Loading...
WS-18-593 (5)207"ORD N". 3 P E C Ti' 0 i F1, fi.. POST ON SITI Permit NO.WS-3-18-593 Miami Sbc)res Village 10050 N.E. 2nd Avenue Miami Shores, FL 33138-0000 Work Classification: iZ I "d Phone: (305)795-2204 Fax: (305)756-8972 Issue Date: 318/2018 INSPECTION REQUESTS: (305)762-4949 or Log on at hftps://bldg.miamishoresviIlage.conVcap REQUESTS ARE ACCEPTED DURING 8:30AM, - 3:30PM FOR THE FOLLOWING BUSINESS DAY. Requests must be received by 3 pm for following day inspections. Windows/Shutters Owner's Name.-ERIK SACCOMANI Job Address: Bond Number: NORTHERN STAR C lid" Door Ro"' ,A# 777nt Expires:09/04/2018 Parcel #: 113 Owner's Phone: Total Square Feet: Total Job Valuation: A It kRhone Ptimaf an TRUCTION (786)201-;55Z2 Yes FA 's w /Vf 10250100 0 $2,000.00 WORK IS ALLOWED: MONDAY THROUGH FRIDAY, 8:OOAM - 7:OOPM. SATURDAY 8:OOAM - 6:OOPM. NO,WDRK IS ALLOWED ON SUNDAY OR HOLIDAYS, BUILDING AND ROOFING INSPECTIONS ARE DONE MONDAY THROUGH FRIDAY. 4 OR NO INSPECTION WILL BE MADE UNLESS THE/,PERMIT CARD IS DISPLAYED AND HAS BEEN APPROVED. PLANS ARE READLY AVAILABLE. IT IS THE PERMIT APPLICANT'S RESPONSIBILITYj, ENSURE THAT WORK IS ACCESSIBLE AND EXPOSED FOR INSPECTION PURPOSES. NEITHER _P THE BUILDING OFFICIAL NOR THE CITY SHALL'BE LIABLE FOR EXPENSE ENTAILED IN THE REMOVAL OR REPLACEMENT OF ANY MATERIAL REQUIRED TO ALLOW INSPECTION. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS" - TO YOUR PROPERTY,.T - A NOTICE OF COMMENCEMENT' BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST "INSPECTION. IF YOU INTEND TO OBTAIN F11NANC(NG, CONSULT WITH YOUR LENDER PER OR AN ATTORNEY BEFORE COMMENCING WORK OR RECORDING YOUR NOTICE OF COMMENCEMENT. INSPECTION RECORD INSIaECTIO"� DATE INSP'' Foundation Stemwall Slab Columns (1st Lift) Columns (2nd Lift) Tie Beam Truss/Rafters Roof Sheathing Bucks Interior Framing Insulation _ Ceiling Grid _ Drywall Firewall Wire Lath Pool Steel Poo(<Deck Final Pool Final Fence .J I.ICCiI LnI.IOJLIre Driveway Driveway Base Tin Cap ? Roof in Progress Mop in Progress Final Roof Shutters Attachment Final Shutters Rails and Guardrails ADA compliance FINAL DOCUMENTS Soil Bearing Cert Soil: -Treatment Cert ri- rl Ele Floor [ievd%iuii Survey Reinf Unit Mas Cert Insulation Certificate Spot Survey Final Survey Truss Certification `STRUCTURAL COMMENTS INSPECTION I D i E iNSP Attachment WORKSPOBLIC INSPECTION DATE INSP Excavation ELECTRICAL iNSPECTION DATE IIVJP Temporary Pole 30 Day Temporary Pool Bonding Pool Deck Bonding Pool Wet Niche Underground Footer Ground Slab Wall Rougii Ceiling Rough Rough —� Telephone Rough Telephone Final TV Rough TV Final Cable Rough Cable Final Intercom Rough Intercom Final Alarm Rough Alarm Final Fire Alarm Rough Fire Alarm Final Service Work With ELECTRICAL COMMENTS INSPECTION I DATE JINSP Final Sprinkler Final Alarm INSPEECTiON DiaTE iivSP Rough Water Service 2nd Rough Top Out Fire Sprinklers Septic Tank Sewer Hook-up Roof Drains Gas LP Tank Well Lawn Sprinklers Main Drain Pool Piping Backflow Preventor Interceptor Catch Basins Condensate Drains HRS Final III PLUMBING COMMENTS MECHANICAL INSPECTION DATE INSP Underground Pipe Rough Veribldtion Rough Hood Rough Pressure Test Final Hood Final Ventilation Final Pool Heater Final Vacuum MECHANICAL COMMENTS