Loading...
PL-18-1329�"CORiDp` Project Address Miami Shores Village 10050 N.E. 2nd Avenue NE Miami Shores, FL 33138-0000 Phone: (305)795-2204 Permit NO. PL-5-18-1329 in ON Permit Type: Plumbing - Residential Pen Work Classification: Addition/Alteration PennitStatus: APPROVED Parcel Number Issue Date: 6/1/2018 1 Expiration: 11/28/2018 Applicant 54 NE 95 Street 1132060130470 JUDITH WILLIAMS Miami Shores, FL 33138- Block: Lot: Owner Information Address JUDITH WILLIAMS 54 NE 95 Street MIAMI SHORES FL 33138-2707 Contractor(s) Phone Cell Phone ALDAN PLUMBING INC (305)829-3031 Type of Work: REPLACE PLUMBING AS PER PLANS AT EX Type of Piping: Additional Info: Bond Return : Classification: Residential Scanning: 3 Fees Due Amount CCF $3.60 DBPR Fee $3.38 DCA Fee $2.25 Education Surcharge $1.20 Permit Fee $225.00 Scanning Fee $9.00 Technology Fee $4.80 Total: $249.23 Cell (305)756-1312 Valuation: $ 5,200.00 Total Sq Feet: 0 Pay Date Pay Type Amt Paid Amt Due Invoice # PL-5-18-67578 05/17/2018 Check #: 1015 $ 50.00 $ 199.23 06/01/2018 Check #: 1016 $ 199.23 $ 0.00 AvanaDle inspections: Inspection Type: Top Out Final Review Plumbing Underground In consideration of the issuance to me of this permit, I agree to perform the work covered hereunder in compliance with all ordinances and regulations pertaining thereto and in strict conformity with the plans, drawings, statements or specifications submitted to the proper authorities of Miami Shores Village. In accepting this permit I assume responsibility for all work done by either myself, my agent, servants, or employes. I understand that separate permits are required for ELECTRICAL, PLUMBING, MECHANICAL, WINDOWS, DOORS, ROOFING and SWIMMING POOL work. OWNERS AFFIDAVIT�_4cert"e foregoing information is accurate and that all work will be done in compliance with all applicable laws regulating construction and z nq. ut m I uthorize the above -named contractor to do the work stated. June 01, 2018 Authori d_.157ig4t*dr Owner / Applicant / Contractor / Agent Building Department Copy June 01, 2018 1 Miami Shores Village Building Department 10050 N.E.2nd Avenue, Miami Shores, Florida 33138 Tel: (305) 795-2204 Fax: (305) 756-8972 INSPECTION LINE PHONE NUMBER: (305) 762-4949 BUILDING PERMIT APPLICATION ❑BUILDING r-1 ELECTRIC ❑ ROOFING �LUMBING ❑ MECHANICAL ❑PUBLIC WORKS JOB ADDRESS: F FBC 20 C-A �0 Master Permit No.C; � �� —�9_-) Sub Permit No.PL- 19 ❑ REVISION ❑ EXTENSION ❑RENEWAL [] CHANGE OF ❑ CANCELLATION ❑ SHOP fj CONTRACTOR DRAWINGS G Cam/ VV l Is the Building Historically Designated: Yes NO Occupancy Type: Load: Construction Type: Flood Zone: BFE: FFE: rO1IUNEIt: Name (Fee Simple Titleholder): �Tdna'it/Lessee Name: 4 Phoned'' l Email: VVUGb1Q4_-t Wt L.I e- a*^aA I - CQn., CONTRACTOR: Company Name: _ �" (�cv r �/,,�� ;µ_� ^�� C, Phone#: `2,3j1 Address: 1I b 00 Aram City: (k [ Q a d( State: Qualifier Name: �r (�v ado [ G �, ��,--ra Phone#: �_3q —315 3 State Certification or Registration #: C /y 2 $l 7/ Certificate of Competency #: DESIGNER: Architect/Engineer: Phone#: Address: City: State Value of Work for this Permit: $ � P� _ Square/Linear Footage of Work: __- Type of Work: ❑ Addition ®Alteration ❑ New Q air/Replace Description of Work: Specify color of color thru tile:, Submittal Fee $_ Scanning Fee $ Technology Fee $_ Structural Reviews $ (Rev1sed02/24/2014) g�j Zip: ❑ Demolition Permit Fee $ 1 CCF $ CO/CC $ Radon Fee $ S DBPR $ `� _ 3 b Notary $ Training/Education Fee $ Double Fee $ Bond $ TOTAL FEE NOW DUE $ I '). 9 • '27-3- Bonding Company's Name (if applicable) Bonding Company's Address City �� State Zip Mortgage Lender's Name (if applicable) Mortgage Lender's Address City State Zip Application is hereby made to obtain a permit to do the work and installations as indicated. I certify that no work or installation has commenced prior to the issuance of a permit and that all work will be performed to meet the standards of all laws regulating construction in this jurisdiction. I understand that a separate permit must be secured for ELECTRIC, PLUMBING, SIGNS, POOLS, FURNACES, BOILERS, HEATERS, TANKS, AIR CONDITIONERS, ETC..... OWNER'S AFFIDAVIT: I certify that all the foregoing information is accurate and that all work will be done in compliance with all applicable laws regulating construction and zoning. "WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT." Notice to Applicant. As a condition to the issuance of a building permit with an estimated value exceeding $2500, the applicant must promise in good faith that a copy of the notice of commencement and construction lien law brochure will be delivered to the person whose property is subject to attachment. Also, a certified copy of the recorded notice of commencement must be posted at the job site for the first inspection which occurs seven (7) days after the building permit is