RC-17-2993 (4)Miami Shores Village A 2 911
Building Department BY:
10050 N.E.2nd Avenue, Miami Shores, Florida 33138
Tel: (305) 795-2204 Fax: (305) 756-8972
INSPECTION LINE PHONE NUMBER: (305) 762-4949
FBC 20
BUILDING Master Permit No.ILL �� 2 n ` zs `i
PERMIT APPLICATION Sub Permit No.
❑BUILDING ❑ ELECTRIC ❑ ROOFING ❑ REVISION EXTENSION RENEWAL
PLUMBING ❑ MECHANICAL PUBLIC WORKS ❑ CHANGE OF CANCELLATION SHOP
CONTRACTOR RAWINGS
JOB ADDRESS: AIE 9z/ Y y -
r
City:5 �/�( 1000 Miami Shores County: Miami Dade Zip:
Folio/Parcel#: O'/O Is the Building Historically Designated: Yes NO
Occupancy Type: Load: Construction Type: Flood Zone: BFE: FFE:
OWNER: Name (Fee Simple Titleholder): EL/r 115r4-VO . 1rIa0 iGL �'Ghri2 — Phone#:
Address:°� �� E� /V//9
City: '/�Q / -.; .520A1a State: Zip:
Tenant/Lessee Name: Phone#:
Email: - 7
CONTRACTOR: Company Name: o �5�� ckX�n Phone#: r e (D — z02 - (23 7
Address:
n S S S� q CI 8-- I SE I"
N1b
City: 1 �%• State: Zip:
Qualifier Name: vv �o Phone#:
State Certification or Registration #: C-G C 1-S 2 LA (0 b 45 Certificate of Competency #:
DESIGNER: Architect/Engineer:
one#:
Address: City: State: Zip:
Value of Work for this Permit: $ �� ��� Square/Linear Footage of Work: ip0 O
Type of Work: ❑ Addition ❑ Alteration ►❑ New ❑ Repair/Replace ❑ Demolition
Description of Work:
e•Nµ+:W:.:(r. G•w't.•: A"x. •:Y.i'n+i..eri.H,arvM'v`v+✓.Yw •M•'.ww, w
ro/or
Submittal Fee $_
Scanning Fee $ _
Technology Fee $,
Structural Reviews $
tile:
Permit Fee $
Radon Fee $
Training/Education Fee $
DBPR $ Notary $
Double Fee $
Bond $
TOTAL FEE NOW DUE $ T
(Revised02/24/2014)
s
Bonding Company's Name (if applicable)
Bonding Company's Address
City
State
Mortgage Lender's Name (if applicable)
Mortgage Lender's Address
City
State
Zip
Zi
Application is hereby made to obtain a permit to do the work and installations as indicated. I certify that no work or installation has
commenced prior to the issuance of a permit and that all work will be performed to meet the standards of all laws regulating
construction in this jurisdiction. I understand that a separate permit must be secured for ELECTRIC, PLUMBING, SIGNS, POOLS,
FURNACES, BOILERS, HEATERS, TANKS, AIR CONDITIONERS, ETC.....
OWNER'S AFFIDAVIT: I certify that all the foregoing information is accurate and that all work will be done in compliance with all
applicable laws regulating construction and zoning.
"WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY
RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND
TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING
YOUR NOTICE OF COMMENCEMENT."
Notice to Applicant: As a condition to the issuance of a building permit with an estimated value exceeding $2500, the applicant must
promise in good faith that a copy of the notice of commencement and construction lien law brochure will be delivered to the person
whose property is subject to attachment. Also, a certified copy of the recorded notice of commencement must be posted at the job site
for the first inspection which occurs seven (7) days after the building permit is issued. In the absence of such posted notice, the
inspection will not be approved and a reinspection fee will be charged.
Signature %�Yy+'�l l Signature ✓•
OWNER or AGENT CONTRACTOR
The foregoing instrument was acknowledged before me this The foregoing instrument was acknowledged before me this
v day of % e 20 19 by n 2� day of �� 20 by
�ICJil (,' a/2h-'0-GGL4who is perso!_ nally }1
known to A'Qlv•O 1'01(� who is personally known to
me or who has produced as me or who has produced as
identification and who did take an oath. identification and who did take an oath.
NOTARY PUBLIC: NOTARY PUBLIC:
Sign: Sign:e 44*---,�
Print:
Print:
Q1nQ C 4 �1
MILENACHICIUC W-ASeal: •( WOOMMIa3S� SO022MM
Seal: � MY COMMISSION # GG 120106 ;; E G%tE&**123. 210
EXPIRES: June 29, 2021 ' •.M.. •�j Bp�dedlhu PuEklh-de Mere
. , S•;�' Bonded Ttw Nobuy PrbliC UndatrRNert
rs*******ss*****ss**s**ssr**•***�r******rs****s..:*.***rrsss**s*****ss******r***.**s**•*�:*�.�**:***********
APPROVED BY Plans Examiner Zoning
Structural Review Clerk
(Revised02/24/2014)
0
STS
I /
-Customer Information:
Name:
NAVICON CONSTRUCTION
Address:
I., I, Ir.l%#;
Superior Truss Systems, Inc Cover Sheet
I
8500 N.W. 58th St Miami, FL 33166 Order #
Office: (305) 591-9918 JOB # 16797e
Printed: Wed, Apr 10 2019
Contact., Office or Home Phone: Cell Phone: _
Fill in later
City, State, Zip: Fax:
Description:
ADDITION @ 94 ST
Region:
Invoice Number., Customer P.O. #:
Invoice Date:
Address:
City, State, Zip:
Payment Terms
1234 NE 94TH ST
MIAMI SHORES, FL 33037
Fill in later
Salesman:
I Designer.,
Fill in later
Mariela
0000
•••• ••••••
Loading Information: • • • • • • .'
