RC-18-37574
e
t
I"
Certificate of Completion
Miami Shores Village
10050 N.E. 2nd Ave, Miami Shores, Florida 33138
Tel: 305-795-2204 Fax: 305-756-8972
Building Inspection Department
Description: INTERIOR RENOVATION OF KITCUEN AND INTERIOR WALLS, BATHROOM AND INTERIOR WALLS MODIFICATION OF
EXTERIOR OPENING AND MASTER BATHROOM ADDITION (WITHIN EXISTING FOOTPRINT OF HOUSE)
Permit Type
Owner
Subdivision/Project
Construction Type V -B
Square Footage
Location
431 NE 100TH ST
Miami Shores, FL 33138
Building (Residential)
ERIN HALLORAN
6111111111]
Bldg. Permit No. RC -12-18-3757 n _
Contractor HOME OWNERvt
Date Issued 08/27/2019 r
ae
.Y
Occupancy Single Family .4
Type
Flood Zone X
If the building is located in a special flood hazard area documentation of the as -built lowest floor
elevation or lowest horizontal structural member has been provided and is retained in the records of
Miami Shores Village.
This certificate issued pursuant to the requirements of the Florida Building Code certifying that at the
time of issuance this structure was in compliance with the v . ious ordinances of the jurisdiction
regulating building construction or use.
to/tJ �4
Building Officials Approval Ismael Naranjo, CBO
Not Transferable
POST IN A CONSPICUOUS PLACE
Miarni Shores Village
Building Depa.rrment
10050 NE 2 Ave
Miami Shores Fl- 33138
Issue Date: 2/4/2019 Expires: 06/24/2019
INSPECTION REQUESTS: (305)762-4949 or lag on at https://bidg,msvfi.gov/energov_prod/selfservice POST ON SITE
Requests must be received by 3:30pm
WORK IS ALLOWED: MONDAY THROUGH FRIDAY, 8OOAM-TOOPM 1132060170500
SATURDAY 8:OOAM - 6:OOPM.
NO WORK IS ALLOWED ON SUNDAY OR HOLIDAYS
BUILDING AND ROOFING INSPECTIONS ARE DONE MONDAY THROUGH FRIDAY .
NO INSPECTION WILL BE MADE UNLESS THE PERMIT CARD IS DISPLAYED AND HAS BEEN APPROVED . PLANS ARE
READILY AVAILABLE. IT IS THE PERMITAPPLICANTS RESPONSIBILITY TO ENSURE THAT WORK ISACCESSIBLE AND
EXPOSED FOR INSPECTION PURPOSES. NEITHER THE BUILDING OFFICIAL NOR THE CITY SHALL BE LIABLE FOR
EXPENSE ENTAILED IN THE REMOVAL OR REPLACEMENT OF ANY MATERIAL REQUIRED TO ALLOW INSPECTION .
Owner's Name: ERIN HALLORAN Owner's Phone: (352)252-3193
Job Address: 431 NE 100TH ST Total Square Feet: 500
Miami $hones. FL 33138 notal Job Valuation: $ 50,000.00
Contractor(s) Phone Address
HOME OWNER
Description: INTERIOR RENOVATION OF KITCUEN AND INTERIOR WALLS, BATHROOM AND INTERIOR WALLS
MODIFICATION OF EXTERIOR OPENING AND MASTER BATHROOM ADDITION- (WITHIN EXISTING FOOTPRINT OF
HOUSE) �. ;� e
I nib inW i M U11
'AT 'TI M'V'�, OF
��419 r
IT
WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF'
COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS
TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED
AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU
INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN
ATTORNEY BEFORE COMMENCING WORK OR RECORDING YOUR NOTICE OF
COMMENCEMENT.
Page 1 of 1
INSPECTION RECORD
INSP
Foundation
Stemwall
Slab
Columns (1st Lift)
Columns (2nd Lift)
Tie Beam
Truss/Rafters
Roof Sheathing
Bucks
Interior Framing
Insulation +
Ceiling Grid
Drywall
f
Firewall'
Wire Lath
Pool Steel
Pool Deck
Final Pool
Final Fence
Screen Enclosure
Driveway
Driveway Base
Tin Cap
In -Progress
Roof Installation
Roofing Final
Shutters Attachment
Final Shutters
Rails and Guardrails
ADA compliance
DOCUMENTS
Soil Bearing Cert
Soil Treatment Cert
Floor Elevation Survey
Reinf Unit Mas Cert
Insulation Certificate
Final Survey
Truss Certification
I STRUCTURAL COMMENTS I
WINDOWSDOORS
INSPECTION
DATE INSP
Attachment
Rough l
Water Service
PUBLIC WORKS
INSPECTION
DATE INSP
Excavation
ELECTRICAL
INSPECTION
DATE INSP
Temporary Pole
30 Day Temporary
Pool Bonding
Pool Deck Bonding
Pool Wet Niche
Underground
Footer Ground
Slab
Wall Rough
Ceiling Rough
Rough
Telephone Rough
Telephone Final
TV Rough
TV Final
Cable Rough
Cable Final
Intercom Rough
Intercom Final
Alarm Rough
Alarm Final
MECHANICAL
INSPECTION
Fire Alarm Rough
de wrou d ipe
YW 11 M
Rough
Fire Alarm Final
Ventilation Rough
Service Work With
t
ELECTRICAL C
MM NTS
Final Hood
Final Ventilation
Final Pool Heater 17
Final Vacuum
r
MECHANICAL COMMENTS
INSPECTION I DATE JINSPt
Final Sprinkler
Final Alarm
R
2
PLUMBING
INSPECTION
DATE INSP
Rough l
Water Service
2nd Rough
Top Out
Fire Sprinklers
Septic Tank
Sewer Hook-up
Roof Drains
Gas
LP Tank
Well
Lawn Sprinklers
Main Drain
Pool Piping
Backflow Preventor
Interceptor
Catch Basins
Condensate Drains
HRS Final
PLUMBING COMMENTS
Q
MECHANICAL
INSPECTION
DATE INSP
de wrou d ipe
YW 11 M
Rough
V1 f-- 4
Ventilation Rough
Hood Rough
Pressure Test
Final Hood
Final Ventilation
Final Pool Heater 17
Final Vacuum
r
MECHANICAL COMMENTS
fz
R
2
Miami Shores Village
Building Department
10050 NE 2 Ave
Miami Shores FL 33:38
INSPECTION REQUESTS: (305)762-4949 or log on at https://bldg.msvfl.gov/energov_prod/selfrervice
Requests must be received by 3:30pm
WORK IS ALLOWED: MONDAY THROUGH FRIDAY, 8:00AM - 7.00PM
SATURDAY 8:OOAM - 6:OOPM.
