future Land Use Map Designations.
In determining the boundaries of any future land use map designation the_:ollo`�_�irg_ules.
shall apply:
A. Boundaries indicated as approximately the centerline of street,, highul 5�or
alleys shall be construed to follow such centerlines:.
B. Boundaries indicated as approximately following platted plot _links_ s 4all be
construed as following such plot lines;
C. Whenever any street, alley or other public way is vacated by official action of the
Village council, the future land use designation adjoining each sid _ of sucl i street._
alley, or public way shall be automatically extended to the center o-- such ), acation_
and all area included in the vacation shall then and henceforth tLe subig."t to all
regulations of the extended designation;
D. Where the streets or alleys on the ground differ from the streets or a.11eys_ac, shown:_
on the future land use map, the streets or alleys on the$•ound shall control
E. Boundaries indicated as approximately following Village limits shall be construed
as following Village limits;
F. Boundaries indicated as following railroad lines shall be construed to be inid_way
between the right-of-way1'nes;
G. Boundaries indicated as following the centerline of all canals, streams or drainage:
ways shall be construed to follow such centerline and boundaries indicated as
Page 6 of 7
following` shore lines shall be construed to follow such shore lines, end in -the event
of a change in the shore line shall be constructed to move with tr_.e actin shore;
line; and
H. Distances not specifically indicated on the future land use map shall be determined
by the scale of the mgp.
[Page 15]
Recommendation
Planning staff recommends to the Village Council, Approval of the amendments to the
Comprehensive Plan, and Approval of the transmittal of the Comprehensive Plan and
amendments to the State.
Page 7 of 7
Appendix A
FY 2010 - 2011 CAPITAL PROJECT BUDGET
Miami Shores Village, Florida
OOOOOOOOOOOOIDO000000OOOOOOOOOOOO,OOOOOe_1
Services _Functions and -Activities
The Capital Proiect Fund is used to account for the fundinc of municipal
capital expenditures for the acquisition, construction or improva-menf_o.` maior
capital facilities or infrastructure; machinery and equipment; and other general
improvements with a life expectancy of more than three years - As reference,
equipment that has a value of $5,000 or less is also included in this document
for budgetary purposes.
Many of the capital proiects are multi -year proiects and maync)t actualNy be in
in FY 2011. The funds are encumbered to the subsequentyBar's budget as.
an obligation until used or released. This year's budget included, a +transfer
from the General Fund to the Capital Pro'e� ct Fund far several pr�jec;ts
BUDGET HIGHLIGHTS
Fly" 10 FY'11 Change
Personnel costs ..... - $ Q
Operating costs........�........................ 125 111ti -----�
Capital outlay ................................. .. 2,828,88) 320,8c)0 _�-!': 8.080j
TOTAL ........... $2,829,005 1320 925 i�2,,1;Q8,080;)
Appendix A
159
Q
x
ai
u
Ci
p
p
p
►
►
i
i#1
i
i
►
►
��
c .0
o
to
O
N
?
�O
O
O
O
O
O
O
O
O
O
O
O
m
'.:Ln
O
00
O
M
f`
O N
enO
u'f
er
Ln
U-
N
�fI
N
a0+
co
a,OI
O
O
ol
N
O
Op
I
M
W I
In
Q
N
7
uN
Co
r��
co
o�
N
I
M
O
O
O
L
N
Ln
In
O
co
O
o�p
O
O
IO(1,
O
wl
O
ol
O
Q
�' LL1
In
ice+
00
n
:�
10
1n
N
O
co
4
Lnav0
M
�
O
r
v
-
"
"
,.a41
p
roll
eni
O10,l
.`�o
�
vei
��0
o�o
N
�
�•�
'.O
O
U M
N
N
'n "
'n
01
o
O
o�
' 'o
N
o
o
0
0
o
co10
a
0
^
O
O
t
} d
U,
'm
N
N
N
00
N
IL E
a
IN
N
o
o y
LW
N
Ln
N
O
In
en
CS
N
C.
IC'
7
a0
O
} A
lL C
N
N
a�
ate+
Y
N
_
UI
lJ
cy
cy
u
E
Q
=
C
E
m
M
z
d
n
u
-L4
u
°
E
E
E
E
E
E
E
>. �+
o
O
CVfu
.V
m
v
u
v
u
y A
OC
A
f6
�C
u
f0
u
m
t6
u
t6
N +'
N r_
G
j
`L
�
[L ; Z
a
�
�
'_
Y
to
.✓
�
aA+
,+A.+
.aAi
m
�i
S
V
V
l>
U
t�
v
upi
d
o v'
o
o
p
o
0
0
o
co-
GVQ.I"
O
O
O
O
N
JI
�I
�Iv
Ln
Ln
-.
i
Appendix A
I— - — - -FY 2010-2011 CAPITAL PROJECT BUDGET _ s
____________ ---------- Miami Snores Village, Florida
CAPITAL PROJECT FU14D
Code 301-0000-519
CODE CLASSIFICATION AMOUNT EXPLANATION
OPERATING EXPENSES 1
.52800 Bank Fees $ 125 Funding related to separate account;
Sub -total: Operatinq Expenses $ 125
1 = 1. 1 i i#tie l�FIaR� ii' F ll i Ifflak 11; ill; ;Al K' It
CAPITAL OUTLAY
.64000 Machinery / Equipment
S 320,800 Upgrade Server, purchase new . corr3uters and
installation - $50,000
Upgrade Thermal Pool Blanke_:_$I'?,000
Resurface Tennis Courts - $15 000
Resurface the Acitivity Pool - i 30,000
Resurface Basketball Courts - ! 10,QOQ
Replace comptAition pool (ai,� ropes 2,800
Police phone system wiring - $18,000
Install accordian storm shutters in 'Police Faci0ty
Police radio infrastructure replacement.
Replace Police phone system _$8 000
Police emergency call retorter - �L8,000
Sub -total: Capital Outlay $ 320,800
TOTAL: Capital Project Funds $ 320,925
Appendix A
161
Appendix A
MIAMI SHORES VILLAGE
Capital Improvement Project Detail Sheet
For Fiscal Year 2011 - 2015
PROJECT STATUS
Existin Program Deferred
Pro ram Improvement I New Program Pro ram
Project Upgrade Seri(?r, purchase new
'Name: computers and installation.
Project rati2,LEt )LffectYear s
Deleted Priorit 1-5 • S;�mittal Effective
Program Rating date year
CQ1. Oct -Dec
Project expected to begin: x
_Jan Mar Q Apr Jun
computers and jnstallalJon..
IITURE SCHEDULE (000'S): do not use less than $5000
Cost TOTAL FY 2011 FY 2012 FY 2013 1 f 20141 FY 2Q1
D„ esign, Permitting__^_
-k Improvement
ngs/Equipment
250 000
50,000
50,000
50,000
5f1,O0c
51J,()(10
S 250,000 $ 50,000 S_ 50,000 $,_ 50,000 50�U�J(1
0( OO'S)
TOTAL FY 2011 FY 2012 FY 2013 FY 2014
5, 5!;�!D�JO
FY 210 11`i_
G SOURCES & SCHEDULE
Funding Source
Fund Capital Outlay
S 250,0)0
$ 50,000
50,000
50,000
5C1 400
se Fund: Stormwater
-
-
se Fund: Sanitation—
!t Maintenance
, 5t�00�1
—
51,00_0
250,000
$ 50,000
50,000
50,000
ING BUDGET IMPACT (000'S)
GENERAL INFOR(AkTION
1st Year 2nd Year 3rd Year
Personnel Costs a__ Proiect Approval Date
Operating Expenses
NET OPERATING IMPACT�$ PROJECT COST (C00'Sl �-
COMMENTS: __ Update existing file storage
Appendix A
Form FIN CAM _.__ _ _______ 162
Appendix A
MIAMI SHORES VILLAGE
Capital Improvement Project Detail Sheet
For Fiscal Year 2011 - 2015
Project —Thermal fool Blankets
Name: --' --- --
PROJECT STATUS Project rathil Affect Year s
Existin Program Deferred Deleted Priorit 1-5 • Submittal �
Program Improvement New Program Program Program Ratjng date Effective ve,ar
�TFFTTQ-
Oct -Dec Q2: Jan -Mar 03 Apr -Jun 0,L Jul_5J_
Cost Estimate $ 12,000 Project expected to begin: X
The existing thermal covert;/ blankets that coffer thecompetition_
fool are fatting apart. This rp oie:t is to purchase new t.iermat E:cil.
blankets.
