Loading...
RC-18-2980 (2)Miami Shores Village 10050 NE 2 Ave Miami Shores FL 33138 305-795-2204 Location Address � rti Ffln T- Issue Date10/17/2018 Parcel Number 9880 NE 9TH AVE, Miami Shores, FL 33138 1132060142400 �n Contacts Permit No.: RC-09-18-2980 Permit Type: Building (Residential) Work Classification: Alteration Permit status: Approved Expiration: 03/27/2019 JENS SCHWARTE Owner 180 PRODUCTION MANAGEMENT INC Contractor 9880 NE 9 AVE, MIAMI SHORES, FL 33138 KEVIN SCHWARTE Other: 3059873741 PO BOX 347947, MIAMI, FL 33234 Business: 7863385360 R Description: KITCHEN AND MASTER BATH RENO Valuation: $ 80,000.00 Requests: Inspection tiotion n R9 TotalSq Feet: 240.00 11,11,11-111, Fees Amount Application Fee - Other $50.00 CCF $48.00 Certificte of Completion for Single Fam $50.00 and Duplex DBPR Fee $36.00 DCA Fee $24.00 Education Surcharge $16.00 Permit Fee $2,350.00 Scanning Fee $24.00 Structural Review ($90) $90.00 Technology Fee $60.00 Total $2,748.00 Building Department Copy Payments Date Paid Amt Paid Total Fees $2,748.00 Check # 0980 10/17/2018 $2,748.00 Amount Due: $0.00 In consideration of the issuance to me of this permit, I agree to perform the work covered hereunder in compliance with all ordinances and regulations pertaining thereto and in strict conformity with the plans, drawings, statements or specifications submitted to the proper authorities of Miami Shores Village. In accepting this permit I assume responsibility for all work done by either myself, my agent, servants, or employes. I understand that separate permits are required for ELECTRICAL, PLUMBING, MECHANICAL, WINDOWS, DOORS, ROOFING and SWIMMING POOL work. OWNERS AFFIDAVIT: I certify that all the foregoing information is accurate and that all work will be done in compliance with all applicable laws regulating construction and zoning.- Futhermore, I authorize the above named contractor to do the work stated. Signature: Owner " / Applicant / Contractor / Agent October 17, 2018 Page 2 of 2 Miami Shores Village X� �Building Department 10050 N.E.2nd Avenue, Miami Shores, Florida 33138 v Tel: (305) 795-2204 Fax: (305) 756-8972 INSPECTION LINE PHONE NUMBER: (305) 762-4949 BUILDING PERMIT APPLICATION ,BUILDING ELECTRIC ROOFING FBC 201 —Wa - 2q Master Permit No Sub Permit No. REVISION EXTENSION EJRENEWAL PLUMBING ❑ MECHANICAL ❑ PUBLIC WORKS CHANGE OF CANCELLATION SHOP CONTRACTOR DRAWINGS JOB ADDRESS: ih City: Miami Shores County: Miami Dade Zip: 3313 Folio/Parcel#:_ ii- 3ag6 - of H- a 9 Qo Is the Building Historically Designated: Yes NO Occupancy Type: Load: Construction Type: Flood Zone: BFE: FFE: OWNER: Name (Fee Simple Titleholder): JkuS SGNw A'tL-T E Phone#: 3oS ` 0 -1 3-741 Address: 9090 VE Q"N Ave - City: 11 I .lstl Sikh ES State: Fi- Zip: Tenant/Lessee Name: Phone#: Email: _ 1 _ L41 SCt. C„d\( nq Qiro•o(,` C.(�YY1 )f CONTRACTOR: Company Name: /0�� ,';'C,,,L7`/'A--' ` 74, /VC Phone#: Address: 7P �aX �y 2k4(7 / City: 1/, -vt ) �' CT? Cne r State: '�-6 zip: 33 Z SY, Qualifier Name: ®r�z LS Phone#:;7 ��9� S��� State Certification or Registration #: C�C �S� 1/ S e5�QS Certificate of Competency #: DESIGNER: Architect/Engineer: _ M&, � A. 6a np�,a 1i Phone#: 30S -Sy Z 1Q V Address: City: ?1ic,, . S.4reS State::�FL Zip: 3313bp Value of Work for this Permit: $ ,J"ivai�/..c(��,Linear Footage of Work: d yO Type of Work: ❑ Addition ❑ Alteration 11 ❑ lNew 1 Repair/Replace El Demolition Description of Work: ���G���n -4 4�aS�1P, c ho.'�hyey%o Specify c or of color thr'^u'tile: Submittal Fee -.,W CCF $ "" CO/CC $ Scanning Fee $ Radon Fee $ DBPR $ Notary $ Technology Fee $ Training/Education Fee $ Structural Reviews $ (Revised02/24/2014) Double Fee $ Bond $ SoO TOTAL FEE NOW DUE $ L 32ug. Bonding Company's Name (if applicable) Bonding Company's Address City State Mortgage Lender's Name (if applicable) Mortgage Lender's Address City State Zip Zip Application is hereby made to obtain a permit to do the work and installations as indicated. I certify that no work or installation has commenced prior to the issuance of a permit and that all work will be performed to meet the standards of all laws regulating construction in this jurisdiction. I understand that a separate permit must be secured for ELECTRIC, PLUMBING, SIGNS, POOLS, FURNACES, BOILERS, HEATERS, TANKS, AIR CONDITIONERS, ETC..... OWNER'S AFFIDAVIT: I certify that all the foregoing information is accurate and that all work will be done in compliance with all applicable laws regulating construction and zoning. "WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT." Notice to Applicant: As a condition to the issuance of a building permit with an estimated value exceeding $2500, the applicant must promise in good faith that a copy of the notice of commencement and construction lien law brochure will be delivered to the person whose property is subject to attachment. Also, a certified copy of the recorded notice of commencement must be posted at the job site for the first inspection which occurs seven (7) days after the building permit is issued. In the absence of such posted notice, the inspection will not be approved and a reinspection fee will be charged. Signature OWNER or AGENT The foregoing instrument was acknowledged before me this a� day of ,,SP_p� ern �r 20 115 by Jah,S S %A- o.t > x. who is personally known to me or who has produced F lot J b VeP % Gehc% as identification and who did take an oath. NOTARY PUBLIC: 2ac,Pcl� Sign: /� Print: I FIE 2qL- ,,n; , •• LESLIE RACKL Seal: s'fi, •;? MY COMMISSION # GG 056758 ,= EXPIRES: March 13, 2021 �'•.io ��. • Bondad Thru Notary Public Under0ters ************* APPROVED BY Signature crzzz-- CONTRACTOR The foregoing instru ent was acknowledged before me this 11'' day of 71 �U DV 20 1 �' by hO-V I r1 C . Sehwa r=P ,who is personally known to me or who has produced �l oY ,d& `,Y t ve e LC°Cn`C.as identification and who did take an oath. NOTARY PUBLIC: Sign:_ Print: Seal: sp Notary Public • State of Florida Commission rr GG 021671 My Comm. Expires Oct 8, 2020 handed through National Notary Assn. Plans Examiner Zoning �10)41 Structural Review Clerk (Revised02/24/2014) 65 O;a�wo.r F'& 4880 &1 4-14 Ave A41� • '��►S �Gh l�vo. r�� � � t.�. h � C O -L R ve�� a ce���a� OX Qua . 10 Ul I I I � - (dWr4-7 if &-A-L- • 4880 '&E g-"' Aude -%r Pecw.,j A& iQ-c�9$p. u.a j FEES CCF DBPR PAID $ 48.00 $ 36.00 CORRECT AMOUNT $ 31.80 $ 23.85 REFUN $ 1 .20 $ ,15 DCA $ 24.00 $ 15.90 $ 8.10 EDUCATION $ 16.00 $ 10.60 $ ' 5.40 PERMIT FEE $ 2,400.00 $ 1,590.00 $ 810.00 TECHNOLOGY $ 60.00 $ 39.75 $ 20.25 TOTAL $ 2,584.Q0 $ 1,711.90 $ 872.10 U,,, a,,,► '71 md(, . Property Search Application - Miami -Dade County Page 1 of 1 OFFICE OF T1 11"nn"TY APPRAISER Summary Report Property Information Folio: 11-3206-014-2400 Property Address: 9880 NE 9 AVE Miami Shores, FL 33138-2510 Owner JENS W SCHWARTE MEGAN N SCHWARTE Mailing Address 9880 NE 9 AVENUE MIAMI SHORES, FL 33138 USA PA Primary Zone 1100 SGL FAMILY - 2301-2500 SQ Primary Land Use 0101 RESIDENTIAL - SINGLE FAMILY: 1 UNIT Beds / Baths / Half 3/3/0 Floors 1 Living Units 1 Actual Area 1,922 Sq.Ft Living Area 1,574 Sq.Ft Adjusted Area 1,748 Sq.Ft Lot Size 5,780.34 Sq.Ft Year Built 1959 Assessment Information Year 2018 20172016 Land Value $173,409 $173,409 $150,386 Building Value $129,772 _......____..._................ _..... _..... _ $130,7185 $131,799 XF Value $0 $0 $0 Market Value $303,181 $304,194 $282,185 Assessed Value $225,249 $220,617 $216,08011 Benefits Information Benefit .... _... __...... . _ _ __..........._.. Type 2018 2017- 2016 Save Our Homes Cap Assessment Reduction $77,932 $83 577 $66,105 Homestead ..................................... Exemption $25,000 $25,000 $25,000 Second Homestead lExemption $25,000 _............................. $25,000 - $25,000 Note: Not all benefits are applicable to all Taxable Values (i.e. County, School Board, City, Regional). Short Legal Description 5-6 53 42 MIAMI SHORES SEC 3 PB 10-37 LOT 1 BLK 72 LOT SIZE 56.670 X 102 Generated On : 9/27/2018 Taxable Value Information County 2018'. 2017 2016 Exemption Value $50,000 $50,000 $50,000 Taxable Value $175,249 $170,617 $163,080 School Board Exemption Value $25,000 $25,000 $25,000 ...................... _.... Taxable Value _..... $200,249 $195,617 $191,080 City Exemption Value $50,000 $50,000 $50,000 Taxable Value _........................... $175,249 $170,617 $166,080 Regional Exemption Value ._ ....1...... ..._...-- Taxable Value $50,000 $175,249 $50,000 $170,617 $50,000 - _. $166,080 Sales Information Previous OR Book - Price Qualification Description Sale Page Corrective, tax or QCD; min 08/29/2012 $0 28602-0449 consideration 08/29/2012 $350,000 28267-1265 Qual by exam of deed Corrective, tax or QCD; min 11/28/2011 $100 27954-0336 consideration The Office of the Property Appraiser is continually editing and updating the tax roll. This website may not reflect the most current information on record. The Property Appraiser and Miami -Dade County assumes no liability, see full disclaimer and User Agreement at hftp://www.miamidade.gov/info/disclaimer.asp Version: https://www.miamidade.gov/propertysearch/ 9/27/2018 1H0 Advanced Industrial Hygiene Services, Inc. All Facets of Industrial Hygiene Service Jens Schwarte September 21, 2018 9880 NE 91 Avenue Page 1 of 5 pages Miami Shores, Florida Attn: Jens Schwarte Re: Pre -Renovation Survey for Asbestos -Containing Building Materials — "Single -Family House", 9880 NE 9d' Avenue, Miami Shores, Florida AIHS Project # 3355-001 Advanced Industrial Hygiene Services, Inc. is pleased to submit the following report for a pre - renovation survey for asbestos -containing building materials (ACBM) conducted September 19, 2018 at the site of the planned renovation in the above -referenced facility located in Miami -Dade County, Florida. This survey was performed to meet the current NESHAP regulation and the Miami -Dade Department of Environmental Resource Management prior to conducting the planned renovation activity. Facility Description & Scope According to county records, the subject facility consists of a three -bedroom, three -bath single- family home with an adjusted area of 1,748 ft2. The construction date is listed as 1959. According to the customer, the planned renovation affects the kitchen and master bathroom only. Affected materials include walls, floor finishes, millwork, plumbing & electrical fixtures. The scope of this project was to sample and identify any ACBM that may be present in the facility that may require special treatment prior to or during the planned renovation. Sampling Strategy Bulk material sampling was conducted according to the following sampling plan: Friable Surfacing Materials: Friable surfacing materials, where encountered, are sampled based on the recommendations found in the EPA "Pink Book" entitled "Asbestos in Buildings: Simplified Scheme for Friable Surfacing Materials" (EPA document 560/5-85-030a). The number of samples collected is based on the total square footage of the homogenous area of the material. If the area is between 100 3611 NW 9711 Avenue ♦ Cooper City, Florida 33024 ♦ Tel (305) 854-7554 ♦ (954) 431-9005 www.aihsinc.com Pre -Renovation ACBM Survey: September 21, 2018 "Single -Family House" AIHS Project # 3355-001 9880 NE 9' Avenue Miami Shores, Florida olv/ and 1000 ft2, three samples are collected. If the area is between 1000 and 5000 ft2, five samples are collected. If the area is between 5000 ft2 and 10,000 ft2, seven samples are collected. Nine samples are collected if the area is greater and 10,000 ft2. Thermal System Insulation (TSI): If present, at least three samples are collected in a randomly distributed manner from each homogeneous area of TSI not assumed to be ACM. At least two samples are collected from each homogeneous area of patched TSI. Where cement or plaster is used on fittings such as tees, elbows, or valves, samples were collected in a manner sufficient to determine whether the material is ACM or not ACM. Miscellaneous Materials: These include materials such as acoustical ceiling tiles, floor tiles and linoleum, wall board, wire insulation, caulking and sealants, laboratory equipment, furniture, draperies, etc. (basically, anything that does not fall into the first two categories). Suspect miscellaneous materials are sampled in such a manner as to determine whether or not they contained asbestos. The number of samples collected of a given miscellaneous material is left to the discretion of the inspector. As a general rule however, the number of samples collected of most friable miscellaneous materials is based on the same scheme as that used for friable surfacing materials. All accessible areas of the renovation area were inspected. Bulk sample specimens of materials suspected of containing asbestos were collected and submitted for analysis by Polarized Light Microscopy in conjunction with dispersion staining as outlined in 40 CFR, Part 63, Subpart F dated January 1987. Analysis was conducted by Advanced Industrial Hygiene Services, Inc. who is accredited for asbestos fiber analysis through successful participation in the National Voluntary Laboratory Accreditation Program (NVLAP) and meets the requirements of section 206(d) of Title II of the USC Chapter 15, TSCA as stated in 40 CFR 763 dated April 30, 1987. Samples were analyzed on a positive stop basis. Using this method, samples from the same homogeneous area are analyzed until one is determined to contain greater than 1% asbestos. Once this occurs, no additional samples are analyzed from that homogeneous area and the material is classified as an asbestos -containing material. This method is used to control analytical costs. For additional details on analytical results, please refer to the Analytical Results section of this report. Findings Those suspect asbestos -containing materials that were present and expected to be removed and/or disturbed as a part of this project are listed on the following page: Pre -Renovation ACBM Survey: September 21, 2018 "Single -Family House" AIHS Project # 3355-001 9880 NE 9' Avenue IH Miami Shores, Florida 0 Flooring Materials: Floor substrate consists of the poured concrete floor deck. Affected floor finishes consist of adhered vinyl composition flooring and ceramic tiles set in grout. Representative samples were collected of the vinyl flooring materials with associated mastic and ceramic tile system materials and all were reported by the laboratory to contain no detectable quantities of asbestos. Wall Materials: Affected wall materials consist of drywall paneling finished with plasters applied in a basecoat and topcoat configuration. Bathroom walls also have ceramic tiles. Representative samples were collected of effected wall system materials and all were reported by the laboratory to contain no detectable quantities of asbestos. Ceiling Materials: According to the customer, no ceiling materials are scheduled affected by the planned renovation. Heating, Ventilation and Air -Conditioning (HVAC) System: According to the customer, no HVAC system components are scheduled affected by the planned renovation. Thermal System Insulation (TSI) Materials: According to the customer, TSI materials are scheduled affected by the planned renovation. Additional Miscellaneous Materials: No additional miscellaneous suspect asbestos -containing materials were observed in areas affected by the planned renovation activity. Assessments of ACM No asbestos -containing materials were identified which may become disturbed or damaged as a result of the planned renovation activity in the facility. Laboratory Performing Bulk Sample Analysis Advanced Industrial Hygiene Services, Inc. 3611 NW 971h Avenue Cooper City, Florida 33024 Telephone: (305) 854-7554 (in Miami -Dade County) (954) 431-9005 (in Broward County) olv/ Pre -Renovation ACBM Survey: September -018 "Single -Family House" AIHS Project# 335355001 9880 NE 9'� AvenueMiami Shores, Florida On each page of the report of analysis section is the National Voluntary Laboratory Accreditation Program (NVLAP) laboratory identification number (101006-0) that was assigned to the AIHS, Inc. laboratory upon entry into the NVLAP. A copy of the certificate of NVLAP accreditation as well as a certificate of The Scope of Accreditation is enclosed with this inspection report. AIHS, Inc. is licensed to conduct inspections for asbestos -containing materials in buildings under an Asbestos Consultants Business License (ZA 0000058) and is qualified by Bruce Marchette, CIH (Asbestos Consultants License # IA 0000041). Closing Remarks This limited survey for ACBM is intended for the sole use of Jens Schwarte. The scope of services performed in execution of this investigation may not be appropriate to satisfy the needs of other users, and any use or re -use of this document or the findings, conclusions, or recommendations presented herein is at the sole risk of said user. Opinions and recommendations presented herein apply to site conditions existing at the time of our investigation. They cannot necessarily apply to site changes of which this office is unaware and has not yet had the opportunity to evaluate. Prior to initiating any renovation or demolition project, Federal Law requires that the local EPA representative's office (The Department of Environmental Resource Management, 701 NW 1" Court, Suite 400, Miami, Florida 33136) be notified in writing at least 10 working days prior to the onset of the project. Disclaimer This inspection report is the result of a diligent search of the renovation area for asbestos - containing building materials. The purpose of this inspection was to identify asbestos -containing materials that may require special treatment prior to proceeding with the planned renovation operation. Because this inspection was conducted prior to a planned renovation operation, only those suspect asbestos -containing materials expected to be disturbed as a result of the renovation activities were sampled and submitted to the laboratory for asbestos content. However comprehensive this inspection appears, it does not claim to have identified all of the asbestos - containing materials present in the facility. A Pre -Renovation ACBM Survey: September 21, 018 "Single -Family House" AIHS Project # 335355-001 9880 NE 9" Avenue Miami Shores, Florida �VF AIHS, Inc. is pleased to be of service. Please contact this office should you have any questions or comments concerning this report or any related matter. ,,600 •.00ft Res ectlu�GGs~�'• ERT . t t w; 4710C :mom Bruc61&`rehett�,, i * : Floriiutcensa it CoiAultant License#*'ODW '.;1° `tier. 30, 20118 AIHS, Inc' :�cFf MARC����.