Roof Loads: Floor Loads: • • • • • • • • • • 0 * 0 • 0
j TC Live: TC Dead. ; BC Live: BC Dead., TC Live: TC Dead. BC Live: BC Dead: • • • • • • 0- •
• ••
30 20 0 10 40 10 0 5 • • V . • � • •
•••• • •• ••• •
•
Bldg. Code: Wind Std. Wind Speed. Bldg. Type: Wind Exposure: Wind Type: go** �• :1lates: • • • • • • • •
FBC 2017-HVHZ RES ASCE 7-10 175 Residential - CAT II D MWFRS & C8 C• • • ` ITW •I• • • •. • . •
Pages or sheets covered by this seal from: 1 thru 3 Total 3 drawings. With my seal affixed to this sheet, I;erebyCertify t!at •1 am the •. •.: •
•••••
Truss Design Engineer and this index sheet conforms to 61 G15-31.003, section 5 of the Florida Board of Professional;Rgineers Rules. Chaper 13
of the Florida Building Code. • • • 0 0 0 • •••••• • •
.
This signed and sealed index sheet indicates acceptance of my professional engineering responsibility solely for the truss design d*avArgs listed
below. The suitability and use of each truss component for any particular building is the responsibility of the building designer, per TPI 2007.
OSCAR CORRAL P.E. STATE OF FLORIDA REG. NO 12467 - 8500 NW 58 ST, MIAMI, FL 33166
# DESCRIPTION SEQNO # DESCRIPTION SEQNO # DESCRIPTION SEQNO # DESCRIPTION SEQNO
1 T1 389910 2 T1A 389912 3 T1B 389914
OFMWUS STRUCTURAL DESIGN LL C
SHOP DRAWING REVIEW
REVIEW [7
Review of shop drawings prepared by a
specialty engineer is only of a cursory nature to
determine that the submittals have been
furnisbed, and that the submit'91s have been
Signed and sealed by the sue.,., „tf-v engineer.
No detailed check of calculi,,, ,., has been
Performed. No data Maheek of dirnc'nsinns or
quantities has base MWe. The specialty
elnvin.eer siSft and tn8}ing th- li-, ng s will
•>0101y responsible f : c:ctural
.;..ivacy of the proposee .3-tv, system.
?SD Will not be res:f; :k ,r any
Wficlencies Qtl.aW <htri-V.V fq _')1X • pst-'n by
improper design nscaltla;�Y ether
operations rOat . +ue sy < ern ,1u
draoo, these
wings. �j
Page 1 of 1
�z
0
ST
/FSS�O
Iff�llrrlllltli������
16797e TRUSS BRACING REQUIRED BY TRUSS
QTY TRUSS Brace Qty Type Size Length Total Ft.
2 T1 2 CLB 2x4 02'04"03 12
TOTALS
2x4 12 Ft. CLB
2x4 12 Ft. TOTAL
•
Job Number: 16797e Ply: 1 SEQN: 389910 / T7 / COMN
ADDITION @ 94 ST Qty: 2 FROM: JP DRW:
Truss Label: T1 Wgt: 151.2 Ibs .. / ... 04/10/2019
12.8• _� 19'S' + 25.4•
SEAT PLATE REQ. SEAT PLATE REQ.
L 25.4"
�-- 2.4- ---I �-
47/16"
4 / 6-
Loading Criteria (psf) Wind Criteria
TCLL: 30.00 Wind Std: ASCE 7-10
TCDL: 20.00 Speed: 175 mph
SCLL: 0.00 Enclosure: Closed
BCDL: 10.00 Risk Category: II
Des Ld: 60.00 Mean
D
Mean Height: 15.00 ft
NCBCLL: 10.00 TCDL: 5.0 psf
Soffit: 2.00 BCDL: 5.0 psf
Load Duration: 1.33 MWFRS Parallel Dist: 0 to h/2
Spacing: 28.2 " C&C Dist a: 3.00 It
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.33
Lumber
Top chord 2x4 SP SS
Bot chord 2x4 SP SS :B2 2x4 SP #1:
Webs 2x4 SP #3 :W2 2x4 SP #2 N:
:Lt Stub Wedge 2x6 SP #2::Rt Stub Wedge 2x6 SP #2:
:Lt Level Return 2x4 SP #3:
:Rt Level Return 2x4 SP #3:
Bracing
(a) Continuous lateral restraint, equally spaced on
member.
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Purlins
In lieu of structural panels use purlins to brace TC @
24" oc.
Wind
Member design based on both MWFRS and C&C.
