RF-05-19-1007 TILE UPLIFTCIVIL Reileh Engineering Corp.
(Consulting Engineer)
2370 Southwest 123"' Avenue
RMiami, Florida 33175-1174
Tel: 305-823-8008/305-397-6414
ENGINEER Fax: 305-823-3300 / 305-884-8834
May 10, 2019
Erhan Kostepen
270 Grand Concourse [ /�
Miami Shores, Florida
Project: ROOF Ti LE UPLIFT TEST REPORT
Residential Home
270 Grand Concourse
Miami Shores, Florida
Information provided by client:
Permit Number: Not Provided
Date Completion: May 7, 2019
Roofina Contractor: EA Emanuel LLC
Project Number: 19-0831
(Testing Laboratory Certificate # 16-0602.01)
Dear Sirs;
In accordance with your request and authorization, a representative of Reileh Engineering
Corporation completed the Roof Tile Uplift Test at the above referenced project. This testing was
performed in general accordance with Roofing Application Standard TAS No.106 -- Standard
procedure for field verification of tile bonding of mortar or adhesive set the system and mechanically
attached, rigid, discontinuous roof•systems.
The total of the tested roof surface area was less than 10000 square feet, and the mean height of the
roof is less than 40 feet above ground surface. The type of tile used for this project was reported to
be concrete/clay Roof Tile. This tile was reported to have been foamed in place.
At the time of our inspection, the entire area of the roof was examined for loose tiles. Not less than
one (1) the in ten (10) of all components in the field area and one (1) the in five (5) of all tiles in the
perimeter and comer areas were physically examined. A minimum of one (1) test per every two (2)
squares in the field, one (1) test per square in the perimeter area, ridge caps and one (1) test, in each
corner were conducted. `
Based on our test results, we conclude that the installation of the roof tile at the above referenced
project meets the test requirement outlined in the above -mentioned protocol. Attached please find
a copy of our test report for your review.
Reileh Engineering Corporation appreciates the opportunity of assisting you in this project. If you
have any questions or if we may be of further assistance, please do not hesitate to contact the
undersigned.
Respectfully submitted;
Reileh Engineering Corporation
i1
allamad Sonny Salleh, P.E.49014
Project Manager
TILE UPLIFT TEST
Residential Home
270 Grand Concourse
Miami Shores, Florida
Submittals:
Cover Page
Page 2 thru 6 of 6
Drawing 19-0831
Rcilch Engineering Corporation -- Project Number - 19.0831 — Page 2 of 6
Report of
TILE UPLIFT TEST
for
Residential Home
270 Grand Concourse
Miami Shores, Florida
Project Number: 19-0831
Test Number
Test Load lb
Test Status
1
35
Pass
2
35
Pass
3
35
Pass
4
35
Pass
5
35
Pass
6
35
Pass
7
35
Pass
8
35
Pass
9
35
Pass
10
35
Pass
11
35
Pass
12
35
Pass
13
35
Pass
14
35
Pass
15
35
Pass
16
35
Pass
17
35
Pass
18
35
Pass
19
35
Pass
20
35
Pass
21
35
Pass
22
35
Pass
23
35
Pass
24
35
Pass
Reileh Engineering Corporation — Project Number - 19-0831 — Page 3 of 6
Test -Number
Test Load b
Test Status
25
35
Pass
26
35
Pass
27
35
Pass
28
35
Pass
29
35
Pass
30
35
Pass
31
35
Pass
32
35
Pass
33
35
Pass
34
35
Pass
35
35
Pass
36
35
Pass
37
35
Pass
38
35
Pass
39
35
Pass
40
35
Pass
41
35
Pass
42
35
Pass
43
35
Pass
44
35
Pass
45
35
Pass
46
35
Pass
47
35
Pass
48
35
Pass
49
35
Pass
50
35
Pass
51
35
Pass
52
35
Pass
53
35
Pass
54
35
Pass
Reilch Engineering Corporation — Project Number - 19-0831— Page 4 of 6
mnber.
' lisilbid b
Test Status
55
35
Pass
56
35
Pass
57
35
Pass
58
35
Pass
59
35
Pass
60
35
Pass
61
35
Pass
62
35
Pass
63
35
Pass
64
35
Pass
65
35
Pass
66
35
Pass
67
35
Pass
68
35
Pass
69
35
Pass
70
35
Pass
71
35
Pass
72
35
Pass
73
35
Pass
74
35
Pass
75
35
Pass
76
35
Pass
77
35
Pass
78
35
Pass
79
35
Pass
80
35
Pass
81
35
Pass
82
35
Pass
83
35
Pass
84
35
Pass
Raileh Engineering Corporation -- Project Number - 19.0831— Page 5 of 6
T,esi Number
Teat Load b
Teat Status
85
35
Pass
86
35
Pass
87
35
Pass
88
35
Pass
89
35
Pass
90
35
Pass
91
35
Pass
92
35
Pass
93
35
Pass
94
35
Pass
95
35
Pass
96
35
Pass
97
35
Pass
98
35
Pass
99
35
Pass
100
35
Pass
101
35
Pass
102
35
Pass
103
35
Pass
Test 1-18 Corner, 19-29 Ridge Caps, 30-51 Perimeter, 52-103 Field
Relish Engineering Corporation -- Project Number - 19-0931 — Page 6 of 6
C I V I L Reileh Engineering Corp.