•• Enclosed: Table: Analytical Results Summary Consultant's credentials Laboratory credentials Appendix: AIHS Analytical Report - Log # 18970 Table: Analytical Results Summary TABLE 1 ASBESTOS ANALYTICAL RESULTS SUMMARY Single -Family House" 9880 NE 9t1 Avenue Miami Shores Florida Sample Number Location Description Asbestos NESHAP Classification 3355-18970-1 to 3 Walls Drywall /Plaster System NAD 6 3355-18970-4 & 5 Floor Ceramic Tile System NAD 6 3355-18970-6 & 7 Floor Vinyl Composition Flooring NAD 6 KEY: NESHAP Classification 1. Friable Surfacing ACM 2. Friable Thermal System ACM 3. Friable Miscellaneous ACM 4. Category I Non -Friable ACBM 5. Category II Non -Friable ACBM 6. Non -ACM NOTES: NAD No Asbestos Detected Asbestos Licenses RICK 3C[DTr. G! YERNOR STATE CW FL40R1OA MEPARTMEMT CIF BUSIMESS At4D/ PRC)FESSICZf4AL RE43ULATIC]N P ,,L ASBIBSCCn LICEMSIING'-UMITi THE ASBESTOS BCl5lNfi55 ORGANIEA714N HERLIN IS�LPCENSEO UNDER T"E PRQVISlCWS OF CHAPTFKA169, FLQRIUA STATUTES Al:sVAtMCE6—fN0USTM(AL HYG_ [EIVE SERVE(M aCS C 13MUC6 E. NIARCHETTE �� 36IVNW 97 AVr / COOPER CITY FL 33M.4 . I. LIGENs6 NU Aom;L- 2A40Q©OSe E3CVIRATION VATEc !4CWEPpRBER. 310. 2039 . lov /7- o,ti.tc aC N6yF6n,+lAalJeCne�.com l4]OMTHAN PXY(CM. SCOIRARY dlt�jar El DI CIO .aot.94s tteis cfocuarzeaC A.:oeK form. Q TIMs is ywat If—.— It ft for anyone onset tt-- the Ii-- — to use this docyw—t. RICK SCOTT, GOVERNOR KEN LAIN. SECRETARY STATE OF FLORIDA DEPARTUMT OF BUSSMESS AND PROFESSIONAL REGULATION ASBESTOS LECENISING UNIT V=00041 f n The ASBESTOS CONSULTANT Named bebw IS LICENSED Under the provWom of ChapW, 469 FS. Expira5on dale* NOV 30, 2 18 MARCHETTE, BRUCE ERVIN 3611-NW 97M AVE COOPER CITY FL 33024 r m%j Fn- 9utwaie OISPLAYAS RECUIRED BY LAW � SEQ# LtSl1130002030 United States Department of Commerce National Institute of Standards and Technology Certificate of Accreditation to ISO/I€C NVLAP LAB CODE: 101006-0 17025:2005 Advanced Industrial Hygiene Services, Inc. Cooper City, FL is accredited by the National Voluntary Laboratory Accreditation Program for specific services, listed on the Scope of Accreditation, for: Asbestos Fiber Analysis This laboratory is accredited in accordance with the recognised International Standard ISWEC 17025:2005. This accreditation demonstrates technical competence for a defined scope and the operation of a laboratory quality management system (refer to joint ISO-ILAC-1AF Communique dated January 2009). 2018-04-01 through 2019-03-31 Effective Dates For the Nslional Voiunt"barnio�Accreditatton Program i'+trza a� 04 Appendix: Analytical Results ov/ Advanced Industrial Hygiene Services, Inc. All Facets of Industrial Hygiene Service Account # 3355 Date: 20/SEP/18 Project # 001 Page 1 of 7 pages Jens Schwarte Sample Log # 18970 9880 NE 9`h Avenue NVLAP Lab Code 101006-0 Miami Shores, FL 33138 Attn: Jens Schwarte Collected by: Bruce Marchette Sample Received: 19/SEP/18 Sample Analyzed: 20/SEP/18 Sample Designation: Limited Survey for Planned Renovation Single -Family House, 9880 NE 9t' Avenue, Miami Shores, Florida Analytical Results: ASBESTOS CONTENT Sample # 3355-18970-1: Wall System to be Demo (Kitchen) 1. Sample Appearance: 2. Was Asbestos Detected? 3. Is Sample Homogeneous? 4. Non -Asbestos Fibers Present: 5. Non -Fibrous Material Present: Cellulose fibers anisotrooic, (+) sign of Lab workstation temperature: 25 °C Off-white chalk -like drywall with gray and white plaster layers No No 5% cellulose fibers 40% calcium sulfate (gypsum) 30% mineral/calcite binders 25% mineral granules medium, pleochroic, incomplete extinction This analysis report is valid for sample # 3355-18970-1 only. Advanced Industrial Hygiene Services, Inc is accredited for asbestos fiber analysis through participation in the NIST National Voluntary Laboratory Accreditation Program (NVLAP) and meets the requirements of 40 CFR Part 763.87, Vol. 52, No. 210 Dated Friday, October 30, 1987. Accreditation renewal date: March 31, 2019. Analytical Method: EPA-600/M4-82-020 "Interim Method for the Determination of Asbestos in Bulk Insulation Samples" & EPA/600/R-93/116: "Method for the Determination of Asbestos in Bulk Building Materials" (NVLAP Lab Code 101006-0). Analyzed by: Bruce Marchette, CIH Laboratory: Advanced Industrial Hygiene Services, Inc., 3611 NW 97' Avenue, Cooper City, Florida 33024 Telephone: (954) 431-9005 This report shall not be reproduced except in full, without the written approval of Advanced Industrial Hygiene Services, Inc. Furthermore, this report may not be used to claim product endorsement by NVLAP or any agency of the U.S. Government. Respectfully Submitted, Bruce Marchette, CIH Authorized Signatory AIHS, Inc. 3611 NW 97th Avenue ♦ Cooper City, FL 33024 ♦ Tel (305) 854-7554 ♦ FAX (954) 431-9202 www.aihsine.com Account # 3355 Project # 001 Jens Schwarte 9880 NE 91 Avenue Miami Shores, FL 33138 Attn: Jens Schwarte Sample Received: 19/SEP/18 Date: 20/SEP/ 18 Page 2 of 7 pages Sample Log # 18970 NVLAP Lab Code 101006-0 Collected by: Bruce Marchette Sample Analyzed: 20/SEP/18 Sample Designation: Limited Survey for Planned Renovation Single -Family House, 9880 NE 91 Avenue, Miami Shores, Florida Analytical Results: ASBESTOS CONTENT Sample # 3355-18970-2: Wall System to be Demo (Kitchen) 1. Sample Appearance: Off-white chalk -like drywall with gray and white plaster layers 2. Was Asbestos Detected? No 3. Is Sample Homogeneous? No 4. Non -Asbestos Fibers Present: 5% cellulose fibers 5. Non -Fibrous Material Present: 40% calcium sulfate (gypsum) 30% mineral/calcite binders 25% mineral granules 2ellulose fibers anisotronic_ (+) Bien of eloneation. birefrineence: medium, vleochroic, incomplete extinction Lab workstation temperature: 25 °C This analysis report is valid for sample # 3355-18970-2 only. Advanced Industrial Hygiene Services, Inc is accredited for asbestos fiber analysis through participation in the NIST National Voluntary Laboratory Accreditation Program (NVLAP) and meets the requirements of 40 CFR Part 763.87, Vol. 52, No. 210 Dated Friday, October 30, 1987. Accreditation renewal date: March 31, 2019. Analytical Method: EPA-600/M4-82-020 "Interim Method for the Determination of Asbestos in Bulk Insulation Samples" & EPA/600/R-93/116: "Method for the Determination of Asbestos in Bulk Building Materials" (NVLAP Lab Code 101006-0). Analyzed by: Bruce Marchette, CIH Laboratory: Advanced Industrial Hygiene Services, Inc., 3611 NW 97' Avenue, Cooper City, Florida 33024 Telephone: (954) 431-9005 This report shall not be reproduced except in full, without the written approval of Advanced Industrial Hygiene Services, Inc. Furthermore, this report may not be used to claim product endorsement by NVLAP or any agency of the U.S. Government. Respectfully Submitted, Bruce Marchette, CIH Authorized Signatory AIHS, Inc. Account # 3355 Project # 001 Jens Schwarte 9880 NE 91 Avenue Miami Shores, FL 33138 Attn: Jens Schwarte Sample Received: 19/SEP/18 Date: 20/SEP/ 18 Page 3 of 7 pages Sample Log # 18970 NVLAP Lab Code 101006-0 Collected by: Bruce Marchette Sample Analyzed: 20/SEP/18 Sample Designation: Limited Survey for Planned Renovation Single -Family House, 9880 NE 9t1 Avenue, Miami Shores, Florida Analytical Results: ASBESTOS CONTENT Sample # 3355-18970-3: Wall System to be Demo (Bathroom) 1. Sample Appearance: Gray basecoat plaster with a white calcite topcoat 2. Was Asbestos Detected? No 3. Is Sample Homogeneous? 4. Non -Asbestos Fibers Present: 5. Non -Fibrous Material Present No 5% cellulose fibers 60% mineral/calcite binders 35% mineral granules Cellulose fibers anisotropic, (+) sign of elongation, birefringence: medium, pleochroic, incomplete extinction Lab workstation temperature: 25 °C This analysis report is valid for sample # 3355-18970-3 only. Advanced Industrial Hygiene Services, Inc is accredited for asbestos fiber analysis through participation in the NIST National Voluntary Laboratory Accreditation Program (NVLAP) and meets the requirements of 40 CFR Part 763.87, Vol. 52, No. 210 Dated Friday, October 30, 1987. Accreditation renewal date: March 31, 2019. Analytical Method: EPA-600/M4-82-020 "Interim Method for the Determination of Asbestos in Bulk Insulation Samples" & EPA/600/R-93/116: "Method for the Determination of Asbestos in Bulk Building Materials" (NVLAP Lab Code 101006-0). Analyzed by: Bruce Marchette, CIH Laboratory: Advanced Industrial Hygiene Services, Inc., 3611 NW 97' Avenue, Cooper City, Florida 33024 Telephone: (954) 431-9005 This report shall not be reproduced except in full, without the written approval of Advanced Industrial Hygiene Services, Inc. Furthermore, this report may not be used to claim product endorsement by NVLAP or any agency of the U.S. Government. Respectfully Submitted, Bruce Marchette, CIH Authorized Signatory AIHS, Inc. Account # 3355 Project # 001 Jens Schwarte 9880 NE 9' Avenue Miami Shores, FL 33138 Attn: Jens Schwarte Sample Received: 19/SEP/18 Date: 20/SEP/ 18 Page 4 of 7 pages Sample Log # 18970 NVLAP Lab Code 101006-0 Collected by: Bruce Marchette Sample Analyzed: 20/SEP/18 Sample Designation: Limited Survey for Planned Renovation Single -Family House, 9880 NE 91 Avenue, Miami Shores, Florida Analytical Results: ASBESTOS CONTENT Sample # 3355-18970-4: Ceramic Tile System (Bathroom Floor) 1. Sample Appearance: Off-white ceramic the with a white glaze and gray & white grouts 2. Was Asbestos Detected? No 3. Is Sample Homogeneous? No 4. Non -Asbestos Fibers Present: None detected 5. Non -Fibrous Material Present: 75% calcite& mineral binders 25% mineral granules Lab workstation temperature: 25 "C This analysis report is valid for sample # 3355-18970-4 only. Advanced Industrial Hygiene Services, Inc is accredited for asbestos fiber analysis through participation in the NIST National Voluntary Laboratory Accreditation Program (NVLAP) and meets the requirements of 40 CFR Part 763.87, Vol. 52, No. 210 Dated Friday, October 30, 1987. Accreditation renewal date: March 31, 2019. Analytical Method: EPA-600/M4-82-020 "Interim Method for the Determination of Asbestos in Bulk Insulation Samples" & EPA/600/R-93/116: "Method for the Determination of Asbestos in Bulk Building Materials" (NVLAP Lab Code 101006-0). Analyzed by: Bruce Marchette, CIH Laboratory: Advanced Industrial Hygiene Services, Inc., 3611 NW 97' Avenue, Cooper City, Florida 33024 Telephone: (954) 431-9005 This report shall not be reproduced except in full, without the written approval of Advanced Industrial Hygiene Services, Inc. Furthermore, this report may not be used to claim product endorsement by NVLAP or any agency of thc U.S. Government. Respectfully Submitted, Bruce Marchette, CIH Authorized Signatory AIRS, Inc. Account # 3355 Project # 001 Jens Schwarte 9880 NE 91h Avenue Miami Shores, FL 33138 Attn: Jens Schwarte Sample Received: 19/SEP/18 Date: 20/SEP/ 18 Page 5 of 7 pages Sample Log # 18970 NVLAP Lab Code 101006-0 Collected by: Bruce Marchette Sample Analyzed: 20/SEP/18 Sample Designation: Limited Survey for Planned Renovation Single -Family House, 9880 NE 911 Avenue, Miami Shores, Florida Analytical Results: ASBESTOS CONTENT Sample # 3355-18970-5: Ceramic Tile System (Bathroom Floor) L Sample Appearance: Off-white ceramic tile with a white glaze and gray & white grouts 2. Was Asbestos Detected? No 3. Is Sample Homogeneous? No 4. Non -Asbestos Fibers Present: None detected 5. Non -Fibrous Material Present: 75% calcite& mineral binders 25% mineral granules Lab workstation temperature: 25 °C This analysis report is valid for sample # 3355-18970-5 only. Advanced Industrial Hygiene Services, Inc is accredited for asbestos fiber analysis through participation in the NIST National Voluntary Laboratory Accreditation Program (NVLAP) and meets the requirements of 40 CFR Part 763.87, Vol. 52, No. 210 Dated Friday, October 30, 1987. Accreditation renewal date: March 31, 2019, Analytical Method: EPA-600/M4-82-020 "Interim Method for the Determination of Asbestos in Bulk Insulation Samples" & EPA/600/R-93/116: "Method for the Determination of Asbestos in Bulk Building Materials" (NVLAP Lab Code 101006-0). Analyzed by: Bruce Marchette, CIH Laboratory: Advanced Industrial Hygiene Services, Inc., 3611 NW 97' Avenue, Cooper City, Florida 33024 Telephone: (954) 431-9005 This report shall not be reproduced except in full, without the written approval of Advanced Industrial Hygiene Services, Inc. Furthermore, this report may not be used to claim product endorsement by NVLAP or any agency of the U.S. Government Respectfully Submitted, Bruce Marchette, CIH Authorized Signatory AIHS, Inc. Account # 3355 Project # 001 Jens Schwarte 9890 NE 91 Avenue Miami Shores, FL 33138 Attn: Jens Schwarte Sample Received: 19/SEP/18 Date: 20/SEP/ 18 Page 6 of 7 pages Sample Log # 18970 NVLAP Lab Code 101006-0 Collected by: Bruce Marchette Sample Analyzed: 20/SEP/18 Sample Designation: Limited Survey for Planned Renovation Single -Family House, 9880 NE 91' Avenue, Miami Shores, Florida Analytical Results: ASBESTOS CONTENT Sample # 3355-18970-6: Vinyl Floor Tiles & Mastic (Kitchen) 1. Sample Appearance: 2. Was Asbestos Detected? 3. Is Sample Homogeneous? 4. Non -Asbestos Fibers Present: 5. Non -Fibrous Material Present: Gray vinyl composition tile over off-white sheet vinyl with transparent mastic No No 15% cellulose fibers 5% fibrous glass 50% vinyl/mineral binders 25% mineral granules 5% glue resins Cellulose fibers anisotropic, (+) sign of elongation, birefringence: medium, pleochroic, incomplete extinction Fibrous glass fibers isotropic, no sign of elongation, no birefringence, non-pleochroic Lab workstation temperature: 25 °C This analysis report is valid for sample # 3355-18970-6 only. Advanced Industrial Hygiene Services, Inc is accredited for asbestos fiber analysis through participation in the NIST National Voluntary Laboratory Accreditation Program (NVLAP) and meets the requirements of 40 CFR Part 763.87, Vol. 52, No. 210 Dated Friday, October 30, 1987. Accreditation renewal date: March 31, 2019. Analytical Method: EPA-600/M4-82-020 "Interim Method for the Determination of Asbestos in Bulk Insulation Samples" & EPA/600/R-93/116: "Method for the Determination of Asbestos in Bulk Building Materials" (NVLAP Lab Code 101006-0). Analyzed by: Bruce Marchette, CIH Laboratory: Advanced Industrial Hygiene Services, Inc., 3611 NW 97'" Avenue, Cooper City, Florida 33024 Telephone: (954) 431-9005 This report shall not be reproduced except in full, without the written approval of Advanced Industrial Hygiene Services, Inc. Furthermore, this report may not be used to claim product endorsement by NVLAP or any agency of the U.S. Government. Respectfully Submitted, l 311 1� 1"IX21�1.` Bruce Marchette, CIH Authorized Signatory AIHS, Inc. Account # 3355 Project # 001 Jens Schwarte 9880 NE 9th Avenue Miami Shores, FL 33138 Attn: Jens Schwarte Sample Received: 19/SEP/18 Date: 20/SEP/ 18 Page 7 of 7 pages Sample Log # 18970 NVLAP Lab Code 101006-0 Collected by: Bruce Marchette Sample Analyzed: 20/SEP/18 Sample Designation: Limited Survey for Planned Renovation Single -Family House, 9880 NE 9" Avenue, Miami Shores, Florida Analytical Results: ASBESTOS CONTENT Sample # 3355-18970-7: Vinyl Floor Tiles & Mastic (Kitchen) 1. Sample Appearance: 2. Was Asbestos Detected? 3. Is Sample Homogeneous? 4. Non -Asbestos Fibers Present: 5. Non -Fibrous Material Present: Gray vinyl composition tile over off-white sheet vinyl with transparent mastic No No 15% cellulose fibers 5% fibrous glass 50% vinyl/mineral binders 25% mineral granules 5% glue resins (mastic) Cellulose fibers anisotronic_ (+) sign of eloneation, birefringence: medium, pleochroic, incomplete extinction Fibrous glass fibers isotropic, no sign of elongation, no birefringence, non-pleochroic Lab workstation temperature: 25 °C This analysis report is valid for sample # 3355-18970-7 only. Advanced Industrial Hygiene Services, Inc is accredited for asbestos fiber analysis through participation in the NIST National Voluntary Laboratory Accreditation Program (NVLAP) and meets the requirements of 40 CFR Part 763.87, Vol. 52, No. 210 Dated Friday, October 30, 1987. Accreditation renewal date: March 31, 2019. Analytical Method: EPA-600/M4-82-020 "Interim Method for the Determination of Asbestos in Bulk Insulation Samples" & EPA/600/R-93/116: "Method for the Determination of Asbestos in Bulk Building Materials" (NVLAP Lab Code 101006-0). Analyzed by: Bruce Marchette, CIE Laboratory: Advanced Industrial Hygiene Services, Inc., 3611 NW 97' Avenue, Cooper City, Florida 33024 Telephone: (954) 431-9005 This report shall not be reproduced except in full, without the written approval of Advanced Industrial Hygiene Services, Inc. Furthermore, this report may not be used to claim product endorsement by NVLAP or any agency of the U.S. Government. Respectfully Submitted, J Bruce Marchette, CIH Authorized Signatory AIHS, Inc. Advanced Industrial Hygiene Services, Inc. Chairs -of -Custody Record All facets of Industrial Hygiene Service J& I-- —F., W , . aw��nihcinacom email?aihsinc.com Tel:(954)431-9005 Fax: (954)431.9202 Page 1 of i page IHI Project Name or Number: Project Location: Analyses Requested Single-IFarnily House, 9880 NE 9'a Avenue, Miami 157 3355-001 Shores Florida Customer Name: Jens Sehrvarte Sample DescriptiordTypc (check one) Sample Volume Amu Number of Conte ncrs Comments Item # Sample B Date Time Air I(specify) Bulk Swab Other 3355' 19970 1.7 SePt 19. 