RF-12-19-2861 TILE UPLIFTC I V I L Re ileh Engineering a Corp.
2370 Southwest 123`d Avenue
Miami, Florida 33175-1174
ENGINEER Tel: 305-823-8008 / 305-397-6414
Fax:305-823-3300
June 16, 2020
Bassard Roofing
Miami, Florida
Project: RQC)F TIIlI: lil'L1FT TEST REPORTResidential Home
174 Northwest 110 Street
Miami Shores, Florida
lnformalion provided by cliew:
Permit Number: RF-12-19-2861
Date Completion: July 0, 2020
Roofing Contractor: Bassard Roofing
Project Number: 20-0603
(Testing Laboratory Certificate -9 16-0602.01)
Dear Sirs;
In accordance with your request and authorization, a representative of Reileh Engineering
Corpor•arton completed the RoofTiie Uplift: Test at the above referenced project. This testing was
performed in general accordance with Roofing Application Standard TAS No.106 -- Standard
procedure for field verification oftile bonding ofmortaroradhesive set tile system and mechanically
attached, rigid, discontinuous roof systems.
The total of the tested roof surface area was less than 10000 square feet, and the mean height of the
roof is less than 40 feet above ground surface. The type of tile used for this project was reported to
be concrete/clay Roof Tile. This file was reported to have been foamed in place.
At the time of our inspection, the entire area of the roof was examined for loose tiles. Not less than
one (1) the in ten (10) of all components in the field area and one (1) tile in five (5) of all tiles in the
perimeter and corner areas were physically examined. A minimum of one (])lest per every two (2)
squares in the field, one (1) test per squarc in the perimeter area, ridge caps and one (1) test in each
corner were conducted.
Based on our test results, we conclude that the installation of the roof tile at 1lie above referenced
project meets the test requirement outlined in the above -mentioned protocol. Attached please find
a copy of our test report for your review.
Reileh Engineering Corporation appreciates the opportunity of assisting you in this project. If you
hav6 any questions or if we may be of further assistance. please do not hesitate to contact the
undersigned.
Respectfully submitted;
Reileh Engineering Corporation
�i
i
f r
Moharnad Sonny Salleh, P.E.49014
Project Manager
TILE UPI.IF-1" I'ES
Residential I lame
174 Northwest 110 Street
Miami Shores, Florida
Submittals:
Cover Page
Page 2 thru 4 of 4
Drawing 20-0603
Reileh Engineering Corporation -- Project Number - 20-0603 — Page 2 of 4
Reporl o, f
TILE UPLIFT TEST
for
Residential Home
174 Northwest 110 Street
Miami Shores, Florida
Project Number: 20-0603
Test Number
Test Load lb
Test Status
1
35
Pass
2
35
Pass
3
35
Pass
4
35
Pass
5
35
Pass
6
35
Pass
7
35
Pass
8
35
Pass
9
35
Pass
10
35
Pass
11
35
Pass
12
35
Pass
13
35
Pass
14
35
Pass
15
35
Pass
16
35
Pass
17
35
Pass
18
35
Pass
19
35
Pass
20
35
Pass
21
35
Pass
22
35
Pass
23
35
Pass
24
35
Pass
Rcilch rnginccring Corporation -- Project Number - 20-0603 — Page 3 of 4
Test Number
Test Load Obo
Test Status
25
35
Pass
26
35
Pass
27
35
Pass
28
35
Pass
29
35
Pass
30
35
Pass
31
35
Pass
32
35
Pass
33
35
Pass
34
35
Pass
35
35
Pass
36
35
Pass
37
35
Pass
38
35
Pass
39
35
Pass
Test 1-9 Corner, 10-14 Ridge Caps,
15-25 Perimeter, 26-39 Field
Mich Engineering Corporation -- Project Number - M-MU3 — rage 4 01 4