Miami Shores 08-CIE1Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project Description Dept FY 2009
Fund
Source
3,516,040$
Specialized equipment for planning P&Z 2,000 GEN
2,000$
Replace air conditioner at Community Center Rec 11,730$ GENFB
Tot Lot equipment replacement Rec 90,000 GENFB
Lifepak Defibrillator with Grachical display Rec 2,500 GENFB
Folding tables (10) (Communities Center)Rec 1,510 GENFB
New tables and chairs for Shipwreck Cove deck Rec 2,000 GENFB
Refurbish Shipwreck Cove Rec 34,000 GEN
141,740$
Replace current phone system POL 15,000$ GENFB
Radio infrastructure replacement ($350,000) - annual cost POL 70,000 GENFB
85,000$
Replace Fuel Pump PW:Sts 4,800 FLT
New Fleet Maint. Facility PW-Sts 1,500,000 GENFB
1,504,800$
Resurface street & alleys Village wide PW: Sts 140,000$ LOGT
ADA ramps & improvement to Village intersections PW: Sts 15,000 LOGT
Replace broken & damage sidewalk Village wide PW: Sts 25,000 LOGT
Maintain inventory of sign materials PW: Sts 1,000 LOGT
Tree replacement PW:Sts 5,000 LOGT
NE 2 Ave renovations PW:Sts 650,000 LOGT
836,000$
Replace Pick-up Truck V-19 PW:FF 23,000$ STW
Street resurfacing to improve the drainage system PW: Sts 40,000 STW
63,000$
Replace Trash Truck V-9921 PW:San 78,000$ SAN
Purchase garbage dumpsters PW:San 5,500 SAN
83,500$
Repair & upgrade of Railway crossing Village boundary PW:CT 150,000$ CITT
NE 2 Ave renovations PW:CT 650,000$ CITT
800,000$
STORMWATER FUND (F. 402)
CITT FUND (F. 135)
SANITATION FUND (F. 405)
POLICE
TOTAL: ALL DEPARTMENTS
Public Works
LOCAL OPTION GAS TAXES (F. 130)
RECREATION
PLANNING & ZONING
Source: Departmental Submissions 90.1
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project Description Dept FY 2010
Fund
Source
1,688,247$
Refinish Hardwood Floor (CC)Rec 3,811$ CAP
Basketball court sunshade Rec 19,000 CAP
Resurface Tennis courts Rec 18,500 CAP
Resurface Basketball courts (CC)Rec 16,000 CAP
Thermal pool blankets Rec 15,000 CAP
Lifeguard chairs Rec 6,000 CAP
Auditorium floor replacement (CC)Rec 13,000 CAP
91,311$
Replace air conditioner in North Wing area LIB 8,436$ CAP
8,436$
Scenario Based Firearms Training POL 7,300$ CAP
Locker Room Renovation POL 8,000 CAP
Radio infrastructure replacement ($350,000) - annual cost POL 70,000 CAP
85,300$
Purchase 2 portable generator lights PW:Sts 18,000$ CAP
Purchase 1 portable solar powered message board PW:Sts 17,000 CAP
Sealcoat and restripe Public Works yard PW:Sts 6,000 CAP
Security wall on NW 2nd PW:Sts 50,000 CAP
Replace foxtail palm trees PW:Sts 10,000 CAP
101,000$
Replace Pickup Truck V-9765 PW:FF 27,000$ FlM
Replace P/W Director vehicle V-0202 PW:FF 25,000 FlM
Replace Police Van V-9835 PW:FF 25,000 FlM
Replace Service Truck V-9552 PW:FF 25,000 FlM
Building Official's vehicle V-0402 PW:FF 25,000 FlM
Replace John Deere Tractor V-178 PW:FF 17,500 FlM
Replacement of Recreation van V-9660 PW:FF 30,000 FlM
Replace Service truck V-9662 PW:FF 37,000 FlM
Replace Police SUV V-9839 PW:FF 25,000 FlM
Replace water truck V-9556 PW:FF 110,000 FlM
Replace 4 Police vehicles PW:FF 120,000 FlM
466,500$
Purchase 44" Lawn mower PW:Sts 6,700$ LOGT
Renovate median at 109 St from N Miam Ave - 2nd Ave PW:Sts 150,000 LOGT
Village entrance signs - engineer, design & construct PW:Sts 50,000 LOGT
Damage walls replacement PW:Sts 20,000 LOGT
Paving for streets and alleys PW:Sts 150,000 LOGT
Replace sidewalks PW:Sts 100,000 LOGT
Sign material PW:Sts 6,000 LOGT
POLICE
TOTAL: ALL DEPARTMENTS
Public Works
FLEET MAINTENANCE (F. 550)
LIBRARY
RECREATION
Source: Departmental Submissions 90.2
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project Description Dept FY 2010
Fund
Source
ADA Improvements PW:Sts 15,000 LOGT
Tree repalcement PW:Sts 25,000 LOGT
522,700$
Replace recycle truck V-9557 PW:San 185,000$ SAN
Replace Trash Truck V-9922 PW:San 78,000 SAN
263,000$
Repair & upgrade of Railway crossing Village boundary PW:CT 150,000$ CITT
150,000$ CITT FUND (F. 135)
SANITATION FUND (F. 405)
LOCAL OPTION GAS TAXES (F. 130)
Source: Departmental Submissions 90.3
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Purchase 44" Lawn mower PW:Sts 6,700$ LOGT
Renovate median at 109 St from N Miam Ave - 2nd Ave PW:Sts 150,000 LOGT
Village entrance signs - engineer, design & construct PW:Sts 50,000 LOGT
Damage walls replacement PW:Sts 20,000 LOGT
Paving for streets and alleys PW:Sts 150,000 LOGT
Replace sidewalks PW:Sts 100,000 LOGT
Sign material PW:Sts 6,000 LOGT
ADA Improvements PW:Sts 15,000 LOGT
Tree repalcement PW:Sts 25,000 LOGT
522,700$
Replace recycle truck V-9557 PW:San 185,000$ SAN
Replace Trash Truck V-9922 PW:San 78,000 SAN
263,000$
Repair & upgrade of Railway crossing Village boundary PW:CT 150,000$ CITT
150,000$ CITT FUND (F. 135)
SANITATION FUND (F. 405)
LOCAL OPTION GAS TAXES (F. 130)
Source: Departmental Submissions 90.4
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project Description Dept FY 2011
Fund
Source
1,612,000$
Plastic lockers Rec 8,500 CAP
8,500$
Radio infrastructure replacement ($350,000) - annual cost POL 70,000$ CAP
70,000$
Storage shed PW:Sts 50,000$ CAP
50,000$
Replacement of Hustle mower V-9836 PW: FF 18,000$ FlM
Replace Chipper Truck [V-9661]PW: FF 90,000 FlM
Replacement of Pickup V-9764 PW: FF 28,000 FlM
Replacement of Bucket truck V-9920 PW: FF 120,000 FlM
Replacement of Public work's van V-2001 PW:FF 29,000 FlM
Replace Box truck V-9767 PW:FF 32,000 FlM
Police vehicles (3)PW:FF 91,500 FlM
Replace PZ Director's car V-0102 PW:FF 28,000 FlM
436,500$
International Truck V-9558 PW:Sts 60,000$ LOGT
Replace Toro lawn mower V-180 PW:Sts 26,000 LOGT
Decorative street sign posts PW:Sts 100,000 LOGT
Resurface streets and alley throughout the Village PW:Sts 175,000 LOGT
Replace sidewalks PW:Sts 100,000 LOGT
Sign materials PW:Sts 6,000 LOGT
ADA ramps & improvement to Village intersections PW:Sts 15,000 LOGT
Tree repalacement PW:Sts 25,000 LOGT
507,000$
Replacement of Loader V-35 PW: San 130,000$ SAN
International Truck V-9553 PW: San 60,000 SAN
Replace Garbage Truck [V-3150]PW: San 200,000 SAN
390,000$
Repair & upgrade of Railway crossing Village boundary PW:CT 150,000$ CITT
150,000$
TOTAL: ALL DEPARTMENTS
Public Works
LOCAL OPTION GAS TAXES (F. 130)
FLEET MAINTENANCE (F. 550)
RECREATION
CITT FUND (F. 135)
SANITATION FUND (F. 405)
POLICE
Source: Departmental Submissions 90.5
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project Description Dept FY 2012
Fund
Source
1,097,000$
Radio infrastructure replacement ($350,000) - annual cost POL 70,000$ CAP
70,000$
Replace Office Trailer PW:50,000$ CAP
50,000$
Replacement of Rec. Van V-0203 PW: FF 33,000$ FlM
Replace Pickup V-9768 PW: FF 27,000 FlM
Replace Chief's police car V-0301 PW: FF 31,000 FlM
91,000$
Paving for streets and alleys PW:Sts 200,000$ LOGT
Replace sidewalks PW: Sts 100,000 LOGT
Sgin materials PW: Sts 6,000 LOGT
ADA Improvements PW: Sts 15,000 LOGT
Tree replacement PW:Sts 25,000 LOGT
346,000$
Replacement of Trash truck V-0110 PW: San 80,000$ SAN
Replacement of Trash truck V-2002 PW: San 80,000 SAN
Replacement of Garbage truck V-4148 PW: San 230,000 SAN
390,000$
Repair & upgrade of Railway crossing Village boundary PW:CT 150,000$ CITT
150,000$ CITT FUND (F. 135)
SANITATION FUND (F. 405)
POLICE
TOTAL: ALL DEPARTMENTS
Public Works
LOCAL OPTION GAS TAXES (F. 130)
FLEET MAINTENANCE (F. 550)
Source: Departmental Submissions 90.6
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project Description Dept FY 2013
Fund
Source
9,848,000$
New Community Center Rec 8,500,000$ CAP
8,500,000$
Radio infrastructure replacement ($350,000) - annual cost POL 70,000$ CAP
70,000$
Replacement of Toro workman V-172 PW: FF 15,000$ FlM
Police vehicles (7)PW: FF 224,000 FlM
Replacement of Recreation blue bus V-0310 PW: FF 75,000 FlM
Replacement of John Deere's 310J V-0318 PW: FF 65,000 FlM
379,000$
Paving for streets and alleys PW:Sts 225,000$ LOGT
Replace sidewalks PW:Sts 100,000 LOGT
Sgin materials PW:Sts 6,000 LOGT
ADA Improvements PW:Sts 15,000 LOGT
371,000$
Replacement of Trash Grabber V-161 PW: San 120,000$ SAN
Replacee of Recycle truck V-0457 PW: San 230,000 SAN
Replace Pickup truck V-0201 PW: San 28,000 SAN
378,000$
Repair & upgrade of Railway crossing Village boundary PW:CT 150,000$ CITT
150,000$
TOTAL: ALL DEPARTMENTS
LOCAL OPTION GAS TAXES (F. 130)
FLEET MAINTENANCE (F. 550)
RECREATION
CITT FUND (F. 135)
SANITATION FUND (F. 405)
POLICE
Source: Departmental Submissions 90.7
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5)
Rating
Submittal
date Effective year
X FY 2009
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
X
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