2018 X 7 X Suspect ACBM Person Responsible for Sample: Bruce Marchette, CIH Transfer # Item # Transfers ReRn wish d Date Time Accepted by: pate Time 1 3355.18970 Sept 19, 2018 16:00 Scpt 19, 42019 16:00 Remarks: Pre-rcnovation Survey for ACBM 2 3 4 5 RICK SCOTT, GOVERNOR JONATHAN ZACHEM, SECRETARY dbpr a STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION CONSTRUCTION INDUSTRY LICENSING BOARD r- THE GENERAL CONTRACTOR HEREIN IS CERTIEIED UNDER THE PROVISIONS OF CHAPTER 489, FLORIDA STATUTES SCHWARTE, KEVI N CH RISTOPH ER 1I30 PRODUCTION MANAGEMENT INC., P.O. BOX 347947 y` ti ,MIAMI FL 33234 r-- LICENSE NUMBER: CGC15:14585 EXPIRATION DATE; AUGUST 31, 2020 Always verify licenses online at MyFloridaLicense.com aDo not alter this document in any form. This is your license. It is unlawful for anyone other than the licensee to use this document. 018973 Local Business Tax R eipt Miami -Dade Count C Florida -THIS IS NOT BILL -'DO State of Florida 6215677 BUSINESS NAME/LOCATION 180 PRODUCTION MANAGEMFNTJNC RECEIPT NO. 245 SE 1 ST ST 326 RENEWAL MIAMI FL 33133 6480396 EXPIRES SEPTEMBER 30, 2019 Must be displayed at place of business Pursuant to County Code Chapter 8A - Art. 9 & 10 OWNER SEC' TYPS OF BUSINESS 180 PRODUCTION MANAGEMENT INC 196 GENERAL BUILDING CONTRACTOR CGC1514585 PAYMENT RECEIVED Worker(s) i SY TAX COLLECTOR $45.00 07/09/2018 This Local Business Tax Receipt onl CREDITCARD-18—p51838 Permit, are certification cR c Y confirms payment f or nongovernmental regulatory laws end requirements which a es Busmess Tax. The Receipt is not a license, ueluirement, to do h apply s. Holder must comply with any governmental The RECEIPT N0. shove must be displayed on all commercial vehicles apply to the business. For more Information, visit M1smiADade Code Sec 8a-270. WWW-Miamideds ae t - l 180PROD-01 ACORO" CERTIFICATE OF LIABILITY INSURANCE MA SE C DATE (MM/DDmyY) 9/26/2018 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(les) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endomement(s). PRODUCER License # OE67768 Insurance Office of America, Inc. 2633 Centennial Blvd. Suite 206 Tallahassee, FL 32308 cOMTACT Chris Massey �a"c°,"ri , Ex<: (850) 309-8167 22807 Fv , Ne :(850) 577-8674 Em . Chris.Massey@ioausa.com INSURE S AFFORDING COVERAGE NAIC / INSURER A: Colony Insurance Company 39993 INSURED 180 Production Management, Inc. P. 0. Box 347947 Coral Gables, FL 33234 INSURER B : Builders Mutual Insurance Company 10844 INSURER C : INSURER D : INSURER E INSURER F : nenTr e0 su uaoco. RFVIRInkl NIIMIRFR• v THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCE ADDL SUBR POLICY NUMBER POLICY EFF POLICY EXP LIMITS A X COMMERCIAL GENERAL LIABILITY CLAIMS -MADE � OCCUR 103CGL0008775-05 02/15/2018 02/15/2019 EACH OCCURRENCE $ 1,000,000 PAMAGETOREcTEDnc $ 100,000 MED EXP (Any one $ 5,000 PERSONAL & ADV INJURY 1,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: X POLICY D jg?T El LOC OTHER: GENERAL AGGREGATE E 2,000,000 PRODUCTS-COMP/OPAGG $ 2,000,000 AUTOMOBILE LIABILITY ANY AUTO OWNED F SCHEDULED AUTOS ONLY AU AUTOS ONLY AUTOS ONL� COMBINED SINGLE LIMIT $ BODILY INJURY Perperson) $ BODILY INJURY Per accident BODILY $ (PR.,:: DAMAGE $ b UMBRELLA LIAB EXCESS LIAB OCCUR CLAIMS -MADE EACH OCCURRENCE $ AGGREGATE $ DED I I RETENTION $ B WORKERS COMPENSATION AND EMPLOYERS' LIABILITY YIN ANY EXCLUC EC�� N (Mandatory in NH) If yas, describe rawer DESCRIPTION OF OPERATIONS below N / A WCP104198603 09/21/2018 09/21/2019 X PER OTH- TAT E.L. EACH ACCIDENT 1,000,000 b E.L. DISEASE - EA EMPLOYE $ 1,000,000 E.L. DISEASE - POLICY LIMIT 1,000,000 S DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) License #: CGC1514585 Miami Shores Village Building Department 10060 N.E. 2nd Avenue SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE �oml-zv ACORD 25 (2016103) U 19115-21115 AGUKLI cUKI-UKA I lun. Au ngms reserves. The ACORD name and logo are registered marks of ACORD vt= jUA Document A104" E0 OCT 2 9 2018 QLA i---, Standard Abbreviated Form of 'Agreement Between Owner and Contractor AGREEMENT made as of the First day of October in the year Two Thousand Eightccn (In wordr indicate day, month and year) BETWEEN the Owner: (Name, legal status; address and other information) Jens and Megan Schwarte, Individual 9880 N*E 9th Ave Miami Shores, F1. 331,38 and the Contr=tor• (Same, legal gtatus, address and tether information) 180.Production Martagement; General Corporation PO Box 347947 toral (sables, Fi. 3 234 Telephone Number: 7$6-338-S3f it for the followia&pioject: (='Verne., location and detailed description) Jens and Megan Schwarte Residence 9880 NE 9th Ave, Miami Shores, Fl. 3308 Restoration of kitchen and bathroom The Architect; (Name, legal status, address and other information). Mark A. Campbell, Sole; Proprietorship 373 `I>tE 92nd Street Miami Sboras, ft 13138 The Owner and Contractor agree as follows: ADOrtIi1NS AND DEI.E'I`IONS.- The author of this document has added Infbrmalion needed for its completion, The author may silo have revised the'text of the original AIA standard torte, An Additions and boletkas Report that nbtas added Information as well as revisions to the standard form text Is available from the author and should be reviewed. A vertical line in the left margin of this document Indicates where the author hat added necessary information and "where the author has added to or deleted from the original AIA text. this document has Important legal txiances+:'tukation with an ittoiney is encouraged with respect to its compte6w or modification. Init AiAOotumeMAlb(""-211't7(fomtedyA10tU-'n07).copynghtPDlbm,1951;:a958.teat.>tti63.1966,1970,1914,1911 American Institute of Architects, All rights meervsd. WARM1,1G: Thit AW Vocoment is: protected by U.S. Copye4fit Lai Unauthorized reproduction or &attribution of this AIA" Doc4mont, foe any portioo of it:, may result In severe civil and 3 prosecuted to than maximum extent, posett90 under the law'; This dowmint was produced by AIA software at 18:24 01 on No.0326010691 which tirpkt s on 10r2&MI9, end Is iwt for resale. User Maus: 196741997, 200E and 2017 by the and InWnatlimal Treatise. What penetfies:and *111 be untler (Im adose7) TABLE OF ARTICLES 1 THE WORK OF THIS CONTRACT 2 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION 3 CONTRACT SUM 4 PAYMENT z 5 DWOUTE RESOLUTION 6 ENUMERATION OF CONTRACT DOCUMENTS 7 GENERAL PROVISIONS 8 OWNER 9 CONTRACTOR 10 ARCHITECT 11 SUBCONTRACTORS 12 CONSTRUCTION BY OWNER OR BY SEPARATE CONTRACTORS 13 CHANGES iN THE WORK 14 TIME Is PAYMENTS AND COMPLETION 16 PROTECTION OF PERSONS AND PROPERTY 17 INSURANCL.AND BONDS 18 CORRECTION OF WORK, 19 MISCELLANEOUS PROVISIONS' 20 TERMINATION,'OF T14E CONTRACT 21 CLAIMS AND DISPUTES, E men A DETERMINATION OF THECOSTOF THE WORK ARTICLE 1 THE WORK 6F' THIS CONTRACT The Cdntmetor shall execute the Work d s>ycribedio the Contract Documtnts., except as specifically indicated in the Contract Documents to be the responsibility ofothers. ARTICLE 2 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION' § 2:1 Tho date of commencement of the Work shall be: (Check one of the bilowing boxes.) ( I The date of this Agreement Ame0can institute ofArrhnects. All rights raeerve&WAABNriG: This AIAz'Docuaunt ts'oratected by'U U.S. Copyright l-v unauthorized reproduction or distribution of this AW Document, or Any portion of It, may result in se"to civil and Prosecuted is the maximum extent possit)ls under the iaw, This document Was produced by AlAscftwera at .18:24:01 on No,0320810691 which expires on 101=019, snd is mg for resale. ttssr Notes:. and 2017 by The i Ttestiee. And will be '(1932somy) 2 1"It. A date set forth in a nonce to proceed issu6d by ,theOwner,, t X J, Established as follo*s:, (Inserta date,ora means to determine the date ofcommeneeMe't,01theVork), Subject to the issuance of a WditigPerniit- If a date of commencement -of the Work it not selected, then the, dAe,orcoittindicernebt 9hall be the, date of this .Agreement: 2.2 The Contract Time thall be meas.wed from tht'date of'otnthencement. 2.3 SWMantliCompledo", 23.1 Subject to adj6sttnents ofthe ContractTimi as proVidid, in the Contract Ddedthents, the Contractor -shall achieve Substactial'Completion of the entire Work— (Check the appropriate &.-x and complete The necessary information.) X I Not later than One Hundred T'wenty ( 110 -) calendar days fidtn, the date of conunencernent of the Work. ( J By the fiollowing"date: 23.2 Subject Wadjostraents of the Contract Time as provided in the Contract Doctunents, ifp ftons ofthe W&kare; to be completed prior to Substantial Completion of the entifeVork, the Contractor shall achieve Substantial Completion of, such portions, by the following dates: Portion 01W0* Substantm Comptevon 090 J13.3 Ifthe Contractor failstoachieve Substantial Cftpletiqads proVide,d'iftthis :Section 2.3, litluidated daimages, if any, shall be assessed as set forth M gection ARTICLE -C*NT - kACT SUM -3.1 The Owner shall pay the Contractor the Contract. Sum in currcki funds for the Contractor's perfbrmAnce of the Contract. The Contract Sum shall be one of the lollowitfig: (Check the appropriate box) Stipulated'Sum, in accordance ,with Seddon 3.2 below - Cost of the Wotk plus the ContmotorN #ee, in accordance with -Section 3.3,btl6w Cost of the Work plus the Contractor's tet with W Cmariinteed Mwtimurn Prjce, its accordance with' Sectioni 3.4 below (Bused on the selecrion above, 6mpielf SecfiQn3.!o4.3 or3.4&16W)., §32 The Stipulated Sum shall U, Eighty Thousand-bollArs,and Zero Cttxts. ($!89,006.00- )isaijectio additions and deductions as provided in the Cotitract.bocuments. 1132.1 TheStiVuktcd Sum is based upon the following alternates, if any; which Ich die d6s5ribid in. the 'Untract Documents and are hereby accepted bythe Owner: (Siate4he numbers or outer identification ofaccepied alternqtes. P'the, -long orpto pmuldocumenupermitihe Owner to acceptodw allernalav subsequent -to the ictectalon of this Agreen.umt. attach wkkedula of such other ,alternate$, showing the amountJor each and the date when thai amount eVtrm� NdA32691W which e*ftson 10128=9, and knot for. MSaW- sheer No"61 (1932SMM7) § 31.2 Unit prides, if any: (Identify the item and strife the tikl price acid the quaittiity!iinil itirins f any, fo. whkh the rtrrit,prlce- 11.7te applkable i ttetri° Units and-Umbilms Elect ical Fork Plturtbittg%Wgtk: Mechanical' Work- l7emolition; Drywall, Paiudag Cabinet Mooring Corttrartots.Ovtrhead and Fee (Paragraphs deleted) (Paragraphs deleted] 13.4,3 Guaranteed Maxbmim Prigs § 3.4.3.1 The sari of the Cost of the Work and the Contractor's Fee is gusiranteed by the Contracw' r not to exceed' Eighty Thousand Dollars and Zero Cents (3 80,000:00' ); suts ect to additions and deductions by. 4Nmges in the Work as provided its the Contract Doctimeuts. 'This' maxiitsum sum'is te&tte&to. in the.Contrart`Docutnents aq:the Guaranteed Maximuth Price., Costs which would; cause the Guarat ter4 Maximum; Price wbel exceeded shall be paid by the Contractor without reimbursement by &d Owner (insert spec#(c provis dris f the Contractor, is to participate to any savings) maragrr k deleleelj ("able deleted) (ParWraphs del,04 ARTICLE 4 PAYMENT §'4,1 Piogresti: Psymotib 4.1.1 Based upon Applications :for Payinent submitted to The Architect. by the Contractor mid Cettificatos for - Payment issued by the Architect, the Owner shall matte progress payments od accouht:ofthe Pori ttct Scurf to the Contractor as provided below and elsewhere in the Contract Documeits. 4.1.2 The period covered by each Application for Payment aball be dice calendar month ending on:the last stay pf the. month, or as follows: . 14.13 Provided that an Application fdr Payment:is'received (y,th4Archlwt nut later that'the 2St11 slily of a rtitinth. the Owner shall make payment oftho, eertified amount to the Cowtrsctor not later thrill. the 1041 day of the Ulowing month. If an Application for Payment is rirceivedtry the Architect after the.2late fixed abol e, payment shall be made by the Owner, not later than ten (10 ) days after the Architect receives the Application. For Payment. {Federal, stateorlocal laws may require payment within"rtrertain period of time.) § 4.1A For,eacb progress payment made prior, to Substantial Completion of the-wl ;, , the owoer may withhold' rstaiaage from the .paymefit _otherwise due as follows: (Insert a percentage yr amount to be withheld as rel yite from each Appl icatiarifor Paymerxtand any let mt for reduction o)'retalrrrige.drrt r'rrg the ,course of `the. i1'ork ?7teattrmtnt of "retai Cage mayhe JiWWliyt governi* tow). 6,00% tntt. MADOCUmatttA104M-3b17(tOe**dyA1Q1T—21a'f):COpytlQh1C5lQX,195i,low. 4961,1ii63.i9a8 197019fid:1978.1$87,1947.�t37artdZ0i7by"Ths American institute of Arot*60s. A9 riahts nssrved.ANAR.N)SG: Ti7isNh i!$rd(rira+ft is tr iylOe" ay v.S, Cop hahi tairr`Afld intaktWOM an h iss. ttneUl?iOfiX@drtptgcibCtlon or dtsi(ftsvt7on bf tJ+i� At,�.+' �Uacre�riL: tir�ry,.p�tYon of it, ia"ay sasu'.t in s6vena:ciVCi and erir�tngi psnet£ibx.'atfd iNln i»- t prdsecat� to lttE ,ri3iti,»u+iY A+ir6ne Ros9tbte i:ndrr fhe �-rw, Thiel doEumettt wgsp%duoaa tYyi AUlsoRwarY et lS:?A:tS1 np 1iH2gi20181indBF Order N6.03260i OS9't which as pk" on 1012WO19, Arai is-M fw muls. User Not": (932l106S81} 4.1.5 Payments due and uppaid.under.tht Cotitract'shall bezr,ftA6rest,.ft6mthe ditepqment is'diie at'dw ratestate& below, or in the absence thereof; at the legii rate prevailingfrom time to Litt it the,VIqqiW9ft the *q'l;d it Wated, ffioort-ra;t of inkriat agreed upon; 1f aqv.) 10 % !,en 42 Final hyment 42.1 Final payment, constituting We catireun;saidbalince of Me Contract Sutrt,lhall be,madckby the ,OwnertoAhe Contractor when .1 the Contractor has ' Nlly'performed the Cintrict eximptfor the C�*cto�$ZttIiiycoTrect Work as provided in Section 18.2,and,to satisfy other equirements, `if any; h extendbeyond final Payment;, the Contractor has submli,-A a final accounting for tbe.Qsc ofthe.Wo*, Wherepayment istinthe basis of the Cost of the Work with or without a Gumntetd Maximum Price; and 1 4 final Certificate for Payment has beetsissuedby, theArdhitect in accordance with,"Section 15-7.1. 4.2.2 The Ovmer.*-& fbiki,pombmt to the Contractor shaft tie madipho, tat.er thanjo days affer thei ssuatict, of the Architect's firW Certificate for P"e0t;,oras.fbIIm:- A"CLE 5 MSPUTE RESOLUMN j 5.1 Shiding,Dlepute Res6ludon, For any claim -Subject to, but not resolved by, mediati6 purkrant to Section,21.5, the method. ofbinding dispute- resolution shall be as fbildws: (Check the appropti*0 bqx�). [ X ]-1 AWtrWft pijWmt to Section 1 L .6 of this Agreement I I Litigation in A court of txidipetent"juritificiibri, [ ] Other ($,#"ify) if the Owner and Contractor do -not select a method "cif binding dispute resolution,; or do riot subseqtfettly dgiv6 in writiog,th a binding dispute resolution, method other than litigations claims. will be fesdWed ijf a coUnt. of competent jurisdiction. ARTICLE 6 ENUMERATION OF CONTRACT IJOCUM&M 16.1The Contract Wrents Are defined f11,k:riic1a-7 add, ektqx forModificAtions issued after executioin of this Agreement, zeenumi:iated in the saciiow belo:W— ClAnt Agreement is this exectited AIADOcument k`160�100.4'Standard 1ib6revkW Foiri4of Air t. aetw6en Owidr and Contractor. (Paragraphs deleted} 16.1.5 The.Drawings; {Table deletea!) (Either list the Drawings, here or rqler in an exhibit attached 1() this Agreement) Number A-1 ,A-2 Tide. 113*1 '94-18, 9-6-'a trtiit AIA D*0WnSntA1041m —2017 (f*M6ViYA107'0-1110. I93b;-1951. 