Loading...
RF-06-20-1146 TILE UPLIFTFL Re f�hEE gineyring Corp. 2370 Southwest 123`d Avenue Miami, Florida 33175-1174 Tel:305-823-8008/305-397-6414 EER Fax:305-823-3300 November 24, 2020 Roofs to Go USA LLC 5392 Southwest 33 Avenue Fort Lauderdale, Florida 33312-5578 Project: ROOF TILE UPLIFT TEST REPORT Residential Home 960 Northeast 92 Street Miami Shores, Florida Information provided by client: Permit Number: Not Provided Date Complexion: November 21, 2020 Roofing Contractor: Roofs to Go USA LLC Project Number: 20-1670 (Testing Laboratory Certificate # 16-0602.01) Dear Sirs; In accordance with your request and authorization, a representative of Reileh Engineering Cotcoration completed the Roof Tile Uplift Test at the above referenced project. This testing was performed in general accordance with Roofing Application Standard TAS No.106 -- Standard procedure for field verification of the bonding of mortar or adhesive set tile system and mechanically attached, rigid, discontinuous roof systems. The total of the tested roof surface area was less than 10000 square feet, and the mean Height of the roof is less than 40 feet above ground surface. The type of tile used for this project was reported to be concrete/clay Roof Tile. This tile was reported to have been foamed in place. At the time of our inspection, the entire area of the roofwas examined for loose tiles. Not less than one (1) the in ten (10) of all components in the field area and one (1) the in five (5) of all tiles in the perimeter and comer areas were physically examined. A minimum of one (1) test per every two (2) squares in the field, one (1) test per square in the perimeter area, ridge caps and one (1) test in each corner were conducted. Based on our test results, we conclude that the installation of the roof tile at the above referenced project tneets the test requirement outlined in the above -mentioned protocol. Attached please find a copy of our test report for your review. Reileh Engineering Corporation appreciates the opportunity of assisting you in this project. If you have any questions or if we may be of further assistance, please do not hesitate to contact the undersigned. Respectfully submitted; Reileh Engineering Corporation M❑ amad Sonny Salleh, P.E.49014 Project Manager TILE UPLIFT TEST Residential Home 960 Northeast 92 Street Miami Shores, Florida Submittals: Cover Page Page 2 thru 5 of 5 Drawing 20-1670 Reileh Engineering Corporation -- Project Number - 20-1670 — Page 2 of 5 Report of TILE UPLIFT TEST for Residential Horne 960 Northeast 92 Street Miami Shores, Florida Project Number: 20-1670 Test Number Test Load Obf) Test Status 1 35 Pass 2 35 Pass 3 35 Pass 4 35 Pass 5 35 Pass 6 35 Pass 7 35 Pass 8 35 Pass 9 35 Pass 10 35 Pass 11 35 Pass 12 35 Pass 13 35 Pass 14 35 Pass 15 35 Pass 16 35 Pass 17 35 Pass 18 35 Pass 19 35 Pass 20 35 Pass 21 35 Pass 22 35 Pass 23 35 Pass 24 35 Pass Reileh Engineering Corporation --Project Number - zu-i 6 /u — cage sot D Test Number Test Load lb Test Status 25 35 Pass 26 35 Pass 27 35 Pass 28 35 Pass 29 35 Pass 30 35 Pass 31 35 Pass 32 35 Pass 33 35 Pass 34 35 Pass 35 35 Pass 36 35 Pass 37 35 Pass 38 35 Pass 39 35 Pass 40 35 Pass 41 35 Pass 42 35 Pass 43 35 Pass 44 35 Pass 45 35 Pass 46 35 Pass 47 35 Pass 48 35 Pass 49 35 Pass 50 1 35 Pass 51 35 Pass 52 35 Pass 53 35 Pass 54 35 Pass Reilch Engineering Corporation -- Project Number - 20-1670 — Page 4 of 5 Test Number Test Load Ib Test Status 55 35 Pass 56 35 Pass 57 35 Pass 58 35 Pass 59 35 Pass 60 35 Pass 61 35 Pass 62 35 Pass 63 35 Pass 64 35 Pass 65 35 Pass 66 35 Pass 67 35 Pass 68 35 Pass 69 35 Pass Test 1-20 Corner, 21-28 Ridge Caps, 29-39 Perimeter, 40-69 Field Reileh Engineering Corporation -- Project Number - 20-1670 — Page 5 of 5 0 0 � � M N � T z O z M w O � LL O O O >G RNZ RN- O O \v O O 11 ZZ O » O\ V �O CO -O 11 11 11 11 O M M � M N � M �