2,000$ -$ -$ -$ -$ 2,000$
- - - - - -
2,000$ -$ -$ -$ -$ 2,000$
Fund / Department Cap/ Planning & Zoning Purchase Scanner
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 2,000$ Project expected to begin:
Description of Item(s) or Project:Purchase scanner
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
IF DENIED, possible alternatives which
may be considered:
TOTAL
Funding Source
Source (1) Cap Projects
Source (2)
Source: Departmental Submissions 90.8
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5)
Rating
Submittal
date Effective year
X 1 3/4/2008 FY 2009
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
X
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
11,730$ -$ -$ -$ -$ 11,730$
- - - - - -
11,730$ -$ -$ -$ -$ 11,730$ TOTAL
Funding Source
Source (1) Cap Projects
Source (2)
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
Existing unit needs to be repaired often. Currently only half the unit
is working.
IF DENIED, possible alternatives which
may be considered:
Keep repairing as needed.
Description of Item(s) or Project:Replacement of air conditioner and handler for the south end of the
Community center. Estimate includes electrical work that needs to
be completed.
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 11,730$ Project expected to begin:
Fund / Department 1403/Community Center Air Conditioner Replacement
Source: Departmental Submissions 90.9
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5)
Rating
Submittal
date Effective year
x 1 3/3/2008 FY09
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
x
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
90,000$ -$ -$ -$ -$ 90,000$
- - - - - -
90,000$ -$ -$ -$ -$ 90,000$ TOTAL
Funding Source
Source (1) Cap Projects
Source (2)
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
The current play ground equipment is nearing its life expectancy and
showing signs of wear and tear from heave use. In conjunction the
mulch surface should be replaced with an shock absorbing rubberized
surface and shade covers installed over all play equipment.
IF DENIED, possible alternatives which
may be considered:
Replace rotten beams and broken parts as needed.
Description of Item(s) or Project:Replace existing playground equipment, install new play surface, and
new sun shade covers.
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
Children's playground equipment.
PROJECT STATUS Project rating & Affect Year's)
Cost Estimate $90,000 Project expected to begin:
Fund / Department 1401/Recreation New Tot Lot Equipment
Source: Departmental Submissions 90.10
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5)
Rating
Submittal
date Effective year
X 1 3/7/2008 FY 09
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
X
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
2,500$ -$ -$ -$ -$ 2,500$
- - - - - -
2,500$ -$ -$ -$ -$ 2,500$ TOTAL
Funding Source
Source (1) Cap Projects
Source (2)
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
Live safety equipment
IF DENIED, possible alternatives which
may be considered:
Description of Item(s) or Project:Lifepak 1000 Difibrillator with Grachical Display , Ship Kit, carrying
case and preconnect system
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 2,500$ Project expected to begin:
Fund / Department 1402 / Recreation Lifepak Difibrillator
Source: Departmental Submissions 90.11
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5)
Rating
Submittal
date Effective year
X 3 FY 2009
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
X
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
1,510$ -$ -$ -$ -$ 1,510$
- - - - - -
1,510$ -$ -$ -$ -$ 1,510$ TOTAL
Funding Source
Source (1) Cap Projects
Source (2)
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
Existing tables are worn and are beginning to split open on the
edges.
IF DENIED, possible alternatives which
may be considered:
Limit the amount of tables that the department can use for events
and programs
Description of Item(s) or Project:Purchase 10 new mity-lite 5' tables for programs and special events.
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 1,510$ Project expected to begin:
Fund / Department 001/1403 Folding Tables
Source: Departmental Submissions 90.12
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5)
Rating
Submittal
date Effective year
X 4 FY 2009
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
X
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
2,000$ -$ -$ -$ -$ 2,000$
- - - - - -
2,000$ -$ -$ -$ -$ 2,000$ TOTAL
Fund / Department 1405 / Recreation New tables and chairs
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate $2,000 Project expected to begin:
Description of Item(s) or Project:Purchase new tables and chairs for Shipwreck Cove deck.
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
Double-wrapped chairs and round tables.
Justification, Rationale, or Explanation
of need to authorize project request:
Tables have warped due to rain and storage. Chars legs have broken
as well as chair straps.
IF DENIED, possible alternatives which
may be considered:
None
Funding Source
Source (1) Cap Projects
Source (2)
Funding Request by Year & Source
Source: Departmental Submissions 90.13
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5)
Rating
Submittal
date Effective year
x 2 3/3/2008 FY2009
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
x
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
34,000$ -$ -$ -$ -$ 34,000$
- - - - - -
34,000$ -$ -$ -$ -$ 34,000$ TOTAL
Fund / Department 1405/ Recreation Refurbish Shipwreck Cove
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate $34,000 Project expected to begin:
Description of Item(s) or Project:Repair and repaint Shipwreck Cove structure, slides, rails, pads and
play equipment.
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
Shipwreck Cove play equipment.
Justification, Rationale, or Explanation
of need to authorize project request:
Shipwreck Cove play apparatus will be 9 years old. The original paint
and finish has faded and is not visually appealing. This is due to solar
fading, water chemicals and wear and tear of touching.
IF DENIED, possible alternatives which
may be considered:
Minor touch-up work is on going by staff. The effects of age, extreme
environment and heave use will require a complete professional
refurbishing.
Funding Source
Source (1) Cap Projects
Source (2)
Funding Request by Year & Source
Source: Departmental Submissions 90.14
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5)
Rating
Submittal
date Effective year
x 2 3/3/2008 FY2009
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
x
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
15,000$ -$ -$ -$ -$ 15,000$
- - - - - -
15,000$ -$ -$ -$ -$ 15,000$
Funding Source
Source (1) Cap Projects
Source (2)
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
Current system was installed in 1997, The system has started to
required repair as parts are falling. System was out of service on
several occasions during the past year. A new system would
consolidate our lines andlead to a cost savings on our monthly phone
charges.
IF DENIED, possible alternatives which
may be considered:
Description of Item(s) or Project:Replace current facility phone system. Original system installed in
1997.
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
Norstar Meridian phone system 0 x 32
TOTAL
Fund / Department Police Facility Phone System - Replacement
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate $15,000 Project expected to begin:
Source: Departmental Submissions 90.15
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5)
Rating
Submittal
date Effective year
x 1 FY2009
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
70,000$ 70,000$ 70,000$ 70,000$ 70,000$ 350,000
- - - - - -
70,000$ 70,000$ 70,000$ 70,000$ 70,000$ 350,000$ TOTAL
Fund / Department Police Radio Infrastructure Replacement
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate $350,000 Project expected to begin:
Description of Item(s) or Project:This project will provide funding to replace our current police radio
system.
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
Replace all portable, truck mounted and handheld radio equipment
and infrastructure.
Justification, Rationale, or Explanation
of need to authorize project request:Current radio system is approximately 15 years old and the
equipment manufacturer has notified the users that the equipment
has reached its "end-of-life" phase. Parts availability will be based
on what is already in inventory.