E SCHEDULE
(000'S): do not use less than $5000
Cost
TOTAL FY 2011
FY 2012
F1' 2013 F'Y 201 4 FY 2015-
m,
-ovement
— -
--•--- _—._.._.__._
ut'pment
12,000 12,000
$ 12,000 $ 12,000
,�
,`� ,�-�-__ 5��+__•,P�
JRCES Et SCHEDULE (000'S)
Funding Source TOTAL FY 2011 FY 2012 FY 2013 FY 2014 FY 2(YI.5
Fund Capital Outlay 12,000 $ 12,000_—__ _
e Fund: Stormwater - _
e Fund: Sanitation -- _
t Maintenance _ ^
12,000 $ 12,000_��_.�..�__
1st Year 2nd Year 3rd Year
Personnel Costs $ _ $ Project Approval D il.e
Operating Expenses
NET OPERATING IMPACT $ $ � PROJECT COST
COMMENTS: Existing covers will be 10 years old and have been repaired several Tri es. ..�
Appendix A
163
Appendix A
MIAMI SHORES VILLAGE
Capital Improvement Project Detail Sheet
For Fiscal Year 2011 - 2015
Recreation / Community Project
Fund /Department --- — Resurfa,:(? Tennis Courts
Center Name: -
PROJECT STATUS Project ratiiLq ft Affect Year s',�
Existing Pro ram Deferred Deleted Priorit 1-5)• iijbmiltz l
Program Improvement New Program Pro ram Program Rating date EffectheN!ea
—
-
— —-
371MUfT.
Q2a Jan -Mar E3: Apr-Juri
-F`7 FU.T (—
H 4: J_it 5gp
Oct -Dec
X —
��a�es�r
Cost Estimate $15,000 Project expected to begin:
+��a
Description of Item(s) or Proiect: —_The tennis courts are in need of resurfacing. j:urrently the tens. is
courts have areas where the surfacing is pealng,,uac;cing, anti ;jf!?
raised. This project will fill all cracks, patch dam,Neci areas ak_icl
resurface the courts.
EXPENDITURE SCHEDULE (000'S): do not use less than $5000 g -�
Cost
TOTAL
FY 2011
FY 2012
FY 2013
FY 2014
FY ;!015
Planning, Design, Permitting
_
Site Work Improvement
-
-
-
Construction
15,000
15,000
Furnishings/Equipment - -
Vehicles •- - — - _---.-__.
Other_
----•-•--:—
TOTAL $ 15,000 $ 15,000_��--
FUNDING SOURCES £t SCHEDULE (000'S)
Funding Source TOTAL FY 2011 FY 2012 FY 2013 : Y 2014
FY 013
General Fund Capital Outlav
15,000
S 15,000
-
-
Enterprise Fund: Stormwater
Enterprise Fund: Sanitation
ISF: Fleet Maintenance
— -
Grants
Dther: Capital Project Fund
_�'�_"
TOTAL
$ 15,000
$ 15,000
1st Year 2nd Year 3rd Year
Project Approval C ate
$ �- $�- PROJECT COST IDDO'S�__.,___._.._:_
Appendix A
164
Appendix A
MIAMI SHORES VILLAGE
Capital Improvement Project Detail Sheet
For Fiscal Year 2011 - 2015
PROJECT STATUS
Existin Program Deferred
Program Improvement New Program Program
Project —Resurface Basketball Courts
Name: _-- —^.
Project rating & Affect Year s
Deleted Priority 1-5 • _5_ubmit:ta_E_ Effective
Program Rattn date yea r ~
— i ZMTTO—.-TTZl1i-1-'
1: Oct -Dec 02: Jan -Mar O_I: Anr-Jun 04: Jul-Sei
Cost Estimate $ 10,009 1 Project ex ec:ted to begin:
Description of Item(s) or Project: — The basketball co arts are in need of resurfaci Currently Lhe.
basketball courts have areas where the surfacing ispe3ling,
cracking and worn out under the goals. This Qroject_wiU fill crgc'csv_
patch damaged areas and resurface the area_
Cost
TOTAL
FY 2011
FY 2012
FY 2013
I 'f 2014
FY 2015
Design, Permitting_,
-k Improvement
:don
10,000
101000
n sQ /Equipment
$ 10,000 $ 10,000
(000'S)
TOTAL FY 2011 FY 2012 FY 2013 f Y 2014
- FY 20.15
G SOURCES & SCHEDULE
Funding Source
Fund Capital Outlay
10,000
$ 10,000
se Fund: Stormwater
- -
--�
—
se Fund: Sanitation
—
—
A Maintenance
—
—
S� GENERAL INFOR)C%TION
1st Year 2nd Year -3rd Year
$ Project Approval C ate
$ - PROJECT COST (000'S)
COMMENTS:
Appendix A
165
Appendix A
MIAMI SHORES VILLAGE
Capital Improvement Project Detail Sheet
For Fiscal Year 2011 - 2015
nd / Depart rient Recreation / 1405 Project —Replace Competition Pool Lane Ro:.-)es.
Name:
PROJECT STATUS Project ratirij ri �Lftft�Lygar s
Existin Program Deferred Deleted Priority (1-5 • S=Mit7
I
ff.tc
Program Improvement Program Program date ti",.'_!L6A I New Progra n I I — —
1 01: Oct -Dec IL. Jan -Mar I4_ Apr, -Jinn
Project expected to begin: L
E SCHEDULE (OOO'S): do not use less than $5000
Cost
TOTAL
FY 2011
FY 2012
FY 2013
-
F'r 20747
_FY 20,15—
gn
800
2,800
-
rovement
z
z
juipment
z
z
z
z
$ 2,800
$ 2,800
Funding Source TOTAL FY 2011 FY 2012 FY 2013 FY 2014 FY 2,:),,, 5
Fund Capital Outlay $ 2,800 $ 2,800 — -----
;e Fund-. Stormwater - -
;e Fun& Sanitation
z
I Maintenance z
$ 2,800 $ 2,800
ING BUDGET IMPACT (000-S). GENERAL
1st Year 2nd Year 3rd Year
Personnel Costs Projlect Approval ))te
Operating Expenses
NET OPERATING IMPACT PROJECT COST (000'
COMMENTS: Existing lane ropes are chipping off into pieces.
Appendix A
166
Appendix A
MIAMI SHORES VILLAGE
Capital Improvement Project Detail Sheet
For Fiscal Year 2011 - 2015
Eroiect
/ 1405 —Resurface tie pc'iv_il� Pool
Name: _
PROJECT STATUS Project rating F± 4ffect Year(s)
Existing Pro ram Deferred Deleted Priorft 1-5 • Submilaa7 EffecFive
Program Improvement New Program Program Program Rating date eear
Tr477U7T FY Z(Ji i
(Q1:. Oct —Dec 02.. Jan -Mar QI: Air -Jun 04: JuI-SEA
,Cost Estimate $ 30,000 Project expected to begin:
Description of Item(s) or Proiect: _—Resurface the act-ivjty pool buttom with Diarn)nd Brite.
:NDITURE SCHEDULE (000'S): do not use less than $5000
Cost
TOTAL
FY 2011
FY 2012
FY 2013
_f 2C14
ling Design, Permitting
Work Improvement
truction
30,000
30,000
ishings/Egui ment
_
ales
r
AL
$ 30,000
$ 30,000
DING SOURCES Et SCHEDULE
(000'S)
Funding Source
TOTAL
FY 2011
FY 2012
FY 2013
FY 2014
!rat Fund Capital Outlay
$ 30,000
$ 30,000
rprise Fund: Stormwater
rprise Fund: Sanitation---�--
Fleet Maintenance
ts
GENERAL INFORJUTION
Preiect Approval [late
AL
$ 30,000
$ 30,000
tATING BUDGET IMPACT (000'S)
1st Year
2nd Year
and Year
)nnel Costs
$ —
�_
sting Expenses
OPERATING IMPACT__
$
S� �_
PROJECT COST i000'SI
ik/CWTc•
Appendix A
Form FIN CAPI 167
Appendix A
MIAMI SHORES VILLAGE
Capital Improvement Project Detail Sheet
For Fiscal Year 2011- 2015
PROJECT STATUS
iProgram � Deferred
Program Improvement New Program Program
Project
—Facility - `-,torrn Shutters
'Name:
-----'--
Project ratingaffEct Year s
Deleted
Priorit 1-5 Submittal Effective
Pro ram
Ratjn date, year
I � Oct -Dec 0
5,000 Protect expected to begin.
>r Project: — Install accordian shutters on E
that cover 1 /3 of the facility.