issued. In the absence of such posted notice, the inspection will not be approved and a reinspection fee will be charged. Signature VJ `tip OWNER or AGENT The foregoing instrument was acknowledged before me this ( y- dayofr-rN u cars- _, 20 f ( — -by K!Q`L-!at L who is personally known to me or who has producedas identification and who did take an oath. NOTARY. PUBLIC: -Sign: Print} Ca k,-s fa- � . ��r � � v� V'-�r Signature CONTRACTOR The foregoing instrument was acknowledged before me this day of P 20 �r by who is personally known to me or who has produced as identification and who did take an oath. NOTARY PUBLIC: / Sign:1 -_ - Print: Seal:) ANA I FERREIRA Seal: Notary Public State of New Jersey ****ww************ W*qq*►**► io Ex Ire9 Feb. 28, 2021 ,ice**ww*ww** *w***w*w APPROVED BY [A% ! /2// 10 Plans Examiner Notary Pubiic — State of Florida Commission # GG 161158 My Comm. Expires Mar 13.2022 Bonded through National Notary Assn. ***ww****w*ww**********ww**********w**sw***w** Zoning Structural Review (Revisedo2/24/2014) Clerk Piumbing Contract This Agreement, Made as of March 20, 2018. Between the Contractor: DLF Services LLC PO Box 138904 Hialeah, Florida 33013 United States CGC1515978 3054208135 And the Subcontractor: ALDAN PLUMBING INC Contact Primary Telephone For the Project: PROJECT#1336 WILLIAMS 54 NE 96 STREET MIAMI SHORES FL Article 1. SCOPE OF WORK Article 1.1. Subcontractor has heretofore entered into a contract with said Contractor to furnish all labor, materials and equipment to perform all work described below according to the construction documents. General - Contractor shall review construction documents and provide labor and materials pertaining to the mechanical systems as required in said documents and as specified herein, while complying with all applicable building codes. 15100 - Plumbing - Plumbing shall be a fully operational system of hot and cold water. Provide and install all piping, soil, vents, drains, sewage removal and water supply systems to connect with appropriate water and sewage systems. Provide and install appropriate insulation around piping. All permits and inspections are to be obtained by contractor as required by local building codes and the Uniform Plumbing Code. Sewer and Waste Piping - Drainage system shall be Schedule 40 PVC pipe, or cast iron. All connections shall have PVC cement or appropriate joint compound and assembled tight for no leakage. Condensate drains shall be be constructed of Schedule 40 PVC. Valves shall be 125 PSI NIBCO SCOTT, STOCKMAN OR EQUAL. Connection to public sewer system shall comply with all local requirements. Caulk joints or provide neoprene gaskets for all sewer lines. Pitch shall be a minimum 1/8" per foot for soil lines larger than 3" diameter and a minimum of 1/4" per foot for soil lines 3" diameter or less. Insulate all interior drain/waste piping with batt insulation for sound attenuation. Water Pipes - From public water line, install Type "L" or "K" " (minimum) copper pipes, located below frost line. From the meter to the building, install " supply water lines. Use 1/2",3/4" minimum lines from supply lines to each plumbing fixture as required. At water heaters and hose bibs install a minimum 3/4" pipe. From water heater install 3/4"-1" pipe to each room with branches to fixtures as described above. Fittings shall be wrought copper, soldered with 95-5 adjustable brass P-traps with wall escutcheons at all exposed locations. Provide shut-off valves at sinks, toilets, water heater and other fixtures as required. Test all pipes under 100 Ibs pressure per building code requirements. Initialed by: Contracto Subcontractor Waste Drainage - Install sewage clean -out at the end of each horizontal drainage run and every 100 feet per building code requirements. Vents shall be installed throughout plumbing connections and connected with the vertical stacks and vented through the roof. Check with local building code officials for specific venting requirements. Water Heater - Install one 80 gallon electric water heater per construction documents. Water heater shall have appropriate safety valves, back flow preventers, pressure relief valves and drain assemblies. Follow manufacturer recommendations and building code requirements for installation and use. Optional Plumbing - If required install necessary plumbing requirements for Septic tank ,disposal system, and solar water system. 