DS-19-1148 (2)Miami Shores Village
Public Works Department
(305)795-2210
IM
Public works forms are available from the building department, 10050 NE 2"d Ave., Miami Shores, FL 33138
JUL la 3 Z13
PUBLIC WORKS PERMIT APPLICATION
Permit Type: Work in the Right -of -Way on Miami Shores Village or Miami -Dade Property
Q y�
Permit�(,k)
, , ! J
Name of Applicant (if utility see below): �y
�/ly i f) l/,4-L_J Lf
J/ Owner off the following described property:
Legal Description: Lot Block Subdivision
Folio #; ��
Address: qG �,� 1UF �`'' Alf- (loadSllc+��� (— 3
UTILITY NAME:
Qualifier/Authorized Agent:
Address: _
City:
Telephone:
State Certification or Registration #:
CONTRACTOR NAME:
Qualifier/Authorized Agent:
Address:
City:
Telephone:
State: _
Email:
9w OwnLtr
State: _
Email:
ZIP:
Certificate of Competency #
ZIP:
State Certification or Registration #: Certificate of Competency #:
Requests permission to install (describe work, attach separate page if necessary) in the adjoining right of
way: =3- it
Type of Work: ❑ Paving ❑ Utility
❑ Landscape ❑ Antenna
DESIGNER: Architect/Engineer:
❑ Sidewalk .[J.s; Electric ❑ Irrigation
❑ Other:.
Address:
City: State: ZIP:''
Telephone: Email: "r
Registration #:
.. t�l�erf+i;s,s1ti�.
Value of Work for this Permit: $ N Square/Lineal Footage of Work:
*****Fees*****
Permit Fee $ 100.00
Notary $ Training/Education $ 0.20 Technology Fee $ 0.80 Scanning $
Bond $ (if required) Total Fee Now Due $
u�
Bonding Company's Name (if applicable):
Bonding Company's Address:
City:
State:
ZIP:
Application is hereby made to obtain a public works permit to do the work in the right of way and
installations as indicated. I certify that no work or installation has commenced prior to the issuance of a
permit and that all work will be performed to meet the standards of all laws, regulation construction in
this jurisdiction. I understand that separate permits must be secured for
APPLICANT'S AFFIDAVIT: I certify that all the foregoing information is accurate and that all work will be
done in compliance with applicable laws regulating construction and specifically construction in the
right-of-way.
"WARNING TO APPLICANT: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN
YOUR PAYING TWICE FOR IMPROVEMENTS TO THE RIGHT-OF-WAY. IF YOU INTEND TO OBTAIN
FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF
COMMENCEMENT."
Notice to Applicant: As a condition to the issuance of a public works permit with an estimated value
exceeding $2,500, the applicant must promise in good faith that a copy of the notice of commencement
and construction lien law brochure will be delivered to the person whose property is subject to the
attachment. Also, a certified copy of the recorded notice of commencement must be posted at the job
site for the first inspection which occurs seven (7) days after the public works permit is issued. In the
absence of such posted notice, the inspection will not be approved and a reinspection will be charged.
Signature
Applicant or Authorized Agent
The foregoing instrument was cknowledged before
^yme this }-3''" day o 26—E by
! )G(YA tT�1Ay who
is per a, known to me or who has produced
Signature
Company/Utility Agent
The foregoing instrument was acknowledged before
me this day of . 20, by
is personally known to me or who has produced
as
F ;ey PR/r?gv
tom' /// identification.
�L �
t*0'25, 2�_�in�. NnTGRV DI IRI
Si
Sign:
Print: G ,* -,04' nb �`A00 • A Print:
SEAL: // •ok \\\` SEAL:
*******************************************
APPROVED BY:
Public Works Director, or Designee
who
2017-04-15