Loading...
RC-18-1164 (2)�ss.JwTLtpM�P,�V",.e:.:.lYeY.LS lT^.k.�e4:L�.'�HS�tl�t7.ti�41:`::�v�Gi:tdWtFl.�.�SxWXtAL$XiZ9CAti:ni7!'iK�iJ;1,01�.ti'3&'. w�c �J4i �K11K4S�ffi'flt7'JAV.[: eN7C;iVeiFv,.K�),'K..F'.tt7q Certificate of Completion� Miami Shores Village N.E. 2nd Ave, Miami Shores, Florida 33138 10050 Tel: 305-795-2204 Fax: 305-756-8972 Building Inspection Department i Description: UPDATE CABINETS REMODEL MASTER BATHROOM INSTALL LAMINATED FLOORING THROUGHOUT F' Permit Type Building (Residential) Bldg. Permit No. RC-5-18-1164 t Owner SCOTT D ALEXANDER Contractor :PIC DEVELOPMENT Date Issued & CONSTRUCTION 12/04/2018 CORE j Subdivision/Project Construction Type V-B Occupancy R-3 Type Square Footage 200.00 Flood Zone X Location3 If the building elevation or is located lowest horizontal in a special flood hazard area documentation structural member has been provided and of the as-built lowest floor is retained in the records of 100 NE 92 ST Miami Shores Village. 's Miami Shores, FL 33138 i pursuant to the requirements of the Florida Building Code certifying that at the This certificate issued " 0CA time of issuance this structure was in compliance with the arious ordinances of the jurisdiction regulating building construction or use. I 7 so is -•- Building Officials Approval Ismael Naranjo, CBO ORI Not Transferable POST IN A CONSPICUOUS PLACE i i Miami Shores Village 10050 N.E. 2nd Avenue Miami Shores, FL 33138-0000 Phone: (305)795-2204 Fax: (305)756-8972 Permit NO.RC-5-18-1164 issue Date: 6/28/2018 work Type: INSPECTION REQUESTS: (305)762-4949 or Log on at https://bidg.miamishoresvillage.com/cap REQUESTS ARE ACCEPTED DURING 8:30AM - 3:30PM FOR THE FOLLOWING BUSINESS DAY. Requests must be received by 3 pm for following day inspections. Expires: 12/25/2018 Residential Construction Parcel #:1132060133290 Owner's Name: SCOTT ALEXANDER Owner's Phone: (786)282-2104 Job Address: 100 NF 92 Street Total Square Feet: 200 Miami Shores, FL 33138- 3810 Total Job Valuation: $25,000.00 Bond Number: { s .WORK #5 ALLOWED: MONDAY THROUGH t0EV, 8.00AM - 7:OOPM. Contractor(s) Phone Primary Contractor SATURDAY 8:OOAMfflG PM. EPIC DEVELOPMENT & CONSTRU( (954)251-2590 Yes NO WOIIK IS ALLON SUNDAY OR HOLIDAYS. BUILDING AND ROINSPECTIONS ARE DONE MONDAY THROUGH FRIDAY. os� 1* --U�' Miff/ .�J�`�� sem-✓- ��a�' ��-� I /I NO INSPECTION WILL BE MADE UNLESS THE PERMIT CARD IS DISPLAYED AND HAS BEEN APPROVED, PLANS ARE READLi'"AVA' ABLE. IT IS THE PERMIT APPLICANT'S RESPONSIBILITY TO ENSURE THAT WORK IS ACCESSIBLE AND EXPOSED FOR INSPECTION PURPOSES. NEITHER THE BUILDING OFFICIAL NOR THE CITY SHALL BE LIABLE FOR EXPENSE ENTAILED IN THE REMOVAL OR REPLACEMENT OF ANY MATERIAL REQUIRED TO ALLOW INSPECTION. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE COMMENCING WORK OR RECORDING YOUR NOTICE OF COMMENCEMENT. hIM -------------STRUCTURAL--- INSPECTION _ DATE INSP Foundation Stemwal► Slab Columns (1st Lift) Columns (2nd Lift) Tie Beam Truss/Rafters Roof Sheathing Bucks Interior Framing Insulation Ceiling Grid Drywall Firewall Wire Lath Pool Steel Pool Deck Final Pool Final Fence Screen Enclosure Driveway Driveway Base )Tin Cap i __I Roof in Progress Mop in Progress Final Roof -j Shutters Attachment Final Shutters Rails and Guardrails ADA compliance DOCUMENTS Soil Bearing Cert Soil Treatment Cert Floor Elevation Survey Reinf Unit Mas Cert Insulation Certificate Spot Survey Final Survey Truss Certification STRUCTURAL COMMENTS WINDOWS INSPECTION ; DOORS DATE INSP Attachment PUBLIC INSPECTION WORKSIm DATE INSP Excavation ELECTRICAL INSPECTION DATE INSP Temporary Pole 30 Day Temporary Pool Bonding Pool Deck Bonding Pool Wet Niche Underground Footer Ground Slab Wall Rough Ceiling Rou Rou Telephone Rough Telephone Final TV Rough TV Final Cable Rough Cable Final IntPrrnm Rnnah Intercom Final Alarm Rough Alarm Final Fire Alarm Rough Fire Alarm Final Service Work Wi ELECTRICAL COMMENTS u INSPECTION DATE INSP Final Sprinkler Final Alarm FINAL INSPECTION DATE • p Rough e f Water Service 2nd Rough Top Out Fire Sprinklers Septic Tank Sewer Hook-up Roof Drains Gas LP Tank Well Lawn Sprinklers Main Drain Pool Piping Backflow Preventor Interceptor Catch Basins Condensate Drains HRS Final PLUMBING COMMENTS ke CA '.7Nc.-�:�i/ k MECHANICAL INSPECTION DATE INSP Underground Pipe Rough Ventilation Rough Hood Rough Pressure Test Final Hood Final Ventilation Final Pool Heater Final Vacuum MECHANICAL COMMENTS