ADr-Jun 1 04: Jui
2.�Ela,__e sleet panels,
EXPENDITURE SCHEDULE (000'S): do not use less than $5000
Cost
TOTAL
FY 2011
FY 2012
FY 2013
F,
Planning Design, Permitting
Site Work Improvement
-
-
Construction
-
-
Furnishings/Equipment
45,,000
'� 15,000
15,000
15,000
Vehicles
-
z
-
Other
-
z
-
TOTAL
$ 45,000
$ 15,000
L_15,00q
15,000
T_
NDING SOURCES £t SCHEDULE (000'S)
Funding Source TOTAL FY 2011 FY 2012
ieral Fund Capital Outlay 45,000 $ 15,000 15,00
erprise Fund: Stormwater -
.erprise Fund: Sanitation
Fleet Maintenance
rots -
ier - -
TAL $ 45,000 $ 15,000F7 15,00C►
( 2014• FY 2015.
FY 2013 FY 2014 FY 2{)15
15,000-- ------ - _
1st Year 2nd Year 3rd Year
$ Project Approval Date
es
IMPACT $ $ PROJECT COST
Current steel storm panels cover approximately 1,f3 of the facility, hnstailati� n requirEas,_.-
significant manpower from the public works department. Program wcUld cover all operlines
with accordian type shutters.
Appendix A
Form FIN CAP1 168
Appendix A
NLIAMI SHORES VILLAGE
Capital Improvement Project Detail Sheet
For Fiscal Year 2011 - 2015
PROJECT STATUS
Existing Program Deferred
Pro ram I Improvement I New Program Program
or
Proiect expected to begin:
system.
Project _Radio Infrastruc:ure_ Replacement
Name: —
Project rating Et � ffec;t Year Us
Deleted Priority 1-5 • Submittal_ Effective -
Program Ratin date. ytai
01 Oct -Dec g2: Jan -Mar Oz Apr -Jun D4: Jrt6_-Sei2
imr current police radi
E SCHEDULE (000'S): do not use less than $5000
Cost TOTAL FY 2011 FY 2012 FY 2013 I r' 2014• FY R11 7
gn, Permitting -
rovement - -
ui ment 50,000 50,000
e an nnn a an nnn e c t e
FUNDING SOURCES Et SCHEDULE
(000'S)
Funding Source
TOTAL
FY 2011
FY 2012
General Fund Capital Outlay
50,000
$ 50,000
Enterprise Fund: Stormwater
-
Enterprise Fund: Sanitation
_
ISF: Fleet Maintenance
Grants
Other: Capital Proiect Fund
TOTAL
50,000
$ 50,000
-
FY 2013 FY 2014: FY 2;)15
1st Year 2nd Year 3rd Year
$`_ Praject Approval Date
ises
3 IMPACT — $ PROJECT COST (IOWS)
Current radio sytem is approximately 16 years old and the equipment manufacturer has
notified users that the equipment has reached its "end -of -Life" phase. Parts av_ai ability_!ill be
based on current parts_ availability.
Appendix A
Form FIN CAP1 169
Appendix A
MIAMI SHORES VILLAGE
Capital Improvement Project Detail Sheet
For Fiscal Year 2011 - 2015
Fund / Department Police Project —Facility Phone ' j,stern _ F�eplacem,�nt
-- Name: --
PROJECT STATUS Project ratinLft jAffec.t Year(s)
Existing Program Deferred Deleted Priork 1-5 Submit:tat_ EffeclIvea
Program Improvement New Program Program Program Rating date year
g,1: Oct -Dec 02•. Jan -Mar Q't: Apr, -Jun g4: Jul-5ep
Cost Estimate $ 80,000 Project expected to begin: X
Description of Item(s) or Project: —Replace current facility hone system. Origiiril sisten_i installed in
1997.
WITURE SCHEDULE (000'S): do not use less than $5000
Cost TOTAL FY 2011 FY 2012 FY 2013 FY 2014 FY 2a:115
ng, Design, Permitting_—
-
-
—
—
ork Improvement
iing_s/Eoui ment
80,000
80,000
$ 80,000 $ 80,000 $� S,_ �__��___�•�
(000'S)
TOTAL FY 2011 FY 2012 FY 2013 FY 2014
�� a
FY 2IM5�
_
ING SOURCES & SCHEDULE
Funding Source
al Fund Capital Outlay
45,000
$ 45,000
$ -
—
—~
s
rise Fund: Stormwater
o
-
rise Fund: Sanitation
eet Maintenance
Capital Fund Balance
35,000
35,000
GENERAL INFOR UTION .
XING BUDGET IMPACT (000'S)
1st Year 2nd Year 3rd Year
osts S_ Project Approval Cate
:xpeenses = _
TING IMPACT ; ,�__ L PROJECT COST (DDO'SL__._-_„�
>: Current system was installed in 1997. The system has started to require repairs as arts are
failing. System was out of service on several occasions during the Pa;1_year_ A new sWterrn
would consolidate our Ilines and lead to a cost savings on our monlily !Fmrie char es
Appendix A
Form FIN CAP1 __ _ 170
Appendix A
MIAMI SHORES VILLAGE
Capital Improvement Project Detail Sheet
For Fiscal Year 2011 - 2015
Project
Fund / Department Police Facility - Em :�:gecyCa-.[ Recorder
-- Name:
PROJECT STATUS Project ratinga Affe__t Years,
Existin Pro ram Deferred Deleted Priorit 1-5 • >ubmittal
Pro ram improvement New Program Pro ram Program Rating date Effec:t�var
Oct -Dec e2: Jan -Mar g3: Aer-Jur Q4:.1i,�1_S!p
> 38,000 Project expected to begin: X _ 3: �—
li:em(s) or Project: — Replace exjstin mergencyphone line /radii call recorder.
EXPENDITURE SCHEDULE (000'S): do not use less than S5000
Cost TOTAL FY 2011 FY 2012 FY 2013 FY 201.4 FY 2.015
Planning, Design, Permitting -� - — -� r � _
Site Work Improvement - — - — -
Construction - —�•� —
Furnishings/Equipment 38,000 38,000 - —
Vehicles _
Other
TOTAL $ 38,000 $ 38,000
FUNDING SOURCES & SCHEDULE (000'S)
Fundin Source TOTAL FY 2011 FY 2012 FY 2013 IY220'I�� ,
General Fund Capital Outlay 20,000 $ 20,000 - _
Enterprise Fund: Stormwater
Enterprise Fund: Sanitation
ISF: Fleet Maintenance
Grants —
Other - Capital Fund Balance 18,00 18,000 z
TOTAL $ 38,000 $ 38,000
OPERATING BUDGET IMPACT (000-S) GENERAL INFORhULTIOIN !
1st Year 2nd Year 3rd Year
Personnel Costs �' �__ Pro-ject Approval )3te
Operating Expenses —
NET OPERATING IMPACT - $ PROJECT COST (t)UO_Sj___.—"L_•-_._;—
Appendix A
Analog recorder is past its service life and is no longer under contract for lrerairs and.
maintenance. A digital recording unit is needed to work with new tele�Figne s sy tern,
171
Appendix A
MIAMI SHORES VILLAGE
Capital Improvement Project Detail Sheet
For Fiscal Year 2011 - 2015
PROJECT STATUS
Existing Pro ram Deferred
Program Improvement New Program Pro ram
x
Project expected to begin:
Protect 2DneSytem Wirinp
Name:
Project ratiigEt Affe;_t Year s
Deleted Priority (1-5 • i_ubmjtt.al
Program hating date Effective vea
01 Oct Dec g2r. Jan -Mar g3: Apr_Jur Q4: Ji,�,I�S��p
x
EXPENDITURE SCHEDULE (000'S): do not use less than $5000
Cost TOTAL FY 2011 FY 2012 FY 2013 FY 2014
Planning, Design, Permitting - -
Site Work Improvement
Construction
Furnishings/Equipment 18,000 18,000 _
Vehicles _
Other _
TOTAL
$ 18,000
$ 18,000
FUNDING SOURCES It SCHEDULE
0( 00'S)
Funding Source
TOTAL
FY 2011
FY 2012
FY 2013
=Y 20
General Fund Capital Outlay
18,00
$ 18,000
S_ =
S__=
L—
Enterprise Fund: Stormwater
Enterprise Fund: Sanitation
ISF: Fleet Maintenance
V
Grants
Other
TOTAL
18,000
$ 18,000
$�_
$,_—
OPERATING BUDGET IMPACT (000'S)
--
GENERAL INFORP
MON
FY 2015
1st Year Znd Year 3rd Year
�= S_ Project Approval Cate
PROJECT COST
Appendix A
and recorder. �
172
Appendix A
MIAMI SHORES VILLAGE
Capital Improvement Project Detail Sheet
For Fiscal Year 2011 - 2015
Fund /Department Public Works/Fleet Project —Replace V �1556 Water Truck.