3-5/8" L
r
10, 7'3-9/16-
+ 24-�{
7'8• ,
17'8• 24'11-9/16'
Snow Criteria (Pg,Pf in PSF)
Defl/CSI Criteria
♦ Maximum Reactionsyibs) •
Pg: NA Ct: NA CAT: NA
PP Deflection in loc L/defl L/#
Loc A /41 • / Rw lF" ? RL
/ W ' • • • •
Pf: NA Ce: NA
VERT(LL): 0.100 H 999 240
••••
B 2V J / 1497 / 1459 / -• / 663 / 8.0 • •
•/9
Lu: NA Cs: NA
VERT(TL): 0.292 H 999 180
L 2282 19*7 / 145t ! • / -
/ 8.E • • • • •
Snow Duration: NA
HORZ(LL): 0.043 H - -
Wind TAL' "based on C&C
• •
HORZ(TL): 0.084 H
B Mir• &rj Width Reg" 2.7
• • • • • •
Code / Misc Criteria
Creep Factor: 2.0
L 4%grgodth RecC= 2.7 •
Bldg Code: FBC 2017-HVH
f@IaSTC CSI: 0.740
surface. id B & L are a s rigid
Bearin 9 9
• 0: • -
•
TPI Std: 2014
Max BC CSI: 0.912
BearAlsV8%require at pl te.
� s g�
• • • • •
Rep Factors Used: No
Max Web CSI: 0.858
• • go 0000
• • • • • -
FT/RT:20(0)!10(0)
Mfg Specified Camber:
MaXimem•Top Chord Forces Per Ply (Ibs) . -
Chords Tlns::omp.
Plate Type(s):
• Chords
Teni.4 n _
WAVE
VIEWVer:17.02.01A.1114.21
A -B• *7 0:•8*t0
172.3 -27%
B - C• • • 162$ - 3084 • E i E
16" &WO
C - D 1726 - 2760 • 9-Go
1 �7 S
••••
Maximum Bot Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords
Tens. Comp.
B - 1 2466 -1049 H - F
2462 -1088
I- H 1669 -456
Maximum Web Forces Per Ply (Ibs)
Webs
Tens.Comp.
Webs
Tens. Comp.
A-J
1 0
D-H
991 -684
C - 1
616 -592
H -E
614 -590
1- D
999 - 686
K- G
1 0
"WARNING`" READ AND FOLLOW ALL NOTES ON THIS DRAWING!
"IMPORTANT"' FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
�s require extreme care in fabricating, handlin shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building
onent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary -- ��«�-----�.
g per BCSI., Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly
ed ri id ceilin .Locations shown for permanent lateral restraint of webs shall have bracin installed per BCSI sections B3, B7 or B10,
-1q g f g y
)licab�e. Apply plates to each face o truss and position as shown above and on the JoinfDetails, unless noted otherwise. Refer to
1gs 160A-Z for standard plate positions. 'p
a division of ITW BuildincQ�Components Group Inc. shall not be responsible for any deviation from this drawingg any failure to build the
n conformance with ANSI 1, or for handling, shipping, installation and bracing of. trusses. A seal on this drawing or cover page.
1 this drawing indicates acceptance of ppro esslona engineering responsibility solely for the design shown. The suitability
rse of this yawing for any structure is the responsibility of the Building Designer per ANSIITPI 1 Sec.2.
Job Number: 16797e Ply: 2 SEQN: 389912 / T6 / COMN
ADDITION @ 94 ST Qty: 2 FROM: JP DRW
Truss Label: TlA Wgt: 302.4 Ibs .. / ... 04/10/2019
Loading Criteria (psf)
TCLL: 30.00
TCDL: 20.00
BCLL: 0.00
BCDL: 10.00
Des Ld: 60.00
NCBCLL: 0.00
Soffit: 2.00
Load Duration: 1.33
Spacing: 48.0 "
Lumber
5'11" 12'8'
SEAT PLATE REQ. SEAT PLATE REQ.
2.4- �p
4
Wind Criteria
Wind Std: ASCE 7-10
Speed: 175 mph
Enclosure: Closed
Risk Category: 11
EXP: D
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.33
Top chord 2x4 SP SS
Bot chord 2x4 SP SS :B2 2x4 SP #1:
Webs 2x4 SP #3 :W2 2x4 SP #2 N:
:Lt Stub Wedge 2x6 SP #2::Rt Stub Wedge 2x6 SP #2:
:Lt Level Return 2x4 SP #3:
:Rt Level Return 2x4 SP #3:
Nailnote
Nail Schedule:0.128"xY, min. nails
Top Chord: 1 Row @ 7.50" o.c.
Bot Chord: 1 Row @12.00 o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Purlins
In lieu of structural panels use purlins to brace TC @
24" oc.
Wind
Member design based on both MWFRS and C&C.
7'4"
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NP
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code: FBC 2017
TPI Sid: 2014
Rep Factors Used: No
FT/RT:20(0)/10(0)
Plate Type(s):
WAVE
25'4"
0'
1 T8"
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.085 H 999 240
VERT(TL): 0.248 H 999 180
HORZ(LL): 0.037 H - -
HORZ(TL): 0.072 H
Creep Factor: 2.0
RFRSTC CSI: 0.602
Max BC CSI: 0.777
Max Web CSI: 0.420
Mfg Specified Camber:
VIEW Ver: 17.02.01A.1114.21
T4��q.{� 2-4-
♦ Maximum Reactionw(lbs) e
Loc 4 /•L?• /Rw 7f2R9RL
/W `•*0•
B 3885 / 2549 / 2484 / 9 / 1130 / 8.0 •
L 3M :2%29 /24M?* /-
/B.Os•s••
Wind"I'LOA 1b11S based on CBrC
• •
B Min Bi@sWidth Req� i 2.3
• • •
L Ai0 P6ggWidth Reg = e2.3 •
• �
Bearings B & L are a rigid surface.
