Loading...
FRAMING INSPECTION CERTIFICATE DGT-07-19-1641Arshad Viqar, Professional Engineer # 38863 12260 SW 8 St Suite 224 Miami FI 33184 Phone: 786-502-7913 FRAMING INSPECTION CERTIFICATE August 18, 2020 The Building Official Miami Shores Village — Building Department Job Address: 9495 Biscayne Boulevard Miami Shores Fl 33138 Master Permit: 4DGT-07-19-1641 Project: Open Aluminium and Wood Trellis Inspection Type: Framing METHODOLOGY: Visual Inspection using Approved Permit documents At the request of the Contractor, we visited the Siite, and performed a visual inspection of the framing to verify conformity to the approved permit documents and FBC and found the following: 1) Columns. 2- 3" X 8" X 1/8 Al. chanels connected to footing with embedded 12" X 12" X 3/4 Al plate with 4 3/4" x 6-1/4 wedge anchor and prewelded 3/8 X 2-1/8 al. chanels with '/2 " ss screws. 2) Beam: 3" X 10" Aluminium connected to columns with aluminium plate and 9-1/2" X 1 ss screws. 3) Rafters: 2" X 8" wood attached to Al.with '/z" thru bolt into a prewelded 3" X 4 al. channel @ 19" o/c. We confirm that these installations conform with approved permit documents and Florida Building Code 2017 To the best of my knowledge and ability, this report represents an accurate appraisal of the present condition of the building based upon careful evaluation to the extent reasonably possible. Please feel free to call us at 786-502 2096 should you require further information I 411V I I Ili�li:1 .��5►�+o vrp,� �r., Sincerely. ',* No. 38863 STATE OF ?y�_s- Arshad Vi ar P.E # 38863 12260 SW 8St Suite 224 Miami FI 33194 Phone: 786-502-7913 0$-18-2020