1"S. 1961, Wa, 1964, 197,6,1974, 1079,1997 American 1nWute,*fAmhft9ct*,. AN rights LOW a0tij UfmqlhoAmd fspWdUctionbr digirtbution di'thisAlAt gAd'dilmlni prozecuteola too mWmum eaten "z�!We urtibi the law, This dacWnentwittiv�a ,t�tAlAs6ftWat* at It-24:01 06 104*. Na.03269i0691 w" ftpfts on 10dW2019,'and Is tug for rdgain,, User "is: 1aW2017bVT116 %I TrAttim , mind iWin ber order - 0911280051371 DA 'M-48 E-1 Ex 1 �r:i$ • M-1 9-G= t P-t �9-6.18 (Rwagraphs deleted) (14b1e delgteO (Paragraphs ,deleted) .ARTICLE T GENEUL PRO'ViSrtONS § i .1, The, Contract Iiotap oft The Contract Documents are enumerated in Atticle l and cofssist of this Agreement (including: if applicable, Supplementary and other Conditions of the Coatfact),T) tiwings, SpecificdionC ;Addenda issued priot:to the executiodofthis Agreement,, other documentslisted in this Age&ment; and Modificatiolrs•issued after•exect tion of this Agreement. A Modification is (1) a written amendment to the Cormact Signed Ely both parties, (2) a Change Girder, (3) a Construction Change Directive, or (4) a -written oraet for a minor change io the Work issued by tha Architect; The interitofthetontract Documents -is to include all items neces saryforthe proper execution and completion ofthe Work by the t ontrac:tor fire Contract Docu ients are t orlipleimentary. and what is rbiluited by one shall be as biIad ng as if required by all; performance by the Contractor shall be rtipuired to the extent consistent with the Contract DolitAenti and reasonably inferable from them as being, necessary ttrproduce the'indcated results. § 72 The;Costtrad The Contract Documents forth the Contract for.Construction,; The Contract represents the entire and integrated agreement between the parties hereto and supersedesprior negotiations, mpresentatioits, of seer eats, either written' or oral. Thi,Contract shay be amended or modified only:bya Mbdifrcatiofi,'The Contract Documents shalt'patbe construed to create acontractual relationship of any kind between any persons or entities oth sham thb.Owner and the Contractor. � 7.3 i'Ite Work , The terns "Work" means the.construttion and services required by'the Contract i)ocaments; whettter:cottpliyted or partially completed; and iltcludes all other ltrboi, materials; et(uiptrtcnt, nnd'setvices provided onto be provided by the Contractor to fulfill the Cordractor's Obligations.. Thei-Work'hm3riignsotutethe,wholt or a part of the proje�i § 7A Instru"nty`oftervice bw t mebts of Servitaoam reptnsoAmtions, ittauy mediut n€expressi6n now knownor iaterdevelope,O; ofitre tWigible and iitrtangible .creative work perfornied'Vy ibi Aichitect An& the t rchiteet's� .cbfiW1tir►ts ut ar their spictive professional services agmempts. fratruments of set vice fttay include, vritlt&it limitition,- studies; slovens, iuodcts, sketches, drawings, speciiicatisnts and'ather similar materials:, ._ § 7.5 OWtiersftip and use of Clrawlrigs, Specific;Wtins aitd; {ether h ilmmer t of Servo § 7.5.1 The Architect and the Architect's consultants shall W deemed the aitthoN and owne s'of their respective tain Instruments of Service, including the Drawings and Specifications, bd will reall common law, statutory and other ` reserved rights in their Instruments of Service, includingcopyrights, The Contractor, Subcontractiars. Sub-subcorrtractors,.and suppliers shall not own or shirts a copyrigf t in'tie, Insirtimcnts' of Service. ubmiital or distribution to meet offrcial regulatory rtmquiiements or ,for oihi r ptisposa in c6n.r ectioti with the 'Proient is not to be construed as publication in derogation of the Architect's or, Architect's cotltants' reserved § 1.5 2 The. Contractor, Subcontractors, Sub-s iticonttactors and suppliers' are authsn',`*ed't8: use kid tefl1roduce t9e Instruments of Service provided to them, subject to t'~ie protsicols establishesipthsitant to Seitiohs 7.6 and' 7J, solely. and exclusively for execution of the Work. All copies made under this autbotizat din shall bear the copyright notice,; if any, shown on the lnstt tents gfSery ice. The. Contractor. Subcontractors, Sub-subcontractois, AM supplJ ers May not, use the Instruments of Service on other projects or for additions to #his f i jecf.ouiside. die t560 of the. Workwithout the specific written donsent of the Owner, Arcfiitectand the Architects cotisuitim ., 7 s Digital Data:tlse and TraitsrhItStch The parties shall agree upon protocols goverbini the transmission snd use of Instruments of Service or any other information or documentation is digital form. The parties -%%tilI use AbA, Document t2OT"O13,,8uilding a�oot�,ttter+tk+an yz�v ttornwrtr xtar�-arlot'l, tia+p+sue tsisl, is;sa;=less. reteas, teas.. wr ham, tars. ire; �sa�.rear. roar ern sort oy'rri+t Init. A7nedaan lft#ftte of Armhrt 0% AN tiptoe aafved. ti NIOIiNG3 � AIA$ 00CM M is Txotearea U s. C*yrWd law and tntemafionat ryeattas- Urlwtivirlred rersm&ction Or di3strIbut* of aril AW, oopumeht, ro wtwpof cn'o'f t AlAry r"u!1 in aevwtt 60 And Wimrnol penattl" Anti -WO b4 1 prostruted to the matimrim estent possible under t;igla i TqW document was produced bi AlAtOlt wmra at 18:24:01 on 10128018 finder order No;03269ttlb9l +thkh expire$ ot11tU' NZI9 arirf is not bt rouls. user Notes;•. (i937d00S87) Information Modeling ad Digital Data t%hibit; to establish the.protocolfifDr the develnpincnt,`use, trattimisiion;'and, exchange of digitai'+data'. § 7 7:Bttltding lnfaniMon kladets Uiii1nd RellBntm Any use of, or reliance on, all or a portion ofn.but'Iding information matiel'w tltout agt'eement taprtiroculs govtirnt the use of, and reliance on the information oontained in the model and without hawing tliose±`ptbtocals: set ForW in.AfA Document E203Tm-20*,,Building Information'Modeiing and Digital Data,Exhibit, Aad the requisite AIA Documebt G202Tm--2013, Project Building Information Modeling fttocol Form, shall be afthe using of relyingpatty's sole tt*- and without liability to the oilier party And its contracioes or constiltants; ttt authors itf ° ar cfintrittutots to. the building information model, and each of their agents and employees. § 7.8 $evetabilil i The invaiidity, elf any provision of the Contract Documents shall not, invalidate:the Comract br its retnaiidng provisions. -If itis deteimined that anyproyision ofthe Oontract'Document violates arty law, oris otherwise invalid or- unenformble, then that provision sballbe revised to the extent'necessary_to make that pmvisionlegal and enforceable. In such case the Contract bociunents shall be coustr �ed; to the fullest exi tent prcrrctitted by law, to give effect to the pasties' intentions and purposes°in executing the Gaantract. 4, 7,9 Notice § 7.91 Except as othetwise,provided in Section, 7 9,2, where the Contract boctt t is require octet pidy to notify or' givanodoe to the other jxa ,, such notice shall. be provided in writing td the desigtimea moftsentative of the p,a,rtY to whE►m tttf riot3ce is sad t#nd'zhatl be deemed ter have'l t duly strrvetl''tf Olive*in petgott�"by trail, by Courier; or by electronic transmission in accordance with AIA Docum6n UOYK;2611, 041Wng lnf:Yrir6tiort Modeling and Digital Data Exhibit, -if completed, or as otherwise set forth below: (ff other.thnn in accoedawt with Film Doeument' E10j-2©7'3, b&sdrrt requirerzten& jor dWivering f ike is eletsry iir format.streh as nawt� tit% and email address of the r6cip ent dod whether andhow the system will be ►equired to generate a read r_&t* tAt, Me transrnissIo►r:) - § 7.9 2 Notice.tif Claims shall be provided in writing -and shall be deemedto have beeeu dOb+ served only if dclivere&to the designatedrepreMpt4ve of the party to whom the nati is addressed % ter'tified gr,registered mail pr by courier providing prnof of delivery. �§ 7.10 ROW*nahip of the_ Parlitts Where thi='Contract is,based oti the Cost ofthe Work plus the Contractor's `Fm with or withouta GwAnteed Maximum Price; fife Cotttractot accepts the relationship oftrnst acid co"ned esiabfith t`tiy tliis:Agreetnmt and covenants with tlie'Ownef tocooperate with the AtchiWt attd exercise, the 6ntmaor's skill abd jtidgtnent is fut#b&1 tg the interests ofthe Owner, to furnish efOcient business admigistiation anti supervision; to,Aittiish at ail.: times an'adequate supply of workers aitd taa_tetials; end to perform the WA in atn expeditious and econoBtical npann consistent wi4i the Owner's interests. The Owner. agrees to furnish and approve: in a timely matttier. information: required by the Contractor, and to make payments to the Contractor in accordance with the requirements of Contract Docurhents. ARTICLE 9 OWNER § A Inkrrttatliih and Setvires Required Of the Niter, 4 § 8,1.1 Prior to commencement o f the Work; at the iwr'ttrett request by die Canttsctctr; the t)iwtier shall Atrmsh"o. the. Contractor taasonable evideuct .that the Ownerbas mado, fmocial arr�agemcrits to fitlrll " t,s obligations under.the Cimtract. the Contractor shall have no 6bligadon. to commence the Work-tiritil.dte C 'ne!'pt+o�ides smelt evidence., If cor0nenoment of the work is delayed tmdce Qls redid# 9. ti i 'thi Contract Titaae�iittll: be extetrded appately, 0.1.21he (honer shall furnish all necessary surveys an ,a legal description of the: site,, § 8, 1 1 i The CdAtm t6t shall be entitled to rely cii the; acci m;Y of i}fiiimation,.fi fished by the ci%lier.6ut shad exercise proper precautions relating -to the safe-pedbrrnab of the Wrath; H11t. AlAttoeumerrtt►t6rM-ierr{totr�►tuxes=+s�rl.copyrranee,ra�rt.,rsst._las�:iser;tsss:tsaa,hsrb,tare°,tab;,tsei.'aaat';�doxandztitsey�rne American lnstittde of Arahiteats. Alt Mlh3% raseryotl. V^ AANtttr. 7619 AW tloralms9}t3o-pcotectaA ny u.'s, CON f0*t1 w am inwulw :si TrS~. 7 Unauthof od reprotlucudn ordistrlbii"n »tints ALM Dowirn*01, or afty i ?gin 0 42 iriq rosi �t s� aerissrt ciidi:aas5iinim!aal p M'ItItt. artd will bw f. pmsecoL-t ro tide maaithum erletit,itoaatbte; undaat^ the law. This domment was prvdycid'by AIA %ottw0l6 t t 8:24:01 bn iWarAls uhdir ordpt No"032010691which lies oM 1i)1=019, and Is riot for tessis. user t+ O*$: 00US00"n § MA Except for percents and fees.that are the responsibility ofthe-Contractor underthe Contract 1 ocumeats . including those required under:Section 9.6.1, the Owner shall secure and pdt for other.necessary approvals; casements,.assesstrterits, am charges required for.the cdnstructiot4 use, or occttpancy of pemipnetit structures or fot- permanent changes in existing facilities. § 82 Owner's Right to Stop the Work if the Contractor fails to correct Wor'it which is'not is accordance with the requirements ofthe Contract Documents, or repeatedly fails to carry" out the Wort; in accordance Ankh the Contract Doiaintenis, di'e.Owner may issue a wtitten order to the Contractor to stop the Work; or any portion thereof, until thi cause for such order is ethbineted; however;, the,right of the; Owner to stole the Work shall, not give rise to s duty an the pa"ofthe Owner ib exercise this right for the benefit of the Contractor or any other persoff or etitity. 8.3 owner's Right to Carry out the work, If the Contiactor'detkatts :or neglects to carry out the Wdit in accotda` cii with the Contract D_ ocwnen'tis,. and, fails within a ten-day period aft receipt of notice from the Owner -to commence and continue c8ird6t on of Inch ,default or neglect *ilit diligence'and promptness, the Owner may, without pitejddice to` atiy'othertemodies the Owner tray have, correct such default or neglect: -Such actic ti by the Owner, and amounts,charged to the Contractor ate both subject to prior.approval of the Architect and the Architect may, t umuant to Section ,l3 A.3, wol%61d. or nullify a Cettificate for Payment in whole or in, girt, to thv extent reasonably necessary to mimb6 se`the Owner for the,ri ts6ablc cost of; correcting such def cietiv m including the OwTteV expe es and co'rripinsation fnr the Architect's hdditionii services made necessity by such default, negldci,.or failure. if the Conwicto3i Oisagc�s with 'tl a actions of that Owttteroir. doe, Architect. or the amounts claimed as costa to the Owner, f lee Comet* inay floe a Cootie pursdattt "to Article 2:L. ,A101CLE 9 CONTRACTOR § 9.1 Review ofContract Oocun*nts and Field Conditlins.by Contactor 9.1.1 Executiomof the Contract by the Contractor is a"represen4tion that the Contractor has visited the site! become generally -familiar with local conditions under which the Work, is to he perib tned and correlated person at viise ivations with. requirements of the Contract `Documents. § 9.1:2 ilecattse the ContractDooumeats are cotnpletnentoty. tlidContiwtor shall,' before starting each 0onioit df the Work; carefully study and compare the various Contract Documents relitiiie to that portion ofthe World as dell e§ the information furnished by the Owner pursuant.to Section ,8.1:7, shad' taste, 6otd.m6�atutemaots ofany ekistiit� conditions related to that portion ofthe Work acid shall observe;atty;cnndt`tions at the site affati ag it. 'These obligations are for the purpose offacilitating,c6drdinatibn and cobsttuction by the Contractor and gee moot fiir the purpose of discovering errors, omissions, or inconsistent iesin the Contract Documents; however, the Contractoryshokllit arrtptiy report to the Architect any errors, inconsistencies,-oromissibns discovemsd by ot� made known to the Contractor as a request for nforrnatioli in such form.as the Architect may.itoite: lt'is tecognized _that the Contractor szevic4v is made in the. Contractor's capacity -as a contrictof and not as a Weixsdd design professioiial_unless othervYise specifically provided in the Cortaro-DOCumcnts. § 9.1.3 The Contractor ismot required to ascertain trial the Coaitract Dot utneettts are in accordance with applicable laws, statutes, ordinanoesi codes, males and regalatiuhs, 4r lawful orders o f jmblic autltot es, bu the Contractor shall promptly report to the Architeet.any' nonmonform ty.discovered by or Mudd known to the Contractor'as a request f6i information in such form as the Architect may require. § 9.2 Supervision 8nd Construction hrOceduras § 9.2.1 The Con trait arstall supervise and.direct the.VKork,,using.,the Contract oei'best skilt and -ad ant ion, T'1fe Contractor shall be solely responsible for and; have confrol overconstruction, metmsrinett ods, techoiques, 3equetices,. .and procathm, and forcoordinating all portions of the Workander tha tobtrsct; Uhless"the CElttt i'T3octuncrits give other specific :instructions coricerriing these matters_ § 922 The Contractor shall be mponsilile to'the Owner r& acti and omissions of the C`ontractor'$,eftl4yees, Subcontractors and their agents and employs, and other persons or.entities pecfVnning porticins,of'the Work force on behalf ofthe Contractor or any of its. Subcontractors; IniE ALA 06cumentAI04v*=70,1T'ttbh*k*Av07""- 1'CopfthtCl93w. 195t„t¢8,1981.1961,1ti66. AM20t7byThe- Atit ft to k d*Ute bf Arehb t , A9 rights rs V44+ WARNING; "0 Triiilq 6_ Unatibie ed mp'rpductron or siistrihotic4i or thts,AJAV Documept, crony poN64 of tr,;iftay risotto in savcro ch Rsgd crimtrtar par+air as amd wul 5e prosawted to Ow m ucirnum extent ptssible sm*r tits hw This docu[fte�t W" p' by AiA tbttwan bt 19 ?d:ot oft. 1tft2 /IISiB under order No 0326910691 w$tiioh exoms on it)NW2019, sent is not tcr.resale. UsarMow (193280058Ti" §9.3l.abbrand Matta Is § 9:3.1 iJnlcss otherwise provided 'in the Contract AoGutnesits,-the Coiit aetor ,-tWl pritivide and pay for labor, materiels, equipment, tools,, canstntction.et rtq nt and msciiinery„water; hea4milities,• tranapr�rtut on, and other :facilities and services necessary for proper czec"Iir. and cotrtpletiarl oftbe Workwbother:temporary or permanent and whether or, not incorporated or to' be°ntcor;iotsted n the•SVc�tk. 19.12 2 The Contractor shall enforce stiri&Mciplint and good order among the. Coni actor; s:employ, es "other persims carrying out: the Work, The Contractor shall opt perrtiit Crn}rlcrymt nit bf unfiit parsons or person not•skilled in tasks assigned to theft' 9.3.3 The Contractor may make a substitution only with Ilit consent of the Owfiir, after evaluation by the Are l,itect and in accordance with a Modification. § 9A Warranty. The Contractor warrants to the Owner and Architect that materials and equipment furnished under the,Contrw will be of good quality aztti tttw unless the Contrast 13ocumettts quite or;pertttit othetv'tise.,The Contractof furt warrants that the Work: will conform to the requirement's of the Con;r a Dotiments and will be free lien dbfects, ezpept for those inherent in the quality ofthe. Work the Cat►tract Docutnents require or permit. Work, ttfatetiais; or equipmeant not conforming to lthese requirements may, be considered defective.-ttt Contractor's wartudiy eitcludes remedy;for damage�or defect caused by abuse, alterations to the Work not.esecuted by the Cxmtract6v,,:inYproner or insuffkient, maintenance; improper aperation:ur norntal wear and tear under ►otmal usage, All bthei warranti required t ylhe t ontract aoeuirrettts shall be. issued in the, name of the O%ynerjOF ihall -be;translerable.to the Owner, and shalt commence in abcordauce with Section 15A.3✓ '§ 9.5 Tow The Confractar•sisall puy sates; consumer, use, and other similar;taxe§Nhat pre legalty,enacied when biels are teceived or.negotiations cxincluded,vbOfier or not yet effective or merely. schi"adjol gti into effect. § OA Panntts,:Fe* tintless, and Y ttttpllanco with Lai i § 9 .1 Unless otherwise provided in the Contract Documettta; the Cow shall secure acid pay i%r the blinding, permit as wells other permits, fees, licenses, and inspections by govbrttrttent agencies necessary, for proper execution and romp etionof`theVoik,that are cuatefoaritysdcured slier executioi of the_�dn:tiact and Ic`gally,requi`rred at the time bids ere received of neg+atiation3 concluded. § 9.6.2 The Contractor shall comply withand' give notices -required by applicable: laws, statutes, n"ttf naut es, codes;. rules and regulations, and lawful orders of public authorities applicable to perforitiance of the Work. ff the'Contractor pert`ohns Work knowing if to be contnuy,to applicable laws; statutes, ordinances;-codesk rules and regulations, or lawful orders of public authorities, the Conu-Actorshall asssumeappropriate re dnsibilityforsucitWork and shallbear the casts attributable to correction. § 9.7 Allowant The Contractor shall include in -the Contract Sum all lowattces smte4 in the Contract Documents. ` 1* Owner Shall, select maierlits and egtiipment under &9o*Mcd� *iiih't'dhs Ifable ptbmptt e r Allowaik amounts shall include -the; costs to the Contractot of:materials rind equip ent.d.0l verej at the site and all required tars, less Applicable'trade discounts. Contractor'scersts for unlaadurg and handling at the site labor, installation;,ovethead, pfofit,'and other expenses coxtte mplated for stated_ allowance amburtts sball be included in the Conntract Stem but not in the, allo wattce. 