Name:
PROJECT STATUS
Proiect rating Ft Affect Year(s)
ExIstin
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priorit 1-5 • uibmittal
Rating date
Effecti,oe year
---
373TZ1Ti'�
-�Y-ZII�
Cost Estimate $ 126,000 Project expected to begin:
g1'. Oct -Dec
02; Jan -Mar �3: Apr-Juk_i
9A* J�,-iINSep
x
—
Description of Item(s) or Project: Water truck 9556 )as met its life expectance and should be
replaced. _—.--_.�--
EXPENDITURE SCHEDULE (000'S): do not use less than $5000
Cast
TOTAL
FY 2011
FY 2012
FY 2013
FY 2014
FY 2015
Planning, Design, Permitting
�
:� -
-
� -
-
�_�
-
�_ ��—•
—
';a __--~—
-�
— _
Site Work Improvement
Construction
-
-
Furnishings/Equipment
-
-
-
-
Vehicles
126,000
126,000
Other
_
_
-
-- -
TOTAL
$ 126,000
$ 126,000
FUNDING SOURCES tt SCHEDULE
(000'S)
Funding Source
TOTAL
FY 2011
FY 2012
FY 2013
-Y 2014
F1' �:1015
General Fund Capital Outlay_^_�
Enterprise Fund: Stormwater--
126,000
126,000
�—
---•—__.
Enterprise Fund: Sanitation
ISF: Fleet Maintenance
—
�__-.—__
Other
-
---'—
--
TOTAL
$ 126,000
$ 126,000
$
OPERATING BUDGET IMPACT (000'S)
GENERAL INFORIWION
Protect Approval C ate
PROJECT COST (OQO'S) _• ___
1st Year
2nd Year
3rd Year
Personnel Costs
$
�`-
Operating Expenses
NET OPERATING IMPACT
$
,$ _
Appendix A
COMMENTS: � �� •�
73
Appendix A
MIAMI SHORES VILLAGE
Capital Improvement Proiect Detail Sheet
For Fiscal Year 2011 - 2015
Fund /Department Public Works/Fleet Project —Replace Pick Up Tmck '966s
Name:
PROJECT STATUS
Proiect rating & Affe_it Year Ls
Existin
Pro
Program
New Progr
Deferred,
Program
Deleted
Program
Priority 1-5 • ;iubmittal
date
EffectivEjear
x
—
3137ZZPf iT'
Cost Estimate $ 25,000 Proiect expected to begin:
(1 c Oct -Dec
Q2: Jan -Mar g3; Apr -.Jun.
Q4: juil`Sep
X
Description of fi:em(s) or Proiect: Pick up Truck #9663 has met its life expectarn_y_
EXPENDITURE SCHEDULE (000'S): do not use less than $5000 H
Cost TOTAL FY 2011 FY 2012 FY 2013 FY 2014 FY 2015
Planning, Design, Permitting
Site Work Improvement
Construction
Furnishings/Equipment
$i�i
Vehicles
Other
$ 25,000
$ 25,000
,� -
,�� -
�_
_.-_•_
TOTAL
$ 25,000
25,000
FUNDING SOURCES £t SCHEDULE
(000'S)
funding Source
TOTAL
FY 2011
FY 2012
FY 2013
Y 2014
FY 015
General Fund Capital
Enterprise Fund: Stormwater
$__
�_�_
_
$_�^
Enterprise Fund: Sanitation
S
ISF: Fleet Maintenance
,� 25,000
25,000$_
Grants
Other: Local Option Gas Tax
$_
TOTAL
$ 25,000
$ 25,000
,�—
;_ _
-�•
OPERATING BUDGET IMPACT (000'S)
GENERAL INFOPJOTION �.
Project Approval E ate
PROJECT COST
1st Year
2nd Year
3rd Year
Personnel Costs
��
�_;:
Operating Expenses
NET OPERATING IMPACT
$ -
___
Appendix A
Form FIN CAP, -- -----------------__--, 174
Appendix A
MIAMI SHORES VILLAGE
Capital Improvement Proint Detail Sheet
For Fiscal Year 2011 - 2015
Public Works/LOGY Project
Fund / Department ---Rep[` (:e Sidewalks
130-1202-541 Name:
PROJECT STATUS
Project rating Et Affe A Year s
Existing
Program
Program
Improvement New Program
Deferred) Deleted
Pro ram P o ram
Priority 1-5 •
iubmittal
date Effective near
hating
x
-
3 T577GT T ' --F -ZD- '
g1: Oct -Dec
Cost Estimate $ 10,000 Project expected to begiri: X
02: Jan -Mar
g3: Apr -Jury 44, Juj—SSM
_
Description of Kem(s) or Project: Replace broken and damaged sidewalks throe+shout the Vila a-,
EXPENDITURE SCHEDULE (000'S): do not use less than $5000
Cost
TOTAL
FY 2011
FY 2012
FY 2013
FY 2014
FY E15
Planning, Design, Permittjng
�_
10,000
00,0 00
-
-
-
�_—_ _
—�
------
$,— _
Site Work Improvement
— -
----••_�--
Construction
Furnishings/Equipment
-
-----
--
Vehicles
-
------
--
-
------•
-----•-_:-
Other
TOTAL
$ 10,000
$ 10,000
—
FUNDING SOURCES ft SCHEDULE
(000'S)
Funding Source
TOTAL
FY 2011_
FY 2012
FY 2013
IY 2014
FY 2015
__--_:
General Fund Capital Outlay
$—____-__
Enterprise Fund: Stormwater
_
_
-- _
--'
--"'
-`—
— -
-------•
-------•
--•__..___
_.—__.._.__
Enterprise Fund: Sanitation
ISF: Fleet Maintenance
Grants
Other: Local Option Gas Tax
10,000
10,000
TOTAL
$ 10,000
> 10,000
$— -
�- -
OPERATING BUDGET IMPACT (000'S)
GENERAL INFORNJ,TION
Project Approval )ite
PROJECT COST MOWS)
1st Year
2nd Year
3rd Year
Personnel Costs
_
Operating Expenses
NET OPERATING IMPACT
-
__�
�—
Appendix A
'175
Appendix A
MIAMI SHORES VILLAGE
Capital Improvement Pro pact Detail Sheet
For Fiscal Year 2011 - 2015
Public Works/LOGY P��oec it
Fund / Department Sire Material
130-1202-541 Name:
PROJECT STATUS
Proiect ral,12 & AffEj t Year s
Existing
Program
Program
Improvement New Program
Deferred
Pro ram
Deleted
Program
Priority 1-5 •
iijbmittal
date
r
Effective ear
i—F7-;!CT
(Rating
x
-
3 T5 ZU'T -'
Cost Estimate 5 5,000 Project expected to begirt:r—
�1 Oct Dec
Q2: Jan Mar
�3: Apr Juri
I
Q4: Jil�Se�
—
X
I
Description of Item(s) or Project: Maintain inventor, of sin material to replace
damaged signs
throughout the Village.
EXPENDITURE SCHEDULE (000'S): do not use less than $5000
Cost
TOTAL
FY 2011
FY 2012
FY 2013
FY 2014
FY 2015
_.�.__.._.._V
—--
__—.__.__._,
'®...._
Planning, Design, Permitting
$_
5,000
5,000—
---•--
_
S�_��—.
Site Work Improvement
Construction
_
--�
—
--
Furnishings/Equipment
—
-
-
Vehicles
_
-__.
Other
TOTAL
$ 5,000
$ 5,000
,�
,�� -
FUNDING SOURCES Et SCHEDULE
(000'S) ..a_
TOTAL FY 2011_ FY 2012 FY 2013 1=Y 2014 FY 2.015
Fundin Source
General Fund Capital Outlav
Enterprise Fund: ')'tormwater
-- --
--------.—
-------__.