•' • • •
BeanMV A: require a sge9tQlate.
*-*so
e• •• eggs
so•ge•
MaxWRnmT@* Chord Fords Per
Ply (Ibs) g g
Chor:s AnCComp. • Chords
Tens._Corwp.
A - Bs 617 0: • b�-�'
t ir
14§7 - 23,V
B - C s • ol 31: - 2626
134* 9-013k
C - D 1470 -2350•a Ci
117 e
• •g
Maximum Sot Chord Forces Per Ply (Ibs)
Chords Tens.Comp. Chords Tens. Comp.
B - I 2100 - 893 H - F 2096 - 927
1- H 1421 -388
Maximum Web Forces Per Ply (Ibs)
Webs
Tens.Comp.
Webs
Tens. Comp..
A-J
1 0
D-H
844 -582
C -1
524 - 504
H - E
523 - 503
1- D
850 - 584
K- G
1 0
"WARNING" READ AND FOLLOW ALL NOTES ON THIS DRAWING!
—IMPORTANT" FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handlin shipping, installingand bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) fo'r safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathin and bottom chord shall have a propperly _ q
attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7 or 610,
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Defer to � e
drawings 160A-Z for standard plate positions.
Alpine, a division of ITW Buildinggs�Components Group Inc.. shall not be responsible for any deviation from this drawing any failure to build the
truss in conformance with ANSI PI 1, or for handlingf shipping, installation and bracing of trusses. A seal on this drawing or cover page,
listing this drawing indicates acceptance of pro esslona engineering responsibility solely for the design shown. The suitability
and use of this gnawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
Job Number: 16797e Ply: 2 SEQN: 389914 / T8 / COMN
ADDITION @ 94 ST Qty: 3 FROM: JP DRW:
Truss Label: T16 Wgt: 288.4 Ibs .. / ... 04/10/2019
25.4"
5'11'
116X8(G2)
SEAT PLATE REQ.
24'
T4"
25'4'
10,
17'8"
BEAT PLATE REQ.
7'3-9/16"
24'11-9116"
4-�6-
li
Loading Criteria (pso Wind Criteria
Snow Criteria (Pg,Pf in PSF)
Defl/CSI Criteria
♦ MaxYnurn 5eactions TIbs)•
TCLL: 30.00 Wind Std: ASCE 7-10
Pg: NA Ct: NA CAT: NA
PP Deflection in loc L/defl L/#
Loc R• / W • / Rw /*rRL
I W' • • • • •
TCDL: 20.00 Speed: 175 mph
Pf: NA Ce: NA
VERT LL : 0.082 H 999 240
( )
• • • •
B 39p7� 1 ��6� / 2484 / -• / 1017
/ 8.0 � •
BCLL: 0.00 Enclosure: Closed
Lu: NA Cs: NA
VERT(TL): 0.241 H 999 180
J 3376 /41887 / 1936%e * / -
/ 8.(? " • • •
BCDL: 10.00 Risk Category: II
Snow Duration: NA
HORZ(LL): 0.032 G - -
Wind W161sbased on C&Q
• •
EXP. D
Des Ld: 60.00
HORZ TL : 0.063 G
( )
B MirrBr Width Re F• 2.3 •
9 q
• • • •' •
• •
NCBCLL: 0.00 Mean Height: 15.00 ft
Code / Misc Criteria
Creep Factor: 2.0
J 0%Ijrs Vdth Req� 42 •
TCDL: 5.0 psf
Soffit: 2.00 BCDL: 5.0 psf
P
Bldg Code: FBC 2017-HVH
R ES TC CSI: 0.597
Bearin s B & J are a rigid su ace.
9• B J e
•; •'
•
Load Duration: 1.33 MWFRS Parallel Dist: 0 to h/2
TPI Std: 2014
Max BC CSI: 0.834
Bearin s e uire s t e.
• • • •
• • • •
Spacing: 48.0 " C&C Dist a: 3.00 ft
Rep Factors Used: No
Max Web CSI: 0.451
0066
000000
Loc. from endwall: Any
FT/RT:20(0)/10(0)
Mfg Specified Camber:
MaxiiD&A4ApChord Forces Per Ply (Ibs)
Chor Tens�omp. Chords Ten
GCpi: 0.18
Plate Type(s):
�
. oml._
Wind Duration:1.33
WAVE
VIEW Ver:17.02.01A.11 44.21
••
A-B• 1q7 0 • D••- •
152$ -2407.
Lumber
B-C�•.1411-2644 • E61�
144t•02600,
•
C - D 1493 -2368 •00
Top chord 2x4 SP SS
.0
Bot chord 2x4 SP SS :B2 2x4 SP #1:
Webs 2x4 SP #3 :W2 2x4 SP #2 IN:
Maximum Bot Chord Forces Per Ply (Ibs)
:Lt Stub Wedge 2x6 SP #2::Rt Stub Wedge 2x6 SP #2:
Chords Tens.Comp. Chords
Tens. Comp.
