Loading...
PLC-18-3622 (2)DERM PROCESS NO.: % ���� Z'l o 1O l DATE: TIME: `% = 3c') �' MUNICIPAL PROCESS/PERMIT NO.: /mil L - /') - / Y " •-7'5�- J� ---)- • ADDRESS: G� 'SG / �v /� Ila rn 1 COMMENTS: 1' e r INSPECTOR NAME: e PHONE NO.: J'G�-> 3 V INSPECTOR E-MAIL: APP��VEtj SIGNATURE: HYDROMECHANICAL FOG CONTROL DEVICE (H-FCD) INSTALLATION INSPECTION' MIAMI-DADE COUNTY RER-DERM FOG CONTROL PROGRAM TO BE FILLED OUT BY THE APPLICANT Building Permit No.:. DERM Process No.: Site Address: � City: Folio: /%— � �0 '�w _ QQ/0 Zip Code: Contact Person: C ✓!I r.� S�•.e �/-Cn -s Title: �ZJ-�—jn7-�rrGr" �>77` Ph: s Email: �• � QGl/� ��-v�7'�.1�.� • GG'� FOR RER-DERM USE ONLY Date: Q/� /� Time: � .. 3v GDO: DERM Inspector: Mayde Izquierdo Ph: (305)372-6640 Email: Mayde.lzquierdo2@miamidade.gov DERM Supervisor: Ashton Younquist Ph: (305)372-6957 Email: Ashton.Youngquist@miamidade.gov INFORMATION FROM APPROVED PLANS Number of FCDs : #1 #2 #3 #4 #5 Manufacturer: �&ker Third Party Certifier: Model #: Capacity (gpm): a)d Lbs. of Grease Retention 99% removal efficiency: Monitoring Alarm System:/ Solids Separator: 1 MDC Code, Section 24-42.6(7)(ii) ON -SITE INSPECTION CHECK LIST GDO- # ITEM Yes No No Applicable 1 Are plans available on site with DERM approved stamp ❑ ARE THE FOLLOWING PER APPROVED PLANS? 2 FCD location ❑ 3 Identification of the FCD visible G' ❑ 4 Installation of the FCD (inlet/outlet) ❑ 5 FCD type U El6 FCD size (gpm) D/ ❑ 7 FCD lbs. of grease retention ❑ 8 FCD accessibility ❑ 9 Sampling point installation E,-;r' ❑ 10 Sampling point accessibility ❑ 11 Monitoring alarm system ❑ ❑ 12 Solids separator installation ❑ ❑ ._ I� 13 Inspection outcome' PASS: FAIL.- ** Payment of re -inspection fee required prior to requesting the second re -inspection and thereafter. The total amount to be paid is eighty dollars and sixty-three cents ($80.63). To make the payment contact the DERM Cashier at 305-372-6755. The confirmation number obtained from the DERM Cashier shall be provided to schedule the re -inspection. Note for the DERM Cashier: Fee: $75.00, Surcharge(7.5%): $5.63, Total Fee: $80.63 INSPECTION NOTES Gtr�t' -/At lal-7 s Sh, uW cry �' r.J �rssQ� �i 5Llt� -e�.��� Updated: 5/30/2018 2 If the inspection results show that the FOG Control Device (FCD) is not what was approved on plans, the applicant would have two options: a) Revise the plans to show alternative FCD, which would need to be approved by DERM and Plumbing, or b) Replace the FCD to match the one on the approved plans, and schedule a re -inspection.