Enterprise Fund: Sanitation
ISF: Fleet Maintenance
—
—
Grants
-
-----
—
--
Other: Local Option Gas Tax
5,000
— 5 000
TOTAL
$ 5,000
$ 5,000
OPERATING BUDGET IMPACT (000'S)
GENERAL INFORAUMON
Project Approval Date
I
1st Year
2nd Year
3rd Year
Personnel Costs
�___�
Operating Expenses
NET OPERATING IMPACT
$ -_—�
PROJECT COST__—�_____
Appendix A
Form FIN CAP1 176
Appendix A
MIAMI SHORES VILLAGE
Capital Improvement Proi mt Detail Sheet
For Fiscal Year 2011 - 2015
Public Works/LOGT Proiect -�-_��
Fund /Department --Roadway Resurfacirr
130-1202-541 dame:
PROJECT STATUS
Project rattig Et Affect Year(s)
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority 1-5 • Submittal
Rating date
Effecdveyear
---
— 37572 T(T"
-Fi71M
g1 Oct -Dec Q2: Jan -Mar g3: Apr-JuryJihSe�
Cost Estimate 200.000 Project expected to begin: x
Description of I tem(s) or Project: Resurface roadwa,/ and alleyway surfaces tha-.- are in e reat need of
.attention. Without resurfacing some road beds wilt be damaged
beyond repair which wilt cost more in the future to re' air_
EXPENDITURE SCHEDULE (000'S): do not use less than $5000
Cost TOTAL FY 2011 FY 2012 FY 2013 F'Y 2014 FY 2015
Planning, Design, Permitting
Site Work Improvement
Construction
200,000
2001.000
-
-
„-
-
f
Furnishings/Equipment
Vehicles,.__...__.._._
Other: Local Option
--
-
-
TOTAL
$ 200,000
200,000
-
$ -
K-7__-�_�
FUNDING SOURCES Bt SCHEDULE
(000'S) .�
Funding Source
TOTAL
FY 2011
FY 2012
FY 2013
FY 2014
FY 2015
General Fund Capital Outlay
-i_
—
----�"--
-"-"
Enterprise Fund: Stormwater
Enterprise Fund: Sanitation
ISF: Fleet Maintenance
—
Grants
Other: Local Option Gas Tax
200,000
200,000
=
TOTAL
$ 200,000
$ 200,000
OPERATING BUDGET IMPACT (000'S)
GENERAL INFORfAMON �
Project Approval Gate
~•�---•`""—•—
1st Year 2nd Year
3rd Year
Personnel Costs
---
Operating Expenses
= —
NET OPERATING IMPACT
$
PROJECT COST (OOO,S) �. �•_-__",_�
Appendix A
177
Appendix A
MIAMI SHORES VILLAGE
Capital Improvement ProiEact Detail Sheet
For Fiscal Year 2011 - 2015
Public Works/LOGT Protect
Fund / Department Roadway -free ReDtac�rnent
130-1202-541 Name: -
PROJECT STATUS
Project rating 8 Affect Year(s)
Existin
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priorit 1-5 • Submittal .�
Rating date Effective year
Cost Estimate $ 5,000 Project expected to begirt:
g1: Oct -Dec
02: Jan -Mar g3: A r-.Jur a' 4: Jul -Sep
X
Description of Kern(s) or Project: On goigg project to re lace diseased and non-native tress..
EXPENDITURE SCHEDULE (000'S): do not use less than $5000
Cost
TOTAL
FY 2011
FY 2012
FY 2013
FY 2014
FY 2015
Planning, Design, Permitting
~~
--�®__..��_---•---_..
-
Site Work Improvement
Construction
Furnishings/Equipment
-
Vehicles
-
--_
-
- _
Other : Local Option Improv.
5,000
5,000-_-
TOTAL
$ 5,000
$ 5,000
FUNDING SOURCES It SCHEDULE
(000'S)
TOTAL
FY 2011 FY 2012 FY 2013 FY 2014 FY2015
_--
-
�- - -'- - --••----_.._._.
5 000
$ 5,000�-
Funding Source
General Fund Capital Outlay
$�__
Enterprise Fund: Stormwater
Enterprise Fund: Sanitation
ISF. Fleet Maintenance~
Grants
-
Other: Local Option Gas Tax
5,000
TOTAL
$ 5,000
OPERATING BUDGET IMPACT (000'S)
GENERAL INFORIA4TION
Project Approval Date
PROJECT COST ICoo'S1„�.__--_.___
1st Year
2nd Year
Ird Year
Personnel Costs
Operating Expenses
NET OPERATING IMPACT
-
$
Appendix A
Form FIN CAN 178
Appendix A
MIAMI SHORES VILLAGE
Capital Improvement ProiE?ct Detail Sheet
For Fiscal Year 2011 - 2015
Fund / Department Public Works/Stormwater Project —Improve Drainage 5 stM
Name:
- '� —
PROJECT STATUS Project rating Ft Affect Year s
Existin Pro ram Deferred Deleted Priorit 1-5 Submittal
Program Improvement New Program Program Program Rating date EffectiwEjear
Cost
1
Project expected to begin_
TOTAL FY 2010 F`( 2011
100,000 100,0)0
$ 100,000 $ 100,000�
the drainage s-,!tem.
FY 2012 FY 2013 FY 2014
FUNDING SOURUS Et SCHEDULE
(000'S)
funding
TOTAL
FY 2010
FY 2011
FY 2012
IY 2013
FY 2014
General Fund Capital Outlay__;
Enterprise Fund: Stormwater
100,000
100,000
Enterprise Fund: Sanitation
I
ISF: Fleet Maintenance
;; —
�,_
�_
�
,�_
Grants
$^
Other:
TOTAL
$ 100,000
$ 100,000
OPERATING BUDGET IMPACT (000'S)
IGENERAL INFORNJ,TION
••�
1st Year 2nd Year 31-d Year
Proiect Approval Dite
$ = PROJECT COST (UUO'SL__;; ,_
Appendix A
179
Appendix A
MIAMI SHORES VILLAGE
_Capital Improvement Proi(?ct Detail Sheet
For Fiscal Year 2011 - 2015
Public Works/Sanitation Proiect
Fund /Department 405-3000-534 -Replace GzrbaRe T_rcck ;r41g_!3
Name• _
PROJECT STATUS
Proiect rating & AffeYear s'1
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Pro ram
Priority 1-5 • Submittal n�
Rating date Effective year
^-77
x
--- —
-
T 7TZGT(T ' ,!IM
Cost Estimate $ 125.000 Proiect expected to begin:
�1 Oct -Dec
O_2: Jan -Mar _Q Apr -Jeri (?4,4Jul-SSe
v
x
Description of Items) or Proiect: Garbage Truck
4148 is nearing its life expect ,a icy. This_gurchacf will
pLrt away 50% of the total cost of $250,000 fur_purchase next year,
EXPENDITURE SCHEDULE (000'S): do not use less than $5000
Cost
TOTAL
FY 2011
FY 2012
FY 2013
"Y 2014
FY 201,15
Planning, Design, Permitting
Site Work Improvement
-
-
V
Construction
-
-
-
Furnishings/ Equip rnent
125,000
125,0(10
Vehicles
_
- �-
-
-
-----
•—__.._.._
Other
TOTAL
$ 125,000
125,000�
FUNDING SOURCES Et SCHEDULE
(000'5)
Fundin >ource
TOTAL
FY 2011
Fe 2012
FY 2013
FY 2014
F7715
General Fund Capital Outlay
Enterprise Fund: Stormwater
Enterprise Fund: Sanitation
125,000
_125,000
�__
ISF: Fleet Maintenance
=
�
Grants
-—_—
-
$�—
Other:
TOTAL
,� 125,000
$ 125,000
-
$
OPERATING BUDGET IMPACT (000'S)
GENERAL INFORMATION
Proiect Approval [)<.te
PROJECT COST (CCOS)_�
Personnel Costs
Operating Expense?s
NET OPERATING IMPACT
1st Year
-
2nd Year 3rd Year
;,
_�_ $
Appendix A
180
Appendix A
MIAMI SHORES VILLAGE
Capital Improvement Proie?ct Detail Sheet
For Fiscal Year 2011 - 2015
Fund / Department Public Works/Sanitation Proiect —Replace Trash Truck #0110
405-3000-534 Name: - ----
PROJECT STATUS
Project rating & Affert Year s�
Existing
Program
Program
Improvement New Program
Deferred Meted
Program Program
Priority 1-5 • Submittal
Rating date Effective year
x
Oct -Dec Q2: Jan -Ma g.1 Apr -Jun (74: LLi-m
Cost Estimate $ 85,000 Project expected to begin_ x F
Description of Item(s) or Project: Replace Trash Truck #0110 which has met it's I ife exDE'ctaacV_
EXPENDITURE SCHEDULE (000'S): do not use less than $5000
Cost
TOTAL
FY 2011
FY 2012
FY 2013
I ( 2014
FY 2015
Planning, Design, )ermitting
_
-
-
Site Work Improvement
Construction
Furnishings/Equiprnent
85,000
85,000
Vehicles
-
Other
-
----
-
-_.----•--•..-
TOTAL
$ 85,000
85 000�
-_��•�_�_���
FUNDING SOURCES Et SCHEDULE (000'S)
Funding Source TOTAL FY 2011 F" 2012 FY 2013 FY 2014 F1 20 `;
General Fund Capital Outlav
$;—___
Enterprise Fund: Stormwater
Enterprise Fund: Sanitation
S 85,000
_85 000
$—
ISF: Fleet Maintenance
y---._..--
Grants---
$_----=
Other:---
$_--�
TOTAL
$ 85,000
85,000
_
-
,�_
,•�_•�_ �
OPERATING BUDGET IMPACT (000'S)
GENERAL INFORK%'rION
Project Approval Cate
PROJECT COST (0)2�S.L__—__ _,
Personnel Costs—__
Operating Expenses
NET OPERATING IMPACT
1st Year 2nd Year 3rd Year
-
�__�_�
Appendix A
COMMENTS•
181
Appendix
MIAMI SHORES VILLAGE
Capital Improvement Proi(?ct Detail Sheet
For Fiscal Year 2011 - 2015
Public Works/CITT Project
Fund /Department 96th Street RR Crossii2g
135-1210-541 Name:
PROJECT STATUS
Project rating £t Affect Year s)
Existin
Program
Program
Improvement New Program
Deferred Deleted
Program Program
Priority 1-5 • Submittal
Ratin date
Effective -year
x
Q1: Oct -Dec
Cost Estimate $ 127,270 Project expected to begin: X
Q2: Jan -Mar g3: Apr -.Jun
i' : Jul®Sep
w -
Description of Item(s) or Proiect: Partial investment to replace RR crossing on 95th Stre:at.