15410 - Plumbing Fixtures - Provide necessary piping, water and drains for plumbing fixtures as shown on the construction documents. Plumbing fixtures to be provided by owner. Article 2. PAYMENT TERMS Article 2.1. The Contractor agrees to pay the Subcontractor within 15 days after submittal of pay application and the completion of the work and payment by the owner for such work. Article 2.2. Subcontractor understands and agrees that progress payment requests shall be written and given to the contractor/job superintendent before Monday for payment on the following Friday. All work for the portion requested must be completed prior to the request for payment. The Contractor will request a draw and payment will be made to the Subcontractor after the draw is received. A release of lien from all sub -subcontractors or suppliers must be obtained prior to payment being issued. Please note that a certificate of Workman's Compensation Insurance must be received before the first payment is made or the contractor will hold a percentage needed to cover the labor portion of the job. Article 2.3. The Total Contract Amount shall be $5,200.00 ( FIVE THOUSAND TWO HUNDRED DOLLARS) Article 3. TIME OF COMPLETION Article 3.1. Subcontractor shall keep both an adequate size and properly trained crew on the job site so as to complete the project work within the project schedule. Initialed by: Contractor Subcontractor Article 4. CHANGE ORDERS Article 4.1. Subcontractor understands and agrees that no change orders or contract additions will be made unless agreed to in writing by Contractor. If any additional work is performed and not covered in this contract, the Subcontractor proceeds at his own risk and expense. No alterations, additions, or small changes can be made in the work or method of the performance, without the written change order signed by the Contractor and Subcontractor. Article 5. CLEAN-UP Article 5.1. Subcontractor will be responsible for cleaning up the job on a daily basis, including all generated construction debris, drink cans, food wrappers, and/or other trash. If it becomes necessary, the Subcontractor will be back charged for appropriate clean up by deducting clean up costs from payments. Article 6. TAXES AND PERMITS Article 6.1. The Subcontractor understands and agrees that he shall be responsible for all taxes, fees and expenses imposed directly or indirectly for its work, labor, material and services required to fulfill this contract. The Subcontractor is responsible for all permits pertaining to the law, ordinances and regulations where the work is performed. Article 7. INSURANCE AND INDEMNITY See Exhibit A — Insurance Sample Certificate Must Keep insurance thru all project phase or insurance cost will be deducted from last payment. Article 8. LIQUIDATED DAMAGES Article 8.1. If the project is not substantially completed on the stated completion date, the Subcontractor shall pay to the Contractor the sum of ($ 180 per day) for each calendar day of inexcusable delay until the work is substantially completed, as liquidated damages. Article 9. WARRANTY Article 9.1. Subcontractor shall warranty all labor, materials and equipment furnished on the project for 1 year against defects in workmanship or materials utilized. The manufacturers warranty will prevail. No legal action of any kind relating to the project, project performance or this contract shall be initiated by either party against the other party after 2 year beyond the completion of the project or cessation of work. Initialed by: Contractor Subcontractor Article 10. HAZARDOUS MATERIALS, WASTE AND ASBESTOS Article 10.1. Both parties agree that dealing with hazardous materials, waste or asbestos requires specialized training, processes, precautions and licenses. Therefore, unless the scope of this agreement includes the specific handling, disturbance, removal or transportation of hazardous materials, waste or asbestos, upon discovery of such hazardous materials the Subcontractor shall notify the Contractor immediately and allow the Contractor to contract with a properly licensed and qualified hazardous material contractor. Article 11. ARBITRATION OF DISPUTES Article 11.1. Any controversy or claim arising out of or relating to this contract, or the breach thereof, shall be settled by arbitration administered by the American Arbitration Association under its Construction Industry Arbitration Rules, and judgment on the award rendered by the arbitrator(s) may be entered in any court having jurisdiction thereof. Article 12. ATTORNEY FEES Article 12.1. In the event of any arbitration or litigation relating to the project, project performance or this contract, the prevailing party shall be entitled to reasonable attorney fees, costs and expenses. Article 13. STORAGE _1;3j._=storage space is_umited eacn_suncontractor_Will _D( material left on site! 7T General Contractor, agents, employees_ and owner are '-'any_material or_equipment left on-sitel Article 14. ACCEPTANCE Witness our hand and seal on this �v day of , 202 Subcontr or's Name Exhibit A - Insurance Sample Certificate Exhibit B - Subcontractor / Supplier List Exhibit C - Plans and Specification Exhibit D - Florida Construction Lien Law Warning ate to Initialed by: Contractor Subcontractor