:Lt Level Return 2x4 SP #3:
B - H 2116 -1060 G - F
2162 -1097
Nailnote
H - G 1438 -523
Nail Schedule: 0. 1 28"xY, min. nails
Top Chord: 1 Row @ 7.50" o.c.
Maximum Web Forces Per Ply (Ibs)
Bot Chord: 1 Row @12.00" o.c.
Webs Tens.Comp. Webs
Tens. Comp.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
A - 1 1 0 D - G
904 - 627
in each row to avoid splitting.
C - H 527 - 506 G - E
552 - 539
H - D 846 - 576
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Purlins
In lieu of structural panels use purlins to brace TC @
24" oc.
Wind
Member design based on both MWFRS and C&C.
"WARNING" READ AND FOLLOW ALL NOTES ON THIS DRAWING!
"IMPORTANT"' FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handlin shipping, installing. and bracing. Refer to and follow the latest edition of BCSI (Building
Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary
bracing per BCSI.. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a propperly _ -_ __
attached r gid ceiling Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections 63, B7 or 610, -
as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. �tefer to
drawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this dra,win ' any failure to build the
truss in conformance with ANSUTPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover page,
listing this drawing indicates acceptance of pro esslona engineering responsibility solely for the design shown. The suitability
and use of this gnawing for any structure is the responsibility of the building Designer per ANSI/TPI 1 Sec.2.
General Notes
Notes Genera/es
Trusses are not marked in any way to identify the
Los trusses no estan marcados de ningun modo que
frequency or location of temporary lateral restraint
identifique la frecuencia o localizaci6n de restricci6n
and diagonal bracing. Follow the recommendations
lateral y arriostre diagonal temporales. Use las
for handling, installing and temporary restraining
recomendaciones de manejo, insta/aci6n, restricci6n
and bracing of trusses. Refer to BCSI - Guide to
y arriostre temporal de Jos trusses. Uea ell folleto BCSI
Good Practice for Handling, Installing, Restraining
- Guile de Buena Practica para el Manejo, Instalaci6n,
& Bracing of Metal Plate Connected Wood
Restricci6n y Arriostre de IDS Trusses de Madera
Trusses*** for more detailed information.
Conectados con Places de Metal *** pare informacibn
Truss Design Drawings may specify locations of
mas detallada,
permanent lateral restraint or reinforcement for
P
Los dibu os de diseno de IDS trusses pueden especificar
I
individual truss members. Refer to the BCSI-B3***
las localizations de restricci6n lateral permanente o
for more information. All other permanent bracing
refuerzo en los miembros individuates del truss. Vea
design is the responsibility of the building designer.
la hoja resumen BCSI-B3***para mas informacibn. El
resto de los diserlos de arriostres permanentes son /a
responsabilidad del disenador del ediffcio.
Hoisting and Placement of Truss Bundles
Recomendaciones Para Levantar Paquetes de Trusses
(� DON'T overload the crane.
NO sobrecargue la grua.
NEVER use banding to lift a bundle.
NUNCA use las ataduras para levantar un paquete.
A single lift point may be used for bundles of
top chord pitch trusses up to 45' (13.7 m) and
parallel chord trusses u m .
P p to 30' (9.1 )
Use at least two lift points for bundles of top
chord pitch trusses up to 60' (18.3 m) and parallel - WAR NiNG Do not overload supporting
chord trusses up to 45' (13.7 m). Use at least structure with truss bundle.
three lift points for bundles of top chord pitch
trusses >60' (18.3 m) and parallel chord trusses iADVERTENCIA! No sobrecargue la
>45' (13.7 m). estructura apoyada con el paquete de
DANGER The consequences of improper Puede usar un solo lugar de levantar para trusses.
handling, erecting, installing, restraining 0 Place truss bundles in stable
and bracingcan result in a collapse of the Paquetes de trusses de la cuerda superior position.
P hasta 45' y trusses de cuerdas paralelas de
structure, or worse, serious personal injury 30' o menos. Use per to manes dos puntos position astable.
se Paquetes de trusses en una
or death. •! ^ . , de levantar con grupos de trusses de cuerda Po
•�, !• r' -
iPELIGRO! El resultado de un manejo, levanta- "_� t �superior inclinada haste py trusses de cuerdas
miento, instalaci6n, restricci6n y arriootre incorrecto para/alas haste 45'. Use per to menos dos puntos de levantar con grupos de trusses de cuerda
puede ser la caida de la estructura o aun peor, superior inclinada mas de 60' y trusses de cuerdas paralelas mas de 45'.
heridos o muertos.
ACSC• U OOo a Exercise care when remov-
ing banding and handling trusses to avoid
damaging trusses and prevent injury. Wear ®�
personal protective equipment for the eyes,
feet, hands •rt1166#6d when working with '\
trusses. • • 'GOOOm
000*
• §0! flaWce cautela a:quilarrw ataduras
• • o Jos pedazos dG metal de sujetar para evitar
• • • • ✓aril a Jos trulslB•yiirevenir I% * It^6rsonal.