IF DENIED, possible alternatives which
may be considered:
Funding Source
Source (1) Cap Projects
Source (2)
Funding Request by Year & Source
Source: Departmental Submissions 90.16
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5);
Rating
Submittal
date Effective year
X 2008-2009
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
X
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
4,800$ -$ -$ -$ -$ 4,800$
- - - - - -
4,800$ -$ -$ -$ -$ 4,800$
Fund / Department CAP/Public Works Replace Fuel Pump
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 4,800$ Project expected to begin:
Description of Item(s) or Project:Replacement of fuel pump at fuel island.
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
N/A
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
"Regular" fuel pump is slowing down. Increased usage with
additional police vehicles.
IF DENIED, possible alternatives which
may be considered:
Continue to use old pump with reliability issues.
TOTAL
Source (1) Cap Projects
Source (2)
Funding Source
Source: Departmental Submissions 90.17
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5);
Rating
Submittal
date Effective year
X 2008-2009
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
X
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
1,500,000$ -$ -$ -$ -$ 1,500,000$
- - - - - -
1,500,000$ -$ -$ -$ -$ 1,500,000$
Fund / Department CAP/Public Works New Fleet Maintenance Facility
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 1,500,000$ Project expected to begin:
Description of Item(s) or Project:Construction of new fleet maintenance facility.
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
Existing fleet maintenance building.
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
Existing fleet maintenance facility is over 40 years old needing
mayor repairs.
IF DENIED, possible alternatives which
may be considered:
Continue to make mayor repairs to current building.
Funding Source
TOTAL
Source (1) Cap Projects
Source (2)
Source: Departmental Submissions 90.18
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5);
Rating
Submittal
date Effective year
X 2009-2013
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
140,000$ 150,000$ 175,000$ 200,000$ 225,000$ 890,000$
40,000 - - - - 40,000
180,000$ 150,000$ 175,000$ 200,000$ 225,000$ 930,000$
Justification, Rationale, or Explanation
of need to authorize project request:
Due to wear and tear, streets and alleys in the Village are in need of
rehabilitation. This project enhances the overall appearance of the
Village.
IF DENIED, possible alternatives which
may be considered:
Do not repair/Maintain streets
Description of Item(s) or Project:Resurface streets and alleys throughout the Village
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
N/A
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 890,000$ Project expected to begin:
Fund / Department Logt & Stw/Public Works Paving for streets and Alleys
TOTAL
Funding Request by Year & Source
Funding Source
Source (1) LOGT
Source (2) Stormwater
Source: Departmental Submissions 90.19
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5);
Rating
Submittal
date Effective year
X 2009-2013
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
15,000$ 15,000$ 15,000$ 15,000$ 15,000$ 75,000$
- - - - - -
15,000$ 15,000$ 15,000$ 15,000$ 15,000$ 75,000$
Fund / Department LOGT/Public Works ADA Improvements
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 75,000$ Project expected to begin:
Description of Item(s) or Project:Continue with ADA ramps and improvements to Village intersections
and Facilities.
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
N/A
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
Funds must be available to enable The Village to comply with
Federally mandated ADA requierements. In addition, funds are
required to continue installing ADA ramps at intersections, for
wheelchair residents are able to travel through the village.
IF DENIED, possible alternatives which
may be considered:
Make no improvement
TOTAL
Source (1) LOGT
Source (2)
Funding Source
Source: Departmental Submissions 90.20
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5);
Rating
Submittal
date Effective year
X 2009-2013
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
25,000$ 100,000$ 100,000$ 100,000$ 100,000$ 425,000$
- - - - - -
25,000$ 100,000$ 100,000$ 100,000$ 100,000$ 425,000$ TOTAL
Source (1) LOGT
Source (2)
Funding Source
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
Miami Shores Village has an extensive amount of broken and
damaged sidewalks. Repairing damaged sidewalks reduces the
potential for trip and fall situations. It is an ongoing project to
enhance the appearance of the Village.
IF DENIED, possible alternatives which
may be considered:
Do not repair/ Replace Sidewalks
Description of Item(s) or Project:Replace broken and damage sidewalks throughout the Village.
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 425,000$ Project expected to begin:
Fund / Department LOGT/Public Works Replace Sidewalks
Source: Departmental Submissions 90.21
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5);
Rating
Submittal
date Effective year
X 2012-2013
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
1,000$ 6,000$ 6,000$ 6,000$ 6,000$ 25,000$
- - - - - -
1,000$ 6,000$ 6,000$ 6,000$ 6,000$ 25,000$ TOTAL
Source (1) LOGT
Source (2)
Funding Source
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
By maintaining an inventory of sign material, it allows us to respond
quickly to damaged/missing/worn traffic signs.
IF DENIED, possible alternatives which
may be considered:
Wait for another agency to replace
Description of Item(s) or Project:Maintain inventory of sign materials
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
N/A
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 25,000$ Project expected to begin:
Fund / Department LOGT/Public Works Sign Material
Source: Departmental Submissions 90.22
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5);
Rating
Submittal
date Effective year
X 2009-2012
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
5,000$ 25,000$ 25,000$ 25,000$ -$ 80,000$
- - - - - -
5,000$ 25,000$ 25,000$ 25,000$ -$ 80,000$
Fund / Department LOGT/Public Works Tree Replacement
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 80,000$ Project expected to begin:
Description of Item(s) or Project:Ongoing project to replace diseased and non native trees
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
N/A
Justification, Rationale, or Explanation
of need to authorize project request:
Diseased and non-native trees need to be replaced in order to
maintain the appearance of Village swales and streets. A lush
canopy of green is an enhancement to property values in the Village
IF DENIED, possible alternatives which
may be considered:
Do not replace trees
TOTAL
Source (1) LOGT
Source (2)
Funding Request by Year & Source
Funding Source
Source: Departmental Submissions 90.23
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5);
Rating
Submittal
date Effective year
X 2008-2009
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
X
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
650,000$ -$ -$ -$ -$ 650,000$
650,000 - - - - 650,000
1,300,000$ -$ -$ -$ -$ 1,300,000$
Funding Source
TOTAL
Source (1) LOGT
Source (2) CITT
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
To improve image of the Village.
IF DENIED, possible alternatives which
may be considered:
N/A
Description of Item(s) or Project:Mayor renovation of NE 2 Ave including drainage improvements,
sidewalk expantions and landscaping.
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
NE 2 Ave.
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 1,200,000$ Project expected to begin:
Fund / Department LOGT&CITT/Public Works NE 2 AVE RENOVATIONS
Source: Departmental Submissions 90.24
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5);
Rating
Submittal
date Effective year
X 2008-2009
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
x
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
23,000$ -$ -$ -$ -$ 23,000$
- - - - - -
23,000$ -$ -$ -$ -$ 23,000$
Fund / Department Stw/Public Works Replace Pickup Truck V-19
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 23,000$ Project expected to begin:
Description of Item(s) or Project:Replace pickup V-19
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
V-19 (1993)
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
This vehicle has met its life expectancy and needs to be replaced
IF DENIED, possible alternatives which
may be considered:
Continue with increased maintenance costs and reliability issues
TOTAL
Source (1) Stormwater
Source (2)
Funding Source
Source: Departmental Submissions 90.25
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5);
Rating
Submittal
date Effective year
X 2008-2009
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
x
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
78,000$ -$ -$ -$ -$ 78,000$
- - - - - -
78,000$ -$ -$ -$ -$ 78,000$ TOTAL
Source (1) Sanitation
Source (2)
Funding Request by Year & Source
Funding Source
Justification, Rationale, or Explanation
of need to authorize project request:
This vehicle is used 5 days a week, 52 weeks a year and is essential
to our trash operation. It has met its life expectancy and needs to
be replaced.
IF DENIED, possible alternatives which
may be considered:
Continue with increased maintenance costs and reliability issues
Description of Item(s) or Project:Replace Trash Truck V-9921
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
V-9921 (1999)
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 78,000$ Project expected to begin:
Fund / Department San/Public Works Replace V-9921 Trash Truck
Source: Departmental Submissions 90.26
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5);
Rating
Submittal
date Effective year
X 2008-2009
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
X
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
5,500$ -$ -$ -$ -$ 5,500$
- - - - - -
5,500$ -$ -$ -$ -$ 5,500$
Fund / Department SAN/Public Works Garbage Dumpsters
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 5,500$ Project expected to begin:
Description of Item(s) or Project:Garbage dumpsters
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
N/A
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
As an ongoing capital expense, dumpsters wear out (rust out) and
need to be replaced
IF DENIED, possible alternatives which
may be considered:
Continue to use existing rusted dumpsters.
Funding Source
TOTAL
Source (1) Sanitation
Source (2)
Source: Departmental Submissions 90.27
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5);
Rating
Submittal
date Effective year
X 2009-2013
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
150,000$ 150,000$ 150,000$ 150,000$ 150,000$ 750,000$
- - - - - -
150,000$ 150,000$ 150,000$ 150,000$ 150,000$ 750,000$
Fund / Department CITT/Public Works Phase IV R.R. xing
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 750,000$ Project expected to begin:
Description of Item(s) or Project:Repair and upgrade of Railway crossing within the Village boundary.
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
Miami Shores Village is responsible for maintaining the approaches
and level crossings. This investment will ensure adequate funding
for future expenditure.