1,9.8 Conirdt:tor's Construction Schedules 104.1 the Contractot, promptly ahor being awittitd;the. Coattact;; shall'submk fc r the, C6utr's. aril-Arihi>;ect's information a.Contraetor's constritatl6h: chedule flit the Work.'The.schedule shall trot �cceetl -titm lirttits curropt under the,Coruract Documents, shall be reviseti'at appraprtate intervals vquiied y tl►tr` conditibh cif the Vltork and Project, shall l;e'related id, the entire Ptoject.to the extent'requtrcd bythe tZ�onttactb&umiiits,'and Stan provide for expeditious and practicable exc&ttian of the Work. 9.81 The t :ontractoz�shall,perform the W orlc'in general accordance with most recent schcdtdt4-submitted to the Owner and Arcbitem 9,9 Submittals § 9.9.1The Contractor shsll ftview foi;compliattcc with the Contract Dociiindutg hud subittit to the Architect �hup bran 4qp, Product Data, Samples, and Simi lir submittals regtfired,by the Contract l)&v rtertts m co ' natioh with the Contractor's construction schedule apd in such sequence °as to.all w, the Architect teasonuble firnifot review. By submitting Shop Drawitngs, Product Data,.3amptes, and sttrellar subrtiittals, tine Con tractor r. resents tin the (hdner and .Architect that, the Contractor has (1 ) reviewed and apprave4 therms; (2) determidW and virified materials field; measurements: and field construction criteriaulitedthereto; or dtxi .and (3)tb;;ked anti coordinated the information contained c1thin'such SO'limittals with tho-fequitoinents ofthe V4+ * and of'ttii Contract Documents. The Work shall be in accordance with approved submittals: 9.9.2 Shop, Drawings, Product Data, Samples and sirs ilar submittals are not Contract. Document*• 9.9.3" Phe Contractor shall not be required 0 prbvide professional servic' tha't cbnstititte the pixctice of architecture or engineering unless.such services nit speciticallyrequired bg'the Contract Docutents or unless the COtitmctdr needs topmvide sueh'services its order to carryoutthe`Contractot;'s own espotisibilities: lfprpfessional'design services or cchificationsby a design professional' are spar jfically regpir etl,'ihe, tJwtteK attd the Architect will Oecify the perf0mance and design criteria:thatsuc,b services. must satisfy.,The Contractor ihalk� tse s Vices or certifications to be provided by an appropriately .Iicensed design prat' ssional. If no critetia are specifred;-lhe :design shall comply With applicable codes and ordainadices. reach Party shall be entitled to rely ulititr`the:irrfor>xmation provided by the other Pcrty. Th Architect will review and approve or tape tither appropriate action od'submittals .for the liniitdii purpose ofcheckingfoir conformance with inftirmaHon provided and the design concept expiessddin the Contract Documents. T�cArWd teces review of Sbop Drawings, Pioniicc Data,,SaCnples�'and similar-submittalsshalf be fortha• limiteed purlstrse of checking for corif trance �� in information, given and the design concept expreskd its the'Contract documents: Iii per6oning such .review. the Architect will approve, or, take .+ t}tlrir:appr"optime action upon; the - Cvtttwtoes.5bop Dr4wings, ProductData, Samples. endsiinuar.subniittals: § 910 use of SAA The Contractor shall confine operations at the situ to areas perrn4td'by°applitab1e'laws, statutes, urdinhnces, codes, rules and regulations, iawtitl orders of public auih_oritties;trid the + on}tetct Documents aird sill not aizreasr►uably encumber the .site with materials or equipment §'9.i 16W' and Patching The +Couttactor •shall be responsible for;crttting, fitting,.or patching required to complete)e'V dr_k. or to rage its parts, fit togeflliivroperly: , § 8.12 C1MfthV Up The Contractor shall keep the pro -miser and surrounding area free froth accumulation of waste materials and rubbish caused by operations under the CoattacL At completion of tfte W 4he.•Costra) for shall;remove-waste in' atcrials; rubbish, the Contractor's tirols, construction equipment mat binary, and surplWmaterial from and about the Project.. I-S.A'Access to Work The Contractor shah provide the Owner.and Architectwith access to the -Work in preparation a'nd prog"rdS wherever' iiacated: � _ 19.14 Roy P$pnts and Ccpys'ights 'lire Contractor droll pay all royalties and license Errs. T1te Contractor, shall defend suits or claims for iltfringentent of copyrights and patent rights and shall hold the "Ownq and Are6ect batmless from loss. -oft -account thereof, but shall not be responsible 'for defense or loss wh' p a particular designs pmceeas, or product of a particular ,manufacturer or maratrftreturers :as requited by the Contract Documents, or u tiara the rsoPY1 ht violatibns are, contained its Drawings,, 906fications or odw, 'documents prepared lay"the Owner, or'Air&ttect.,ilowtver, if tw irriringenasiri of acupyright patent[ is discovered by, or rtiade known to, the 6nm ctor, tlte.toh"cior. shall be responsible - for ttte,los'§..unksslbe information is:promptiy furnished to ft-Architect: a § 9.151ndemnifimdon 19.15.1 to the fullest ea£tent permitted by law, the Contractor shall indemnify andhald hairntl.eSs fife dwiter, li rehired, Architect's consultatits, and agents and employees of any of thein, from and agaitist:elair . damagesi losses and expenses, including but not limited to.attorneys' foes, arising out of or resulting Adm pe;lthtxktatice of ikre'vork, Init. n1Aona„"MA1O4*-aeltttarrneryrAlur - #1. ocyr heotasa t9st,i§sa 196is'1063,iM.1970094,1979._t9st.4ss7,2007aW20176y7re Amartcan inaeitute of Arehfhus. AY riyAta ruet+nd +hrArliHG art s AiA+' tSor titis4niroteer6dtry,U arpy►tgtltl ark arrtr irctarRrdari Treatr:+s i d rlvusutisan7odlnp+ l�+ctlorta�0i8tritr�GonotefsiiJlA� Document,fit0oyOr4br�9tif,rtts�yxlG�iRA4 svRtre;CivVfeRdat;Yshxarpe $1t% #fndwlOhr r }5re a 4tad is eta. trtnrcirltup► eYteiit �p?twitire urtdtt We ir►. Thb d ortWa!ltroQi(oed ArA £iigeMat1tt: 4.�1 ewlift 8r1$18 uniid►'t�rtler No.032Bi11t)b91 w�lttih:expins on /0/29120�9. end h �iot�tbr . User Nolen: �ta�eon§srl provided that.such.claim. dainage, loss, -or expense is attributibkto bodilyy Outy;aickne*.d1kisk�ritlWh of to. injury to or destruction of tangible property (other than the.Work itself), bnt unly to the mxtent caused by file negligent injury omissions of the Contractor, a Subcontractor, anyone ditectiy or.ittdireetly. employed by theta, or•anytipe for whose acts they tnaybe.liable, regardless ofwhetheror not such claim, damage, loss, or a tpense is eaitsod in dart isya. party indemnified hereunder. Such obligation shall not be a tis`trued to.negate, abridge, or'reduce othentights or obligations of indemnity which would otherwise, trust as to a pasty or. persmdesgn`k and in this Section 9.15. l: § MS 2 In clsi ivss against any;petson orentity indemtiitiii under° this Section 9.i S liy an' emplo*- a `iti the Col trai tor,'A Subcontractor, atiyone.directly or cndirecdy employed ljr iltefil, or; anyone ior°v hbie acts.tl y may be liable, the indemnification obligation un4er`Section`4A3.1 shaltstot be limitedb`y:a limitation ot�amoufit or.type ofdannages . compensati6n or benefits' payable by'or for the Contractor of Subeofiiiaetor undeir workers' compensation acts, - disability benefit acts.oi Delver tmployce irotit acts: ARTICLE 10 ARCHITECT § 10.1 The ArchitW. will provide administration ofthe Conu tas described1h the Cofttrad Documents and%will be an Owner's repregsentative durmgonstruction,:tintil',the date the Architect issues''the' fetal Cettificiite4br Plynient,'Che Arahiteo twill` bAve -authority to: act on:be..htilf.oi'the Owner only to the t ent provided in tht• Coottaci tocuments; unless oilietwise modified in writing in accordance iihi other proi%isions of awtontmet. J.10.2 Duties, responsibilities, and limitations of authorii of the ArAitect asset forth in theC6titraet bocumetits shall not be r2stricted, modified; or extended without written ctinstuti of the.6wner, Contractor, and Architect. Consent shall not unreasonably withheld , 110:3 The -Architect will visit be site at intertJats.appropriate.tc) thm;stagc d t£re constrtictro>i io"be o ne gtinetelll% familiar wit}t,thm progrzss and quality of the portion ofthe,Wofk tsomilettxi, and ib deiermne in general; iftlte V17ork observed is being performed in a mantter,indicatint that tlta'Wro* whett`ftlly�do'Itipleted, will Ise itt'accordance. with the.Contract Documents. However'; theArchitect- Will :nor be required to mike exhaustive oi`ctattinur us on-skYe' inspections to check the quality or quantity of the Work:_'Che Architect w%Il not,haye corttrsil off; dharo or or responsibility for the conktuetion means,methods, techniques, sequences, brprocedures, or' far'safety.precautiorts and programs in connection vAih the Work, since these are solely.'die Cctaitractor's rights avid responsibilities under the. Cctuttvsct Documents. 1 OA On the bs'sis of the site'visits; the.Arch sect will keep the Oivner ressonabiy ofotmed About the progress.and quality of thaportion of the Work complkekattd prornptty report to.tlie 0*=,�(1) 6r wo "ittions 6,om the C:onuwct Docutxw* (2) known deviations froarn;the most meet cbnaSi aclisttuedule submitted by the Contractor, and 0) defects,and cieneies :observed in thcv Work.. !lie Alrciiit r will not be responsible fo-r rho Chiptmctoes failuie to;perfnrm the Work in accordance with the requirements ofthe Contract Dc ewnents: The Atchitect�vill nett. have controloveror charge.,of and,will fiet:be responsible for ads or omissions of the Contractor,:Subc ir►tractors, of their agents or employees, at any.other persons or entities performing portions of the-Wgrk. '110.5 Based on the Architect's evaluations of the Work and oft3trs Coontradtges Applicationafor Pay OU the Architect wily review and certify the amounts'4ue theConttact& and'witissue Certificates for' Paytl "tin such' ahtnutits. § 10:6The, Arelritect has authotity to reject Wf rk that doi s not is mi'atin. to the Contactbncun its and to regtriie inspection or testing of the Work: 1 10.7'The Architect will review and approve or take other apptopriate action upon, the Contractor's submittals.such as Shop Dmvvings, Prdduct,Data, and Samples, but only for the lvmired.purpose of"eheckittg far conformance with information given and the design concepts xpressed in thg-ContttactDocuments:. 10.8 The Architect will interpret and decide ranters conewhing.perfoe under, and _tvquuemettts oC the Contract Documents on written request ofeither the Owrier or C b*rActor." bte,Ati�liiieetwill make triiiil tleeisiotis lire all claims. disputes, and other matters in quetstic#n been the Owner,and Contractor but wilt not be liable for results of any biterpretations or decisions .rendeted in good faith. roil AlAnocumentA104'^'-20tttormeriyAliV"'-20s7�Copyrfog,I93 1951,19M1901,-1M.19N,,Jt nme,**6 insm"&Atthk6ct3. Au ri" ressmatL N7ARiattic: The<-Ato act"(i 461 at protected -lip U.S, Olauth411184 +eriitduttson or dibfritwtlbn 4f Ns AiAt Doeumw+u.orarts parCea+t of iL.maY mssltto,�w ! prrniecctsced is tf� maetm",rr �apterit �forr.4'ibla �,rwls�,tite t$r�r:,T?rW doarrrrt3r)t was educed dN At,� fO1tW8re N6.03MI001 Which'eipiros nri 1012812o19.4nd it M for fisok. „* tieet`NeRrs: . by Too �, 11 fsa '(1932t70056T) § 1b.9 The Architect's decitions on matted relating tq'ae6thetic et%ct wirrrll be final if consistent with the intent expressed in the Contract Documents. ARTICLE 11 SUBCONTRACTORS § 11.1 A Subcontractor is a person or entity who,has a direct contract with the Contractor to perfornra portion of the Work at the site. §.11.2 Unless othenkise•stated in the'Contract.[?octrmitnts,°theCor>tracttir, as•soon:as•practii able afteraward of the Contract, -shall notify the Owrter:and Architect of tiie Su&#ntract6A' or suppliers propdsed for, each of the pr"rrrcipal portions of the Work.. The, Contractor shalt not co itract tvm any Subcontractot or supplier to whom the ovwtter or Architectlhbis made reasonable written objection vrithiti ter" days after receipt of the Contractor's' List dfSubcontnWtors and suppliers. -if the proposed bait refectedSubcontractor,was reasonably capable of performing the'.Work;'the Contact Suitt and Contract Time shall be increased or, decrea§ed by the difference, if any, occasioned by such,change, and an appropriate Change Order shall be issued before:oontmencement of the substitute Subcotttiwbr's W6ric., The. Contractor shall not be required to contract with anyorte to whom the Contractor has made reasonable obipoorl: § 11.3 Contracts between the Contractor and' Subcontractors shall (1) require S Subcontractor,•to tht.extent of the Work to be performed by the'Subcotttractor, to.be bou, role the•Cc ntencby tor 'the titans of the Contract DoCumentsi and to assume tdWard the Contractor all the obligatr'nns'and resporfsibilities, including tliaresportst'bility.1`ois4fety of the Subcorittacwt's, Work, which the Contractor, by the -contract Ilocutnents, aseumes towartl the Owder and Architect, end (2) allow the Subcontractor the benefit of all rights remediei"And rediecs against the t,: 6fitraotoi that tbd . Contractor, by these Contract Documents; hala against ibe Owner. ARTICLIE 12 •, CONSTRUCTION, BY OWNER OR BY ISEPARAIIE tyt;?N AACTORS' § '12.1 The tern "Separate Contractor's}" shall men oilier: contractots retained by;the tjtv,iet under, separate agreements. The Owner reserves the right to perform tkinstructim,dr operations related to'the Projedt t ith the Owner's own flutes. and with Separatee Contractors retained tinder Conditi as of the Contract subettuttially similar, to those of -this Conhict, inctudittg.those•ptovisions ofthe t: o6diti6as°ofthe Contractrtlatedlo insuranbe grid waiver of< subregationt § 12.2. The Contractor ihall afford the Owner<and Separate Contractors reasonable opportunity for introduction acid storage of their materials and equipment and performan ,of heiractivities, and shall ecinriect and coordinate the, Contractor's activities with theirs as requited by'the Contract Documents: JIZ 3 The Ot ncr shad be reimbursed the Cotatrtrctor for costs incurred try file Ovimerwh clt ato pt yable to a Separate Contrtctorbecause of delaysx impto erly,timed activities, or defective +consiructicun of the Coritractcii f Tht Owner shall be-respAnsible to tltc Contractor.Zicosts incuraedbythe Contractor because of delays; improperly timid activities, damage to.tiie Work or defective consiruction ofa Separatc,(Jontracwt ARTICLE 13 CHANGESIN THE WdRK i3,1$y apl mpriate Modification, changes iu the, Work may be accorrtpiished after execution of the Contract. The Owner, without invalidating the.Contraet, natty oftlet changes in the Wdrk *ithiii the g+enetal scope dr the Contract co>Lsistting ofaddit onkdeletions; or outer revisions, with the Contract suni and Contract Time being adjusted accordingly, Su& changes in ills Work shall be authorized by written Change Order siecd by'the Owner, Contractor, and Architect, or by written Construction Change Directive signedtiy the Owner and.Architpet.' Upon issuance ofthe Change Order or Construction, Change'Dir'ect Vt. the Contraddr shall proceed promptty with such.changes,,in the Work, unless othertvi§e provided in the Change Order or. Constructiop,. harige Directive. § 13.2.Adjustments in the Contract Sum and Contract resulting frorn a change iti the.work shalt'bc determined by mutual agreement of the parties or, in the case of it Construction Change: DirectiVe,signed only, by the Owner. ands Architect, by the Contractor's cost of labor, 4iaterial, equipinent, and:rewonaSlt overhead ind,proftt, unless the parties agape oil another,method far dbt+ermlht ng tiie cost or•credit. Pendi lg final deternimation_ofthe total cost of a. Constructionthange Directive, the Conunctormayzequest payrneni'for Workeotiapleted pursuanto the tonstntction 6iange Directive. 'life Architect will make an intcrim'detertrlinat r as 6f the amount of payment clue ,tot purposes of certifying the Contractor's monthly Application ekPayment: When thet5amer and CoAtractorai rt- oil adjustments to the Contract Sun and Contract Time arising :frbm'a Constrifc ion'Chtnge..Dire ti*e; the Aiuhi ect..Wilfpit p ' a Change Order. trait.; AtAfloci nentAtti�1" �2of7 ft4rmetiyA167TM — 17� GaRyl tstE31&3 : 1951;1913a 1961, t983.18a6,19TPA9?4.'_1978;1t 7r 1', f7 erfd2fl17byTW American Insaute or Am6fta*. AM rights nlerved Y+Ffi til4PG*.T3tis A1A• t tnna Otis {arotattZd nY tl. ; Corairj 3 igty t?