Lleve ell equip%protectivo persyrypl fijos,
• • • • ties, manos y cabeza cuando trabala on A BOO R Use
lFusses. 6@1NJb�Ctl29
• • • •
• special care in Utilice cuidado
& • • • • • • • • • • • • 0000 windy weather or especial en
near power lines dias ventosos o
• •klandlilrg; -; Mapp,�! � and airports. cerca de cables
• 0000 • • i• e/ectricos o de
• £"L Avoidlajeral • • aeropuertos.
• bending. •
• • Spreader ' • • • Esirite /a Flealjfgp �p�gpt• P
• for truss
actor•
r • The c O
responsig1eTTor • •
properly recerere,• •
unloading and storing m O O
the trusses at the
jobsite. Unload trusses
to smooth surface to prevent damage. 0 Use proper rig- Use equipo apropiado
El contratista tiene /a responsabilidad de recibir, ging and hoisting para levantar a
descargar y almacenar adecuadamente los equipment. improvisar
trusses en la obra. Descargue Jos trusses en /a
tierra liso para prevenir at dano.
01
r
Trusses may be unloaded directly on the ground at (S) DO NOT store
the time of delivery or stored temporarily in contact unbraced bundles
with the ground after delivery. If trusses are to be upright.
stored for more than one week, place blocking of
sufficient height beneath the stack of trusses at 8'
(2.4 m) to 10' (3 m) on -center (oc).
Los trusses pueden ser descargados directa-
mente en at suelo en aque/ memento de entrega
o almacenados temporalmente en contacto con el
suelo despues de entrega. Si Jos trusses estaran
guardados para mas de una Samaria, ponga
bloqueando de a/tura suffciente detras de la pila
de los trusses a 8 hasta 10 pies en Centro (oc).
If trusses are to be stored for more than
one week, cover bundles to protect from
the environment. DO NOT store on
Para trusses guardados per mas de una semen, uneven ground.
Jos a uetes para rote erlos del ambiente.
cubra p q p p g
Refer to BCSI*** for more detailed information per-
taining to handling and jobsite storage of trusses.
Vea ell folleto BCSI*** para informaci6n mas detal-
lada sobre at manejo y almacenado de Jos trusses
en area de trabajo. -- --
NO almacene
verticalmente Jos
trusses sueltos.
NO almacene en tierra
desigual.
Mechanical Hoisting Recommendations for Sin5ple Trusses
Recomendaciones Para Levantar Trusses Indiv/duales
Using a single pick -point at the peak can damage the truss.
E/ use de un solo lugar en el pico para levantar puede
hater Dania at truss.
reader bar
Toe -in, TEoe-in
Spreader bar 1/2 to
2/3 truss length
Tagline TRUSSES UP TO 60(18.3 m)
TRUSSES HASTA 60 PIES
60 or less 11
Approx. 112
truss length
Tagline TRUSSES UP TO 30- (9.1 m)
TRUSSES HASTA 30 PIES
Locate Spreader bar Aaach
3 0'(m)
above or stiffback oc max.
mid -height I I
I Spreader bar 2is to
0 Hold each truss in position with the erection I/-►
P 3l4 truss length
equipment until top chord temporary lateral TaglineXI
restraint is installed and the truss is fastened II TRUSSES UP TO AND OVER 60' (18.3 m)
Imo_ TRUSSES HASTA Y SOBRE 60 PIES -�
to the bearing points.
Sostenga cada truss en posici6n con equipo de grua hasta que /a restricci6n lateral temporal de
la cuerda superior Este instal/ado y el truss esta asegurado en Jos soportes.
Installation of Single Trusses by Hand
Recommendacciones de Levantamiento de Trusses
Individuales Por La Mano
Q Trusses 20' - t+ _ - �✓ Trusses 30'-
1.
(6.1 m) or ' (9.1 m) or less, f
less, support support at
near peak. III quarter points,
Soporte 'li Soporte de
cerca a/ pico - --- - --ll IDS cuartos
Jos trusses E Trusses up to 20' ♦ de tramo Jos E Trusses up to 30'
de 20 pies o 1 (6.1 m) trusses de 30 (9.1 m)
menos. Trusses hasta 20 pies pies o menos. Trusses haste 30 pies
Temporary Restraint & Bracing
Restriccion y Arriostre Temporal
Refer to BCSI.Ei for more information. Top Chord Temporary
Vea ell resumen BCSI-B2*** para mas informacibAr-Lateral Restraint
TCTLR)
Locate ground braces directly in line with all rows2x4 min.
of top chord temporary lateral restraint (see table
in the next column).
Coloque Jos arriostres de tierra para el primer 5 2' oc, typ.
truss directamente en I(nea con cada una de /as
fflas de restricci6n lateral temporal de la cuerda Brace first
superior (vea /a tabla en la proximal column). truss
securely
DO NOT walk on unbraced trusses. before
F NO Gamine en trusses sue/tos. erection ofadditional
DO NOT stand on truss overhangs until trusses.
Structural Sheathing has been applied to
the truss and overhangs.
Q NO se pare en voladizos cerchas hasta
Revestimiento estructura/ ha side aplicado
a la armadura y voladizos.
Steps to Setting Trusses
Las Medidas de la Instaiacion de los Trusses
0 1) Install ground bracing. 2) Set first truss and attach securely to ground bracing. 3) Set next 4
trusses with short member temporary lateral restraint (see below). 4) Install top chord diagonal
bracing (see below). 5) Install web member plane diagonal bracing to stabilize the first five trusses
(see below). 6) Install bottom chord temporary lateral restraint and diagonal bracing (see below).
