Loading...
RC-19-1021OR Permit nro RC Miami Shores Viflage 1 Building Department 10050 NE 2 Ave w i� =� Miami Shores FL 33138 f20, Io r �L' Issue Date 5/10/2019 GI/V Dli19 INSPECTION REQUESTS: (305)762-4949 or log on at https://bldg.msvfi.gov/energov_prod/selfservice Requests must be received by 3:30pm WORK IS ALLOWED: MONDAYTHROUGHFRIDAY, 8:00AM-7:00PM SATURDAY 8:00AM - B:OOPM. NO WORK IS ALLOWED ON SUNDAY OR HOLIDAYS BUILDING AND ROOFING INSPECTIONS ARE DONE MONDAY THROUGH FRIDAY . NO INSPECTION WILL BE MADE UNLESS THE PERMIT CARD IS DISPLAYED AND HAS BEEN APPROVED . PLANS ARE READILY AVAILABLE . IT IS THE PERMIT APPLICANT'S RESPONSIBILITY TO ENSURE THAT WORK IS ACCESSIBLE AND EXPOSED FOR INSPECTION PURPOSES. NEITHER THE BL41-DING OFFICIAL NOR THE CITY SHALL BE LIABLE FOR EXPENSE ENTAILED IN THE REMOVAL OR REPLACEMENT OF ANY MATERIAL REQUIRED TO ALLOW INSPECTION . Owner's Name: KENNETH LUND Job Address: 1001 NE 96TH ST Miami Shores, FL 33138 Contractor(s) Phone Address HOME OWNER 705 ' P4,921 �e�)iie�thl.; Expires 11 /06/2019 POST ON SITE 1132060143740 Owner's Phone: (714)721-2270 Total Square Feet: 308 total Job Valuation: $ 10,000.00 Description: REMOVE EXISTING TERRACE PERGOLAAND REPLAGE WITH HIP ROOF. REPLACE EXISTING COLUIV WITH NEW STRUCTURAL COLUMNS AS PER PLANS. TO REPLACE RC-14-7.44. i WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE COMMENCING WORK OR RECORDING YOUR NOTICE OF COMMENCEMENT. Page 1 of 1 INSPECTION RECORD STRUCTURAL INSPECTION DATE INSP Foundation Stemwall Slab Columns (1st Lift) Columns (2nd Lift) Tie Beam Truss/Rafters Roof Sheathing Bucks Interior Framing Insulation Ceiling Grid Drywall Firewall Wire Lath Pool Steel Pool Deck Final Pool Final Fence Screen Enclosure Driveway Driveway Base Tin Cap In -Progress Roof Installation Roofing Final Shutters Attachment Final Shutters Rails and Guardrails ADA compliance !d DOCUMENTS Soil Bearing Cert Soil Treatment Cert Floor Elevation Survey Reinf Unit Mas Cert Insulation Certificate Spot Survey Final Survey Truss Certification STRUCTURAL COMMENTS WINDOWS & ...• INSPECTION DATE INSP Attachment PUBLIC WORKS INSPECTION DATE INSP Excavation ELECTRICAL INSPECTION DATE INSP Temporary Pole 30 Day Temporary Pool Bonding Pool Deck Bonding Pool Wet Niche Underground Footer Ground Slab Wall Rough Ceiling Rough Rough Telephone Rough TelephoneFinal TV Rough TV Final Cable Rough Cable Final Intercom Rough Intercom Final Alarm Rough Alarm Final Fire Alarm Rough Fire Alarm Final Service Work With • ELECTRICAL COMMENTS INSPECTION DATE INSP Final Sprinkler Final Alarm PLUMBING INSPECTION DATE INSP Rough Water Service 2nd Rough Top Out Fire Sprinklers Septic Tank Sewer Hook-up Roof Drains Gas LP Tank Well Lawn Sprinklers Main Drain Pool Piping Backflow Preventor Interceptor Catch Basins Condensate Drains HRS Final PLUMBING COMMENTS MECHANICAL INSPECTION DATE INSP Underground Pipe Rough Ventilation Rough Hood Rough Pressure Test Final Hood Final Ventilation Final Pool Heater Final Vacuum MECHANICAL COMMENTS