EXPENDITURE SCHEDULE (000'S): do not use
less than $5000
Cost
TOTAL
FY 2011
F)l 2012
FY 2013
FY 2014
FY 2.015
Planning, Design, Permitting
$_
-
-
—
Site Work Improvement
Construction
127,270
127,270
-
Furnishings/Equipment
Vehicles
Other
_
TOTAL
$ 127,270 ,� 127,270 $
(000'S)
FUNDING SOURCES it SCHEDULE
Fundine'Source
TOTAL
FY 2011
FY 2012
FY 2013
FY 2014
FY 5T
S__
General Fund Capital Outlay`
�__�_�
Enterprise Fund: Stormwater
Enterprise Fund: Sanitation
ISF: Fleet Maintenance
--_.__.
.�.--•--•--:
Grants
-
----
--
Other: CITT
127,270
127,270-_—
TOTAL
$ 127,270
127,2i10
5-
$
OPERATING BUDGET IMPACT (000'S)
GENERAL INFORMATION
Project Approval Dae
1st Year
2nd Year
3rd Year
Personnel Costs
Operating Expenses
=
_
NET OPERATING IMPACT
-
�_
$ -
PROJECT COST LMIS)_�•,
Appendix A
Form FIN CAP1 ____ _ _ _ _ _ 182
Appendix
FIVE-YEAR CAPITAL IMPROVEMENT PLANT
Miami Shores Village, Florida
000000000000000000o0oo0oo000000004--►0000
Services, f unctions and -Activities
The FY 2011-2015 Capital Improvement Plan (CIP) represent.3 department
requests for capital equipment and proiects valued at more than $3,000 witht a
life expectancy of at least three years. The purpose of the CIP is t0 establish a
long term plan of proposed capital expenditures with the means and methods of
financing. In accordance with the Staite's Growth Management Act the Villa. is
required to undergo this process in order to meet the n,i�eds of its
Comprehensive Plan.
The five-year CIP is updated annually to add new projects, to m-evaluale the
program and project priorities in light of unanticipated needs, s3 1d to revue
recommendations to take into account new requirements and nEW sources of
funding. Capital Improvement programmin thus becomes a con ii!u!n rt.of
the Village's budgeting and management pro�;edures_
The Proposed Budget is divided into each funding year and identifies the
following: 1) project or program description; 2) the department .mbmitting the
request; 3) the division that will benefit from the investment; and, 4 the cost of
the project by funding source. For the five-year period scheduled to begirt en
October 1, 2010 and continue through September 30, 2015, $14,905 370 is
learned for investment in Village assets and infrastructure as follow:_
FISCAL YEAR
REQUESTED
2010-2011
$ 1,129,070
2011-2012
1,3 55,100
2012-2013
867,200
2013-2014
1,307,000
2014-2015
10,267,000
1"OTAL
$ 14,905,370
DEPT.
FIVE: -YEAR TOTAL
Administrative
$ 383,000
Police Dept.
_
47 4,500
Public Works Dept.
_
3,283,470
Recreation Dept.
10,75 7,400
$ 14,905,37`D
TOTAL
Appendix A
183
Appendix A
Miami Shores Village
Capital Project Master List
FY2011 thru FY2015 Det)artment Fund
Project Description
Dept
FY 2011
Fund Source
TOTAL: ALL DEPARTMENTS
1,129,070
Computer, server and installation
Fin
50,000
GEN
--- -----._.------------
Thermal Pool Blankets
Rec
12,000
GEN
GEM
---------------
GEti
Resurface Tennis Courts
----------------------
Resurface Basketball Courts
Rec
15,000
- --
10,000
- -
Rec
Resurface Competition Pool Lane Ropes -
Rec
2,800
GEN
esur- -
30t,000
GENtTe�ttyt
Facility Storm Shutters
- ------- ---- ---- ---
Radio infrastructure — replacement----
POL
15,000
50,000
80,100
GEN
GEN
GEN/CAPFB.
Gf.N/CAPFE.
-
POL
Facility phone system
Facility emergency call recorder J
POL
POL
38 1,00
Facility phone system wiring
POL
18.000
GEN
CAPITAL PROJECT (F. 301)
329,800
—
r
ep ace a er Truck I V-95561
PW-Flt
126.000
FLTFB
Replace Pick-up Truck fV 96631
PW-Flt
25,000
FLTFB
FLEET MAINTENANCE FUND (F. 550
151 C!00
— _
Replace broken Et damage sidewalk Village wide
pW: Sts
10,(►00
LOcT
LOGT
Maintain inventory of sign materials
PW: Sts
5,1)00
Roadd resurfacin ------ ------------- - ---
Pw:Sts
200,()00
Tree replacement
PW:Sts
51000
LOGT
�—
LOCAL OPTION GAS TAX (F. 1�LOJ
220,000
Street resurfacing to improve the drainage system. PW: Sts
100,i)00
STORMWATER FUND (F. 402)
100,()00
— -
Replace Garbage Truck fV-41481
Replace Garbage Truck (V-01101
PW:San
125,000
PW:San
85i)00
SANFB
SANITATION FUND (F. 4051
210,000
—
Repair It upgrade of Railway crossing Village bounder
PW:CT
1271t70
0,17 _
CITT FUND (F. 135)
127,_L70
Appendix A
Source: Departmental Submissions ______ _ __________________ 184
Appendix A
Miami Shores Village
Capital Project Master List_
FY2011 thru 2015
by Department
Project Description
Dept
FY 2C 12
Funs}
TOTAL: ALL DEPARTMENTS
1,3 51100
Purchase Accounting Software^�
Purchase Computers
Fin
1CsU,000
`iO,000
!�
Fin
e
FINANCE
1 ° U,00-0
Replace drywall in shower and the at the Pool —�
Rec
S -- 4,000
GEN
GEtd
GEN.
Portable Basketball backstop
` i
Rec
;i,300
7,000
Replace Community Center carpet
Rec
New Tables and benches for park area aft Field House
Rec
_II),000
GEN.
u i orium soun system -
-------Re—
Rec
!i,000
---
GEt,
- -- -
GEf�I
GEM
GErI
--
Laser Level Soccer Fields -------c
R_eptace Umbrella Tops
Field House Windows Replacement —
_l'�,000
Rec
3,800
Rec
i,500
RECREATION
$ iiO 600
Facility storm shutters
POL
S�_I'i,000
GEtJ
GEII
ra—cility Key Management
POL
) 3,500
Radio infrastructure replacement ( 350,000 - annual cast
POL
70,000
GEJ
POLICE
$ 1131500
—
ReplacE- Director Car LV-02021
Replace, Police Van fV-98351 i-- - — --- -^-
-----
PW: FF
wit 5,000
FUG.