IF DENIED, possible alternatives which
may be considered:
Allow further deterioration of these crossings
Funding Source
TOTAL
Source (1) CITT
Source (2)
Source: Departmental Submissions 90.28
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5)
Rating
Submittal
date Effective year
X 3 3/4/2008 FY 2010
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
X
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
-$ 3,811$ -$ -$ -$ 3,811$
- - - - - -
-$ 3,811$ -$ -$ -$ 3,811$ TOTAL
Fund / Department 1403 / Recreation Refinishing Hardwood floors in Coconut
Pam Room and Queen Palm Room
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 3,811$ Project expected to begin:
Description of Item(s) or Project:Refinish with commercial grade polyurethane in queen palm room
and coconut palm room
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
Justification, Rationale, or Explanation
of need to authorize project request:
Floor is showing wear and tear.
IF DENIED, possible alternatives which
may be considered:
Leave as is.
Funding Request by Year & Source
Funding Source
Source (1) Cap Project
Source (2)
Source: Departmental Submissions 90.29
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5)
Rating
Submittal
date Effective year
2 3/8/2008 FY10
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
X
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
-$ 19,000$ -$ -$ -$ 19,000$
- - - - - -
-$ 19,000$ -$ -$ -$ 19,000$ TOTAL
Funding Source
Source (1) Cap Projects
Source (2)
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
This is shade area is greatly needed at the basektball courts during
basketball season and during summer camp. The shade will cover
the bleacher area which will allow for a comfortbale setting for
parents and fans during games and will be a life saver to
IF DENIED, possible alternatives which
may be considered:
Description of Item(s) or Project:Sun Shade to shade area on the west side of the basketball courts
over bleacher area.
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 19,000$ Project expected to begin:
Fund / Department Athletics Sun Shade
Source: Departmental Submissions 90.30
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5)
Rating
Submittal
date Effective year
x 2 3/3/2008 FY2010
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
x
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
-$ 18,500$ -$ -$ -$ 18,500$
- - - - - -
-$ 18,500$ -$ -$ -$ 18,500$ TOTAL
Fund / Department 1406 / Recreation Resurface Tennis Courts
PROJECT STATUS Project rating & Affect Year's)
Cost Estimate $18,500 Project expected to begin:
Description of Item(s) or Project:Fill cracks, patch damage areas and resurface tennis courts.
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
Four outdoor tennis courts.
Justification, Rationale, or Explanation
of need to authorize project request:
Maintain a safe and attractive sports facility.
IF DENIED, possible alternatives which
may be considered:
Spot patch cracks and damage areas.
Funding Source
Source (1) Cap Projects
Source (2)
Funding Request by Year & Source
Source: Departmental Submissions 90.31
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5)
Rating
Submittal
date Effective year
x 2 3/3/2008 FY 2010
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
x
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
-$ 16,000$ -$ -$ -$ 16,000$
- - - - - -
-$ 16,000$ -$ -$ -$ 16,000$ TOTAL
Funding Source
Source (1) Cap Projects
Source (2)
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
Maintain a safe and attractive sports facility.
IF DENIED, possible alternatives which
may be considered:
Spot patch cracks and damage areas.
Description of Item(s) or Project:Fill cracks, patch damage areas and resurface basketball courts.
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
Two outdoor basketball courts.
PROJECT STATUS Project rating & Affect Year's)
Cost Estimate $16,000 Project expected to begin:
Fund / Department 1403 / Recreation Resurface Basketball Courts
Source: Departmental Submissions 90.32
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5)
Rating
Submittal
date Effective year
X 3 FY2010
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
X
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
-$ 15,000$ -$ -$ -$ 15,000$
- - - - - -
-$ 15,000$ -$ -$ -$ 15,000$ TOTAL
Funding Source
Source (1) Cap Projects
Source (2)
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
Existing blankets are tattered and grommets are damaged. Ends
have begun to fray. The pool blankets have deen repaired and
reinforced many times over the last 3 years (mainly due to wind,
chemical and sun damage).
IF DENIED, possible alternatives which
may be considered:
Continue repairing year to year.
Description of Item(s) or Project:Purchase new thermal blankets for the Competition Pool.
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
25 meter x 25 yard thermal pool blankets
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate $15,000 Project expected to begin:
Fund / Department 1405 / Recreation Purchase new pool blankets
Source: Departmental Submissions 90.33
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5)
Rating
Submittal
date Effective year
X 3 FY2010
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
X
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
-$ 6,000$ -$ -$ -$ 6,000$
- - - - - -
-$ 6,000$ -$ -$ -$ 6,000$ TOTAL
Fund / Department 1405 / Recreation Lifeguard Stands
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate $6,000 Project expected to begin:
Description of Item(s) or Project:(3) low profile portable lifeguard stands with umbrella holders.
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
Low profile lifeguards stands
Justification, Rationale, or Explanation
of need to authorize project request:
Low profile lifeguard stands need replacing due age (7years) in sun ,
wear and tear and moving.
IF DENIED, possible alternatives which
may be considered:
Continue repairing year to year.
Funding Source
Source (1) Cap Projects
Source (2)
Funding Request by Year & Source
Source: Departmental Submissions 90.34
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5)
Rating
Submittal
date Effective year
x 3 FY 2010
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
x
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
-$ 13,000$ -$ -$ -$ 13,000$
- - - - - -
-$ 13,000$ -$ -$ -$ 13,000$ TOTAL
Fund / Department 001/1403/ Recreation Auditorium Floor Replacement
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 13,000$ Project expected to begin:
Description of Item(s) or Project:Replace floor in auditorium linoleum tile/ roll flooring.
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
Justification, Rationale, or Explanation
of need to authorize project request:
Replace 35 years old vinyl flooring.
IF DENIED, possible alternatives which
may be considered:
Patch as tiles come up.
Funding Source
Source (1) Cap Projects
Source (2)
Funding Request by Year & Source
Source: Departmental Submissions 90.35
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5)
Rating
Submittal
date Effective year
x 3 FY 2010
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
x
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
-$ 8,436$ -$ -$ -$ 8,436$
- - - - - -
-$ 8,436$ -$ -$ -$ 8,436$ TOTAL
Funding Source
Source (1) Cap Projects
Source (2)
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
The AC Unit was installed in 1985 and is now 22 years old. Parts are
no longer avaiable. Recently, the air handler coil pan was leaking; it
was discovered that it was rusty and full of holes. It could not be
replaced. It has been temporarity repaired with sealer and tape.
IF DENIED, possible alternatives which
may be considered:
Continue to repair as best as possible.
Description of Item(s) or Project:Replace Air conditioning Unit in North Wing of the library.
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
Carrier Model #40RR00850.
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 8,436$ Project expected to begin:
Fund / Department Library AC/ North Wing
Source: Departmental Submissions 90.36
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5)
Rating
Submittal
date Effective year
x 3 FY 2010
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
x
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
-$ 7,300$ -$ -$ -$ 7,300$
- - - - - -
-$ 7,300$ -$ -$ -$ 7,300$ TOTAL
Fund / Department Police Scenario Based Firearms Training
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 7,300$ Project expected to begin:
Description of Item(s) or Project:Equipment necessary to replace training inserts and broken
protective masks for scenario based firearms training.
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
Simmunition training inserts for older pistols will not work in newer
guns. Older protective mask have broken, re designed newer masks
offer better protection from training projectiles.
Justification, Rationale, or Explanation
of need to authorize project request:
Used to meet required scenario based, force on force training and
discretionary shooting. Scenario based, force on force training is
mandated by the Criminal Justice Standards and Training Commission
and US Supreme Court cases.
IF DENIED, possible alternatives which
may be considered:
Purchase Airsoft equipment as an alternative. Weapons that shoot
soft "BB's." Weapons and associated equipment approximately
$2700. Not as realistic, but easier to set up.
Funding Source
Source (1) Cap Projects
Source (2)
Funding Request by Year & Source
Source: Departmental Submissions 90.37
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5)
Rating
Submittal
date Effective year
x FY 2010
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
-$ 8,000$ -$ -$ -$ 8,000$
- - - - - -
-$ 8,000$ -$ -$ -$ 8,000$
Funding Source
Source (1) Cap Projects
Source (2)
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
The shower stall is too small and the surface does not clean well.
There are more female employees now and there is room for two
stalls if they are configured like the renovated men's shower stalls.
IF DENIED, possible alternatives which
may be considered:
Description of Item(s) or Project:Demolish, dispose of and install new, larger tiled shower stalls in
women's locker room.
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
Older, fiberglass enclosure.
TOTAL
Fund / Department Police Locker Room Renovation
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 8,000$ Project expected to begin:
Source: Departmental Submissions 90.38
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5)
Rating
Submittal
date Effective year
x FY 2010
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
-$ 18,000$ -$ -$ -$ 18,000$
- - - - - -
-$ 18,000$ -$ -$ -$ 18,000$ TOTAL
Fund / Department Hurricane/Public Works Generator Lights
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 18,000$ Project expected to begin:
Description of Item(s) or Project:2 portable generator lights.
