Loading...
RC-18-37574 e t I" Certificate of Completion Miami Shores Village 10050 N.E. 2nd Ave, Miami Shores, Florida 33138 Tel: 305-795-2204 Fax: 305-756-8972 Building Inspection Department Description: INTERIOR RENOVATION OF KITCUEN AND INTERIOR WALLS, BATHROOM AND INTERIOR WALLS MODIFICATION OF EXTERIOR OPENING AND MASTER BATHROOM ADDITION (WITHIN EXISTING FOOTPRINT OF HOUSE) Permit Type Owner Subdivision/Project Construction Type V -B Square Footage Location 431 NE 100TH ST Miami Shores, FL 33138 Building (Residential) ERIN HALLORAN 6111111111] Bldg. Permit No. RC -12-18-3757 n _ Contractor HOME OWNERvt Date Issued 08/27/2019 r ae .Y Occupancy Single Family .4 Type Flood Zone X If the building is located in a special flood hazard area documentation of the as -built lowest floor elevation or lowest horizontal structural member has been provided and is retained in the records of Miami Shores Village. This certificate issued pursuant to the requirements of the Florida Building Code certifying that at the time of issuance this structure was in compliance with the v . ious ordinances of the jurisdiction regulating building construction or use. to/tJ �4 Building Officials Approval Ismael Naranjo, CBO Not Transferable POST IN A CONSPICUOUS PLACE Miarni Shores Village Building Depa.rrment 10050 NE 2 Ave Miami Shores Fl- 33138 Issue Date: 2/4/2019 Expires: 06/24/2019 INSPECTION REQUESTS: (305)762-4949 or lag on at https://bidg,msvfi.gov/energov_prod/selfservice POST ON SITE Requests must be received by 3:30pm WORK IS ALLOWED: MONDAY THROUGH FRIDAY, 8OOAM-TOOPM 1132060170500 SATURDAY 8:OOAM - 6:OOPM. NO WORK IS ALLOWED ON SUNDAY OR HOLIDAYS BUILDING AND ROOFING INSPECTIONS ARE DONE MONDAY THROUGH FRIDAY . NO INSPECTION WILL BE MADE UNLESS THE PERMIT CARD IS DISPLAYED AND HAS BEEN APPROVED . PLANS ARE READILY AVAILABLE. IT IS THE PERMITAPPLICANTS RESPONSIBILITY TO ENSURE THAT WORK ISACCESSIBLE AND EXPOSED FOR INSPECTION PURPOSES. NEITHER THE BUILDING OFFICIAL NOR THE CITY SHALL BE LIABLE FOR EXPENSE ENTAILED IN THE REMOVAL OR REPLACEMENT OF ANY MATERIAL REQUIRED TO ALLOW INSPECTION . Owner's Name: ERIN HALLORAN Owner's Phone: (352)252-3193 Job Address: 431 NE 100TH ST Total Square Feet: 500 Miami $hones. FL 33138 notal Job Valuation: $ 50,000.00 Contractor(s) Phone Address HOME OWNER Description: INTERIOR RENOVATION OF KITCUEN AND INTERIOR WALLS, BATHROOM AND INTERIOR WALLS MODIFICATION OF EXTERIOR OPENING AND MASTER BATHROOM ADDITION- (WITHIN EXISTING FOOTPRINT OF HOUSE) �. ;� e I nib inW i M U11 'AT 'TI M'V'�, OF ��419 r IT WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF' COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE COMMENCING WORK OR RECORDING YOUR NOTICE OF COMMENCEMENT. Page 1 of 1 INSPECTION RECORD INSP Foundation Stemwall Slab Columns (1st Lift) Columns (2nd Lift) Tie Beam Truss/Rafters Roof Sheathing Bucks Interior Framing Insulation + Ceiling Grid Drywall f Firewall' Wire Lath Pool Steel Pool Deck Final Pool Final Fence Screen Enclosure Driveway Driveway Base Tin Cap In -Progress Roof Installation Roofing Final Shutters Attachment Final Shutters Rails and Guardrails ADA compliance DOCUMENTS Soil Bearing Cert Soil Treatment Cert Floor Elevation Survey Reinf Unit Mas Cert Insulation Certificate Final Survey Truss Certification I STRUCTURAL COMMENTS I WINDOWSDOORS INSPECTION DATE INSP Attachment Rough l Water Service PUBLIC WORKS INSPECTION DATE INSP Excavation ELECTRICAL INSPECTION DATE INSP Temporary Pole 30 Day Temporary Pool Bonding Pool Deck Bonding Pool Wet Niche Underground Footer Ground Slab Wall Rough Ceiling Rough Rough Telephone Rough Telephone Final TV Rough TV Final Cable Rough Cable Final Intercom Rough Intercom Final Alarm Rough Alarm Final