�t iiitar iaStor� i fi ttitsl,� Unauitivrttaxi re Wodudrorr'o1' dtsrrihuuan 6i tlfiia XiA" t�ciliw�rli. o(afrt� twiu'en er i!, ' rasgN trz aevdra �ei�if er�a'tminat P�yG�s4; aixi v�tii b� / pros*cute# td vlit maximum bxre�ic,possibie.und4t life fav►• This document imtoo PrCidfi _byAlAspdwsrs et 1841:o1 on `IQ1E8018 under Order Ab.t1311t9'i r3591 wtiktl �cpkea on'tOf2817Y!!Ss aGxf is riot for resale:, ` uerr Not.:: (i932titIt1567) 113J The Architect Will have autho ityto order diixtor chirtges in the %Ibrk not inWlviiig adjustment in the Contract Sum or, extension bf the.Coutraet Titne. and not utcot�istent withRtlie ittttxttt of iht Gonttacc l5oc Suclt citati�3 shall be effected byvritten older and shaki be binding on that�ivner and Cciatraettir. The Contractor shall carry out such written orders promptly. If the Contractor believes that the proposed au'nor chiinge in the Wbrk will affect the - Contract Sum or ContractTitne the Con tractor,shafl ntitifjrthe Architec#,and shall not proceeo? to.itiijstettent fire changls'in`the Work. § 13A if concealed or untwoWn physical con tions.are ener`sunteredit.the sitethat differ materially from those. indicated in the Contmt Docutne;nts or frotrt thofe cobddi trEas otdib urily found to exist; ti a Contract Suitt and Contract Time shall be equitably adjusted as mutudily agreed between-thbOwntr and Cotitmttor;-piovided.that'tlic Contractor pi+oyides notice to the Owner and Architect promptlyand before ctinditiotts: are disturbed,: AIii1CLE 14 TIME 14.1 Time limits stated in `the Contract DocumentR are ttf the essence of the. Contract. Sy executing this Agreement the Contractor &Ifimas that the Contract Time is a reasonable period for petfot rig the.Work. § UIUniess otherwise provided, Contract Time is the period of time, including authat izidAdjustments, allotted in the Contract Documents for Substantial Completion of the V' rk. 14.STIte term "day"as used is the Contract Documents, 'shaII mean tnlendar day unless o th efw i se.. spec i tic illy defined. 14.4 The date, of Substantial Completion is the date certified by the Architect in a&ordartce with SectiohI S.b.3. 114.6 if rite Contractor is delayed at anytime iti the 'e6mminceitneni tir progress of ilfe.vork * (I j dtim& ortietmd in the Work; {Z.) by labw disputes, fire, unusual delay in. deliveries, abnormal advimwi other conditions trot reasonably. anticipatatile, unavoidable casua tiosi or any causes heyoInd the Contractors control; of (3 j'by oilier causes that the Contractor„asserts, alai the Archh tecx determineiijiistify delay, the#e the ContiritaT me shall be extended for such reasonable time as the Architect may determine:, sunject.tar the pravi§ia� ofArticie 21: ARTiCLI `15 PAYMENTS AND COMPLETION, JI&I SchW* of Vahues 19.1.1 Where the'ontrita as based owa Stipulated Sum a the Cost of the Work with a Guaranteed Maximurh Price pursuant to Se ctionl2 or 3.4, the Contractor shall stihWt:a schedule ofvalues to.the Architect before the first Application_ fbr Payment, allocating the entire Stipulates .Sum or Guaranteed Maximum Price to the various; pottlonA of the Work. The ichedulepf vaiuea shall. be prepared in. the foriu,•and 6uppotted by & data to substantiate its- awnwy pquhvd by the j tc tect. This schedule of values shaft 'be used as a basis for teyirwing tlwtontractor•'s Applications .tor Payownt. g 15.t,2 The allocation of the Stipulated Sum or C,uatantetd Maji7mum Prit i cinder this Section BA shall not constitute a separate stipulated sutra or guaranteed maximum. price for each individual line ifem in the schedule of values. 153 CMW Ea ttiie § 15.2A Where the. Untied Sum is• the'Cost of the, Work,, ptus the Connector's fee with* a,4uarnuteed Maximum Price pursuant to, Section 33? the Contractor shalLprepare and submit -to the Chvner4 Control.Wtnatae within 14 days - of exetnuing this Agreement.,The Control Estimife i ikll include the es(imatedCostof the>Wotk pies the contractor'"s Fee. § 15.2.2 The Conirol Estimate sftall include: .l the docuinents crnumerated' in Article F; inclurding, i1L igodifuc ations thereto;, a list of the assumptions made by lire Contractor lit the ptcpnratitm of tine, Contt't�i h§tiniaie w supplement the information provided by:. the Owner and echtatned itr the Contract Da±ettmctits; 3 a statement of the esiimatid Cost'of the Work or i trade cata oriel ofsystems and the. $attired by g Contractor's Pee; A1A troantiarx AtOu'■ —26i7 (forrnariy Aib:r"—26a7j. Copyrlphf©1838.1951,195Ei,19bl, 1963. i�8; �t970. i8i�,1478; t�t3i.,19BT.�07 and 2f)'f 7,hyTei+s tnit A doon MstlhAe of Awn cWAll tights reserved. W,'AN.PiG: This AIA Vw6m*ntfs profit 44 tly U :€. Cepy:tdhf e. w `ant! kQpni#ior4?i'tnlaiis♦e, ' �• UrmdtholrOd ieproduc. Jgn or disirlbution of tilts nVtk'DoC,0 4A. ar My pbYgon tit si r. Wj result fit $"to, ciWl�ntt"crfrtifhsl ptoW%se and Wid be, ixn5rcnfed to tti;c criasrrni,ni eptgar ssfiafa ur�°+er lira Few� This dxudtent wan produced k;y AIA aoawara et i82Aa01'on itN2S12018 Undaf Order W0326910M wrkh upiris on 10*442019, and is hot for reaala. User Node: fl k loose!} A a project schedule upon which the ControlrEstimate 'is basal I"W esting;proposed Subcontractors, activity sequences and di fgfbits, milestone dates for,receil bled apptrival ofpertinent ittfd.rrnado i, schedule of shop drawings add samples, procurement and detiver�i cif matt bats or`ec{ui�pmettt,the Ownees occupancy sequireinents, and the elate of8ubstaiitiat Completion; and " a list iif any contingency amounts included in-tho Control Estimate for further development of design and construction. § 15.;;,3 Who the Control Estimate is acceptable tolhe Owner and .Architect, the t5i�rner shall acknowledge it in writing. The owner's acceptance ofthe Control Estimatcdoes not imply,that the Cohtroflstimate, constitutes a Guaranteed maximum fl ee. § 15JA'The Contractor shall develop end implement a detailed system ofcost control that will provide the "-Owner and Architect with timely information as to thc'anticipawd total Cost 6fthe Work,,T lie cost' control system mill compare the. Control Estimate with the actual cost for activities in progress and estimates far uttcotnpleted tasks and ptnpoied; changes. Thisinformationshall be reported to the, Owner, in writing, no later than ti a Coutractiies ffrst-Applicatioh for Payment and_ shall be revised and submitted with each Applkation for. Pitymeati § 15.:5 The ovvrier.shali authorize pirpafation bfrEv;s oils to the Contract Doctintefits tltutincotporatt� the agreed -upon assumptions contained in the Control Estimate. `fhOwttbr shall promptly furnish, §tfch retfioo Cohtracr Documents to the Ccntttactot. INC Contractor shall3toti6r thb Owner and Arcbitecrofany irnconsistdncies between the Control Estimate and the revised Contract Doct mm-1a, § 15.3 Appllcaitittns for payment $15.3.1 At least ten days before the date established" foreach progress payatent, the Contractor shall submit tt the Architect an itemized Application for Payment prepared -in accordance with the schedule of values, if tequired tinder Section 15,1, for completed portions of the Work. The application :chaff;be notaii7ed, if requiredi, be supported by all date subsunfiatingtlte'Cobtractot's right to payment that We Omer or Architect reguaite;'sWl re4oct retainage if provided for in the.Contract Documents; ante -include any revjsed cost couttot information requited by 5ebtion 15 2:4, Applications for Payment shal not 'inc lude requests for paymerii: for ptsrtaans of'thd Wtirk for which the, Contractor does not intend topay s Subcontractor or supplier; unless such Work.has been` pbrfot'med by others *hdtu the Contractor intends to pay. , § 15.3.1, With each Application. for Paymend.where the Cottract Sam; is based upon the Cast of the Work, or the'C&A of the Work with a Guaranteed _Maximum Price, the Contractor. shah submit payrolls, .petty cash accounts, receipted invoices or invoices with check vouchers attached, -and any biher evidence requimd by the Owner to r ncutstara that cash disbursements -already made by the Contractor ore aebount_ofthe Cost bf tlrei...Wptic equal. or exae l pro ss. payments already received by, "the Contractor plus payrolis.for theperiod coveredby the present Application for Payment, less that portion ofthe progress payments aldibutable to.the Cont itctks F4 § 15.3J Payments shalt be made on account of materials land equipment delivered and suitably stored. at tb;e site for subsequent incorporation in the Work. if approved in advance by fhe Owner, payment may similarly be made for materials and equipment stored, and protected from damage,, off the site at a location agitecl upon -in writing.. § 15:3.4 The: Contractor warrants. that title to all Work covered 6y an Application for Payment wall pass to the,owner-, no later than the tithe ofpayment.�Me Contractor :t'utther warrants that upon stxbrttitttil'o an Application fbr:Prtynteni all Work for which Certificates for Payment. have been previously i"d and payrttents reccivQ from the owner shall, to the best, of the Contractor's knowledge, information and beliof,'be {ilea , d"bleat of iitens, claims, security axtkiests or other encumbrant m adverse to the owner's i4teresu. 15.4 Certtificates for Payment § 15.4.i The Architect will, within seven days after ieceipt,oftfie Contractor's Application for i�ayment, either issue to - the Owner a Certtificate for Payment, with a sopy to the Contractor, for such amount as the Architect determines. is property dun, or notify tine Contractor and Owner of the:Anchitect's reasons for whhh9ltfin4certification in witple-orin part as provided in,Section 1,5.43. § ftd T'fiir issuance of a Certificate for Payment will constitute A"representation by the Architect to the Owner. based on the Architect's evtduations of the Work and the data in the Application for.Paytnent,'that, to the t eko fthe.• Min AfAttbcumeMA 04w-21h7'(farmN1y1i167ft=I1 ),C-ipVA0101936,f%l,IBM. iga1t1983IM,1879,197A.49T$.f987, 19 ,4DOTend2t)1TbyTise Afnerfcan ►nstbAe of Archkacts: AN tisane resented. WARNIRG Tht! AiAP 73dcun,"t is or otectedrp7righFtaw snit intiirp irtrifti r1*04(e . i4 Uri►Uth'ofl2ad r*pMducrdait:or dht+itriitt'orf of this *A11 neuron!. V, anti po?toa dt IL itiay rst�u$ in savers isiuii and ctiininiO tramltirts, oiwwo tfu i prosecuted va ttw raukitudt astern slossiiita under the few. This dociinient was omduttd by- to software at 18:2401 on U128MBArWor Order N6.0326910691 whlth axpbett on 10M281201 ,, and is Obt for rbs". ,Uiiar•NaEea: tY9378ti05B7 j' Architect's knowledge, inforin2tion, and belief, the Wbtk hm s progressed to;: rile point indicated, tiie quality ofthe Work is in accorda0e vAth iae Contract Documents, aW the Contractor is eatided to-pa0em in the amount certified, The foregoing.repreilenta6ris dmsu*d to an evaluatiotrt ofthe.Votk1orcoinfatinanoe v;Ith the Contract Doci9metits- upon Substantiat Completion, to results of subsequent tists and inspections, to correction btminor deviations from the: Ciiialmct Documents prior to completion and'taspeciftc qualifications expressed by ttie Architect. 9owever; thee_ - issuance of a Certificate for Paymentwill not be a representation that the Architect has (1) made exhaust v> or continuous on -site inspections to check the duality or-gtantity of the Work;(2) reviewed construction means,, methods, techniques, sequences, or procedures, (3) reviewed copies. of regl isitiods received from Subeontractors anct suppliers and other data requested by the; Owner to, substantiate the Contractnr'`a.right,tt payment; or(4) trade exmmination to:ascertaiici hove or for what -purpose the-CD;t" tor.tiits wed mott6y previously paid t' At count -of the Contract Slim.: IUJ The Architectima withhold a Cett icatefbr Pa § y yment in Wholi ar.in putt; to t}re extent, rcasinably necessary co protect the Owner, if inAe Architect's opinion the-repMetttatiahs to the _Owner re4uirea by Section 15.42cannot be - made, Ifthe Architect is unable to certify payment in the amount of the Application, the Architect will notify the Cotttractor.and'OwtierIas provided in Section.15.4.I; jf the Contractor, and the Architect cannot agree on a revised smount, the. Architectwill prozrtptly,,issue a Certificate for, Payment for the amount for which the Architect is able to Maki such representations to the thvtter. The Architect may also withholtl,a Certificate tor'Payment or, because of subsequently disco*eted c�+i'denee, nisy;nullify the whole. or a pact of II•Gertificate for Payment previtWy issuedto such .extent as array be n60ssary In the Architect's opttnion to protect the- owner .h+ottniosts for w hieh the Cooiracior, is restzovWbic, ineiudia&loss resulting irons acts and omissions described in Seclion 9.2.2, because of if defective Work not reme iipd; ,2 "thft&party claims filed or reasonable evidence ini icatittg pmtiable fit'ing of siuh claims runless security acceptable to the Owner is provided by-ibe Contractor; .3 failure of the Contractor to make payments properly to .Subcontractors of suppliers for labor;`materialst or equipment;. A reasonable t vidence that the Work cannot be completed forthe onpaild Bala ice af,& Cap_ nttact aunt; .5 damage to the %met• or a Sep"te Contmetor; .6 reasonable evidence, that the Work, Ill not ire r osnpletat within rile Contract Time aid that the unpaid 6alatrce would notbeadequate to"cover acttuL[cr`:liquidiiedditnages forthe si iciputed delay; or .7 repcatedd.tnihue to carry out.the Work in accordanct4iih the Contract Documaiti. 115 44 When either party disputes the Architect's decision regarding a CooAcate f'or Payment under.Section 15.43. itt whole or in part, that party may submit a Claim inn accordance with Article ll ; _ j 15.5 Progress Paymm is #,5.5.1 The-Couttactor shaft pay each Subcontractor. ruts luxes than seven days at%r,t Apt of pa�teettt ih Owner; the ntttoun£ to which the Subcontractor is,aititw, reflecting pC centag'es actually -urine a i tin p the Contmaor on account of the Subdontraeto'r`s portion of theWork. 'M Conttadtor shall, l"y approptiati with each Subcontractor; require each° Subcontractor to make payments to sub-sub6mtricim in a similar $1 S.0 Neither the Owner not A,rch*d shall have an bbfigaautt to pay or -see to the payment of moneyto a ,Subcontractor or supplier except as may otherwise be required by law. ' 45.5,3 A tweitiftcate ftnPajYrnent, a progress-paymetit, or partial -or. entite use or iocupancy tt3the )cCt;ivy ihs Owner shalt not coniii taut ace pitinn+re of VVortt riot in a ordanee with rite Contract t octttuettts: J'15.8A Provided the Owner has iitllilled 3is "payinbnhobligatiUitis it ader the Contract Documents: the Contractor shall defcrxi and indemnify the Owner from all loss, liability; damage or expense,.inchuling n-iw ablt attorneys fees and litigation expenses,. arising out of any lien claim or other claim for payment by arty Subcontr actor: or-s ippl er of any, tier: ;Upon receipt of notice of a lien claim or other claim tot payment, the: 0ivnefshall notify -the Contractor.If approved by the applicable court,,when iequired; the Contractor"tray substitute u sutaty bond for true p�y:egainst which the lien. or other'claifn for. payment has been dssctted. `/iNttfbaumant A'ttLl*" —20i7 (fonmsriy #1107n' —'fj, Cgtyriglitrb ii#3t3,d9:*s4,1953.19�1 198.1,1868;,t�70.1�7b, Init. AM0dCG t hiWMe of ArchtteM AN ri0his reserved, di it taiiiris A Aa,Ddrutt+a$�t bt oroioatact ky UA. CopylpR Unsummized repro6cuon or disto gut on d1 tiitd AW, troer,nranl, or any partion +dr+t. y nsuit fis saveta c<aii l oroseci,tea to thV cazkrmm extent 04Astble undo the law. Ibis domahant was proceed by AIA aoltwarb at ta:2t M0.0=91t?t; whidr @%fuses on d04W2019, and is MA for resela. 'riser Naffs: 41M. with %, (193780050) § 15.6 Substantial CoavletlOn. 15.6.1 Substantial Completion is the stage tit the progress of tGe Wark w6tti the Wofk or designated poitibn thereof is; siAtiently complete in accordance with the Contract Documents so that the Owner can occupy orutilize the :Work for its intended use. $1&62 When the Contractor considers that the -Work, or a'poffton thereof which the thvrrer agrdes to aecept sepamety, is substantially complete, the.Contractor shall prepare and submit tothe Arcchitect a comprehensive list of items,ta be completed or corrected prior to final payment. Failure to inklu& at item ,on such, list dons notalter the responsibility of the'Coatracfotid complete all Work in accordance with.the Contract l)ocumenis. g,15.6.3 Upon receipt clfithe C bribuctWri liadieAithitect will matte an inipee On, 6determine whether tho Work or designated portiorf thereof is stihmahtialiy;complete. When the Architect & rmines that the Work br designated portion thereof is substantially complete, the Architect will issue a Certfcate d. StIb$f,.amial Ct Inple ioo which shall, establish the date of Substantial Completion; 0stabli'sh responsibilities, ofthe Owner anti Cbntractr r:fr f. security, nYaintenance, heat, utilities, dantagt; to the'Work arty insurgnce- and fr%:the tulle within which. the Cotitractor.shall finish all items an the list accompanying the Certificate: Watratities required'hytl'ie Contract Doe tt thts'shall commence bn the date of Substantial Completion;of. the Wi lk br desigtusted portion thereaturtleai cr wwise prrrvided. in the. Certiiicate of Substandai Completion.. g 15,$a4 The Certificate of Substantial Completion shall tie subm'Ittedi to this pwixerand C66UAd o far their written acceptance afxosponsibilitiesassigned to then ri the a tificate. Upon'such acceptance and'consentof-stnety, if any, the Owner shall, make paymentof fetainage applying to the Woik�or designated poitioo.thetwf Swh paymeftf shalt ba adjusted for Wotk that is incomplete ox not in accordance with fhe requirements of the C:ontratt.Dor.uments, g 15.7' l 1nal Completion Stud Final Pigmy tt. g 15.' I Upon receipt of the Contractor's notice that the;Work ork is reatly.for final anocctitrn slid ociceptagCe and upon receipt of_a final, Application •for Payment. the Architect will°pr+osnptly make such inspection, and; when the Architect Y performed, the Aroliitea �aiif finds the Work etcepW- e, under the Contract 0� cuments and the Contract fully proniptly,issue a:futal Certificate.for Payment stating that,% the best of the Atchit+ect's knc vlddge, infnrrrition and belief, and on the baiis f the Ardhited A on-sitc yis"tts and inspect ons, the Woiklm peen bompletg in accioidi it e with the Cont metDocuments and that the entire balance found to be due the.Contractdirand noted iii *the fuial ' Certifidate.is'due and payab`ie.,The Ax0itect'S rmal'Cei iftcate:for Payment drill constitute'a ftnih&r repxesentadlm, that conditions Stated in SectiottJ5,7.2 as precedent to the,Coniractor`•s being entitled to anal payment live been fulfilled. g,15.7.2 Final pa,ymentr shall not become due until the Contractor has delivered to the Owner, a con plett releMe of all liens arising out of this Contract or redeipts in Tull covering all_labor, materials and equipment fat whit h a lien c ouldbe filed, or a bond satisfactory to the Owner to, indemnify the Owner against such lien;,if suchlreir,rerrrains,unsatisfied after, payments are made,,the Comractor shall refund td the Awner a�L money trit lr he Owner may be cot ipelled'to pay in discharging such lien; including costs and reason able:attorndys"ices,. g 15.7.3 The malting of Anal'payment shall constitute a vaiitr ofclafrn3 by the Oviner ex,41: those arising from .1 liens, claims, security interests or, encumbrances arising out of the Goatra'ct ander�led ,2 failure of the Work to comply with the, retluiterrtents of the Contriict'Dost minN .3 terms of special warranties required by.the'Contract boc"u'rtt nts of A audits performed by the Owner, if perit►itted by the Contract Docuzneuts,,afier'final payment:- g 15:7 4 Acceptance of final payment;by the Contractor; a SubecI tradtrirgt supiiiiist shad :co istitutt a watt+er,bf cT ti»s: by thatpayee'except thosd p eviottily trade in witting and iderntified try stint pa j'ee as urtsesitibd at the time of the fiit;ttl i. Applicatioti foit,Payrttetit. ARTf E.16 PRpTEMN QF PEPMNS'At D PROPERTY g 16,1 Safety !'reeautivns and Programs The Contractor shall be responsible for initiating; maintaining, and supervising all safety precautions as4programs in connection witfi, the-perfnrrnance.of the Contract. 