Loading...
RF-04-19-851 UPLIFTFReileh Engineering Corp. (Consulting Engineer) 2370 Southwest 12V Avenue Miami, Florida 33175-1174 Tel:305-823-8008/305-397-6414 ER Fax: 305-823-3300 / 305-884-8834 June 27, 2019 MG Excellent Services Corporation hh Miami, Florida Project: RQGF TILE UPLIFT TEST I+~EPORT Residential Home 816 Northeast 91 Terrace Miami Shores, Florida Information provided by client: Permit Number: Not Provided Date Completion: June 25, 2019 Roofing Contractor: MG Excellent Services Corporation Project Number: 19-1102 (Testing Laboratory Certificate # 16-0602.01) Dear Sirs; In accordance with your request and authorization, a representative of Reileh Engineering Corporation completed the Root" file Uplift Test at the above referenced project. This testing was performed in general accordance with Roofing Application Standard TAS No.106 -- Standard procedure for field verification o the bonding of mortar or adhesive set tile system and mechanically attached, rigid, discontinuous roof systems. The total of the tested roof surface area was less than 10000 square feet, and the mean height of the roof is less than 40 feet above ground surface. The type of tile used for this project was reported to be concrete/clay Roof Tile. This tile was reported to have been foamed in place. At the time of our inspection. th(: entire area of the roof was examined for loose tiles. Not less than one (1) tilt in ten (10) rof all cor:' punents in the field area and one (1) the in five (5) of all tiles in the perimeter and corner areas were physical ly examined. A minimum of one (1) test per every two (2) squares in the field. one (1) test per square in the perimeter area, ridge caps and one (1) test :n eac`. corner were conducted. Based on our test results, we conclude that the installation of the roof tile at the above referenced project meets the test requirement outlined in the above -mentioned protocol. Attached please find a copy of our test report for your review. Reileh Engineering Corporation appreciates the opportunity of assisting you in this project. If you have any questions or if we may be of further assistance, please do not hesitate to contact the undersigned. Respectfully submitted; Reileh Engineerfrfg Cor 9 d Mohamad'Sonny Salleh, P.E.49014 Project Manager TILE tJPLWTTESf Resiftndal Home B 16 Nonhem 91 Terrace Miami Shores. Florida Submittals: Cover Page Page 2 thru 4 of 4 Drawing 19-1102 Reileh Engineering Corporation -- Project Number - 19.1102 — Page 2 of 4 Report of TILE UPLIFT TEST for Residential Home 816 Northeast 91 Terrace Miami Shores, Florida Project Number: 19-1102 Zes*"Number Test Load lb Test Status 1 35 Pass 2 35 Pass 3 35 Pass 4 35 Pass 5 35 Pass 6 35 Pass 7 35 Pass 8 35 Pass 9 35 Pass 10 35 Pass 11 35 Pass 12 35 Pass 13 35 Pass 14 35 Pass 15 35 Pass 16 35 Pass 17 35 Pass 18 35 Pass 19 35 Pass 20 35 Pass 21 35 Pass 22 35 Pass 23 35 Pass 24 35 Pass Reilch Engineering Corporation » Project Number - 19-1102 — Page 3 of 4 T-Ost_Number Test Load b Test Status 25 35 Pass 26 35 Pass 27 35 Pass 28 35 Pass 29 35 Pass 30 35 Pass 31 35 Pass 32 35 Pass 33 35 Pass 34 35 Pass 35 35 Pass 36 35 Pass 37 35 Pass 38 35 Pass 39 35 Pass 40 35 Pass 41 35 Pass 42 35 Pass 43 35 Pass 44 35 Pass 45 35 Pass 46 47 48 49 50 51 52 53 54 35 35 35 35 35 35 35 35 35 Pass Pass Pass Pass Pass Pass Pass Pass Pass Reilch Engineering Corporation -- Project Number - 19-1102 — Page 4 of 4 C I V I L Reileh Engineering Corp. Rm(Consulting Engineer) 2370 Southwest 123' Avenue Miami, Florida 33175-1174 Tel: 305-823-8008 / 305-397-6414 ENGINEER F=305-823-3300/305-884'8834 1 June 27, 2019 MG Excellent Services Corporation Miami, Florida Project: R90F TILE TPLiFT TEST REPORT Residential Home ; 816 Northeast 91 Terrace Miami Shores, Florida Information provided by client: Permit Number: Not Provided Date Completion: June 25,i2QI9 Roofing Cbntractor: MG!' cellent Services Corporation Project Number: 19-1102 (Testing Labgratory Certificate # 16-0602.01) Dear Sirs; In accordance with your request and authorization, a representative of Reileh Engineering Corporation completed the Roof Tile Uplift Test at the above referenced project. This testing was performed in general accordance w;th Roofing Application Standard TAS No.106 -- Standard procedure for field verification of the Qding ofmonar or adhesive se[ the system and mechanically attached, rigid, discontinuous roof systems. The total of the tested roof surface area was less than 10000 square feet, and the mean height of the roof is less than 40 feet above ground surface. The type of tile used for this project was reported to be concrete/clay Roof Tile. This the was reported to have been foamed in place. At the time of our inspection, the entire area of the roof was examined for loose tiles. Not less than ont (1) ti°le in tbn (10) of all compone 'ts in >3he field area and one (1) the in five (5) of all tiles in the perimeter and corner areas were physically examined. A minimum of one (1) test per every two (2) squares in the field, one (1) test per square in the perimeter area, ridge caps and one (1) test in each comer were conducted. e �instailation of the roof tile at the above referenced .n,, Qe,ave rrieritioned protocol. Attached please find Reileh Engineering Corporation appreciates the opportunity of assisting you in this project. If you have any questions or if we may be of further assistance, please do not hesitate to contact the undersigned. Respectfully, submitted,,- . ROM Engieeel g'Corporation Moharnad'Sonny Salleh, P.E.49014 Project Manager TILE UPLIFT TEST RuidC.1161 Home 816 Northeast 91 Terrace Miami Shores, Florida Submittals: Cover Page Page 2 thru 4 of 4 Drawing 19-1102 Report of TILE UPLIFT TEST for Residential Home 816 Northeast 91 Terrace Miami Shores, Florida Project Number: 19-1102 Wool -Test Load Ib Test Status 1 35 Pass 2 35 Pass 3 35 Pass 4 35 Pass 5 35 Pass 6 35 Pass 7 35 Pass 8 35 Pass 9 35 Pass 10 35 Pass 11 35 Pass 12 35 Pass 13 35 Pass 14 35 Pass 15 35 Pass 16 35 Pass 17 35 Pass 18 35 Pass 19 35 Pass 20 35 Pass 21 35 Pass 22 35 Pass 23 35 Pass 24 35 Pass Reileh Engineering Corporation -- Project Number - 19-1102 — Page 3 of4 alAd ObQ Test Status 25 35 Pass 26 35 Pass 27 35 Pass 28 35 Pass 29 35 Pass 30 35 Pass 31 35 Pass 32 35 Pass 33 35 Pass 34 35 Pass 35 35 Pass 36 35 Pass 37 35 Pass 38 35 Pass 39 35 Pass 40 35 Pass 41 35 Pass 42 35 Pass 43 35 Pass 44 35 Pass 45 35 Pass 46 35 Pass 47 35 Pass 48 35 Pass 49 35 Pass 50 35 Pass 51 35 Pass 52 35 Pass 53 35 Pass 54 35 Pass Reileh Engineering Corporation -- Projecl Numbcr - 19.1102 - Page 4 ot• 4