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
N/A
Justification, Rationale, or Explanation
of need to authorize project request:
Experience has shown that lighting reduces accidents in intersections
and reduces crime when the electrical service is interrupted after a
hurricane. Two added bonuses to having generator lights are; they
can be used for municipal events and they can be used to energize
signal lights at intersections from the built-in generators, Price
includes striping and wheel locks.
IF DENIED, possible alternatives which
may be considered:
Rent lights when and if they are available at a time of emergency.
Funding Source
Source (1) Hurricane
Source (2)
Funding Request by Year & Source
Source: Departmental Submissions 90.39
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5)
Rating
Submittal
date Effective year
x FY 2010
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
-$ 17,000$ -$ -$ -$ 17,000$
- - - - - -
-$ 17,000$ -$ -$ -$ 17,000$
Funding Source
Source (1) Hurricane
Source (2)
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
One of the biggest problems the Village encounteres after a
hurricane is communication with the residents. Informational signs
are useful to transmit recovery information at various locations
throughout the Village. The message can be change quickly
maximizing timely transmissions of essential recovery information.
IF DENIED, possible alternatives which
may be considered:
Rent signs when and if available.
Description of Item(s) or Project:1 portable solar powered message board. Price includes striping and
wheel locks
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
N/A
TOTAL
Fund / Department Hurricane/Public Works Portable Solar Powered Informational
Sign
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 17,000$ Project expected to begin:
Source: Departmental Submissions 90.40
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5)
Rating
Submittal
date Effective year
x FY 2010
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
-$ 6,000$ -$ -$ -$ 6,000$
- - - - - -
-$ 6,000$ -$ -$ -$ 6,000$ TOTAL
Fund / Department CAP/Public Works Sealcoat and Restripe Public Works Yard
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 6,000$ Project expected to begin:
Description of Item(s) or Project:Seacoat and restripe parking areas at Public Works yard.
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
N/A
Justification, Rationale, or Explanation
of need to authorize project request:
Public Works yard has not been resurfaced since the 1980's. The
surface needs to be sealcoated to preserve the existing asphalt.
Restriping will provide an organized layout for vehicle parking.
IF DENIED, possible alternatives which
may be considered:
Continue with deteriorating surface.
Funding Source
Source (1) Cap Projects
Source (2)
Funding Request by Year & Source
Source: Departmental Submissions 90.41
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5)
Rating
Submittal
date Effective year
x FY 2010
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
-$ 50,000$ -$ -$ -$ 50,000$
- - - - - -
-$ 50,000$ -$ -$ -$ 50,000$
Funding Source
Source (1) Cap Projects
Source (2)
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
Experience has shown that a neighborhood on the western fringe of
the Village will benefit in a reduction in crime, from a security wall
being erected to limit the amount of foot and vehicular traffic into
the neighborhood from the western direction. Yearly appropriation
of funds will ensure that in a couple of years enough funds will be
saved to erect the wall.
IF DENIED, possible alternatives which
may be considered:
If no wall is erected, continued restriction of traffic through chain
link fencing will be necessary.
Description of Item(s) or Project:Security wall on NW 2nd.
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
N/A
TOTAL
Fund / Department CAP/Public Works Security Wall on NW 2nd
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 50,000$ Project expected to begin:
Source: Departmental Submissions 90.42
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5)
Rating
Submittal
date Effective year
x FY 2010
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
-$ 10,000$ -$ -$ -$ 10,000$
- - - - - -
-$ 10,000$ -$ -$ -$ 10,000$ TOTAL
Fund / Department CAP/Public Works Security Wall on NW 2nd
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 10,000$ Project expected to begin:
Description of Item(s) or Project:Replace Foxtail Palms with new plant material.
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
N/A
Justification, Rationale, or Explanation
of need to authorize project request:
Some of the foxtail palms are in decline and need to be replaced.
IF DENIED, possible alternatives which
may be considered:
Do not replace
Funding Source
Source (1) Cap Projects
Source (2)
Funding Request by Year & Source
Source: Departmental Submissions 90.43
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5);
Rating
Submittal
date Effective year
X FY 2010
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
-$ 27,000$ -$ -$ -$ 27,000$
- - - - - -
-$ 27,000$ -$ -$ -$ 27,000$
Fund / Department Fleet/Public Works Replace Pickup Truck V-9765
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 27,000$ Project expected to begin:
Description of Item(s) or Project:Replace pickup V-9765
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
V-9765 (1997)
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
This vehicle has met its life expectancy and needs to be replaced
IF DENIED, possible alternatives which
may be considered:
Continue with increased maintenance costs and reliability issues
TOTAL
Source (1) Fleet Maint
Source (2)
Funding Source
Source: Departmental Submissions 90.44
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5);
Rating
Submittal
date Effective year
X FY 2010
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
x
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
-$ 25,000$ -$ -$ -$ 25,000$
- - - - - -
-$ 25,000$ -$ -$ -$ 25,000$
Fund / Department Fleet/Public Works Public Works Director's Vehicle V-0202
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 25,000$ Project expected to begin:
Description of Item(s) or Project:Replacement of Public Works Director's vehicle.
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
V-0202 (2002)
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
The Public Works Director needs a current reliable vehicle. V0202
will be utilized by another department.123,000 miles.
IF DENIED, possible alternatives which
may be considered:
Continue to use old vehicle with reliability issues
Funding Source
TOTAL
Source (1) Fleet Maint
Source (2)
Source: Departmental Submissions 90.45
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5);
Rating
Submittal
date Effective year
FY 2010
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
-$ 25,000$ -$ -$ -$ 25,000$
- - - - - -
-$ 25,000$ -$ -$ -$ 25,000$
Fund / Department Fleet/Public Works Replace Police Van V-9835
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 25,000$ Project expected to begin:
Description of Item(s) or Project:Replace Police van V-9835
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
V-9835 (1998)
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
Vehicle will be transferred to another department for continued
use.
IF DENIED, possible alternatives which
may be considered:
Continue with increased maintenance costs and reliability issues
Funding Source
TOTAL
Source (1) Fleet Maint
Source (2)
Source: Departmental Submissions 90.46
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5);
Rating
Submittal
date Effective year
X FY 2010
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
-$ 25,000$ -$ -$ -$ 25,000$
- - - - - -
-$ 25,000$ -$ -$ -$ 25,000$
Fund / Department Fleet/Public Works Replace Service Truck V-9552
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 25,000$ Project expected to begin:
Description of Item(s) or Project:Replacement of pick up truck V-9552/F150
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
V-9552 (1995).
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
This vehicle will have met its life expectancy and will need to be
replaced.
IF DENIED, possible alternatives which
may be considered:
Continue use 1995 vehicle with increased maintenance costs and
reliability issues.
TOTAL
Source (1) Fleet Maint
Source (2)
Funding Source
Source: Departmental Submissions 90.47
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5);
Rating
Submittal
date Effective year
X FY 2010
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
-$ 25,000$ -$ -$ -$ 25,000$
- - - - - -
-$ 25,000$ -$ -$ -$ 25,000$ TOTAL
Source (1) Fleet Maint
Source (2)
Funding Source
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
Existing vehicles will have approximately 120,000 miles. The
building official needs a current reliable vehicles
IF DENIED, possible alternatives which
may be considered:
Continue to use old vehicle with reliability issues.
Description of Item(s) or Project:Replacement of Building Official's vehicle.
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
V-0402 (2004)
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 25,000$ Project expected to begin:
Fund / Department Fleet/Public Works Building Official's vehicle V-0402
Source: Departmental Submissions 90.48
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5);
Rating
Submittal
date Effective year
X FY 2010
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
-$ 17,500$ -$ -$ -$ 17,500$
- - - - - -
-$ 17,500$ -$ -$ -$ 17,500$
Fund / Department Fleet/Public Works Replace John Deere Tractor V-178
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 17,500$ Project expected to begin:
Description of Item(s) or Project:Replace John Deere tractor used by the Recreation Maintenance
Department.
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
V-178 (1994)
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
This piece of equipment is vital for the maintenance of our
recreation field. V-178 is a 1994 model and has exceeded its life
expectancy and needs to be replaced.
IF DENIED, possible alternatives which
may be considered:
Continue with increased maintenance costs and reliability issues.
TOTAL
Source (1) Fleet Maint
Source (2)
Funding Source
Source: Departmental Submissions 90.49
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5);
Rating
Submittal
date Effective year
X FY 2010
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
-$ 30,000$ -$ -$ -$ 30,000$
- - - - - -
-$ 30,000$ -$ -$ -$ 30,000$ TOTAL
Source (1) Fleet Maint
Source (2)
Funding Source
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
This vehicle will have met its life expectancy and will need to be
replaced.
IF DENIED, possible alternatives which
may be considered:
To continue using an old vehicle will lead to high maintenance costs
and have reliability.
Description of Item(s) or Project:Replacement of Recreation Center Van V-9660
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
V-9660 (1996)
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 30,000$ Project expected to begin:
Fund / Department Fleet/Public Works Replacement of Rec. Van V-9660
Source: Departmental Submissions 90.50
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5);
Rating
Submittal
date Effective year
X FY 2010
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
-$ 37,000$ -$ -$ -$ 37,000$
- - - - - -
-$ 37,000$ -$ -$ -$ 37,000$
Fund / Department Fleet/Public Works Replace Service Truck V-9662
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 37,000$ Project expected to begin:
Description of Item(s) or Project:Replacement of serivce truck V-9662
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
V-9662 (1996)
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
Replacement of 1996 service truck is due. Replacement will be
extended cab and diesel.