NO WORK IS ALLOWED ON SUNDAY OR HOLIDAYS
BUILDING AND ROOFING INSPECTIONS ARE DONE MONDAY THROUGH FRIDAY .
NO INSPECTION WILL BE MADE UNLESS THE PERMIT CARD IS DISPLAYED AND HAS BEEN APPROVED . PLANS ARE
READILY AVAILABLE . IT IS THE PERMITAPPLICANT S RESPONSIBILITY TO ENSURE THAT WORK IS ACCESSIBLE AND
EXPOSED FOR INSPECTION PURPOSES. NEITHER THE BUILDING OFFICIAL NOR THE CITY SHALL BE LIABLE FOR
EXPENSE ENTAILED IN THE REMOVAL OR REPLACEMENT OF ANY MATERIAL REQUIRED TO ALLOW INSPECTION .
POST ON SITE
1132060170500
Owner's Name: ERIN HALLORAN Owner's Phone: .(352)262-3193
Job Address: 431 NE 100TH ST - Total Square Feet: 0
Miami Shores, FL 33138 notal Job Valuation: $ 28,208.00
Contractor(s) Phone Address
PRESTIGE WINDOWS & DOORS (305)820-5999 5500 NW 161 St, Miami Gardens, FL 33014
Description: REPLACING 21 WINDOWS AND 3 DOORS TQjMPACT `
1 t
f, 1�6
a` Q
*01
WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF
COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS
TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST"BE RECORDED
AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU
INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN
ATTORNEY BEFORE COMMENCING WORK OR RECORDING YOUR NOTICE OF
COMMENCEMENT.
Page 1 of 1
Foundation
Stemwall
Slab
Columns (1st Lift)
Columns (2nd Lift)
Tie Beam
Truss/Rafters
Roof Sheathing
Bucks
Interior Framing
Insulation
Ceiling Grid
Drywall.
Firewall
Wire Lath
Pool Steel
Pool Deck
Final Pool
Final Fence
Screen Enclosure
Driveway
Driveway Base
Tin Cap
In -Progress
Roof Installation
Roofing Final
Shutters Attachment
Final Shutters
Rails and Guardrails
ADA compliance
DOCUMEN
INSPECTION RECORD
DATE INSP
JINSPECTION PATE INSP,INSPECTION
Attachment /
DATE INSP
Well
30 Day Temporary
Lawn Sprinklers
Rough
Main Drain,
Water Service
Pool Piping
PUBLIC WORKS
2nd Rough
Underground
Top Out
Footer Ground
INSPECTION DATE I INSP
Fire Sprinklers
Condensate Drains
Excavation
Septic Tank
Ceiling Rough
ELECTRICAL
Sewer Hook-up
Roof Drains
Gas
Soil Bearing Cert "
Soil Treatment Cert
Floor Elevation Survey
Reinf Unit Mas Cert
Insulation Certificate
Spot Survey
Final Survey
Truss Certification
STRUCTURAL COMMENTS
INSPECTION DATE INSP
LP Tank
Temporary Pole
Well
30 Day Temporary
Lawn Sprinklers
Pool Bonding
Main Drain,
Pool Deck Bonding
Pool Piping
Pool Wet Niche
Backflow Preventor
Underground
Interceptor
Footer Ground
Catch Basins
Slab
Condensate Drains
Wall Rough
HRS Final
Ceiling Rough
PLUMBING COMMENTS
ROU h
g
Telephone Rough
Telephone Final
TV Rough
TV Final
Cable Rough
Cable Final"
Intercom Rough
Intercom Final
Alarm Rough
Alarm Final
Fire Alarm Rough
Fire Alarm Final
Service Work With
ELECTRICAL COMMENTS
INSPECTION I DATE JINSP
Final Sprinkler
Final Alarm
INSPECTION DATE INSP
Underground Pipe
Rough
Ventilation Rough
Hood Rough
Pressure Test
Final Hood
Final Ventilation
Final Pool Heater
Final Vacuum
I MECHANICAL COMMENTS