'Tate Contractor shall take reasonable precIauttarrs`far safety of, and shall provide reasonable piotection to prevent damage,,irrjtuy, or loss to. :1 employees'on the Work and othee persons who 6y be afi'ected t2ieceliy; AIAb& mantAi""-abt7trormodyA1071"-20r C phtettesa`ig5t.i ,tgai.tosa Sena~aro.tay4.Ms79,t987.taa7', and2011by'lhe Init. Amwfeari Ks tttft of Amft hotL AN rights re*nItt WARNtfao Tftta AJV 00o maO vtdhsdes bq U-S, 46 .Unituftviiaed tiproOreU4on or cr lribut�bti of thlt,AlR� t7s cumsnt or i 1y t h rhay,resutt in aytra e+ J+ and sitar ponatt a� uttd taiti 6a praraewterf is ti'e ttmtirnum alien i»sitr v untltr "'tgtw- 7hb do0uhunt wes produced Dy AIA 4otiwatN 9t 1$ 24'01 oh IQgS MA nutlet brtw No,032891069't Nit kh owpk a on-10128/2049, amads not for'rewhi,• vzorNotol �1id32aDp5D7y .2 the Work and materials and equipment to be incorporated therein,. whether in stoiage on or ottthe site, under care, Custody, or coniol of the Contractor; -a Sub6 atradnr, or as-'subcontractof, and 3 other property at the, site or adjacent thereto, such as ttees,,shrubs; lawns, walks. pavements;. roadxvays, structures acid utilities not designateta for removal loeation� or s+e7rla cement in the r:outse of construction:. _ ' a . - The: Contractor shall comply with, and give notices required by, applicable laws; staftites.'ordirtimce's, :Hodes; rules and regulations; and 16*M orders ofpu6ltc authoritiesbin$ on safl� ofpersons Ondproperty°and thiar protection ftma damage, injury; or loss. The Contractor shall promptly remedy damage and lass to pro perty caused in whole; or in Hart by the Contractor, a Subcontractor, a sufi-subeorittactbr, or anyone directly or ifialrecdy employed byAny. of diem, or by anyone for whose acts they may be liable and ffor which tht,Contractor isreippissible under Sections 16.1.2 and' 16.1.3. The Contractor may make a claim for the cost to remedy the damage -or 106 to the extent such damage,or loss is attributable to acts or omissions of the Owner or Architect orb, inyorie for wbote acts either of them may, 06 iable. and not attributable to the fault or negligence of the Contractor. 'The forego tag obllgations.of in. addition to -the Contractor's obligations under Section 9.15. 16x'}lttsaidous .iY4'atetlala ifid'Stibitatieft § 161A The Comfruw is responsible for compliance with the requiret'nents of the Contraa l�ocunricnfs regarding .hazardous materials or substances: Ifthe Contractor encounters a hazartiw4 material or substance not addressed it the Contract Documonts,;and if tcasonable precautions wiil.be inadequate td pirCeetrt foreseeable bodily injury or death to parsons -resulting from a material or substance, including but not limited to asbestos or`polychlorinated biphoyl (PCB), encountered on the 3itd try `the. Contractor,. the Cbtitracttn shall. upon recognizing the condition. inmtediatoly _stop Work its the affected area and notify "the Oivne and Architbot of the,ccindit bn. When the material or'substamoe has been rendered harmless,>Work'in- the afteeted area shall resume upon written 'agreement'of the Owper arid Cotatraclwi: Y Change Order; size Contract 7`irrte:shall; be, extended pmpr`rately and the Contract shin "I be ,itit reased m'tiie amount oft�e Comtractor's'reasonable adi itionat costs of sisutdown; delay, acid itatt-0 i.• § 1612 To the fullest extant permitted bylaw, the Owner shall indemnity and Bold harmless the Contractor,. Subcontractors, Architect, Arcbitect's consultants, and agents airid olmptoyees ofany of them from and againsfclaims, damages, losses,,and eipenses.. ncludfq but not limited to artorheys' few arising out of or vesulting from performance of We Work in t1>e affev tcd area, it fwftt;,tbe, tiutiall or substance presents the risk. ofbor(ily injury or,, 4ogi# as described in, Section.16.2.1 and has""not-.eetr retr$ere i harmiess, provided'tliat'sucb clat`ttt ,4>#mage, lass; of expense is attributable.t t bodily injury, sickness, disease "ter death, or to ittj try to.o't'(Whucttoti6ftangible property. (other than the Work itself), except to.the extenfthai steels datnhge;.lom, or.tttpet► tis due to, tlic A ,or negligence of the party seeldngindemnity. § 16.2.3lf withouf negligence ou`the part of the 06rittactor, the Contractor is•held fiable by a gove mentagency for st the coof t'etnediation of a hazardous malarial or substance solely: by reason €sfllerfortninag Work,as required by the Contract Documents, the Cheater "I indemnify the Cbtitractor for all costvand `expense therrstiy indwr'ed. ARTICLE17 INSURANCEAND BONI)$ §_17.1: C4ntf4dar'e insu"Mce § 17.1.1 The Gotitractor shalfpiircbase and main sin insurance ofthe "es attd3 m is of;liabiltry, 6druaitii4 tite endotsement%, and stibJeotto the, terms and conditions, ati lescribed an this Section I T t or• elsewlieie in the Contract Datimenits. The Contractor. shall pumbase and . maintain the insuttutce required by this Agreement from an insurance company.or:insuranee companies lawfullyauthorized to issue insurance f6 the jurisdiction where the :Pv: ject is located, The Conhactor sbalt maintain the required insurance until the expiration ofthe pers for correction. of Work' as set forth in: Section 18.4. unless a dufferaot_dtr ation.is'§tatedbelow § 17.1.7 C&ttmercial General Liattttityinsivance' forthe Project written on an o cuir tef6rmwilfi 66Wy limits of not lesi than One Million-Doilars and No Cams (S 1,096 600.00) each occurrence, Twti %'1400. Dollars and No Cents,. ($' 2,006,'000.00 ) general aggregate, and d to Million Dollars and No Cents- (S 1,006,960.0) aggregate for products-cornpteted operations hazard, providing. , covmge for claims including .1 damages because of bodily injury, -sickness of disease; including occupationalsickness.or disease, and death of any person;' A!ADocumentAi"-=20i?(fom tVAlff- , 2007). CdpAftO IM. Iasi. 1054 i9ei,1963;1M.1070.1871;197a.USY,1997.2ittt73nd20Vby1he Init. A M06Mn htsfttete &AMMecis. AIt"rig+ts reserved. AMINO; t,* MA" 0*00ryart is diotseW by V, C6"itgttt LAW im ratttxwttaTWTmst1m W 12011(orired MprOU001 or &S(fiot+tiod of this AW or a�;ttpo�lfo�i ofy m ft,suitfn ve€e bsiB gtfmieutf pt<stattTa4 end Wal be, f t MvKvted to tee Mai"Um extent gene to". 'this dtacument was p byf-s�tA�cllwiaFe at 1&:" 41,on i0/2a121�ta under Ottl� NOMM10091 which expkW o 10>78t I§. lino is riot IorreiisW, tlsar Matool (1932t O507)' I personal acid advertising injury; .3 diimages bedause of physical damage to or dewliction of fangibie property; including the loss of tine of such property; .4 bodily injury or property damage arisin"g out of campleted operations and 4 the Contm adr`s indemnity obligations under Section 9:'t s.. § 17,1:3 Automobile Liability eo'veting,vehicles owned by,ttie Contractor and non=owded vduel used by the Contractor, with policy limits of net less than Two Oimdti d,Fiiiy �Mousaliin f)ollaia and No: Cents �S Z30.000,00' per accident, for bodiily injury, death of airy person; and properly daiuW arlsing nett of the oWnei`shtp, titantt nance, and use 6f those motor vehicles along writh.arty othei statutorilysegttited'autcsmobile coverage: § 17.1'A The Contractormay achieve the mquko tiffiiis and covemge for, Comore iai Gett eral Liability and' Automobile Liability through a. combination ofp6mary:and excess or umbrella liability°insurance; provided such primary and excess or ti mbrella insurance policies resist iti ate saute or greater coverage as thosorequired under, Section 1111 and 17.1.3, and in no event shall any,excess or umbrella liability insurance provide pnarroivet°coverage than the primarypolicy: The excess policy sha11 ilof ri:quii ".the ei hau§tion ot1he underlying Bruits orly,t roygh the actual payment by the underlying insurar t. § 1714 iVorkers' CotooAsation at statutdry limits:. (Pbragrapkv deleted) § 17.1:10 The. Contractor shall provide certificates of insurance ai ce.ptable'to the Owner eviticttcing,eot9 the. requktrhm% in this Section 17.1. at the following limes;: (l ) prior to commencement of the. Work; (I) or replacement of each required policy of insurtinee, and (3)°upon the Ownet's written request. An add certificate evidellcing continuation of lih6litycoverdge, it tcluiding cove fgr d*pieted.operati h ,, submitted with the.frnal Application for Payment and theft afar upon renewal or replactrrtcnt ttfsucl%c the expiration oftheperiod required.by Section I7.1:1. Thwofftil d%tes wit show the Owneras to atlrt od the Coutttc6es Conimericial Cren ral [.;ability arfd excesg'of timbrella liability policy: § 17:1.11 The Contractor shalf disclose to the Owner ;any deductiltie or, sell intured; retentions applicable to any insurance required to be provided by the Contractor. § 17.1.12 To the fullest extent permitted by law; the Cqntractqr shall causethe tortemerctal iiubiirty,covetage requiredby this Settiod 17a I td include (i),tht Owner, the Architect, abd this �itect's Cionsuitants.as additional iftsttmeds for claims caused ih kholt.or in part by the Contractor -'A neg gent iicts or whissions dif tg ` bb Coittractoir's' operitiirns; anda(2) the Owner is an additional iosared.for claitns caused in- wht�e or in Taff by:the Contracitor'.s negligertt'wts or omissions for which loss occurs during compleiia operations: Theaxiditiorial insured coverage shall,be ptlt`haly anti non-contrifititory to any of the Owner's general liability insuhiade-policies and shall apply io both ongoing and completed operations. - To the extent coots erciallylavailable, the additional insured,eoverage shall be no less than that provided by'lnsumnce Services Mm 1nc.,(1SO) formsCG pia 10101 b 4. CG20 37 6104. and. with respect to the Architect and the Architect's Consult, CG 20 3107 04.. § 11.1.13 Within three (3).businesa days of the date thb Contractor becrhiies�aware of to impending of 4khmf danceltatian or ear' tmtion of ari . insurartr� _ 1i y 1'equtted by this,Section 17.1, <the Ccintr�tor shall pmvidts aottt:e to the Owner of s60t impending at actual cancellation o r'expira Wn. llpnti'rect ipt of not ce firiri9 the Cotltri ct6r, •the .Owtu shall, unless the lapse in coverage arises from an act or omission orthe 6 wrier, have the right eti stop the Work until the, ;laps in coverage has been cured by the'procuretnent. of replbcenteni coverage by,the Contractor. The #i inishing. of notice by the Contractorshallnot relieve the Contractor -,of any contractual -'obligation to provide any required coverage. T " (Table de!¢trd} (Paragrrapii.* daWa ) f Iln owner's insumom § VIA ownees i iability Insurance The Owner shall be.responsible for, purchasing and mai ntaining the Owner's usual liability'insurarim, ttlit AIADocumeatA144-tt2G'17(NnaeHYM07--2bD71CopyTri9hlt1896,"19b1',195a.IWI,10el100,WO, 18'�4,14A.19$7:1007,2 l7ind2011by'OW Amsticsn Inaayuts of Ardti tests. All rights ressrvsd. IVAIiNlNG ihF9 jrAf, t)oCG I {S pP3iecttfd 6y OS. c6pY49W L:aW ami hftrtmtiosfhFt'r*ftm. 1 B Uissu.IwrUAd reegrodnrflbh r-dfstrilM:tiort Othill_A!14d M•?�f.anV,i6rh�tttl6 may, mr#ift in s&verr ttNl and c er�bnet piiAariids; and VAU he, t yra * uted so the Makewro -tent passihka Under th- taw. This; dW 61fW Wits produtaQ by AIA $66ats al i8M ,;ot i 6*Y2812016 iAi i 0110er No.0328W 0891 Which t�"8 cn 10!28I2()19, end (s not for tesald. .usir Natss: ti el28gQy87) § 1722 pmp" Insurance `.§ 17,2IA The fawner shell purchase and maintain, from an'iiisurance company or, insumme dnnpanieslawfuily_ authorize to issue insurance in' he jurisdiction where the Pre)jeet is located; property insurance written on alSuilder's risk^Ali--"risks" completed value or equivstentpolicy fbtm andsufiicieht'to cover'the torah value of the entire Project on a replacembnt:cbstBasis. Tlie Owner's property.tisutncx coverage shill "ono less tliart the amount of the initial Contract Sum, plus the value of subsequent Modifications and.labor perfgtntocf or lttatedils 6r equiptrment aiipplled by others. The property insurance shaltbe maintained until Substantial Completion, and thereitter at provided -in S ction ,t11.2.2, iinfe ss otherwise provided in the Contiract 13ocittlients or otherwiseagreed in writing" by the parties do this Agmement.'This insur=ce sha{l'include"the ititetests df the Owner, Co' tractbr, Subcontradots, and Sub-subcatttt"actors is the"Pmject as insureds. This lbsuh ice shall incluiie'tli+ 'interests dfirlortgaws as.loss payees., 117.2.2.2 Unless the patties agree otherwise, upon Substantial Completion, ft,O Fier shall continue the;Wumce x ,quired by section 17":2.2.1 or, if necessary, repldce the insurance policy required under Sectitm 17:2.2A with property insurance written for the total value of the Project that shall remain. in" of ect"un6l exliirAtion of the period:fot correction of the Work set forth in Section 18.4. § :17.2.2.21fthe insurance requited by this Section 17 2.2,i's subject 0 deductibles or;sel ittaured teteattititt t}le Owner shall be responsible for all loss not covered:because ofsuch deductibles or fe6t one: § "1 J 2A Ifthe Work involves remodeling an eicisiingtiructim or constructing an addition ib an existing i ttruc um"the Owner shalipurt:hase and maintain, until the_expitation otthe period forcomoction of,W;ork as setforth•in Section 111.4, "all-risks" property insurance, on a xeplacementdost basis, protecting the existing sthwWre,again`st direct pfiy4cal loss or damage, notwithstanding the undertaking of the Work The O"er shah be responsible for all. co-insurance penalties. '17.2:2.5 Pridr to commencement of the Work, the Owner shad secure the insurafe' acid Provide, evidence of title coverage; required under this Section 17.2.2 arid;;upotl the C cgni;actot's request, provide a copy,uf fhe,pmpony insurance policy or policies required',by thus Sectir a t7,12. "Ttte:eopy of thi. policy or policies 0rovidsd'shill contain all applicabbecomtlitioiis..defin tiaras; exclusions, such etulorsomonts; § 11,12ANithin three (3) business days of the date the Owner becomes.sw$re ofan impending or actual cancellation or expiration prany instnancexequired bythis Suction 17.2,2, the t3vvrter shall prttvii3e notice to`theCoritractor of such' impending or actual cancellation or expiration: Tiles the lapse mi coverage arises 66m artAct or omissioh of the Cr)ntractiir: j1) the Onntractof, upon,receipt of notice from the Owner; "sha11 have the right to stop the'Work until the, lapse_ in covttage "has:been" cured "by the. procurement of`replacetnetlt. covetuge bY'cther trio t)wuer or the,Ca�titract<ir; (2) the ContractTime and Cdtitmct Sung slraltbe equitAbl'y adjusted; and (3.) the O) vger,wa ve$ Ali righti against the Cotitracior, Subcontractors, and Sub-tubeontractort to the extent anry lost to the O!Ruer would bale been covered'by the insurance had it not expired or been cancel led. if the Contractor purchases replacement �wmrage, the costof the insurance shall be charged to the Owner by an appropriate Change Order. The furnislting,of.notice by the Owner shall not. relieve the Owner of any contractual obligation to provide required insurance. 