IF DENIED, possible alternatives which
may be considered:
To continue using an old vehicle will lead to high maintenance costs
and have reliability.
TOTAL
Source (1) Fleet Maint
Source (2)
Funding Source
Source: Departmental Submissions 90.51
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5);
Rating
Submittal
date Effective year
X FY 2010
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
-$ 25,000$ -$ -$ -$ 25,000$
- - - - - -
-$ 25,000$ -$ -$ -$ 25,000$ TOTAL
Source (1) Fleet Maint
Source (2)
Funding Source
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
This vehicle will have met its life expectancy and will need to be
replaced.
IF DENIED, possible alternatives which
may be considered:
Continue with increased maintenance costs and reliability issues.
Description of Item(s) or Project:Replace police SUV V-9839.
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
V-9839 (1998)
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 25,000$ Project expected to begin:
Fund / Department Fleet/Public Works Replace Police SUV V-9839
Source: Departmental Submissions 90.52
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5);
Rating
Submittal
date Effective year
X FY 2010
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
-$ 110,000$ -$ -$ -$ 110,000$
- - - - - -
-$ 110,000$ -$ -$ -$ 110,000$
Fund / Department Fleet/Public Works Replace Water Truck V-9556
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 110,000$ Project expected to begin:
Description of Item(s) or Project:Replacement of water truck V-9556
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
V-9556
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
This vehicle will have met its life expectancy and will need to be
replaced.
IF DENIED, possible alternatives which
may be considered:
Continue use 1995 vehicle with increased maintenance costs and
reliablity issues.
TOTAL
Source (1) Fleet Maint
Source (2)
Funding Source
Source: Departmental Submissions 90.53
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5);
Rating
Submittal
date Effective year
X 2010-2013
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
-$ 120,000$ 91,500$ -$ 224,000$ 435,500$
- - - - - -
-$ 120,000$ 91,500$ -$ 224,000$ 435,500$ TOTAL
Source (1) Fleet Maint
Source (2)
Funding Source
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
This police vehicle will have met its life expectancy and will need to
be replaced.
IF DENIED, possible alternatives which
may be considered:
To continue using old vehicles will lead to high maintenance costs
and have reliablity issues.
Description of Item(s) or Project:Replace 14 Police vehicles that have reached at least 75,000 miles
at $30,000 per vehicles. Price includes equipment and radios.
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 435,500$ Project expected to begin:
Fund / Department Fleet/Public Works Police Vehicles
Source: Departmental Submissions 90.54
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5);
Rating
Submittal
date Effective year
X FY 2010
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
-$ 6,700$ -$ -$ -$ 6,700$
- - - - - -
-$ 6,700$ -$ -$ -$ 6,700$
Fund / Department LOGT/Public Works Purchase 44" Lawn Mower
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 6,700$ Project expected to begin:
Description of Item(s) or Project:Addition of a 44' Toro-Lawn Mower
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
N/A
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
The addition of a lawn mower is an indispensable unit for the
operation of a second grass crew in order to maximize current
staffing levels.
IF DENIED, possible alternatives which
may be considered:
Continue with current lawn crew structure.
TOTAL
Source (1) LOGT
Source (2)
Funding Source
Source: Departmental Submissions 90.55
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5);
Rating
Submittal
date Effective year
X FY 2010
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
-$ 150,000$ -$ -$ -$ 150,000$
- - - - - -
-$ 150,000$ -$ -$ -$ 150,000$ TOTAL
Source (1) LOGT
Source (2)
Funding Source
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
This is the second and final phase of 109 St beautification project.
An enchanced median will improve the image of the Shores and
increase property values along 109 street.
IF DENIED, possible alternatives which
may be considered:
Continue with existing median design.
Description of Item(s) or Project:Renovate and beautify median at 109 St. from N. Miami Ave to N.E.
2nd Ave.
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
N/A
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 150,000$ Project expected to begin:
Fund / Department LOGT/Public Works 109 Street Median
Source: Departmental Submissions 90.56
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5);
Rating
Submittal
date Effective year
X FY 2010
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
-$ 50,000$ -$ -$ -$ 50,000$
- - - - - -
-$ 50,000$ -$ -$ -$ 50,000$
Fund / Department LOGT/Public Works Village Entrance Signs
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 50,000$ Project expected to begin:
Description of Item(s) or Project:Two entrance signs- Engineer, design and construct.
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
N/A
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
Fund will be used for engineering design and construction for
entrance signs to the Village.
IF DENIED, possible alternatives which
may be considered:
No sign.
TOTAL
Source (1) LOGT
Source (2)
Funding Source
Source: Departmental Submissions 90.57
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5);
Rating
Submittal
date Effective year
X FY 2010
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
-$ 50,000$ -$ -$ -$ 50,000$
- - - - - -
-$ 50,000$ -$ -$ -$ 50,000$ TOTAL
Source (1) LOGT
Source (2)
Funding Source
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
Various wall locations around the Village are in desperate need of
attention for repair or replacement.
IF DENIED, possible alternatives which
may be considered:
Continue with existing wall appearance.
Description of Item(s) or Project:Replacement of damaged walls around the Village.
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
N/A
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 50,000$ Project expected to begin:
Fund / Department LOGT/Public Works Damage Walls Replacement
Source: Departmental Submissions 90.58
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5);
Rating
Submittal
date Effective year
X FY 2010
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
-$ 185,000$ -$ -$ -$ 185,000$
- - - - - -
-$ 185,000$ -$ -$ -$ 185,000$
Fund / Department San/Public Works Replace Recycle Truck V-9557
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 185,000$ Project expected to begin:
Description of Item(s) or Project:Replacement of recycle truck V-9557.
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
V-9557
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
This vehicle will have met its life expectancy and will need to be
replaced.
IF DENIED, possible alternatives which
may be considered:
Continue use 1995 vehicle with increased maintenance costs and
reliability issues.
TOTAL
Source (1) Sanitation
Source (2)
Funding Source
Source: Departmental Submissions 90.59
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5);
Rating
Submittal
date Effective year
X FY 2010
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
-$ 78,000$ -$ -$ -$ 78,000$
- - - - - -
-$ 78,000$ -$ -$ -$ 78,000$ TOTAL
Source (1) Sanitation
Source (2)
Funding Source
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
This vehicle is used 5 days a week, 52 weeks a year and is essential
to our trash operation. It has met its life expectancy and needs to
be replaced.
IF DENIED, possible alternatives which
may be considered:
Continue with increased maintenance costs and reliability issues.
Description of Item(s) or Project:Replace trash truck V-9922.
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
V-9922
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 78,000$ Project expected to begin:
Fund / Department San/Public Works Replace Trash Truck V-9922
Source: Departmental Submissions 90.60
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5)
Rating
Submittal
date Effective year
X 3 FY2011
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
X
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
-$ 8,500$ -$ -$ -$ 8,500$
- - - - - -
-$ 8,500$ -$ -$ -$ 8,500$
Funding Source
Source (1) Cap Projects
Source (2)
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
Metal lockers rust due to chemical in water and require continues
maintenance and painting.
IF DENIED, possible alternatives which
may be considered:
Continue repairing year to year.
Description of Item(s) or Project:Replace metal restroom lockers with low maintance plastic lockers.
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
Lockers in dressing room at aquatic center.
TOTAL
Fund / Department 1405 / Recreation Plastic Lockers
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 8,500$ Project expected to begin:
Source: Departmental Submissions 90.61
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5);
Rating
Submittal
date Effective year
X FY 2011
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
-$ -$ 18,000$ -$ -$ 18,000$
- - - - - -
-$ -$ 18,000$ -$ -$ 18,000$ TOTAL
Source (1) Fleet Maint
Source (2)
Funding Source
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
This unit will have met its life expectancy and will need to be
replaced.
IF DENIED, possible alternatives which
may be considered:
To continue using an old unit will lead to high maintenance costs
and have reliablity issues.
Description of Item(s) or Project:Replacement of Hustle Mower with a 72" cutter deck V-9836.
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
V-9836 (1998)
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 18,000$ Project expected to begin:
Fund / Department Fleet/Public Works Hustler Mower V-9836
Source: Departmental Submissions 90.62
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5);
Rating
Submittal
date Effective year
X FY 2011
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
-$ -$ 90,000$ -$ -$ 90,000$
- - - - - -
-$ -$ 90,000$ -$ -$ 90,000$
Fund / Department Fleet/Public Works Replace Chipper Truck V-9661
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 90,000$ Project expected to begin:
Description of Item(s) or Project:Replace chipper truck V-9661
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
V-9611 (1996)
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
This vehicle will have met its life expectancy and will need to be
replaced.
IF DENIED, possible alternatives which
may be considered:
Continue with increase maintenance costs and reliablity issues.
