DS-18-594 (6)Miami Shores Village
10050 N. E. 2nd Avenue
Miami Shores. FL 33138-0000
Phone: (305)795-2204 Fax: (305)756-8972
POST ON SITE
Permit NO. DS-3-18-594
"�rmlf Type i i ys/Sidewalks/Slabs
rf Work Classrt liiif�: Addition/ f,, � Lion
�f f
Issue Date: 3/8/2018 Expires: 09/04 201 8
I Uo /
INSPECTION REQUESTS: (305)762-4949 or Log on at https:i/bidg.miamishoresvillage.com/cap
REQUESTS ARE ACCEPTED DURING 8:30AM'- 3:30PM FOR THE FOLLOWING BUSINESS DAY.
Requests must be received by 3 pm for following day inspections.
Driveways/Sidewalks/Slabs Parcel #:1131010250100
Owner's Name: ERIK SACCOMAN ;:., Owner's Phone:
Job Address:
Miam' Shores- FL 3"AW9''
Bond Number: =+
t ¢
Contractor(s) Phohe-l` Prim
NORTHERN STAR CONSTRUCTION (786)201-5522 Yes
M.
Total Square Feet: 360
Total Job Valuation: $ 3,200.00
h R'
.
WORK IS ALLOWED:
MONDAY THROUGH FRIDAY, 8:OOAM - 7:00PW
SATURDAY 8:OOAM - 6:OOPM.
NO WORK IS ALLOWED ON SUNDAY OR HOLIDAYS.
BUILDING AND ROOFING INSPECTIONS ARE DONE
MONDAY THROUGH FRIDAY.
NO INSPECTION WILL BE MADE UNLESS THE PERMIT CARD IS DISPLAYED AND HAS BEEN APPROVED. PLANS ARE READLY AVAILABLE IT IS
THE PERMIT APPLICANT'S RESPONSIBILITY TO ENSURE THAT WORK IS ACCESSIBLE AND EXPOSED FOR INSPECTION PURPOSES, NEITHER
THE BUILDING OFFICIAL NOR THE CITY SHALL BE LIABLE FOR EXPENSE ENTAILED IN THE REMOVAL OR REPLACEMENT OF ANY MATERIAL
REQUIRED TO ALLOW INSPECTION.
WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF
COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS
TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED
AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU
INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN
ATTORNEY BEFORE COMMENCING WORK OR RECORDING YOUR NOTICE OF
COMMENCEMENT.
Foundation
Stemw_all
Slab
Columns (1st Lift)
Columns (2nd Lift)
Tie Beam
Truss/Rafters
Roof Sheathing
Bucks
Interior Framing
Insulation
Ceiling Grid
Drywall
Firewall
Wire Lath
Pool Steel
Pool Deck
Final Pool
Final Fence
Screen Enclosure
Driveway
Driveway Base
Tin Cap;`''
Roof in Progress
Mop in Progress
Final Roof
Shutters Attachment
Final Shutters
Rails and Guardrails
ADA compliance
Soil Bearing Cert
Soil Treatment Cert
Floor Elevation Survey
Reinf Unit Mas Cert
Insulation Certificate
Spot Survey
Final Survey
Truss Certification
STRUCTURAL COMMENTS
INSPECTION
�IWINDOWS
DOORS
INSPECTION
DATE INSP
Attachment
FINAL
PUBLIC
INSPECTION
WORKS
DATE? INSP
Excavation
{Oil,,
ELECTRICAL
INSPECTION
!4
DATE INSP
Temporary Pole
30 Day Temporary
Pool Bonding
Pool Deck Bonding
Pool Wet Niche
Underground
Footer Ground
Slab
Wall Rough
Ceiling Rough
Rough
Telephone Rough
Telephone Final
TV Rough
TV Final
Cable Rough
Cable Final
Intercom Rough
Intercom Final
Alarm Rough
Alarm Final
Fire Alarm Rough
Fire Alarm Final
Service Work With
ELECTRICAL COMMENTS
PLUMBING
INSPECTION
DATE
INSP
Rough
Water Service
2nd Rough
Top Out
Fire Sprinklers
Septic Tank
Sewer Hook-up
Roof Drains
Gas
LP Tank
Well
Lawn Sprinklers
Main Drain
Pool Piping
Backflow Preventor
Interceptor
Catch Basins
Condensate Drains
HRS Final
PLUMBING COMMENTS
MECHANICAL
INSPECTION DATE INSP
Underground Pipe
Rough
Ventilation Rough
Hood Rough
Pressure Test
Final Hood
Final Ventilation
Final Pool Heater
Final Vacuum
2111
MECHANICAL COMMENTS