(Consulting Engineer)
2370 Southwest 123"' Avenue
Ral
Miami, Florida 33175-1174
Tel: 305-823-8008/305-397-6414
ENGINEER Fax: 305-823-3300 / 305-884-8834
May 10, 2019
Erhan Kostepen
270 Grand Concourse
Miami Shores, Florida
Project: ROOFTILE PLiFT TEST REPORT
Residential Home
270 Grand Concourse
Miami Shores, Florida
'2 Information provided by client:
Permit Number: Not Provided
Date Completion: May 7, 2019
Roofing Contractor: EA Emanuel LLC
Project Number: 19-0831
(Testing Laboratory Certificate # 16-0602.01)
Dear Sirs;
In accordance with your request and authorization, a representative of Reileh Engineering
Corporation completed the Roof Till Uplift Test at the above referenced project. This testing was
performed in general accordance with Roofing Application Standard TAS No.106 -- Standard
procedure for field verification of the bonding; of mortar or adhesive set tile system and mechanically
attached, rigid, discontinuous rogf.systems.
The total of the tested roof surfacI Ie area was less than 10000 square feet, and the mean height of the
roof is less than 40 feet above grqurn•i surface. The type of tile used for this project was reported to
be concrete/clay Roof Tile. This tile was reported to have been foamed in place.
I
At the time of our inspection, the 6wire area of the roof was examined for loose tiles. Not less than
one (1) the in ten (10) of all comp;nents in the field area and one (1) the in five (5) of all tiles in the
perimeter and coiner areas were physically examined. A minimum of one (1) test per every two (2)
squares in the field, one (1) test per square in the perimeter area, ridge caps and one (1) test in each
corner were conducted.
Based on our test results, we co �HI de that the in tallation of the roof tile at the above referenced
project meets the test requiremen tuned in the alove-mentioned protocol. Attached please find
a copy of our test report for your,,,iew.
i
� I
'� i
Reileh Engineering Corporation appreciates the opportunity of assisting you in this project. If you
haw any questions or if we may be of further assistance, please do not hesitate to contact the
undersigned.
Respectfully submitted;
Reileh Engineering Corporation
Mohatnad Sonny Salleh, P.E.49014
Project Manager
TILE j U41 I T
Rosidenual Home
270 Orand concourse
Miami Sham, Plorida
Submittals:
Cover Page
Page 2 thru 6 of 6
Drawing 19-0831
Reileh Engineering Corporation » Project Number-19.0831— Page 2 of
Report of
TILE UPLIFT TEST
for
Residential Home
270 Grand Concourse
Miami Shores, Florida
Project Number: 19-0831
Test Number
Test Load b
Test Status
1
35
Pass
2
35
Pass
3
35
Pass
4
35
Pass
5
35
Pass
6
35
Pass
7
35
Pass
8
35
Pass
9
35
Pass
10
35
Pass
11
35
Pass
12
35
Pass
13
35
Pass
14
35
Pass
15
35
Pass
16
35
Pass
17
35
Pass
18
35
Pass
19
35
Pass
20
35
Pass
21
35
Pass
22
35
Pass
23
35
Pass
24
35
Pass
Roileh Engineering Corporation -- Project Number - 19-0831 — Page 3 of 6
Test Number
Test Load b
Test Status
25
35
Pass
26
35
Pass
27
35
Pass
28
35
Pass
29
35
Pass
30
35
Pass
31
35
Pass
32
35
Pass
33
35
Pass
34
35
Pass
35
35
Pass
36
35
Pass
37
35
Pass
38
35
Pass
39
35
Pass
40
35
Pass
41
35
Pass
42
35
Pass
43
35
Pass
44
35
Pass
45
35
Pass
46
35
Pass
47
35
Pass
48
35
Pass
49
35
Pass
50
35
Pass
51
35
Pass
52
35
Pass
53
35
Pass
! 54
35
Pass
Reileh Engineering Corporation -- Project Number - 19-0831 — Page 4 or
1W.Nimber
Test Losd b
Test Status
55
35
Pass
56
35
Pass
57
35
Pass
58
35
Pass
59
35
Pass
60
35
Pass
61
35
Pass
62
35
Pass
63
35
Pass
64
35
Pass
65
35
Pass
66
35
Pass
67
35
Pass
68
35
Pass
69
35
Pass
70
35
Pass
71
35
Pass
72
35
Pass
73
35
Pass
74
35
Pass
75
35
Pass
76
35
Pass
77
35
Pass
78
35
Pass
79
35
Pass
80
35
Pass
81
35
Pass
82
35
Pass
83
35
Pass
84
35
Pass
Rcilch Engineering Corporation -- Project Number • 19.0831 — Page s of 6
Test Number
Test Load b
Test Status
85
35
Pass
- 86
35
Pass
87
35
Pass
88
35
Pass
89
35
Pass
90
35
Pass
91
35
Pass
92
35
Pass
93
35
Pass
94
35
Pass
95
35
Pass
96
35
Pass
97
35
Pass
98
35
Pass
99
35
Pass
100
35
Pass
101
35
Pass
102
35
Pass
103
35
Pass
Test 1.18 Comer, 19-29 Ridge Caps, 30.51 Perimeter, 52-103 Field
Reileh Engineering Corporation -- Project Number - 19.0831— Page 6 of 6
co
2 ¥¥
�
�
%
2/
. / �
IN
�
� ` ` ` 2 S � �
�
. 22 IS2
� . . \ �� � u
IS2
%��u