ELM,
-
Pol
33,000-
ReplacE Chipper truck fV-96611------J-
PW: Pk
)D,000
35,000
Flnn
Flni
Replace 2 Code Enforcement Cars (with "Green" Cars)
CoEnf
Re�lacE F250 Pick-up Truck fV-97641
PW:FF
28,000
LIM
FLh6
ReptacE Pick-up Truck W-02011
PW:FF
MOOD
Replacer 1994 John Deere Tractor
ReplacEr Box truck V-9 667 -- ----- — — - — - — -
Metal Roof Extension for Back Shed
-- ---- - — - — ^--�
PW:RMt
2D,000
3D,000
10,000
60,000
Flnn
FLM
6-M
PW:RMt
PW:FF
Rep(dCE' 2 Police K-9 cars
Pot
:—
FLEET MAINTENANCE (F. 550)
53.000
Decorative Sign Posts
NW 2ncl Avenue Wall
PW:Sts
$ 113,000
LOGT
LOGT
LOOT
PW:Sts
50,000
Dama e> walls replacement
AD —Al mprovements
PW:Sts
20,000
PW:Sts
15,000
LOCAL OPTION GAS TAXES (F. 130
165,000
ep ace ec c in rue
ep ac'? ar age ruc TV�4S4T — — —
PW:San
210,0OO
250,000
SAN
PW:San
SANITATION FUND (F. 4051
$ 460,000
Appendix A
Replace F250 Pick-up Truck fV-97651 CT ;1;,000 CITT
CITT FUND (F. 135) ,� ::� ,000
Source: Departmental Submissions Y_____ _ 185
Appendix A
Miami Shores Vi'lage
Capital Protect Master List
FY2011 thru 2015
by Department
Project Description
Dept
FY 2013
Fund
—
TOTAL: ALL DEPARTMENTS
$ 867,200
Purchase Computers
Fin
C ,000
—
FINANCE
$ (11000
ast— .oc er Replacement
Rec
f ,500
GEM
Replace lifeguard stands
Rec
6,000
GEM
Replace Umbrella Tops
Rec
f�,800
GEN
------------------------------
Resurfac:e Competition Pool
--------
Rec
000
GEN
Replace Air Conditioning unit at Field House
Rec
11,000
GEN
Refinish hardwood floor at the Community Center
Rec
,500
GEN
Varnish all doors and stage front at Community Center
Rec
E ,400
GEN
RECREATION
,$ 8E,200
Facility Storm Shutters
POL
1 ° ,000
GEN
Radio infrastructure replacement ( 350,000} -annual cost
POL
$Q,000
GEN
POLICE
sE ° ,000
Replace Altec Chipper rV-01091
PW- Pk
2 ! ,000
FIM
Replace Recreation Van rV-96601
Rec
K,000
FIM
Replace Pick-up Truck 250 w/ lift Rate rV 9768
Pw:Sts
2.7,000
FIM
Replace Motor Pool Service Truck rV-96621
PW:FF
37,000
FIM
Replace Bucket Truck rv-99201
PW:FF
PW:FF
12C,000
FIM
Replace 2002 Toro Workman rV-1721
1 ° ,000
FIM
Replace E350 Van rV-20011
PW:FF
25,000
FIM
Replace Low Speed International Dump Truck rV-5
PW:Sts
EC,000
FIM
Replace High Speed International Dump Truck fV=9553
Pw:Sts
60,000
FIM
Replace Chief's Car rV03011
PW:FF
31,000
FLEET MAINTENANCE (F. 550)
434,000
Replace Trash Truck rV-20021
Pw: San
9C 000
SAN
ep aceTrash ra ber 2002-[V-151 - -
PW:San
12C1000
SANITATION FUND (F. 4051
210E
Appendix A
Source: Departmental Submissions 186
Appendix A
Miami Shores Village
Capital Project Master List
FY2011 thru 2015
by Department
Project Description
Dept
FY 2014
and
Source
TOTAL: ALL DEPARTMENTS
1 30i',000
Purchase Computers
Fin
5 (1_ 000
—
FINANCE
,$ 5( OW
Ptannin� and design for new Community Center
Rec
$ 500,000
CAP
Ird ation system in Constitution Park
Rec
f,,000
GENT
Replace Consession Shutters
Rec
° ,000
GENT
RECREATION
513,000
ep acement Of ecreation van
Rec
,000
FIM
Replacement of Recreation Blue Bus fV-03101
PW:FF
1G0,000
AM,
Replace Police vehicles (4)
PW:FF
11,U,000
FIM..
Repalce 2 Lawnmovers
PW:FF
1;:,000
FIM,
Replace Box Truck fV-97671
PW:FF
3::,000
FlM
Replace Building Director Vehicte fV-01CM
PW:FF
?(1,000
FIM
— - — ------- -----------
Replace Diesel Fuel Pump
PW:FF
-------
°,,000
-------
FIM,
FLEET MAINTENANCE (F. 550)
$ 339,000
Replace 2003 Garbage Truck fV-351
PW: San
$ 13C,000
SAN_
ep ar age ruc
PW: San
2i1,000
SAN
SANITATION FUND (F. 4054
405.000
==
Appendix A
Source: Departmental Submissions 187
Appendix A
Miami Shores Village
Capital Project Master List
FY2011 thru 2015
by Department
Project Description
Dept
FY 2C 15
Fund
TOTAL: ALL DEPARTMENTS
S 10 2fi:'.000
ep ace a servers FIN
i(1,000
FINANCELU,000
ew ommunity Center
Rec
9 5(1q,000
CAP
RECREATION
9 5()(1,000
Replacement of Toro workman V-172
PW: FF
$ 12 ° ,000
RM,
Replace Police Vehicles (4)
Pool
12,1,000
FIM.
Replace Pick-up Truck fV 05521
PW:FF
,E1,000
FtM.
Replace John Deere 310 Backhoe fV-031U
PW:FF
125,000
FtM
Replace F250 Pick up Truck fV 04631 PW:FF
2C,000
FIM.
FLEET MAINTENANCE (F. 550)
43i,000
Replace Loader (V-361
PW: San
$ 13C,000
SAN.
SANITATION FUND (F. 40�j
13C2000
Replace CITT Street Sweeper fV-05321
W:CT
15C,000
CIT7
CITT FUND (F. 135)
$ 15C,000
Appendix A
Source: Departmental Submissions
Appendix B
FIVE-YEAR CAPITAL IMPROVEMENT PLAN
Miami Shores Villace, Florida
Services, Functions and Activities
The Capital Project Fund is used to account for the fundink of municipal capital expo iditures for the
acquisition, construction or improvement of major capital facilities or infrastructurEl machin_e_y and
equipment; and other general improvements with a life expectancy of more than three years. As
reference, equipment that has a value of $5,000 or less is also included in this docu ment for.budgelar),
purposes.
Many of the capital projects are multi -year projects and may not actually begin in F� 2013. The Funds
are encumbered to the subsequent year's budget as an obligation until used or released. Th.is v!ar's
budget inclucles a transfer from the General Fund to the Capital Project Fund for sev,, ral projects.