7) Repeat process with groups of four trusses until all trusses are set.
1) Instate Jos arriostres de tierra. 2) Instate at primero truss y ate seguramente a/ arriostre de tierra.
3) Instate los pr6ximos 4 trusses con restricci6n lateral temporal de miembro Corte (vea abajo). 4)
Instate ell arriostre diagonal de /a cuerda superior vea aba'o . 5 Instate arriostre ost e era Jos
9 P ( 1) )P
Janos de Jos miembros secundarios era estabilice Jos dmeros cinco trusses vea aba'o . 6 Instate
P P P ( /) )
la restricci6n lateral temporal y arriostre diagonal pare la cuerda inferior (vea abajo). 7) Repita Este
procedimiento en grupos de cuatro trusses haste que lodes los trusses esten insta/ados,
Refer to BCSI-B2*** for more information.
Vea el resumen BCSI-B2*** para mas informacibn.
Restraint/Bracing for All Planes of Trusses
Restriccion/Arriostre Para Tbdos Pianos de Trusses
0 Minimum lumber used for lateral restraint and diagonal bracing is 2x4 stress -graded lumber. Attach
to each truss with at least 2-1 Did (0.128x3"), 2-12d (0. 1 28x3.25") or 2-16d (0.131x3.5") nails
La madera 2x4 clasificada par estres as la madera minima utilizada para restricci6n lateral y arnostramiento di-
agonal. Atarlas a cada braguero con at minimo 2 clavos 10d (0.128x3 ), 12d (0.128x3.25") o 16d (0.131x3.5 ).
This restraint and bracing method is for all trusses except 3x2 and 42 parallel chord trusses
(PCTs). See top of next column for temporary restraint and bracing of PCTs.
Este metodo de restdccidn y arriostre es para tool trusses excepto trusses de cuerdas paralelas
(PCTs) 3x2 y 4x2. Vea /a parts superior de /a column para la restricci6n y arriostre temporal de PCTs.
1) T(1P (`Hr)Pn PI ANF - r`11PP IA CIIPPRIni?
Truss Span
Top Chord Temporary Lateral Restraint (TCTLR) Spacing
Longitud de Tramo
Espaciamiento del Arriostre Temporal de la Cuerda Superior
Up to 30'
10' (3 m) oc max.
(9.1 m)
30'- 45'
(9.1Ent -13.7m)
8' (2.4 m) oc max.
- 60'
(13.7 In - 18.3 m)
6' (1.8 m) oc max.
L45'
60'- 80' *
(18.3 m - 24.4 m)*
4' (1.2 m) oc max.
*Consult a Registered Design Professional for trusses longer than 60' (18.3 m).
'Consults a un Professional Registrado de DiseBo para trusses mas de 60 pies.
0 See BCSI-B2*** for TCTLR options.
Vea el BCSI-B2*** para las options de TCTLR.
Refer to BCSI-B3*** _
for Gable End Frame restraint/bracing/
reinforcement information.
Para informacibn sobre restricci6n/
arriostre/refuerzo paraArmazones -_
Hastiales vea e/ resumen BCSI-B3***
Note: Ground bracing not shown for clarity
12'
A
7�'>
TCTLR
10" or >
Truss attachment
0 Repeat diagonal braces for each set of 4 trusses. required at supports)
Repita los arrisotres diagonales para cada grupo de 4 trusses. Section A -A
'® LATERAL RESTRAINT & DIAGONAL BRACING ARE
VERY IMPORTANT
ILA RESTR/CCION LATERAL Y EL ARRIOSTRE DIAGONAL SON
MUY IMPORTANTESF
2) WEB MEMBER PLANE
j PLANO DE LOS MIEMBROS
SECUNDARIOS
Web members :=7`.-----,'I
Diagonal Continuous Lateral Restraint
bracing (Cl splice reinforcement
Truss Member
1 I 2x_ CLR
45" ---
L I
A
L-
Bottom
chords Minimum 2' 2x_ Scab block center it
over CLR splice. Mach
braces every to CLR vdth minimum 8-16d
10 truss spaces 20' (0.135x3.5') nails each side
(6.1 m) max. of splice or as specified by the
10' (3 m) - 15' (4.6 m) max.
Building Designer.
Same spacing as bottom chord
Note: Some chord and web members SECTION A -A
lateral restraint
not shown for clarity.
3) BOTTOM CHORD PLANE -
CUERDA INFERIOR
Truss
Lateral Restraints - 2x4x12' or greater
_
Member
I'
lapped over two trusses
PP
Note: Some chord
or CLR splice reinforcement.
and web members
Bottom
�
°
not shown for
chords
4
clarity.
i Y
10'(3 m) - 15'(4.6 m) max.
Diagonal braces every 10
truss spaces 20' (6.1 m) max.
Restraint & Bracing for 3x2 and 4x2 Parallel Chord Trusses
Restriccion y Arriostre Para Trusses de Cuerdas Paralelas 3x2 y 4x2
10' (3 m) or Diagonal bracing Repeat diagonal bracing
Refer to 15' (4.6 ml* _ every 15 truss spaces 30'
BCSI-B7*** for more (9.1
information.