111121 Waiver ot,$ut gatiw 1171.2.1.1 'The, Ownerr and Contractor Waive all right's against (1) each other mid Mi oftheir subcontractors, sub-stibcamracttixs, agcrtts, and eirtplgyees, each ofiflre opet; "(2) the Architect and Architect's consultants;and°(3) Separate tontracWrs, if any, and any of their sub+contractors,: nul sitbcoritY`aetots, agents, and uniployee� f©r,daift caused by fire, or other causes of loss, to the eztenY, those, tosses are covered by property insurance, required by mi$; Agresstrient or other property insurance applicable ta"tlte Ptnjecf; except such Iightg as they"have to proceeds bf sbcb insurance. The Owner, or Contractor, at'apprtrpriatdi shaltl require similar written ;waivers=in hivor,afthe individuals and entities identified above from the. Architect, Architect's consultants, Separste t'ontraetors,, subcotitraotorsl and sub-subc6ntractors. The policies of insurance porch4sed attd maintained by each parson or entity ag ing to.waive claims putsuarittd this,Section 17.2.17 shalt not timbibit this,waivei of subrogatioh. This wiivt r of subrogeuion shall. "be eft'eetive as to,a person or entity (1) even though that person car entity wotild .otherwlsd have a "duty;of.' indetrintftttion, conttacEual or otiteiwise. (2) even "though that ptrstin or etttt£y.:tlid notpay the insrranet: piamirrm - directly or.' indirecdy;,or (3) whether or not, 'oo thesoyi or entityhad anWidrible'interest in the daataged property,. § 17.2.2.7.2' if +dunes the Project construction period the Owner insums prdpet -6. tail or penal of both, at pr adjacent tit the>sibi by property insurance under'pol cits "separate,froni those iiisaring the Project; pr if after final. AIA t7ocum6MA104"' 2M (r kh*lyr AIV--2007) Cai yrtglitC M6,1951,1956.1961,1903;1968,1970: 1974 19T8,1967;19012007 and 2011 *'The, lint. Amerkin MstdulabtAkh#8L%A14Y1014s rWWf`Kd.#AAkWG Thfs AlA-D meht lsprdtbd" by (45. Gomrtght lawantl'itrfiemxtt inei>~rEi W". i nnolrlo±S edroF�}ceiltctxbaordigt*?'6utior!ofthis,klA*r]au~tRrAftodfV3ngriLMdSy GirJYt t1»utiisn193 n+nialpertattles.andg*INbe- Ixos6tntesliaEhemazimuPrieYtetxtpossibloiinderkita6)FAtktoft ftAr"1a:24;01ifn;i0!28i#0lalrndprO*r Na0326910691 whtdranfts on 90f M010. and' h not toi risalo: UsOe Natm (1932800507).". payment propertyinsuiatide 19 to be provided on the completed,ftejOct through a prsficy or p6liciis other than those i0surilis the Prl�&t during the construction period, to the extent J;eftinible *,,wch polie4a, the tights'in accordance with the termsof Section 11.2-2-7.ffo,rdatnagmcaused .* fate oroilidrcausesofkiss covere6b this separate propertyinsurance. .Y 171.2.8 A loss insured under the Owner's pibpeq insuranceshall be adjusted by theprwner-99 fWucia.J and hade payable to the.Owner as fiduciary for the insureds, as their, interests may -appear, subject to "direments of any applicable mortgaged clause. The Owner shah pay the Architect. add 0�, ttactbr thelrJiM awwofinsuranoe prociceds, received by the Owner, and by aplimpriiite agretmenis, written where, legally required for VaUdtiy, the Architect acrid,Contractorsbal . I . make payments totheir ton . soltaots Md I SOUltittaptort in iiinilaf manncr. (Papqgrr Pw deleted) (Table deleted) deleted) ARTICLE 19 CORRECTION OF WORK I J&I The Conftqtor shall proniptly correct Work vejectdil by the kthitift or failing to cohfdnn Wthe te4ukcinents .of the Contract'DocutneuM whether disr�iveroid bdore orafiii­Substantial Cximpletiottand w1kW or notfabricki6d, insww (W completed. Costs ofrdnftfihg ifth rejected Work, itictudhig addj6ctW testing and moons, the cast of repjaccmeK. and ,compete sation Wvj.* and expenses ft*& necessary therebyshidl be sane Contractor's wq:iense, artless wmpefisable under Section AA.7.Siri 6thibitkDatefthtatipp Qfthepostof 60 Work., .101 in adtliltiw, to the Contractor's obligations under Section 9.4, if, within one year aftai the date of Substantial Completion of the Work or designated potion thereof or after the date fbr commencement of warranties established mdersection lS.4.j,&byterms tifanApptic*biespecial,wmutym*itod� 'y the Contract Documents luty of the Work is found to be not inaccordance.With the tiocements ,of the Contract Documents; the Shan correct It prbmptly'after receipt of notice from the OWoertd do so M10ts tb; Owner hwk pteviouilygiven " I I I . given'thecot1#440ra , written acceptance of such coilditign,The Owner sliiall give queli.n1ofict promptlyafter'discovery ofthe condition. During the one-year period1br correctiombfWort itthe,0wiler falls to notify the tontractdrand gtft the 6W=tor, an opporumity,to make the correction, the Owner Vitityes the rights, to requiritcp=tioa-by the Contractor anti ipmane a claim for brtach.of warranty, § 18.3 it the Contractorhils to correct nonconforming Wo*vitmn A Teagohabtd time, the Ownet;-May-corrvct itin accordance,vith Section 8.3. 18 A* 7!he ono-yetr period for correctionof Work shall be• extivided, with ic to portions of Wo*,f orm respect Uft ocif ad after Su6stailtiai, Completion by the period of time betm7cen Sub staliti oil C omplctibn viii4the amW'i**iti6n, of that portion of, Q*.WbrIL a 118,5 The one-year pentad for correction otWorksha I not battended by corrective e extend Work'perfqrmed by the, Contractor pursuant to this Article, 19. ARTICLE 19 MISCELLANEOUS PROVISIO Neither 6Artyi6the cotitmctshall assi, the Conduct without written consent ottkother, exdcpi thafth&&ner assign "Y$ without consentofft Coriftetorvsigg the CoftiWA10 a'len(ktproviding constnmtion.fhkincing for *PrqJcct if the leiider wUnies, the Ownei's rights and obligations xmddr, the 6ntiket Ddcdmeft. The GAt1for Aw-exectlie all cons"reasonabty.r;quired to facilitate such asgignment. I , 'i 192 Go"ming Law The Contract sl�41 be governed by the law afthe place where the Project is locatecLexcludingthat jurisdiction choice -of law rules. If the parties have. selected arbitration, as'llid method -of bioding dispute tegolationJhe,Federal Arbitttiion Act shall govern Section 11.6., § 19.3 Tow VW fnqm*ns Tests inspections; and approvals of p6rdbm of the Work requitedby the Contract Documents orbyapphdaillielaws, st0utes, ordinances, codes, rules arid itgulikli6its, dr la*M ordefilbf p ublid'aUtfioifti'Os shall be made it an-appropriaie Afteledo ftm*MafAfohft6dL All lights ressr**d. WAVW1QA. This "JJS C6rV14ht Law. tW'tW#MAtrorraelTMAHOC 20 JnAvmortzed F*G&*c:Vt0d 10 thi Maximum MOW idew the taw fink 4o�waz pMducto bV AIA 6�a M 18i24-0i*0A far2=18 Undw brdei Ord po"Ib", U, No,032OeM whith a0hs on 10moto, aw is not rar r#we. user Notes;. (1432006567) snit. time: Unlem.othe ise provided; the. Cptrtrartor shall i ake atxangemetits for such tests, iti iibns, Willi t� als th an independent testing laboratdry or entity acceptable io the Owner; or wiih the appr*iate WiZ atttitor$ty' and shall bearaltrelated costs oftests; inspections, and gnwoyals..Ti tdittractorshtill giveldic Atultitt ct:titt;ely notice of when and where tests and iospet tions are tb,l'ie made so diet the.Architecfniay be pttsrttt'fdr such procedures, Ue Owner shall bw casts of tests, inspectiotrs, or approvals that do not b`ecdrne regttiinme>1ts to lii's#iex bids are received ,or ue tiidons concluded. The 0Wder shalt direct!y arrange andpay for tea, !nsehe;ar approvals *here, building cod" or applicable laws or regulations so require. J 19A The Ownees representative: (Name, address, email address and other informationj Jeri Schwutte 9880 NE 9th Ave Mianti Shores, Fl. 33138 § 19.6 The Cottiritctorf a representative: (Name: address, eniaitait t= and other,informa on)� Keivn Scbwarte, Pei Boz 347947 Coral Oaf les,'Fl. 33234 f 19.6 Neither the Owner's nor the Contractor's repiesenfative shall be'clisitgeci without t6tdays' priornotica to the other party. ARTICLE 10 TERM19AMON OF THE CONTRACT 20.1 Ter nlnWob by the Contract i If the Architect fails to ceitit'y payitsent as provided io ectiop`15.4, t for it perir4df 30 days ftoug t'no fault of the Contractor, or if the owner fails to make payment as provided in gection, 41. for a.period of 30 days, the C6titiiictm may, uponIseven adult oaai dos, notice to the O. wner a6d the Aral hitect, terminate the Contract and recoaer from the: Owner payment for'UVcuk executed,.inciudirig icasonablc uvertitd and profit -costs irietrrnx# by.reastm of such termination, rind damages § 20.2 Tetttertation 4 ft Ofter for Came § 202.1 The Owner may terminate the Co nttact if the Cana cqt t 1 repeatedly.,tefirses or fails to supply enough properly slaillco'workers or' proper materials; I faits tb make pay nt to Subeontractors'tir materials oftabor in accoidanc y%dth the "re§pWfive. agreements between the Contractor ed, 6 5idraontfaetoM-, 3 repeatedly, disregards applicable lows, statutes, ordinances; codes;; rides arid i onsi or lawful orders eft public: authority;, or .. A otherwise is,guiity of substantial bftch of a provision. of iiie. Conttaet Documents: $ 2022 When any of the reasons described in Section 20 3- exists, the (*nee, upon certificationby & Architect that• sufficient causeexists to justify such action; may, without prejudice to any other fed'iedy the Owner may hive and after giving the Catltrgctor seven dajts' notice, terminate: the Cbntra4ct and take poSsessloa of the- gibe attd°trf all' mateiiaLa; egWprttent,-*Is, artd construction equipmept and machinery thewbn owned bji the Coritraotot acidmay- finish the Work by whatever reasouatile method the Owner may d6ein.6:p�dt�e ti t)pon. request of the C+tYntractor, they Owner shall furuis6 to theContr tara &tatted aceout tittg'of"the eosts incurted by",the+ Diner in finisiaittgytke,'l7r?`o& 21 No' 03M91069')`W"exph"oft 1WM?018: 1S?mt%rt"a%L riser Notes: (1832800602), § 20.2.3 When that Owner terminates the Cdrttmct Ibcone afft,;vasilns stated iri Sactitnt 2(%2.1; the C.oitrattor shall not be entitled to receive further payinetit until:.tbd_' Vork is rwisbed. § 20.2.4 If the unpaid balance of Contract Sum eitceedscostsof finiihiag the Work, inclitdins.cdrnpt!bgation for the Architect's services and expenses made necessary thereby, and 6that damages incunbd by the, Ownerand not - expresslywaived. gulch excess shall be paid to`the Corattaotdx. �f stychsts•atid _dattiage exeei thc,ttnpaid balance, the Contractor shall pay the difference to the° Qw er. 'Ilte'amount to bt piiid to ilie Gonttactor ar 4vvtter, as•tKe Ease °maybe, shall be certified by the Architect; upon apptication, and this obligation for payment shall stm ivotrwination of the Contract: (ParugrtiW deleted): ARTICLE 21 .CLAIMS AND DISPUTES § 21A CWms;•disputiss, gad other matter3 -in question arising out.of or relating'to this Contr;ct, including those alleging an error or omission by the Architect but excluding those arising under Section l 6.2, shall be jreferred' initially, to the Architect for decision. Such matters, ex t ept tlfost• vs*aived as.pnMded for in Section 2_l:11, and Sd�tiaas 15.73' and 15.7:4, shall, afiei initial decision by the Architect or-30 days after submission of the mattes to. the. rchtite"be subject to mediation as a condition precedent td lsrtdixrg'dsptitc. rrrlutidn § 2i, NoUee of Claims § 21,2A Claims lay either the.Ow ner or Contractor"Where, tfid condition j�, y4 rise­tb the Claim, is first` iiseov+ew prior to; expirationx of the period for c mection of the Work.sat l'cirth in Section f 8.2, shall be indjgted ley notice to the Architect within 21 days aRer;dccurrcr►ce: nt,theeven t givthg rise to sucli,Claim'br within "21 diysia'M' the claimant first recognizes the conditiori giving rik tti the Claim; whichever, is later. § 212 2 Claims by either the 0tti ur or Contractor; where the condition giving ritae to the Claim is frrst.discovered after expiration of theperiod' for correction of the Work'se t forth inSe coon .l ,Z,• shall be" initiated by notice to the other "iy, § 21.3 %tie'Umits on;;t~ltiitns Tfte tamer and Coattac(or WWI commence ail claims and cams of acticm askitistthe other and.arising out ofor. related to the Contract in accordance with the re`quirenicros of the final. dispute'resoldtion triethod, selectiri this - Agreement whether in contract, tort; breach of warranty; oar,.otherwise,-wit Ibin the peribd'specified byFtipplrcable law; but in ally case,not more ihan'IO.years after the date otSubsiantia Completion ofthe Work,: The Oitner,and, Contractor waive idl`claims Arid causes. of action not cote menaced in accordant- With Ous-Sectiort § 21.41fa claim; dispute or"oihet mattet in gdtstidn tc� to or is tiie subject of a ntecfi6uic's lien, the pritty asserting such riiatter ttaay proceed in accordance with applicable law to Cott taly with the lienrrtoficc or I'iliti deadlines: 211:17he parities shall endcavortb resolve theiudispii otherwise, shall be administered,by the ArttericAn. A it Industry Mediation Procedilto in effi-cton the dhte'oft"s writing, delivered to the other party to this Agreement, a The request may be made.cot currently with the binding in advance of binding dispute resolution.proceedinptvw, from the date-offitir g; unless stayed for a longerperiod stayed pursuant to this Section, the parties may nofieth6( a schedule for.latex prodeedings. mediation:nih"ich.-unles§ tlie: patties in #u , y agree i Association"ill acc otdan`ce'cvilt thiir Gonstntctio t greertient A regtie"st for mediation shall betrrade in led with the person,or entity admittistezing the mediaiintf; ate resolution hat, in such event mediat ottshalfgsrorceed shall be stayed pending mediation fora period of 66 days greement'of & patties or court 6rdet., if 'An ar6iU40t)n is rrrieeed io'the sgtccaiin ofthe atbitratos(s) acid agxea upon § 21.6 [,the. patties have selected,obitmfio6, as the method for bi td hg dispute 1"blution in this Agree turlt; oily elaidl, subject to, but not resolved by, mediation shall be subjt�t to arbitration which, witless the patoi66, ttitually agft otherwise, shall be administered by the American Arbitration' Association, in a`ccot lance with ;the Conitntaion itidttstry Arbitfation ;Aules in of ett on the date of thit Agreemeni: Demand firs aibitrifwn, shell.be-i�nFuie in writing, delivered to the other party to the Contract, arid`filed with the person or entity admiriiateri sg the arbitration; The award: ronnddere`d by tie arbitrator or arbitrators si,all be ftiral; and judgment illy be cote ird ttpOta it in add 14# a With applicable law in any courthaving jutisdictior;,tiiire if.. tttie;'AAooetadr2ntAia4„'-2G17(tarmedyAiOlm-2007),CdpViflbtk Amerkxtn Ins9tute of Architects. AM fthts ra G M& WARNING Mls Unauthorized rsruodoct7on',ordjsu*rkAVen ofwis fi}h"' tliwuhrRnt ptoseCt"d to tare under the raw rhM lie No.03269106W which empims on WIM2019, and Is not for rasa*: User Notm, Law srtii h+t#fMflbrfer ft,4bet.. ` ' d CriN lrt r jll' 8A PS`And *1(6,& 21 ott t`it3lil20i8 urNtET tOidei ttti325aos673 § 21I Subjtet to Cite rides of the American..Arbitration Ass6iatibn or bthet spplicalste ac6iic iai► ►vies; either party; at - its sole discretion, may consolidate an arbitration conducted under this Agreement With any: other arbitration to which it is a party provided that (1) the arbitration gone ittg the otfier arbitration pct�its cvniolidistion (2) ihs arbitrations to be consolidated subitand ally involve common q6egfidas of law br fact, anti(3) the arbitiati6m employ- tnaterially sirnil3tr protxdatrai rules and methods for selecting arliitratox(s}. - 121.4 Sttbjeot to the rules of the Ame ican Arbitratiotr Asso'ciatiott of otherapplirable arlritratsbu roles, airy patty to att arbitration.may include bye joinder persona ot entitie§ substantially introlved in a cormhon question of law ,otf'act whose presence is required if comnplete telief is jol* act orddd iWarrbiblMoo provided that the party sought tote}oined contents in writing to such joinder. Consent -to arbitration involving an additional persoi or, cnti,t . shall notconstitute consent to arbitration 'of a, Claim not'descnbed in the wriftib Consent. 121.9 The fomsoing agreement to arbitrate -and other agreements to arbitrate with- an additional person or entity duly, consented to by patties to this Agreement, shall be specifically `enfimealale uiider,applicalile liw in any -colt" having j urisdiction thereof., § 21 A C+onW uing COMM Pettortrtartce P-coding final Maolution ofa Claim, except as otheiWisoagreeed"in writing, the Coltti ctok4hall probi*d diligently *, th performance of the Contract and the Owner shall continue to matte payments in accordance with the Contract Documents. § 21.11 waitW of ClAns for Cotisb4tokal Damages. The -Contractor anti C3wner waive claims against each other for con guentinl damages arias tg our of oc telating itn i<is` Contract.This mutual;waiver. includes' 1 .damages incurred by the Owner for retrial expenses, for -tosses of w, income; profit, financing,,_ business and. reputation, and for loss of management of cmptoyee prbductivity or,ofthe service4 of such_ persons; and damages incurred, by the Contraevi for pr ncipai office expenses inelttding t#io comperisation of ,persomiel stationed them far lossees ofimaricing,, business &nd i tation,.ettd for losts of profit.ezcepr anti,eipatid prof t ansiog directly i`roni the Work - This �mutuab iges.+i waiver is applicable, %ithottt lmiitatiari, to all,conscgucrifial datruuse to eitheir paltry'§ urtttfWdoh in' accordance with Article 20. Nothing contained in this. Section 21,1'l .shall be- deemed to preclude ad award of liquidated damages, ,when appticaltle; in, accordancewith the requirements of the Contract Documents, ThisAgreemententered into as of ihe:day and year first written abiove: zz&�� Jens Schwitite Owner (Printed naow and title)- AIA Ooeurnent AlCit0 -. iEMI (form6dVAI0T"" -2041 American inedwis of Amhitecm. AM rtphts n oniad: WA Unauihotlzud xspfodtrcd0000r,distrAwIl "n trills ALA ! procacuted to the Maximum ektoot possible u:sd"t is No.032010691 which m mUes on 10128/2014, and is not User Notes: 1C:eiyn`St hwartc President ----- - - ---- (Printed name and ti(le) srr>wo =Purl 81fd i ire 41,10 224:41 oh �'a��11 aymtt at4ar�1`t)atarYira_` -�3,. altos. aid will oe Adsr Clnter (193280058i1