TOTAL
Source (1) Fleet Maint
Source (2)
Funding Source
Source: Departmental Submissions 90.63
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5);
Rating
Submittal
date Effective year
X FY 2011
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
-$ -$ 28,000$ -$ -$ 28,000$
- - - - - -
-$ -$ 28,000$ -$ -$ 28,000$ TOTAL
Source (1) Fleet Maint
Source (2)
Funding Source
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
This vehicle will have met its life expectancy and will need to be
replaced.
IF DENIED, possible alternatives which
may be considered:
Continue with increase maintenance costs and reliablity issues.
Description of Item(s) or Project:Replacement of pickup V9764
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
V-9764 (1997)
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 28,000$ Project expected to begin:
Fund / Department Fleet/Public Works Replacement of Pickup V-9764
Source: Departmental Submissions 90.64
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5);
Rating
Submittal
date Effective year
X FY 2011
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
-$ -$ 120,000$ -$ -$ 120,000$
- - - - - -
-$ -$ 120,000$ -$ -$ 120,000$
Fund / Department Fleet/Public Works Bucket Truck V-9920
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 120,000$ Project expected to begin:
Description of Item(s) or Project:Replacement of Bucket truck V-9920.
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
V-9920 (1999)
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
This vehicle will have met its life expectancy and will need to be
replaced.
IF DENIED, possible alternatives which
may be considered:
Continue with increase maintenance costs and reliablity issues.
TOTAL
Source (1) Fleet Maint
Source (2)
Funding Source
Source: Departmental Submissions 90.65
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5);
Rating
Submittal
date Effective year
X FY 2011
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
-$ -$ 29,000$ -$ -$ 29,000$
- - - - - -
-$ -$ 29,000$ -$ -$ 29,000$ TOTAL
Source (1) Fleet Maint
Source (2)
Funding Source
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
This vehicle will have met its life expectancy and will need to be
replaced.
IF DENIED, possible alternatives which
may be considered:
Continue with increase maintenance costs and reliablity issues.
Description of Item(s) or Project:Replacement of Public Works Van V-2001.
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
V-2001 (2000)
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 29,000$ Project expected to begin:
Fund / Department Fleet/Public Works Replacement of Public Works Van
V-2001
Source: Departmental Submissions 90.66
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5);
Rating
Submittal
date Effective year
X FY 2011
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
-$ -$ 32,000$ -$ -$ 32,000$
- - - - - -
-$ -$ 32,000$ -$ -$ 32,000$
Fund / Department Fleet/Public Works Replace Box Truck V-9767
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 32,000$ Project expected to begin:
Description of Item(s) or Project:Replace Box truck V-9767.
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
V-9767 (1997)
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
This vehicle will have met its life expectancy and will need to be
replaced.
IF DENIED, possible alternatives which
may be considered:
Continue with increase maintenance costs and reliablity issues.
TOTAL
Source (1) Fleet Maint
Source (2)
Funding Source
Source: Departmental Submissions 90.67
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5);
Rating
Submittal
date Effective year
X FY 2011
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
-$ -$ 28,000$ -$ -$ 28,000$
- - - - - -
-$ -$ 28,000$ -$ -$ 28,000$ TOTAL
Source (1) Fleet Maint
Source (2)
Funding Source
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
This vehicle will have met its life expectancy and will need to be
replaced.
IF DENIED, possible alternatives which
may be considered:
Continue with increase maintenance costs and reliablity issues.
Description of Item(s) or Project:Replacement of Planning & Zoning Director's vehicle V-0102.
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
V-0102 (2001)
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 28,000$ Project expected to begin:
Fund / Department Fleet/Public Works Planning & Zoning Director Vehicle
V-0102
Source: Departmental Submissions 90.68
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5);
Rating
Submittal
date Effective year
X FY 2011
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
-$ -$ 60,000$ -$ -$ 60,000$
- - - - - -
-$ -$ 60,000$ -$ -$ 60,000$
Fund / Department LOGT/Public Works International Truck V-9558
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 60,000$ Project expected to begin:
Description of Item(s) or Project:Low side International Truck V-9558.
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
V-9558 (1995)
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
This vehicle will have met its life expectancy and will need to be
replaced.
IF DENIED, possible alternatives which
may be considered:
Continue with increase maintenance costs and reliablity issues.
TOTAL
Source (1) LOGT
Source (2)
Funding Source
Source: Departmental Submissions 90.69
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5);
Rating
Submittal
date Effective year
X FY 2011
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
-$ -$ 26,000$ -$ -$ 26,000$
- - - - - -
-$ -$ 26,000$ -$ -$ 26,000$
Fund / Department LOGT/Public Works Replace Toro Lawn Mower V-180
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 26,000$ Project expected to begin:
Description of Item(s) or Project:Replace Toro Lawn Mower - Reelmaster 3100D with same model.
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
V-180 Reel master 3100S (2003)
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
Lawn Mower will have met its life expectancy.
IF DENIED, possible alternatives which
may be considered:
Continue with increase maintenance costs and reliablity issues.
TOTAL
Source (1) LOGT
Source (2)
Funding Source
Source: Departmental Submissions 90.70
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5);
Rating
Submittal
date Effective year
X FY 2011
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
-$ -$ 100,000$ -$ -$ 100,000$
- - - - - -
-$ -$ 100,000$ -$ -$ 100,000$ TOTAL
Source (1) LOGT
Source (2)
Funding Source
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
Decorative street sign posts will enchance the beauty of the Village,
attracting new investors in the homes of the Village and increase
property values.
IF DENIED, possible alternatives which
may be considered:
Continue to use our current street sign posts.
Description of Item(s) or Project:Decorative street sign posts.
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
N/A
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 100,000$ Project expected to begin:
Fund / Department LOGT/Public Works Decorative Street Sign Posts
Source: Departmental Submissions 90.71
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5);
Rating
Submittal
date Effective year
X FY 2011
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
-$ -$ 130,000$ -$ -$ 130,000$
- - - - - -
-$ -$ 130,000$ -$ -$ 130,000$ TOTAL
Source (1) Sanitation
Source (2)
Funding Source
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
This vehicle will have met its life expectancy and will need to be
replaced.
IF DENIED, possible alternatives which
may be considered:
Continue with increase maintenance costs and reliablity issues.
Description of Item(s) or Project:Replacement of Loader V-35.
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
V-35
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 130,000$ Project expected to begin:
Fund / Department San/Public Works Loader V-35
Source: Departmental Submissions 90.72
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5);
Rating
Submittal
date Effective year
X FY 2011
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
-$ -$ 60,000$ -$ -$ 60,000$
- - - - - -
-$ -$ 60,000$ -$ -$ 60,000$
Fund / Department San/Public Works International Truck V-9553
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 60,000$ Project expected to begin:
Description of Item(s) or Project:High side International truck V-9553.
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
V-9553 (1995)
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
This vehicle will have met its life expectancy and will need to be
replaced.
IF DENIED, possible alternatives which
may be considered:
Continue with increase maintenance costs and reliablity issues.
TOTAL
Source (1) Sanitation
Source (2)
Funding Source
Source: Departmental Submissions 90.73
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5);
Rating
Submittal
date Effective year
X FY 2011
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
-$ -$ 200,000$ -$ -$ 200,000$
- - - - - -
-$ -$ 200,000$ -$ -$ 200,000$ TOTAL
Source (1) Sanitation
Source (2)
Funding Source
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
This vehicle will have met its life expectancy and will need to be
replaced.
IF DENIED, possible alternatives which
may be considered:
Continue with increase maintenance costs and reliablity issues.
Description of Item(s) or Project:Replace Leach /Mack 25 yard garbage truck
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
V-3150 (2003)
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 200,000$ Project expected to begin:
Fund / Department San/Public Works Replace Garbage Truck V-3150
Source: Departmental Submissions 90.74
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5);
Rating
Submittal
date Effective year
X FY 2012
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
-$ -$ -$ 50,000$ -$ 50,000$
- - - - - -
-$ -$ -$ 50,000$ -$ 50,000$
Fund / Department Cap/Public Works Replace Office Trailer
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 50,000$ Project expected to begin:
Description of Item(s) or Project:Office trailer replacement
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
N/A
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
Current trailer shows signs of decay, it needs to be replaced soon.
IF DENIED, possible alternatives which
may be considered:
Contine with current trailer.
TOTAL
Source (1) Capital Project
Source (2)
Funding Source
Source: Departmental Submissions 90.75
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5);
Rating
Submittal
date Effective year
X FY 2012
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
-$ -$ -$ 33,000$ -$ 33,000$
- - - - - -
-$ -$ -$ 33,000$ -$ 33,000$
Fund / Department Fleet/Public Works Replacement of Rec. Van V-0203
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 33,000$ Project expected to begin:
Description of Item(s) or Project:Replacement of Recreation Center Van V-0203
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
V-0203 (2002)
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
This vehicle will have met its life expectancy and will need to be
replaced.
IF DENIED, possible alternatives which
may be considered:
Continue with increase maintenance costs and reliablity issues.