BUDGET HIGHLIGHTS
FY'12 FY'13 Change
Personnel costs ...................................... _— _ $ $
Operating costs ...................................... -
Capital outlay ....................................... ___ 1,387,365 276,070 (1_.11,295
TOTAL .................................. 1,387,365 5276,070 $(1.111,2951
159
Source: DeGartmental Submissions
Appendix B
Proiect Description Crept
FY 2013
Fund Source
TOTAL: ALL DEPARTMENTS
$ 1,128,65P
BUILDING
Purchase Accounting Software (Partial fundin 2/5)
FIN
$ 50,000
GEN
Purchase Computer Equipment and Software
FIN
50,000
GEN
FINANCE
$ 100. 00
Field House Alarm System
REC
$ 8,500
GEN
Field House North Locker A/C Unit
REC
8,500
GEIv
Replace Aquatic Ctr deck chairs, lounges and tables
REC
10,000
GEN
Shipwreck Cave structural inspection and repair
F;EC
20,000
GEM
Replace tables at Community Center
REC
2,500
GEN
Field House interior fixtures
F;EC
6,000
GE(q
RECREATION
$ 55,500
Facility roof replacement (Partial funding '1/3)
POL
$ 25,000
GEN
Computer Infrastructure
POL
50,000
GEN
Radio repeater replacement (Partial funding 1/2)
POL
25,000
GEN
POLICE
$ 100,000
Bayfront Park. Railing
F'W
10,000
GEN
PW Administration Building Roof
F'W
10,570
GEN
PUBLIC WORKS
$ 20,570
Replace Fuel Pump at Public Works Compound
F'W: FF
6,000
FF
Replace 1 (Vu-9663)Pick-up Truck
F'W: FF
36,000
FF FB
FLEET MAINTENANCE (F. 550)
$ 42,000
Replace broken & damage sidewalk Village wide
F'W: LOGT
$ 25,000
LOGT FB
Maintain inventory of sign materials
F'W: LOGT
1,000
LOGT
Roadway resurfacing
F'W: LOGT
100,000
LOGT
LOCAL OPTION GAS TAXES (F. 130)
$ 126,000
Drainage Mitiqation Proiect -- - 'W:STVV
$ 100,000
STUV FQ -
STORMWATER FUND (F. 402)
$ 100,000
Replace V-4148 Garbage Truck
F'W:SAN
$ 233,225
SAN F:B
Replace V-2002 Trash Truck
F'W:SAN
91,000
SAN F B
Replace V-161 Trash Grabber
FW:SAN
130,363
SAN FB
SANITATION FUND (F. 405)
$ 454,588
Repair & upgrade of Railway crossing Village boundar
F'W:CT
$ 20,000
CITT
Roadway resurfacing
F'W:CT
110,000
CITT
CITT FUND (F. 135)
$ 130,000
_
115D
Source: Departmental Submissions
Appendix B
Project Description Deft
FY 2014 Fund Source
TOTAL: ALL DEPARTMENTS
$ 975,703
Purchase Accounting Software (Partial funding 3/5)
FIN
FIN
$ 50,000 GEN
50,000 GEN
Purchase Computer Equipment and Software
FINANCE
$ 100,000
Sand and varnish Community Ctr doors and stage front
REC
$ 7,000 ~
GEN
Replace auditorium sound system
REC
6,0001
GEN
Field House patio tables and benches
REC
10,000
GEN
Resurface activity pool
REC
32,000
GEN
Replace pool strantal system
REC
31,000
GEN
Rebuild 3 baseball dugouts
REC
7,500
GEN
RECREATION
$ 93,500
Public Works Generator (1/3) -W:ADM
-�-
20,000
GEN_^
PUBLIC WORKS
_$ 20,000
Replace V-2001 E-350 Purchasing Van
FW: FF
$ 30,000
FF FB
Replace V-9662 Motor Pool Truck
FW: FF
40,000
FF FB
Replace V-9660 Recreation Van
FW: FF
25,870
FF f=B
Repalce V140 Reel Master 3100D
PW: FF
26,333
FF FB
Replace V-9836 72" Mower
PW: FF
20,000
FF FB
Replace two (2) Pickup Trucks V-9768 & V-9764
PW: FF
50,000
FF FB
Replace V-0101 Building Official's Vehicle,
PW: FF
35,000
FF FB
Replace V-9835 Police Van
PW: FF
30,000
FF FB
Replace John Deere Tractor V-178 (1994'I
PW: FF
20,000
FF FB
Replace V-0702 Village Manager's Vehicle
PW: FF
35,000
FF FB
Replace V-0202 Public Works Director's Vehicle
PW: FF
35,000
FF FB
Replace V-0228 Detective Bureau Vehicle 2000I
PW: FF
30,000
FF FB,
FLEET MAINTENANCE (F. 550)
$ 377,203
ADA ramps & improvement to Village intersections
PW: LOGT
15,000
LOGT
Replace V-9661 Chipper Truck
PW:LOGT
$ 95,000
LOGT
LOCAL OPTION GAS TAXES (F. 130)
$ 110,000
Replace Loader fV-351 2003
PW:SAN
$ 130,000
SAN FB
Replace Garbage Truck fV-61491 1/2 cost
PW:SAN
145,000
SAN FB
SANITATION FUND (F. 405)
$ 275,000
1E1
Source: Departmental Submissions
Appendix B
Project Description
Dept
FY 2015
FLind Source
TOTAL: ALL DEPARTMENTS
$ 1,394,950
Purchase Accounting Software (Partial funding 4/5)
FIN
$ 50,000
C,I_N
Purchase Computer Equipment and Software
FIN
50,000
CAI=N
FINANCE
$ 100,000
Replace lifeguard stands
REC
$ 6,500
GIN
Replace field house windows
REC
8,500
Cif=N
Replace pool lockers with plastic lockers
REC
8,000
GI:N
RECREATION
$ 23,000
_
Replace air conditioner in North Wing area LIB
$ 8,950
GI=N
LIBRARY
$ 8,950
GE=N
Replace Public Works Generator (2/3)
PW:/kDM
$ 35,000
GE:N
PUBLIC WORKS
$ 35,000
_
Replace V-172 Toro Workman (2003)
PW:F:F
$ 20,000
FF FB
Replace V-9767 Box Truck
PW:F7F
32,000
FF FIB
Replace four (4) Police Vehicles
PW:F7F
124,000
FF FB
Replace V-0203 Recreation Van
PW:F7F
40,000
FF FB
Replace V-0310 Recreation Blue & White Bus
PW:F7F
140,000
FIF FB
Replace VT-E; 18 Foot Lawn Trailer (2005)
PW:FF
10,000
FF FB
FLEET MAINTENANCE (F. 550)
$ 366,000
Replace V-9920 Green Bucket Truck
PW:L.OGT ! $ 140,000
LI GT FB
Replace Vehicle T-4 Arrow Board
PW: LOGT 5,000
L1,GT
Replace V-0109 Altec Chipper
PW:LOGT 28,000
LC1GT
LOCAL OPTION GAS TAXES (F. 130) —
$ 173,000
_
Replace Loader [V-361
PW E AN
$ 130,000
SA N FIB
Replace V-9553 High Side International
PW:S�AN
80,000
SF.N FIB
Replace Garbage Truck IV-61491 2/2 cost
PW:SAN
149,000
SAW—
FB-Replace Trash Truck V-0523
PW:1SAN
90,000
SF,N FB
Replace Trash Truck V-0524
PW:SAN
90,000
SA N FB
SANITATION FUND (F. 405)
$ 539,000
Replace V-0532 Street Sweeper _ _IPW:C:T
$ 150,000
CI'FT
CITT FUND (IF. 135)
$ 150,000
_
:L 6
Source: Departmental Submissions
Appendix B
Project Description
Dept
FY 2016
Fund
Source
TOTAL: ALL DEPARTMENTS
1 212,f100
Purchase Accounting Software (Partial funding 5/5)
FIN
50 ADO
GEN
Purchase Computer Equipment and Software
FIN
50,4D0
G(=N
FINANCE
100,330
Planning and design for new Community Center
REC
500,i33O
BONE
Replace concession stand shutters at Aquatic Center
REC
5O
GI:=N
Irrigation system for Constitution Park
REC
4,530
GFEN
RECREATION
509,5130
_
Replace Public Works Generator (3/3)
PW:ADM
35,010
GE-N
Replace V-04.01 Village Hall Generator (partial funding r 1�
PW
70 ),)0
GEN
PUBLIC WORKS
105 I),)0
_
Replace V-0201 Pickup Truck
PW:FF
30,11,
FF: FE:I
Replace V-0463 F250 Pickup Truck
PW:FF
30JILO
FF: FB
Replace V-175 Toro Sprayer (2002)
PW:FF
8,1 jO0
FF FE:I
Replace V-174 Smithco Groom Master (20Q5)
PW:FF
15,0(,)0
FF FEi
Replace 4 Police Vehicles
PW:FF
140,QUO
FF FE?)
Replace V-0505 Crime Watch Vehicle
PW:FF
35,11t)0
FF FE?I
Replace V-0552 F250 Pickup Truck Recreation
Maintenance
PW:FF
35,0O0
FF: FE?I
FLEET MAINTENANCE (F. 550)
293.000
Replace V-0318 Backhoe
PW:SAN
1251100
S_P,N If_B
Replace V-9558 Low Side International
PW:SAN
80,000
Sf�,N 1'=B
e
SANITATION FUND (F. 405)
205,000
Source: Departmental Submissions
Appendix B
Project Des c:ri tion Dept
FY 2017
Fkond Source
TOTAL: ALL DEPARTMENTS
10 201i)OO
Purchase Computer Equipment and Software _ _ FIN
50 G00
GhN
FINANCE
50 C00
_
New Community Center __— REG
9,500,000
RECREATION
9 500i)00
_.._
Replace V-O401 Village Hall Generator (Partial funding yr �=
70.000
GI_N -
Public Works
70 000
_ v
Replace V-0711 Crew Cab Pickup Truck
PW: FF1
35,000
FF FE3 --
Replace V-0704 Trail Blazer
P11: FF
40,000
FF FB�
Replace 4 Police Vehicles
PW: FF
140,000
FF' FE3`
Replace V-0601 F250 Pickup Truck
PW: FF
30,000
Ff= FB
Replace V-T-11 Lawn Trailer
PW:FF
6,000
FF FB
FLEET MAINTENANCE (F. 550)
251 000
_
Replace Variable Message Sign
PW:LOGT
30,000
LC;►GT' FB
Replace V-0703 White Bucket Truck
PW:LOGT
145,200
LOGT FB
Replace V-0710 Stump Grinder
PW:LOGT
30,000
L(:)GT'u__.___
Replace V-34 Skid Loader (2001)
PW:LOGT
40,D00
LCiGT
Replace V-0712 Chipper
PW:LOGT
35,DOO
LQGT'
LOCAL OPTION GAS TAXES (F. 130)
280 DDO
_
Replace Bayshore Drive Generator _---_ PW:STW
50 D.DO
STW FB
STORMWATER FUND IF. 402)
50 DDO
v ` -
_
164
Source: Departmental Submissions