MECHANICAL INSPECTION Fire Alarm Rough de wrou d ipe YW 11 M Rough Fire Alarm Final Ventilation Rough Service Work With t ELECTRICAL C MM NTS Final Hood Final Ventilation Final Pool Heater 17 Final Vacuum r MECHANICAL COMMENTS INSPECTION I DATE JINSPt Final Sprinkler Final Alarm R 2 PLUMBING INSPECTION DATE INSP Rough l Water Service 2nd Rough Top Out Fire Sprinklers Septic Tank Sewer Hook-up Roof Drains Gas LP Tank Well Lawn Sprinklers Main Drain Pool Piping Backflow Preventor Interceptor Catch Basins Condensate Drains HRS Final PLUMBING COMMENTS Q MECHANICAL INSPECTION DATE INSP de wrou d ipe YW 11 M Rough V1 f-- 4 Ventilation Rough Hood Rough Pressure Test Final Hood Final Ventilation Final Pool Heater 17 Final Vacuum r MECHANICAL COMMENTS fz R 2 Miami Shores Village Building Department 10050 NE 2 Ave Miami Shores FL 33:38 INSPECTION REQUESTS: (305)762-4949 or log on at https://bldg.msvfl.gov/energov_prod/selfrervice Requests must be received by 3:30pm WORK IS ALLOWED: MONDAY THROUGH FRIDAY, 8:00AM - 7.00PM SATURDAY 8:OOAM - 6:OOPM. NO WORK IS ALLOWED ON SUNDAY OR HOLIDAYS BUILDING AND ROOFING INSPECTIONS ARE DONE MONDAY THROUGH FRIDAY . NO INSPECTION WILL BE MADE UNLESS THE PERMIT CARD IS DISPLAYED AND HAS BEEN APPROVED . PLANS ARE READILY AVAILABLE . IT IS THE PERMITAPPLICANT S RESPONSIBILITY TO ENSURE THAT WORK IS ACCESSIBLE AND EXPOSED FOR INSPECTION PURPOSES. NEITHER THE BUILDING OFFICIAL NOR THE CITY SHALL BE LIABLE FOR EXPENSE ENTAILED IN THE REMOVAL OR REPLACEMENT OF ANY MATERIAL REQUIRED TO ALLOW INSPECTION . POST ON SITE 1132060170500 Owner's Name: ERIN HALLORAN Owner's Phone: .(352)262-3193 Job Address: 431 NE 100TH ST - Total Square Feet: 0 Miami Shores, FL 33138 notal Job Valuation: $ 28,208.00 Contractor(s) Phone Address PRESTIGE WINDOWS & DOORS (305)820-5999 5500 NW 161 St, Miami Gardens, FL 33014 Description: REPLACING 21 WINDOWS AND 3 DOORS TQjMPACT ` 1 t f, 1�6 a` Q *01 WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST"BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE COMMENCING WORK OR RECORDING YOUR NOTICE OF COMMENCEMENT. Page 1 of 1 Foundation Stemwall Slab Columns (1st Lift) Columns (2nd Lift) Tie Beam Truss/Rafters Roof Sheathing Bucks Interior Framing Insulation Ceiling Grid Drywall. Firewall Wire Lath Pool Steel Pool Deck Final Pool Final Fence Screen Enclosure Driveway Driveway Base Tin Cap In -Progress Roof Installation Roofing Final Shutters Attachment Final Shutters Rails and Guardrails ADA compliance DOCUMEN INSPECTION RECORD DATE INSP JINSPECTION PATE INSP,INSPECTION Attachment / DATE INSP Well 30 Day Temporary Lawn Sprinklers Rough Main Drain, Water Service Pool Piping PUBLIC WORKS 2nd Rough Underground Top Out Footer Ground INSPECTION DATE I INSP Fire Sprinklers Condensate Drains Excavation Septic Tank Ceiling Rough ELECTRICAL Sewer Hook-up Roof Drains Gas Soil Bearing Cert " Soil Treatment Cert Floor Elevation Survey Reinf Unit Mas Cert Insulation Certificate Spot Survey Final Survey Truss Certification STRUCTURAL COMMENTS INSPECTION DATE INSP LP Tank Temporary Pole Well 30 Day Temporary Lawn Sprinklers Pool Bonding Main Drain, Pool Deck Bonding Pool Piping Pool Wet Niche Backflow Preventor Underground Interceptor Footer Ground Catch Basins Slab Condensate Drains Wall Rough HRS Final Ceiling Rough PLUMBING COMMENTS ROU h g Telephone Rough Telephone Final TV Rough TV Final Cable Rough Cable Final" Intercom Rough Intercom Final Alarm Rough Alarm Final Fire Alarm Rough Fire Alarm Final Service Work With ELECTRICAL COMMENTS INSPECTION I DATE JINSP Final Sprinkler Final Alarm INSPECTION DATE INSP Underground Pipe Rough Ventilation Rough Hood Rough Pressure Test Final Hood Final Ventilation Final Pool Heater Final Vacuum I MECHANICAL COMMENTS