TOTAL
Source (1) Fleet Maint
Source (2)
Funding Source
Source: Departmental Submissions 90.76
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5);
Rating
Submittal
date Effective year
X FY 2012
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
-$ -$ -$ 27,000$ -$ 27,000$
- - - - - -
-$ -$ -$ 27,000$ -$ 27,000$ TOTAL
Source (1) Fleet Maint
Source (2)
Funding Source
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
This vehicle will have met its life expectancy and will need to be
replaced.
IF DENIED, possible alternatives which
may be considered:
Continue with increase maintenance costs and reliablity issues.
Description of Item(s) or Project:Replace Pickup V-9768
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
V-9768
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 27,000$ Project expected to begin:
Fund / Department Fleet/Public Works Replace Pickup V-9768
Source: Departmental Submissions 90.77
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5);
Rating
Submittal
date Effective year
X FY 2012
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
-$ -$ -$ 31,000$ -$ 31,000$
- - - - - -
-$ -$ -$ 31,000$ -$ 31,000$
Fund / Department Fleet/Public Works Chief's Police Car V-0301
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 31,000$ Project expected to begin:
Description of Item(s) or Project:Replacement of Chief's police car V-0301
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
V-0301 (2003)
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
This vehicle will have met its life expectancy and will need to be
replaced.
IF DENIED, possible alternatives which
may be considered:
Continue with increase maintenance costs and reliablity issues.
TOTAL
Source (1) Fleet Maint
Source (2)
Funding Source
Source: Departmental Submissions 90.78
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5);
Rating
Submittal
date Effective year
X FY 2012
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
-$ -$ -$ 80,000$ -$ 80,000$
- - - - - -
-$ -$ -$ 80,000$ -$ 80,000$
Fund / Department San/Public Works Replacement of Trash Truck V-0110
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 80,000$ Project expected to begin:
Description of Item(s) or Project:Replacement of trash truck V-0110
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
V-0110 (2001)
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
This vehicle will have met its life expectancy and will need to be
replaced.
IF DENIED, possible alternatives which
may be considered:
Continue with increase maintenance costs and reliablity issues.
TOTAL
Source (1) Sanitation
Source (2)
Funding Source
Source: Departmental Submissions 90.79
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5);
Rating
Submittal
date Effective year
X FY 2012
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
-$ -$ -$ 80,000$ -$ 80,000$
- - - - - -
-$ -$ -$ 80,000$ -$ 80,000$ TOTAL
Source (1) Sanitation
Source (2)
Funding Source
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
This vehicle is used 5 days a week, 52 weeks a year and is essential
to our trash operation. It will have met its life expectancy and will
need to be replaced.
IF DENIED, possible alternatives which
may be considered:
Continue with increase maintenance costs and reliablity issues.
Description of Item(s) or Project:Replacement of trash truck V-2002
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
V-2002 (2000)
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 80,000$ Project expected to begin:
Fund / Department San/Public Works Replacement of Trash Truck V-2002
Source: Departmental Submissions 90.80
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5);
Rating
Submittal
date Effective year
X FY 2012
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
-$ -$ -$ 230,000$ -$ 230,000$
- - - - - -
-$ -$ -$ 230,000$ -$ 230,000$ TOTAL
Source (1) Sanitation
Source (2)
Funding Source
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
This vehicle will have met its life expectancy and will need to be
replaced.
IF DENIED, possible alternatives which
may be considered:
Continue with increase maintenance costs and reliablity issues.
Description of Item(s) or Project:Replacement of Garbage Truck V-4148.
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
V-4148
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 230,000$ Project expected to begin:
Fund / Department San/Public Works Replacement of Garbage Truck V-4148
Source: Departmental Submissions 90.81
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5)
Rating
Submittal
date Effective year
x 1 3/3/2008 FY 2013
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
x
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
-$ -$ -$ -$ 8,500,000$ 8,500,000$
- - - - - -
-$ -$ -$ -$ 8,500,000$ 8,500,000$
Funding Source
Source (1) Capital Program
Source (2)
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
Village has outgrown the current community center. A new
multipurpose center would provide for new and expanded programs
and facilities to meet the growing needs and desires of the residents.
IF DENIED, possible alternatives which
may be considered:
Description of Item(s) or Project:Build new multipurpose community center that will include class
rooms, exercise/ fitness area, indoor gymnasium, computer lab
ect...
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
Current community center.
TOTAL
Fund / Department 1403/Recreation New Community Center
PROJECT STATUS Project rating & Affect Year's)
Cost Estimate $8,500,000 Project expected to begin:
Source: Departmental Submissions 90.82
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5);
Rating
Submittal
date Effective year
X FY 2013
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
-$ -$ -$ -$ 15,000$ 15,000$
- - - - - -
-$ -$ -$ -$ 15,000$ 15,000$
Fund / Department Fleet/Public Works Replacement of Toro Workman V-172
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 15,000$ Project expected to begin:
Description of Item(s) or Project:Replacement of Tora Workman (Turf Truck) V-172.
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
V-172 (2002)
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
This vehicle will have met its life expectancy and will need to be
replaced.
IF DENIED, possible alternatives which
may be considered:
Continue with increase maintenance costs and reliablity issues.
TOTAL
Source (1) Fleet Maint
Source (2)
Funding Source
Source: Departmental Submissions 90.83
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5);
Rating
Submittal
date Effective year
X FY 2013
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
-$ -$ -$ -$ 75,000$ 75,000$
- - - - - -
-$ -$ -$ -$ 75,000$ 75,000$ TOTAL
Source (1) Fleet Maint
Source (2)
Funding Source
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
This vehicle will have met its life expectancy and will need to be
replaced.
IF DENIED, possible alternatives which
may be considered:
Continue with increase maintenance costs and reliablity issues.
Description of Item(s) or Project:Replacement of Recreation Blue Bus V-0310.
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
V-0310 (2003)
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 75,000$ Project expected to begin:
Fund / Department Fleet/Public Works Replacement of Rec.'s Blue Bus V-0310
Source: Departmental Submissions 90.84
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5);
Rating
Submittal
date Effective year
X FY 2013
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
-$ -$ -$ -$ 65,000$ 65,000$
- - - - - -
-$ -$ -$ -$ 65,000$ 65,000$
Fund / Department Fleet/Public Works Replacement of John Deere's 310J
V-0318
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 65,000$ Project expected to begin:
Description of Item(s) or Project:Replacement of John Deers' 310J Tractor Loader Backhoe V-0318.
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
V-0318 (2003)
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
This vehicle will have met its life expectancy and will need to be
replaced.
IF DENIED, possible alternatives which
may be considered:
Continue with increase maintenance costs and reliablity issues.
TOTAL
Source (1) Fleet Maint
Source (2)
Funding Source
Source: Departmental Submissions 90.85
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5);
Rating
Submittal
date Effective year
X FY 2013
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
-$ -$ -$ -$ 120,000$ 120,000$
- - - - - -
-$ -$ -$ -$ 120,000$ 120,000$
Fund / Department San/Public Works Replacement of Trash Grabber V-161
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 120,000$ Project expected to begin:
Description of Item(s) or Project:Replacement of trash grabber V-161.
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
V-161 (2002)
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
This vehicle will have met its life expectancy and will need to be
replaced.
IF DENIED, possible alternatives which
may be considered:
Continue with increase maintenance costs and reliablity issues.
TOTAL
Source (1) Sanitation
Source (2)
Funding Source
Source: Departmental Submissions 90.86
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5);
Rating
Submittal
date Effective year
X FY 2013
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
-$ -$ -$ -$ 230,000$ 230,000$
- - - - - -
-$ -$ -$ -$ 230,000$ 230,000$ TOTAL
Source (1) Sanitation
Source (2)
Funding Source
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
This vehicle will have met its life expectancy and will need to be
replaced.
IF DENIED, possible alternatives which
may be considered:
Continue with increase maintenance costs and reliablity issues.
Description of Item(s) or Project:Replacement of recycle truck V-0457.
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
V-0457 (2004)
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 230,000$ Project expected to begin:
Fund / Department San/Public Works Replacement of Recycle Truck V-0457
Source: Departmental Submissions 90.87
Miami Shores Village
Capital Project Master List
FY2009 thru 2013 by Department
Project
Name:
Existing
Program
Program
Improvement New Program
Deferred
Program
Deleted
Program
Priority (1-5);
Rating
Submittal
date Effective year
X FY 2013
Q1: Oct-Dec Q2: Jan-Mar Q3: Apr-Jun Q4: Jul-Sep
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
-$ -$ -$ -$ 28,000$ 28,000$
- - - - - -
-$ -$ -$ -$ 28,000$ 28,000$ TOTAL
Source (1) Sanitation
Source (2)
Funding Source
Funding Request by Year & Source
Justification, Rationale, or Explanation
of need to authorize project request:
This vehicle will have met its life expectancy and will need to be
replaced.
IF DENIED, possible alternatives which
may be considered:
Continue with increase maintenance costs and reliablity issues.
Description of Item(s) or Project:Replace pickup V-0201
Description or ID of Original Asset to
be replaced (Fixed Asset ID):
V-0201 (2002)
PROJECT STATUS Project rating & Affect Year(s)
Cost Estimate 28,000$ Project expected to begin:
Fund / Department San/Public Works Replace Pickup Truck V-0201
Source: Departmental Submissions 90.88