Vea el resumen 121 r'
era mas informacibn. -
P
1 s�restraintss
y -
Apply diagonal brace to vertical
'.
J
webs at end of cantilever and at
bearinglocations. All la
lapped at least two trusses.
'.� *Top chord temporary lateral restraint spacing shall be 10'
(3 m) oc max. for 3x2 chords
and 15' (4.6 m) oc for 4x2 chords.
Out -of -Plane
_
Installing - Installation
Out -of -Plumb
Max. Be.
Truss Length
Q Tolerances for Out -of -Plane.
3/4"
12.5'
Tolerancias para Fuera-de-Plano. DIN I
D (ft.)
19 rum
3.8 IT
Length Max. Bow 1/4"
i 6 mm
1'
0.3 m
7/8"
22 mm
14.6'
4.5 m
--� --- ---
�-
2'
1"
16.T
Len th -emu m
Max. ow 9 13 rum
0.6 m
25 rum
5.1 m
Max. Bow p 3/4"
3'
1-118"
18.8'
,_ 19 mm
0.9m
29 rum
5.7m
------------------------
Length n
f ► m Plumb t"
4'
1-1/4"
20.8'
p / line 25 mm
f
1.2 m
32 mm
6.3 m
Tolerances for 1-1/4"
5'
1-3/8"
22.9'
Out -of -Plumb. 32 mm
1.5 m
35 mm
7.0 IT
D/50 max 1-1/2"
Tolerancias para I 38 mm
6'
1.8 mStAl
1-1/2"
25.0'
Fuera-de-Plomada. 1.3/q^
7
44 m
2.1 m
•02,E>8'
Construction Loading 51 mm
>-2.4 m)
•
Cargo De Construction • ,
• • • •
• •
DO NOT proceed with construction until all lateraTresIrliA
Maxirrwm Stack Height
and bracing is securely and properly in place. • • • •
for Material on
Trusses*'
•
• •
rlatgfial •
Height
NO proceda con la construcci6n hasta que todas /a. matrtic-
clones /atera/es y las arriostres esten colocados en forma
w is
Gypsum Board
12" (3 mra) •
apropiada y Segura. • • •
•
• •
P"od
R OSB•
16" (406 rum)
DO NOT exceed maximum stack heights in table at dghl • •
Refer to BCSI-B4*** for more information, 000066 Asphalt Shingles 2 bundles
NO exceda Las a/turas maximas de mont6n. Vea el resume: Concrete Block 8" (203 rum)
BCSI-B4 *** para mas informacibn. I • • • •
• Clay i e 3-0 tiles high
• • • 1. Bawd on tplss live load of A%#cP •
e✓eater. Fof dthgr condition# contact
A. AdpKs gn Professional.
2 Instal s f materials as quickly
as possible.
NEVER stack materials near a peak, at mid -span, on cantilevers or overhangs.
NUNCA apile las materiales cerca de un pica, a Centro de la luz, en
cantilevers o Sterols.
DO NOT overload small groups or single trusses.
NO sobrecargue pequenos grupos o trusses individuales.
Place loads over as many trusses as possible.
Coloque las cargas sobre tantos trusses come sea posible.
Position loads over load bearing walls.
Coloque las cargas sobre las paredes soportantes.
Alterations - Alterations
FMOTM Refer to BCSI-B5.**'
Uea at resumen BCSI-B5. *** Truss bracing not shown for clarity.
DO NOT cut, alter, or drill any structural member of a truss unless
specifically permitted by the truss design drawing.
NO Corte, altere o perfore ningun miembro estructura/ de un truss, a
menos que este especiffcamente permitido en el dibujo del diseno
del truss.
IOM Trusses that have been overloaded during construction or altered without the Truss Man-
718
ufacturer's prior approval may render the Truss Manufacturer's limited warranty null and void.
Trusses que se han sobrecargado durante la construcci6n o ban sido alterados sin /a autor-
'., I.zaci6n previa del Fabricante de Trusses, pueden hater nulo y sin efecto /a garantia limitada del
Fabricante de Trusses.
-Contact the Component Manufacturer for more information or consult a Registered Design Professional for assistance.
NOTE: The truss manufacturer and truss designer rely on the presumption that the contractor and crane operator (if applicable) are
professionals with the capability to undertake the work they have agreed to do on any given project. If the contractor believes it needs
assistance in some aspect of the construction project, it should seek assistance from a competent party. The methods and procedures
outlined in this document are Intended to ensure that the overall construction techniques employed will put the trusses into place SAFELY
These recommendations for handling, installing, restraining and bracing trusses are based upon the collective expenence of leading
personnel involved with truss design, manufacture and installation, but must, due to the nature of responsibilities involved, be presented
only as a GUIDE for use by a qualified building designer or contractor. It is not intended that these recommendations be interpreted as
superior to the building designer's design specification for handling, installing restraining and bracing trusses and it does not preclude the
a of other equivalent methods for restraining/bracing and providing stability for the walls, columns, Floors, roofs and all the interrelated
structural building components as determined by the contractor. Thus, SBCA expressly disclaims any responsibility for damages arising
from the use, application, or reliance on the recommendations and information contained herein.
SBCA
6300 Enterprise Lane • Madison, WI 53719
608-274-4849 • sbcindustry.com
'',. B1 WARN11 x17 180321
AYJIY/=I.'INr=JjI[ffA