Loading...
RC-19-1018on pwnit Miami Shores Village �n (ov ec'•+ Building Department 100SO NE 2 Ave �E ,ems o Miami Shores FL 33138 �ORIOf' Issue Date: 5/10/2019 INSPECTION REQUESTS: (305)762-4949 or log on at https:/Ibldq.msvfl.gov/energov_prod/selfservice Requests must be i eceived by 3:30pm WORK IS ALLOWED: MONDAY THROUGH FRIDAY, 8:00AM - T.00PM SATURDAY 8:00AM - 6:OOPM. NO WORK IS ALLOWED ON SUNDAY OR HOLIDAYS BUILDING AND ROOFING INSPECTIONS ARE DONE MONDAY THROUGH FRIDAY . NO INSPECTION WILL BE MADE UNLESS THE PERMIT CARD IS DISPLAYED AND HAS BEEN APPROVED PLANS ARE READILY AVAILABLE. IT !S THE PERMIT APPLICANT'S RESPONSIBILITY TO ENSURE THAT WORK IS ACCESSIBLE AND EXPOSED FOR INSPECTION PURPOSES. NEITHER THE al ILDING OFFICIAL NOR THE CITY SHALL BE LIABLE FOR EXPENSE ENTAILED IN THE REMOVAL OR REPLACEMENT OF ANY MATERIAL REQUIRED TO ALLOW INSPECTION . 1 Expires: 11 /06/2019 POST ON SITE 1132060143740 Owner's Name: KENNETH AND ALEXANDRA LUND Owner's Phone: (714)721-2270 Job Address: 1001 NE 96TH ST Total Square Feet: 2,615 Miami Shores, FL 33138 dotal Job Valuation: $ 16,000.00 Contractor(s) Phone Address HOME OWNER Description: REMOVE AND REPLACE 1940 SQ FEET FLOOR LIMESTONE FLOORS WITH PORCELAIN TILE REMOVE AND REPLACE 675 SQ FT OF CORAL STONE ON 2ND FLOOR TERRACE WITH PORCELAIN TILE WATER PROOF 2N FLOOR TERRACE WITH VULKEM 350 REMOVE AND REPLACE GUARD RAILS TO REPLACE RC-3-14-622 WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE COMMENCING WORK OR RECORDING YOUR NOTICE OF COMMENCEMENT. Page 1 of 1 INSPECTION RECORD STRUCTURAL INSPECTION DATE INSP Foundation Stemwall Slab Columns (1st Lift) Columns (2nd Lift) Tie Beam Truss/Rafters Roof Sheathing Bucks Interior Framing Insulation Ceiling Grid Drywall Firewall Wire Lath Pool Steel Pool Deck Final Pool Final Fence Screen Enclosure Driveway Driveway Base Tin Cap In -Progress Roof Installation Roofing Final Shutters Attachment Final Shutters Rails and Guardrails ADA compliance 4�L DOCUMENTS Soil Bearing Cert Soil Treatment Cert Floor Elevation Survey Reinf Unit Mas Cert Insulation Certificate Spot Survey Final Survey Truss Certification STRUCTURAL COMMENTS WINDOWS DOORS INSPECTION DATE INSP Attachment WORKSPUBLIC INSPECTION DATE INSP Excavation ELECTRICAL INSPECTION DATE INSP Temporary Pole 30 Day Temporary Pool Bonding Pool Deck Bonding Pool Wet Niche Underground Footer Ground Slab Wall Rough Ceiling Rough Rough Telephone Rough Telephone Final TV Rough TV Final Cable Rough Cable Final Intercom Rough Intercom Final Alarm Rough Alarm Final Fire Alarm Rough Fire Alarm Final Service Work With ELECTRICAL COMMENTS INSPECTION DATE INSP Final Sprinkler Final Alarm INSPECTION DATE INSP Rough Water Service 2"d Rough Top Out Fire Sprinklers Septic Tank Sewer Hook-up Roof Drains Gas LP Tank Well Lawn Sprinklers Main Drain Pool Piping Backflow Preventor Interceptor Catch Basins Condensate Drains HRS Final PLUMBING COMMENTS MECHANICAL INSPECTION DATE INSP Underground Pipe Rough Ventilation Rough Hood Rough Pressure Test Final Hood Final Ventilation Final Pool Heater Final Vacuum MECHANICAL COMMENTS